ANU CASCADE is a residential apartment project in RUKMINI PURAM, Kapra mandal, Medchal-Malkajgiri district, developed by registered promoter ANU CONSTRUCTIONS. The project is on Plot B-28, Survey No. 500, with a recorded land area of 543.40 sq m, and comprises one residential building with 1 Stilt + 5 upper floors and 10 homes: five 2BHK and five 3BHK, with saleable areas of 125.42 sq m and 171.5 sq m, respectively. It is registered under TG-RERA registration number P02200006801, and the proposed completion date is 14/11/2025.

01What we found

Period endedTG-RERA registration ran to 14 Nov 2025 - check its extension on TG-RERA
12documents on file - each fact links to its page
2court cases on this project's land (survey 500, Kapra)
12items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

12 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from justdial.comPhoto from justdial.com
▦ View all 2 photos
Kapra, Kapra, Medchal-Malkajgiri · geocoded — approximate.

Project at a glance

Project identity

ItemRecord
Registered nameANU CASCADE RERA record
Project typeResidential apartment project RERA record
Phase / registered portionPhase not separately identified in the supplied record; the registration is for the project at Plot B-28, Survey No. 500. RERA filing
TG-RERA registrationP02200006801 RERA record
Registration validity30/08/2023 to 14/11/2025; the certificate says validity is subject to extension by the Authority. The supplied certificate records no extension. This is registration validity, not an occupancy certificate or a statement of construction completion.
Registered promoterANU CONSTRUCTIONS; the registration certificate uses “Anu Constructions.” RERA record Corporate record
RERA status in supplied recordNew Project; registration certificate issued under section 5. RERA record

Land and geographic identity

ItemRecord
LocalityRUKMINI PURAM / Rukminipuri Colony RERA filing
Revenue villageKapra; the building permit refers to “Khapra.” RERA filing
Mandal / district / PINKapra / Medchal-Malkajgiri / 500062 RERA record
Survey number and subdivisionSurvey No. 500; no project subdivision is disclosed. The RERA filing identifies Block No. 19 in Form B and Plot No. B-28; the registered address also gives H.No. 1-19-71/28B. RERA filing
Plot and site extentPlot B-28; RERA land record: total and net area 543.40 sq m. The building permit records plot area 543.39 Sq. Mtrs and road-affected area 3 sq m. RERA filing
Boundaries in RERA filingEast: Plot B-29; West: Plot B-27; North: 30-wide road; South: Plot A-14. RERA filing

Development identity

ItemRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building approvalBuilding Permit Order 4060/GHMC/LBN/2022-BP, approved 14 November, 2022; file no. T010496/GHMC/5162/LBN2/2022-BP. Approvals record
Approved building configurationOne residential building, identified in the permit as A (RAMAKRISHNA RAO): 1 Stilt + 5 upper floors; stated building height 14.3. No basement or podium is recorded in the supplied building-permit extract.
Approved built-up areaUpper floors area 1,340.55 Sq.Mt.
Parking provision in permitTotal Parking Area 231.9; the supplied extract does not state a number of parking spaces.
UnitsApproved plan: 1 building unit; proposed units in the RERA filing: 1. The unit schedule records 10 homes: five 2BHK and five 3BHK. RERA filing RERA unit table RERA unit table
Other approval identifierApproved Layout No. / LRS Proceeding No. / Subdivision No. shown in the permit: GPK/BP/134/85.

Offering and status

ItemRecord
RERA-filed configurations and saleable areas2BHK: 5 units, 125.42 sq m each as recorded; 3BHK: 5 units, 171.5 sq m each as recorded. RERA unit table RERA unit table
Booked / availablePortal-derived figures show 2BHK: 0 booked / 5 available; 3BHK: 0 booked / 5 available. The portal record has no stated as-of date, so counts are indicative. RERA unit table
Completion deadlineThe Form B declaration and building permit state 14/11/2025 as the project completion date. This is separate from TG-RERA registration validity.
Construction stageNo independently verified site-progress information is supplied. RERA amenity-progress entries shown in the supplied data are 0%; these are portal-recorded figures, not an independent inspection. RERA amenities
Occupancy / completion certificateNo occupancy or completion certificate is supplied in the evidence reviewed. The building permit states that an occupancy certificate is required before occupation.

The project story

ANU CASCADE is filed with TG-RERA as a residential apartment project on Plot B-28, Survey No. 500, in Kapra, Medchal-Malkajgiri district. The registered site description places it in Rukmini Puram/Rukminipuri Colony. The GHMC permit describes one apartment building with a stilt and five upper floors. RERA record RERA filing

The RERA unit schedule lists ten homes—five 2BHK and five 3BHK—and records all ten as available with none booked in the portal data supplied. Those counts have no stated “as of” date and should be treated as indicative. The declared completion date is 14/11/2025; no independently verified construction progress or occupancy/completion certificate is included in the supplied material. RERA unit table

Master plan, architecture & building design

The supplied GHMC building permit is for one residential building, A (RAMAKRISHNA RAO), on a recorded plot area of 543.39 Sq. Mtrs. It sanctions 1 Stilt + 5 upper floors, with an approved upper-floors area of 1,340.55 Sq.Mt. The permit states a building height of 14.3; the extract does not specify a unit for that figure. The RERA filing records total and net site area as 543.40 sq m, while the permit separately records road-affected area of 3 sq m. The permit also lists total parking area of 231.9, without a parking-space count. The supplied extract does not establish floor-by-floor dwelling distribution, building footprint, lift or stair details, internal circulation, or measured landscaped/open-space areas. RERA filing

The filed approved-layout identifier is GPK/BP/134/85. A separate layout-plan item is listed in the RERA documents, but no extracted layout drawing or dimensions are supplied here. Accordingly, layout arrangement and site-area allocations beyond the stated figures cannot be described from this record. Approvals record Document index

Homes, configurations & floor plans

The RERA unit schedule records five 2BHK and five 3BHK apartments, with the following saleable areas. The supplied portal figures show zero booked units for each configuration and five available. The booking record has no stated as-of date. RERA unit table RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK505125.42 sq mNot suppliedNot supplied
3BHK505171.5 sq mNot suppliedNot supplied

A layout-plan document is listed as 293168, but it is not extracted as an available plan in the supplied document list. The drawing-measurement data identifies 1BHK and 4BHK designs, whereas the RERA unit schedule identifies 2BHK and 3BHK; no drawing-based carpet-area figures are therefore presented as measurements for the RERA-filed configurations. Document index Floor plans RERA unit details

Parking & vehicle circulation

The GHMC permit records Total Parking Area: 231.9 and states that approved stilt parking is to be used exclusively for vehicle parking. It does not provide a number of parking spaces, a breakdown by vehicle type, visitor or accessible parking counts, or an allocation of spaces to individual apartments.

The promoter’s vendor-listed amenities include dedicated parking for bikes; this is a vendor claim, not a stated sanctioned space count or unit-specific allocation. The supplied evidence does not describe ramps, vehicle entry/exit arrangements, internal driveways, pedestrian separation, mechanical parking, or EV charging. Promoter website

Amenities, recreation & open spaces

Tot lot
Description / sizeGHMC permit condition refers to a fenced tot-lot maintained as greenery; no size is stated.
Declared progress / verified statusRequired by permit condition; no independent completion evidence supplied.
Peripheral greenery / tree planting
Description / sizePermit requires tree planting along the periphery and in front of the premises, and maintenance of the peripheral green strip.
Declared progress / verified statusNo independent completion evidence supplied.
Common garden
Description / sizeListed by the vendor; no size or plan evidence supplied.
Evidence sourcePromoter website
Declared progress / verified statusVendor-listed; completion not independently verified.

The RERA amenity schedule lists community buildings, recreational open space, internal roads and footpaths, street lighting, solid-waste management, and other common infrastructure, but records 0% progress for each listed item. These are portal-recorded progress figures, not independent site verification. RERA amenities

Utilities, building services & safety

The GHMC permit specifies a rainwater-harvesting percolation pit, transformer space, and a garbage house, and includes requirements concerning services and fire safety. It also states that occupancy requires an occupancy certificate and that a Fire NOC is to be obtained before the occupancy certificate. These permit conditions are not evidence that the facilities or clearances have been completed or obtained.

The RERA amenity schedule marks water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, and an electrical meter room/sub-station/receiving station as “YES,” while showing 0% progress for those entries. The supplied data does not state water sources or storage capacity, sewerage treatment or reuse arrangements, electrical capacity or backup, lift count/capacity, or accessibility provisions. RERA amenities

The vendor lists borewell water supply, power backup, fire safety, security, CCTV, waste management, rainwater harvesting, and a lift. These are vendor-listed features; the supplied evidence does not verify their installation, capacities, or operational status. Promoter website

Location, access & connectivity

The registered location is RUKMINI PURAM/Rukminipuri Colony, Kapra village and mandal, Medchal-Malkajgiri district, Telangana, PIN 500062. The project is identified on Plot B-28, Survey No. 500. RERA record RERA filing RERA filing

The supplied location record gives the cadastral parcel centroid as 17.4822810596349, 78.55469612176046 and lists the nearest sampled Outer Ring Road interchange at approximately 6.4 km. No other measured distances, public-transport details, or approach-road description are supplied. Location record Cadastral map

Developer & development status

The registered promoter is ANU CONSTRUCTIONS, identified in the corporate record as a partnership; its GSTIN is 36ABIFA5764C1ZI. The Form B declaration states that the firm’s registered office is at C-47 Rukminipuram, Opp. Dr A.S. Rao Nagar, Hyderabad, Telangana. Corporate record

The RERA record names KEERTHI SARASWATHI PULAVARTHY as a partner and ROOPESHWARI PULAVARTHY and VENKATA NAGA RAMAKRISHNA RAO PULAVARTHY as authorized signatories. Form B was made by Pulavarthi Venkata Naga Ramakrishna Rao as authorized signatory and declares a completion date of 14/11/2025. Parties record

The evidence does not establish a verified construction stage or an issued occupancy/completion certificate. The declared completion timeline, registration validity, and certificate status are separate matters; see the project-at-a-glance table for their recorded dates and scope.

Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200006801, issued 30/08/2023; validity to 14/11/2025
What the supplied evidence establishesFORM ‘C’ registration certificate for ANU CASCADE, issued under section 5.
GHMC building permit
Identifier / date4060/GHMC/LBN/2022-BP, approved 14 November, 2022; file no. T010496/GHMC/5162/LBN2/2022-BP
What the supplied evidence establishesConditional building permission for a residential apartment on Plot B-28, Survey No. 500; the permit extract records one building, 1 Stilt + 5 upper floors.
Approved-layout reference
Identifier / dateGPK/BP/134/85
What the supplied evidence establishesListed in the building-permit record as the approved layout/LRS/subdivision reference.
Legal title report
Identifier / dateDocument 293165, dated 07.11.2022
What the supplied evidence establishesAdvocate’s title-search report for the Plot B-28 / Survey No. 500 property; the supplied document summary notes the GHMC mortgage.
Title deed
Identifier / dateSale Deed 3726/2022, dated 12.04.2022
What the supplied evidence establishesThe supplied title-report extraction identifies a sale deed to ANU CONSTRUCTIONS for 650.00 Sq.yards, equivalent to 543.40 Sq.Mtrs.
Form B declaration
Identifier / dateDocument 293216, dated 10 January, 2023
What the supplied evidence establishesPromoter declaration concerning the project land, title basis, separate-account undertakings, and proposed completion date.
Occupancy / completion certificate
Identifier / dateNot supplied
What the supplied evidence establishesThe building permit states that an occupancy certificate is required before occupation; no issued certificate is included in the supplied evidence.

Frequently asked questions

Is ANU CASCADE registered with Telangana RERA?

Yes. ANU CASCADE is registered with the Telangana Real Estate Regulatory Authority as P02200006801; the registration status is New Project.

Who is the developer of ANU CASCADE?

The promoter named in the RERA registration is ANU CONSTRUCTIONS.

Where is ANU CASCADE located?

ANU CASCADE is in RUKMINI PURAM, Kapra, Medchal-Malkajgiri, Telangana (500062).

When will ANU CASCADE be completed?

The promoter's proposed date of completion filed with RERA is 14/11/2025. This is the promoter's declaration, not a guarantee.