Green Oaks Block- B
VARDHAN PROJECTS · Medchal-Malkajgiri · RERA P02200005210
GREEN OAKS BLOCK- B is a residential apartment project in Kapra, Kapra mandal, Medchal-Malkajgiri district, developed by registered promoter VARDHAN PROJECTS. The project is on a 529.46 Sq. Meters site and comprises one residential building with 1 Stilt + 5 upper floors. The RERA unit records list 9 3BHK homes of 119.65 Sq. Mtrs each and one additional home entry with a saleable area of 119.75 Sq. Mtrs whose configuration is not identified. It is registered under TG-RERA No. P02200005210, and the promoter’s declared completion date is 30th November, 2024.
More from Vardhan Projects · 4 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered name | GREEN OAKS BLOCK- B RERA record |
| Project type / registered portion | Residential apartment project; registered project name identifies Block B. The registration record does not separately describe a phase. RERA record |
| TG-RERA registration | P02200005210; registered 13/10/2022 and shown as valid through 30/11/2024. The supplied certificate records no extension. RERA record Approvals record |
| Registered promoter | VARDHAN PROJECTS (also styled M/s VARDHAN PROJECTS in filed documents). RERA record Corporate record |
| RERA status | The certificate’s stated validity ended 30/11/2024; current registration status is not established by the supplied record. |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | Kapra RERA record RERA filing |
| Revenue village | Kapra; the filed building-permit extraction also spells the village Khapra. RERA record RERA filing |
| Mandal / district / PIN | Kapra / Medchal-Malkajgiri / 500062 RERA record |
| Survey identifiers | Survey No. 572 and Survey No. 575 Part; the filed permit and registration certificate state these identifiers. RERA record |
| Plot / site extent | Plot No. 2; 529.46 Sq. Meters (also given as 633.33 Sq. Yards). The permit records 529.46 Sq. Mtrs plot and net plot area, with 0.0 road-affected and 0.0 nala-affected area. RERA filing |
| Boundaries | East: ROAD; west: NEIGHBOURS LAND; north: PLOT NO 3; south: PLOT NO 1. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | Building Permit No. 1241/GHMC/LBN/2021-BP, approved 08 December, 2021; file No. 003148/GHMC/1809/LBN2/2021-BP. Approvals record |
| Approved building | One residential building, identified in the permit as Building A (M S VARDHAN PROJECTS), height 14.95 m. |
| Sanctioned configuration | 1 Stilt + 5 upper floors; permit records 1,160.50 Sq. Mtrs residential upper-floor area and 202.39 Sq. Mtrs stilt area. |
| Approved built-up area | 1,160.50 Sq. Mtrs is recorded as approved built-up area in the RERA project fields and as residential upper-floor area in the permit extraction. RERA filing |
| Parking | Stilt parking area recorded as 202.39 Sq. Mtrs in the permit extraction (also stated there as total parking area 202.4); a vehicle-space count is not supplied. |
| Units | RERA unit records show 10 total entries: 9 filed as 3BHK homes and one entry filed as “119.75” without a configuration. The permit requires that sanctioned unit count not be increased, but the extracted permit details do not give its count. RERA unit table RERA unit table |
Offering and status
| Field | Project record |
|---|---|
| Filed configurations and saleable areas | 3BHK: 119.65 Sq. Mtrs per unit, 9 units. One additional home entry is filed as “119.75”, with 119.75 Sq. Mtrs recorded as its saleable area; configuration is not identified. RERA unit table RERA unit details |
| Booked / available | Portal-derived counts show 0 booked and 9 available 3BHK units, plus 0 booked and 1 available unclassified entry. Counts are indicative; the supplied unit record has no as-of date. RERA unit table RERA unit details |
| Construction stage | No independently verified or RERA-filed construction-progress percentage is supplied. The permit extraction states that completion certification has not been established. Document index |
| Completion dates | Promoter’s Form B declares completion by 30th November, 2024; the building permit lists a completion deadline of 08 December, 2024. These are separate records of completion timing. |
| Occupancy certificate | No occupancy certificate is supplied in the evidence reviewed. The permit states that an occupancy certificate is required before occupation. |
2. The project story
GREEN OAKS BLOCK- B is registered as a residential apartment project on Plot No. 2 in Kapra, on the filed land identity of Survey No. 572 and Survey No. 575 Part. Its GHMC permit describes one residential building, 1 Stilt + 5 upper floors, with a stated height of 14.95 m. The RERA unit table lists nine 3BHK homes and one additional unit entry whose configuration is not identified. RERA record RERA filing RERA unit table
The records provide a promoter-declared completion date and permit completion deadline, but do not establish actual construction progress or completion. No occupancy certificate is included in the supplied documents; the building-permit conditions require one before occupation.
3. Master plan, architecture & building design
The supplied building-permit extraction describes a single residential building with 1 Stilt + 5 upper floors, height 14.95 m, on a 529.46 Sq. Mtrs plot. It records 1,160.50 Sq. Mtrs for residential upper floors and 202.39 Sq. Mtrs for the stilt area. These are permit-recorded areas; no separate FSI-counted area, gross built-up area, or building footprint measurement is supplied. RERA filing
The extracted plan set does not provide a complete account of floor-by-floor unit distribution, circulation, stairs, lifts, entry/exit arrangements, landscaping dimensions, or the residential/common-area split. The permit lists setbacks of front 3.5 m, rear 2.5 m, side I 3 m and side II 4.5 m.
4. Homes, configurations & floor plans
RERA’s filed areas are saleable areas. Separately, software measurement of the approved floor-plan drawing estimates carpet area for two measured 3BHK designs; this is drawing-derived, not a RERA disclosure, and the supplied measurement record says it needs review. Saleable area includes the home’s share of common areas and should not be read as carpet area. RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 9 | 0 | 9 | 119.65 Sq. Mtrs | Software-measured range: 94.2–94.6 Sq. Mtrs; median 94.4 Sq. Mtrs | 21% |
| Configuration not filed (RERA entry “119.75”) | 1 | 0 | 1 | 119.75 Sq. Mtrs | Not supplied | Not supplied |
The measured 3BHK drawing labels include living, dining, kitchen, master bedroom, other bedrooms, toilets and foyer areas, and a 1.06 M. WIDE BALC. Room dimensions are available in the drawing extraction, but relate to one measured flat and are not RERA-filed dimensions. RERA unit details
5. Parking & vehicle circulation
The GHMC permit records 202.39 Sq. Mtrs of stilt parking area and says the approved stilt parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. The permit extraction does not establish the number of parking spaces, resident or visitor allocation, accessible spaces, or a unit-by-unit parking arrangement. No basement, podium, mechanical parking, ramp or EV-charging provision is documented in the supplied project records.
6. Amenities, recreation & open spaces
The available RERA amenity record marks several services as available but reports 0% progress for the listed items. Those entries establish what is recorded in the filing, not that facilities have been completed or independently verified. The permit separately specifies certain site provisions and conditions. RERA amenities
| Description / size | Permit condition requires a fenced tot-lot maintained as greenery; permit extraction lists “Tot-lot NA.” |
|---|---|
| Evidence source | GHMC building permit |
| Declared progress / verified status | Required by permit condition; completion not verified. |
| Description / size | RERA amenity entry: “Green Strip/TOT LOT/Park.” |
|---|---|
| Evidence source | RERA amenity record RERA amenities |
| Declared progress / verified status | 0%; completion not verified. |
| Description / size | Listed as an amenity category. |
|---|---|
| Evidence source | RERA amenity record RERA amenities |
| Declared progress / verified status | 0%; no facility description or size supplied. |
| Description / size | Present in a third-party vendor amenity list, not established by the supplied RERA filing or permit extract. |
|---|---|
| Evidence source | Vendor Promoter website |
| Declared progress / verified status | Marketing/vendor-reported only; not independently verified. |
No clubhouse or indoor-facility area, sports facility, landscaping area, or open-space quantity is established by the supplied project records.
7. Utilities, building services & safety
The RERA amenity record marks water supply, sewerage, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, energy management, and electrical meter room/sub-station/receiving station as “YES”; each corresponding listed item shows 0% progress. These are filed availability entries, not proof of completed service. RERA amenities
The GHMC permit specifies 2 Rain Water Harvesting Pits, space for a transformer, a garbage house within the premises, and tree planting and greenery-maintenance conditions. It also requires that sanitation, plumbing, fire-safety requirements, lifts and electrical installations be carried out under qualified technical supervision; it states that an occupancy Fire NOC is required before issuance of the occupancy certificate. The supplied evidence does not establish installed capacities, completed systems, or an issued Fire NOC or occupancy certificate.
8. Location, access & connectivity
The registered project location is Kapra, Kapra Mandal, Medchal-Malkajgiri district, PIN 500062; the filed site is in revenue-village Kapra, also rendered as Khapra in the building-permit extraction. The site record gives the adjoining boundaries as road to the east, neighbouring land to the west, Plot No. 3 to the north and Plot No. 1 to the south. RERA record RERA filing
The supplied location record identifies the nearest sampled Outer Ring Road interchange at approximately 5.5 km. This is the only measured connectivity distance provided in the location data; no travel time or public-transport detail is supplied. Location record
9. Developer & development status
The registered promoter is VARDHAN PROJECTS, identified in the project record as a partnership. The supplied corporate identifier is GSTIN 36AAQFV9688R1ZH. The registered office/address record is 6N, Bhavani Nagar, Kapra, Kapra, Kapra, Medchal-Malkajgiri, 500062; the RERA certificate gives the promoter office as Bhavani Nagar, Kapra, Medchal-Malkajgiri, PIN 500062. Corporate record Parties record
A Form B affidavit dated 07th April, 2022, signed for the promoter by K Subhash Chandra Reddy, declares a completion date of 30th November, 2024 and makes declarations about title, encumbrances, project funds, audits and pending approvals. These are promoter declarations. The evidence supplied does not establish actual completion or independently verified construction progress.
10. Approvals, official records & documents
| Record | What the supplied document establishes |
|---|---|
| TG-RERA Form C, P02200005210 | Records registration of GREEN OAKS BLOCK- B, promoter Vardhan Projects, for Survey No. 572 and Survey No. 575 Part, with stated validity from 13/10/2022 through 30/11/2024. |
| GHMC Building Permit Order, 1241/GHMC/LBN/2021-BP | Permit for one residential building, 1 Stilt + 5 upper floors, on a 529.46 Sq. Mtrs site; approved 08 December, 2021. The extraction includes permit conditions and deadlines. |
| Permit file reference | 003148/GHMC/1809/LBN2/2021-BP |
| Form B declaration | Promoter affidavit dated 07th April, 2022, including the promoter’s declared completion date and other registration undertakings. |
| Layout-plan submission | A layout-plan document is listed in the RERA document register, but its contents were not extracted in the supplied evidence. Document index |
| Occupancy/completion certificate | Not supplied in the reviewed records. The GHMC permit requires an occupancy certificate before occupation. |
1. Project at a glance
Project identity
Registered name: GREEN OAKS BLOCK- B
Project type / registered portion: Residential apartment project; registered project name identifies Block B. The registration record does not separately describe a phase.
TG-RERA registration: P02200005210; registered 13/10/2022 and shown as valid through 30/11/2024. The supplied certificate records no extension.
Registered promoter: VARDHAN PROJECTS (also styled M/s VARDHAN PROJECTS in filed documents).
RERA status: The certificate’s stated validity ended 30/11/2024; current registration status is not established by the supplied record.
Land and geographic identity
Locality: Kapra
Revenue village: Kapra; the filed building-permit extraction also spells the village Khapra.
Mandal / district / PIN: Kapra / Medchal-Malkajgiri / 500062
Survey identifiers: Survey No. 572 and Survey No. 575 Part; the filed permit and registration certificate state these identifiers.
Plot / site extent: Plot No. 2; 529.46 Sq. Meters (also given as 633.33 Sq. Yards). The permit records 529.46 Sq. Mtrs plot and net plot area, with 0.0 road-affected and 0.0 nala-affected area.
Boundaries: East: ROAD; west: NEIGHBOURS LAND; north: PLOT NO 3; south: PLOT NO 1.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Building Permit No. 1241/GHMC/LBN/2021-BP, approved 08 December, 2021; file No. 003148/GHMC/1809/LBN2/2021-BP.
Approved building: One residential building, identified in the permit as Building A (M S VARDHAN PROJECTS), height 14.95 m.
Sanctioned configuration: 1 Stilt + 5 upper floors; permit records 1,160.50 Sq. Mtrs residential upper-floor area and 202.39 Sq. Mtrs stilt area.
Approved built-up area: 1,160.50 Sq. Mtrs is recorded as approved built-up area in the RERA project fields and as residential upper-floor area in the permit extraction.
Parking: Stilt parking area recorded as 202.39 Sq. Mtrs in the permit extraction (also stated there as total parking area 202.4); a vehicle-space count is not supplied.
Units: RERA unit records show 10 total entries: 9 filed as 3BHK homes and one entry filed as “119.75” without a configuration. The permit requires that sanctioned unit count not be increased, but the extracted permit details do not give its count.
Offering and status
Filed configurations and saleable areas: 3BHK: 119.65 Sq. Mtrs per unit, 9 units. One additional home entry is filed as “119.75”, with 119.75 Sq. Mtrs recorded as its saleable area; configuration is not identified.
Booked / available: Portal-derived counts show 0 booked and 9 available 3BHK units, plus 0 booked and 1 available unclassified entry. Counts are indicative; the supplied unit record has no as-of date.
Construction stage: No independently verified or RERA-filed construction-progress percentage is supplied. The permit extraction states that completion certification has not been established.
Completion dates: Promoter’s Form B declares completion by 30th November, 2024; the building permit lists a completion deadline of 08 December, 2024. These are separate records of completion timing.
Occupancy certificate: No occupancy certificate is supplied in the evidence reviewed. The permit states that an occupancy certificate is required before occupation.
2. The project story
GREEN OAKS BLOCK- B is registered as a residential apartment project on Plot No. 2 in Kapra, on the filed land identity of Survey No. 572 and Survey No. 575 Part. Its GHMC permit describes one residential building, 1 Stilt + 5 upper floors, with a stated height of 14.95 m. The RERA unit table lists nine 3BHK homes and one additional unit entry whose configuration is not identified.
The records provide a promoter-declared completion date and permit completion deadline, but do not establish actual construction progress or completion. No occupancy certificate is included in the supplied documents; the building-permit conditions require one before occupation.
3. Master plan, architecture & building design
The supplied building-permit extraction describes a single residential building with 1 Stilt + 5 upper floors, height 14.95 m, on a 529.46 Sq. Mtrs plot. It records 1,160.50 Sq. Mtrs for residential upper floors and 202.39 Sq. Mtrs for the stilt area. These are permit-recorded areas; no separate FSI-counted area, gross built-up area, or building footprint measurement is supplied.
The extracted plan set does not provide a complete account of floor-by-floor unit distribution, circulation, stairs, lifts, entry/exit arrangements, landscaping dimensions, or the residential/common-area split. The permit lists setbacks of front 3.5 m, rear 2.5 m, side I 3 m and side II 4.5 m.
4. Homes, configurations & floor plans
RERA’s filed areas are saleable areas. Separately, software measurement of the approved floor-plan drawing estimates carpet area for two measured 3BHK designs; this is drawing-derived, not a RERA disclosure, and the supplied measurement record says it needs review. Saleable area includes the home’s share of common areas and should not be read as carpet area.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 9 | 0 | 9 | 119.65 Sq. Mtrs | Software-measured range: 94.2–94.6 Sq. Mtrs; median 94.4 Sq. Mtrs | 21% |
| Configuration not filed (RERA entry “119.75”) | 1 | 0 | 1 | 119.75 Sq. Mtrs | Not supplied | Not supplied |
The measured 3BHK drawing labels include living, dining, kitchen, master bedroom, other bedrooms, toilets and foyer areas, and a 1.06 M. WIDE BALC. Room dimensions are available in the drawing extraction, but relate to one measured flat and are not RERA-filed dimensions.
5. Parking & vehicle circulation
The GHMC permit records 202.39 Sq. Mtrs of stilt parking area and says the approved stilt parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. The permit extraction does not establish the number of parking spaces, resident or visitor allocation, accessible spaces, or a unit-by-unit parking arrangement. No basement, podium, mechanical parking, ramp or EV-charging provision is documented in the supplied project records.
6. Amenities, recreation & open spaces
The available RERA amenity record marks several services as available but reports 0% progress for the listed items. Those entries establish what is recorded in the filing, not that facilities have been completed or independently verified. The permit separately specifies certain site provisions and conditions.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / greenery | Permit condition requires a fenced tot-lot maintained as greenery; permit extraction lists “Tot-lot NA.” | GHMC building permit | Required by permit condition; completion not verified. |
| Green strip / open space | RERA amenity entry: “Green Strip/TOT LOT/Park.” | RERA amenity record | 0%; completion not verified. |
| Community buildings | Listed as an amenity category. | RERA amenity record | 0%; no facility description or size supplied. |
| Gymnasium; kids’ play area | Present in a third-party vendor amenity list, not established by the supplied RERA filing or permit extract. | Vendor | Marketing/vendor-reported only; not independently verified. |
No clubhouse or indoor-facility area, sports facility, landscaping area, or open-space quantity is established by the supplied project records.
7. Utilities, building services & safety
The RERA amenity record marks water supply, sewerage, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, energy management, and electrical meter room/sub-station/receiving station as “YES”; each corresponding listed item shows 0% progress. These are filed availability entries, not proof of completed service.
The GHMC permit specifies 2 Rain Water Harvesting Pits, space for a transformer, a garbage house within the premises, and tree planting and greenery-maintenance conditions. It also requires that sanitation, plumbing, fire-safety requirements, lifts and electrical installations be carried out under qualified technical supervision; it states that an occupancy Fire NOC is required before issuance of the occupancy certificate. The supplied evidence does not establish installed capacities, completed systems, or an issued Fire NOC or occupancy certificate.
8. Location, access & connectivity
The registered project location is Kapra, Kapra Mandal, Medchal-Malkajgiri district, PIN 500062; the filed site is in revenue-village Kapra, also rendered as Khapra in the building-permit extraction. The site record gives the adjoining boundaries as road to the east, neighbouring land to the west, Plot No. 3 to the north and Plot No. 1 to the south.
The supplied location record identifies the nearest sampled Outer Ring Road interchange at approximately 5.5 km. This is the only measured connectivity distance provided in the location data; no travel time or public-transport detail is supplied.
9. Developer & development status
The registered promoter is VARDHAN PROJECTS, identified in the project record as a partnership. The supplied corporate identifier is GSTIN 36AAQFV9688R1ZH. The registered office/address record is 6N, Bhavani Nagar, Kapra, Kapra, Kapra, Medchal-Malkajgiri, 500062; the RERA certificate gives the promoter office as Bhavani Nagar, Kapra, Medchal-Malkajgiri, PIN 500062.
A Form B affidavit dated 07th April, 2022, signed for the promoter by K Subhash Chandra Reddy, declares a completion date of 30th November, 2024 and makes declarations about title, encumbrances, project funds, audits and pending approvals. These are promoter declarations. The evidence supplied does not establish actual completion or independently verified construction progress.
10. Approvals, official records & documents
TG-RERA Form C, P02200005210: Records registration of GREEN OAKS BLOCK- B, promoter Vardhan Projects, for Survey No. 572 and Survey No. 575 Part, with stated validity from 13/10/2022 through 30/11/2024.
GHMC Building Permit Order, 1241/GHMC/LBN/2021-BP: Permit for one residential building, 1 Stilt + 5 upper floors, on a 529.46 Sq. Mtrs site; approved 08 December, 2021. The extraction includes permit conditions and deadlines.
Permit file reference: 003148/GHMC/1809/LBN2/2021-BP
Form B declaration: Promoter affidavit dated 07th April, 2022, including the promoter’s declared completion date and other registration undertakings.
Layout-plan submission: A layout-plan document is listed in the RERA document register, but its contents were not extracted in the supplied evidence.
Occupancy/completion certificate: Not supplied in the reviewed records. The GHMC permit requires an occupancy certificate before occupation.
Other registrations of Green Oaks
Frequently asked questions
Is GREEN OAKS BLOCK- B registered with Telangana RERA?
Yes. GREEN OAKS BLOCK- B is registered with the Telangana Real Estate Regulatory Authority as P02200005210; the registration status is New Project.
Who is the developer of GREEN OAKS BLOCK- B?
The promoter named in the RERA registration is VARDHAN PROJECTS.
Where is GREEN OAKS BLOCK- B located?
GREEN OAKS BLOCK- B is in Kapra, Medchal-Malkajgiri, Telangana (500062).
When will GREEN OAKS BLOCK- B be completed?
The promoter's proposed date of completion filed with RERA is 30/11/2024. This is the promoter's declaration, not a guarantee.