Akash Block
SRI YAGNA INFRATECH · Medchal-Malkajgiri · RERA P02200003479
AKASH BLOCK is a residential apartment project in Kapra Village, Kapra Mandal, Medchal-Malkajgiri District. It is being developed by registered promoter SRI YAGNA INFRATECH on 1826.42 sq. m, with one building comprising a cellar, stilt floor for parking and five upper floors, and 35 flats: 10 2BHK and 25 3BHK. The project is registered under TG-RERA number P02200003479, with proposed completion recorded as 30/11/2026.
More from Sri Yagna Infratech · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | AKASH BLOCK RERA record |
| Project type / phase | Residential apartment project; phase or separately identified registered portion: not disclosed RERA record |
| TG-RERA registration | P02200003479 |
| Registration validity | Certificate states validity from 24/09/2021 through 16/07/2026, unless extended by the Authority; the available certificate does not record an extension. This is registration validity, not the completion deadline. |
| Registered promoter | SRI YAGNA INFRATECH, a partnership RERA filing Corporate record |
| RERA status | The record identifies the project as “New Project.” Registration is evidenced by the TG-RERA Form ‘C’ certificate. RERA filing |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / revenue village | Kapra / Kapra Village RERA record RERA filing |
| Mandal | Kapra in the RERA record; the GHMC building-permit document describes the site as in Keesara Mandal. RERA record RERA filing |
| District / PIN | Medchal-Malkajgiri / 500062 RERA record |
| Project survey numbers | 429 and 432; the filing does not identify project-held subdivisions. RERA filing |
| Registered site extent | 1826.42 sq. m in the GHMC permit and RERA land record RERA filing |
| Total / net area | Total area 1826.42 sq. m; net area 1826.42 sq. m; affected area recorded as 0 sq. m. RERA filing |
| Boundaries in filing | East: neighbours building; west: 30 FEET WIDE ROAD; north: others land; south: neighbours building. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | Building Permit Order 53607/HO/EZ/Cir-1/2016, dated 17 07 2020; the RERA filing also lists plan approval number 53607/HO/EZ/CIR-1/20. Approvals record |
| Approved built-up area | 4457.50 sq. m in the project filing RERA filing |
| Building count | One residential building RERA filing |
| Sanctioned configuration | Cellar + Stilt floor for Parking + 5 - upper floors; sanctioned height 14.90 m. |
| Parking provision | Cellar and stilt are designated for parking in the sanctioned order; no total space count is available in the supplied record. |
| Unit count | 35 residential flats in the GHMC permit and RERA unit record RERA unit table |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed configurations | 2BHK: 10 units; 3BHK: 25 units RERA unit table |
| RERA-filed saleable area | 2BHK: 99.17 sq. m; 3BHK: 150.59 sq. m RERA unit table |
| Booked / available | Portal snapshot lists 0 booked and 35 available: 2BHK 0 / 10; 3BHK 0 / 25. The snapshot has no as-of date, so these counts are indicative. RERA unit table |
| Construction stage | Current construction progress is not established by the supplied records. Document index |
| Completion dates | GHMC permit states construction to be completed before 16.07.2026; the promoter’s Form B declares completion by 16th July, 2026. The project header records proposed completion as 30/11/2026. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied documents; current certificate status is not established. Document index |
The project story
- AKASH BLOCK is recorded as a single-building residential apartment project in Kapra Village, on Survey Nos. 429 and 432, with a registered site extent of 1826.42 sq. m. The GHMC building permit describes a cellar, stilt parking and five upper floors, with 35 residential flats; the RERA unit record divides those flats into 10 2BHK and 25 3BHK homes. RERA filing RERA unit table
- The project is registered under TG-RERA number P02200003479. The GHMC permit and the promoter’s Form B state a completion deadline of 16 July 2026; the project header separately records a proposed completion date of 30 November 2026. The available material does not establish actual construction progress or that any part of the building has received an occupancy or completion certificate. RERA record
- The project’s filing describes 35 units as available and none as booked, but the portal snapshot has no stated capture date. Treat that inventory as indicative rather than a current sales confirmation. RERA unit table
Master plan, architecture & building design
- The GHMC permit sanctions one residential building on a site area of 1826.42 sq. m, with Cellar + Stilt floor for Parking + 5 - upper floors and a stated height of 14.90 m. The RERA filing records approved built-up area of 4457.50 sq. m. These are the supplied site, building and approved-area figures; no separate FSI-counted area, gross built-up area or carpet-area schedule is available. RERA filing
- The permit records 27 rain-water harvesting pits (RWHPs) and a tot-lot of 93.53 (unit not legible in the supplied extraction). It also requires a transformer space and garbage house. The available drawing record has two floor-plan sheets, both still awaiting scan measurement; details such as flats per floor, footprint, lift and stair arrangement, circulation and entrances cannot therefore be described from the supplied drawing-derived data. Floor plans
Homes, configurations & floor plans
The RERA filing lists 35 apartments across two configurations. Saleable areas below are RERA-filed figures; no software-measured carpet-area values are available because both supplied floor-plan sheets are pending measurement. RERA unit table Floor plans
| Configuration | Units | Booked | Available* | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 99.17 sq. m | Not available | Not supplied |
| 3BHK | 25 | 0 | 25 | 150.59 sq. m | Not available | Not supplied |
\*The portal snapshot does not state an as-of date; availability should be confirmed directly before purchase. RERA unit table
The supplied record does not provide a measured room schedule or reliable drawing-based detail for room dimensions, balconies, utilities or typical floor arrangements. The saleable figures should not be read as carpet-area measurements; no conversion or loading calculation is supported by the available evidence. RERA unit table Floor plans
Parking & vehicle circulation
The GHMC permit designates both the cellar and stilt for parking and states that those areas must be used exclusively for vehicle parking, without partition walls or rolling shutters. It also requires one entry and one exit, each with a minimum width of 4.5 m and height clearance of 5 m. The supplied evidence does not establish the number of parking spaces, visitor or accessible spaces, two-wheeler provision, parking allocation to individual apartments, ramp arrangement or EV charging. A parking designation in a sanctioned plan does not by itself establish exclusive parking ownership or an allotment to a particular flat. RERA unit table
Amenities, recreation & open spaces
The following items appear in the GHMC permit or RERA amenity filing. The records give no verified completion status; the RERA amenity progress entries supplied show 0% where progress is reported. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green space | 93.53; unit not established in the extracted permit text; permit says it must be fenced and maintained as greenery. | Required before occupancy certificate; completion not verified. | |
| Rain-water harvesting | Percolation pit required; permit records 27 RWHPs. | Required by permit; completion not verified. | |
| Green strip | Strip of greenery on the site periphery required by permit. | Completion not verified. | |
| Garbage house | Required within the premises. | Completion not verified. | |
| Community buildings / recreational open space | Listed in the RERA amenity record; no size or facility detail supplied. | RERA amenities | Progress shown as 0%; completion not verified. |
Utilities, building services & safety
The GHMC permit requires a transformer space, a generator as an alternate electricity source, a garbage house, a rain-water-harvesting structure, and specified firefighting provisions. These are permit conditions, not evidence that the systems have been installed or independently inspected.
The permit specifies a separate underground static water-storage tank of 25,000 lits. and a separate terrace tank of 25,000lits capacity for Residential buildings. It also specifies hose reels and down corner, manually operated alarm system, fire extinguishers, and an automatic sprinkler system where the basement area exceeds 200 Sq.mts. It requires fire-safety measures before an occupancy certificate and electrical-installation certification by electrical engineers.
No verified current information is supplied on water source or treatment, sewage-treatment plant, treated-water reuse, storm-water system, electrical backup capacity, lift number or capacity, CCTV/security, waste segregation, or accessible circulation. Document index RERA amenities
Location, access & connectivity
The registered project location is Kapra Village, Kapra Mandal, Medchal-Malkajgiri District, Telangana, 500062. The GHMC permit identifies Survey Nos. 429 and 432 and records a 30 FEET WIDE ROAD on the west boundary. RERA filing
A location record places the site approximately 6.2 km from the nearest sampled Outer Ring Road interchange. This is a supplied map-based distance, not a travel-time estimate. The available data does not establish project-specific public-transport service or further approach-road details. Location record
Developer & development status
The registered promoter is SRI YAGNA INFRATECH, identified in the RERA filing as a partnership, with GSTIN 36ACIFS8868C2ZM. The listed address is Shashikanth Nagar, Kapra Village, Kapra, Medchal-Malkajgiri, 500062. No official contact details or promoter website are supplied. RERA filing Corporate record Parties record
The promoter’s Form B affidavit, dated 27, July, 2021, is signed by YARRADODDI REDDAPPA REDDY as authorized signatory and declares a completion date of 16th July, 2026. The GHMC permit also states completion before 16.07.2026. The supplied record does not establish actual construction progress, a revised completion order, or occupancy certification. Document index
Approvals, official records & documents
| Identifier / date | P02200003479, issued 24/09/2021 |
|---|---|
| What the supplied record establishes | Form ‘C’ registration for AKASH BLOCK; validity stated through 16/07/2026, unless extended. |
| Identifier / date | 53607/HO/EZ/Cir-1/2016, dated 17 07 2020; file 74766/21/04/2016/HO |
|---|---|
| What the supplied record establishes | Conditional building permission for a residential building at Survey Nos. 429 and 432, Kapra Village, comprising a cellar, stilt parking and five upper floors for 35 flats. |
| Identifier / date | 53607/HO/EZ/CIR-1/20 |
|---|---|
| What the supplied record establishes | Listed in the RERA project filing as the plan approval number. Approvals record |
| Identifier / date | 27, July, 2021 |
|---|---|
| What the supplied record establishes | Promoter declaration concerning title basis, encumbrances, project completion and other undertakings. |
| Identifier / date | Documents 177510, 177511, 177512, 177514, 177525 |
|---|---|
| What the supplied record establishes | Title-report and deed documents are filed; the available extraction of document 177514 is too garbled to establish its contents. Document index |
| Identifier / date | Not included in supplied documents |
|---|---|
| What the supplied record establishes | Current certificate status is not established. Document index |
Project at a glance
Project identity
Registered project name: AKASH BLOCK
Project type / phase: Residential apartment project; phase or separately identified registered portion: not disclosed
TG-RERA registration: P02200003479
Registration validity: Certificate states validity from 24/09/2021 through 16/07/2026, unless extended by the Authority; the available certificate does not record an extension. This is registration validity, not the completion deadline.
Registered promoter: SRI YAGNA INFRATECH, a partnership
RERA status: The record identifies the project as “New Project.” Registration is evidenced by the TG-RERA Form ‘C’ certificate.
Land and geographic identity
Locality / revenue village: Kapra / Kapra Village
Mandal: Kapra in the RERA record; the GHMC building-permit document describes the site as in Keesara Mandal.
District / PIN: Medchal-Malkajgiri / 500062
Project survey numbers: 429 and 432; the filing does not identify project-held subdivisions.
Registered site extent: 1826.42 sq. m in the GHMC permit and RERA land record
Total / net area: Total area 1826.42 sq. m; net area 1826.42 sq. m; affected area recorded as 0 sq. m.
Boundaries in filing: East: neighbours building; west: 30 FEET WIDE ROAD; north: others land; south: neighbours building.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Building Permit Order 53607/HO/EZ/Cir-1/2016, dated 17 07 2020; the RERA filing also lists plan approval number 53607/HO/EZ/CIR-1/20.
Approved built-up area: 4457.50 sq. m in the project filing
Building count: One residential building
Sanctioned configuration: Cellar + Stilt floor for Parking + 5 - upper floors; sanctioned height 14.90 m.
Parking provision: Cellar and stilt are designated for parking in the sanctioned order; no total space count is available in the supplied record.
Unit count: 35 residential flats in the GHMC permit and RERA unit record
Offering and status
RERA-filed configurations: 2BHK: 10 units; 3BHK: 25 units
RERA-filed saleable area: 2BHK: 99.17 sq. m; 3BHK: 150.59 sq. m
Booked / available: Portal snapshot lists 0 booked and 35 available: 2BHK 0 / 10; 3BHK 0 / 25. The snapshot has no as-of date, so these counts are indicative.
Construction stage: Current construction progress is not established by the supplied records.
Completion dates: GHMC permit states construction to be completed before 16.07.2026; the promoter’s Form B declares completion by 16th July, 2026. The project header records proposed completion as 30/11/2026.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied documents; current certificate status is not established.
The project story
- AKASH BLOCK is recorded as a single-building residential apartment project in Kapra Village, on Survey Nos. 429 and 432, with a registered site extent of 1826.42 sq. m. The GHMC building permit describes a cellar, stilt parking and five upper floors, with 35 residential flats; the RERA unit record divides those flats into 10 2BHK and 25 3BHK homes.
- The project is registered under TG-RERA number P02200003479. The GHMC permit and the promoter’s Form B state a completion deadline of 16 July 2026; the project header separately records a proposed completion date of 30 November 2026. The available material does not establish actual construction progress or that any part of the building has received an occupancy or completion certificate.
- The project’s filing describes 35 units as available and none as booked, but the portal snapshot has no stated capture date. Treat that inventory as indicative rather than a current sales confirmation.
Master plan, architecture & building design
- The GHMC permit sanctions one residential building on a site area of 1826.42 sq. m, with Cellar + Stilt floor for Parking + 5 - upper floors and a stated height of 14.90 m. The RERA filing records approved built-up area of 4457.50 sq. m. These are the supplied site, building and approved-area figures; no separate FSI-counted area, gross built-up area or carpet-area schedule is available.
- The permit records 27 rain-water harvesting pits (RWHPs) and a tot-lot of 93.53 (unit not legible in the supplied extraction). It also requires a transformer space and garbage house. The available drawing record has two floor-plan sheets, both still awaiting scan measurement; details such as flats per floor, footprint, lift and stair arrangement, circulation and entrances cannot therefore be described from the supplied drawing-derived data.
Homes, configurations & floor plans
The RERA filing lists 35 apartments across two configurations. Saleable areas below are RERA-filed figures; no software-measured carpet-area values are available because both supplied floor-plan sheets are pending measurement.
| Configuration | Units | Booked | Available* | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 99.17 sq. m | Not available | Not supplied |
| 3BHK | 25 | 0 | 25 | 150.59 sq. m | Not available | Not supplied |
\*The portal snapshot does not state an as-of date; availability should be confirmed directly before purchase.
The supplied record does not provide a measured room schedule or reliable drawing-based detail for room dimensions, balconies, utilities or typical floor arrangements. The saleable figures should not be read as carpet-area measurements; no conversion or loading calculation is supported by the available evidence.
Parking & vehicle circulation
The GHMC permit designates both the cellar and stilt for parking and states that those areas must be used exclusively for vehicle parking, without partition walls or rolling shutters. It also requires one entry and one exit, each with a minimum width of 4.5 m and height clearance of 5 m. The supplied evidence does not establish the number of parking spaces, visitor or accessible spaces, two-wheeler provision, parking allocation to individual apartments, ramp arrangement or EV charging. A parking designation in a sanctioned plan does not by itself establish exclusive parking ownership or an allotment to a particular flat.
Amenities, recreation & open spaces
The following items appear in the GHMC permit or RERA amenity filing. The records give no verified completion status; the RERA amenity progress entries supplied show 0% where progress is reported.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green space | 93.53; unit not established in the extracted permit text; permit says it must be fenced and maintained as greenery. | Required before occupancy certificate; completion not verified. | |
| Rain-water harvesting | Percolation pit required; permit records 27 RWHPs. | Required by permit; completion not verified. | |
| Green strip | Strip of greenery on the site periphery required by permit. | Completion not verified. | |
| Garbage house | Required within the premises. | Completion not verified. | |
| Community buildings / recreational open space | Listed in the RERA amenity record; no size or facility detail supplied. | Progress shown as 0%; completion not verified. |
Utilities, building services & safety
The GHMC permit requires a transformer space, a generator as an alternate electricity source, a garbage house, a rain-water-harvesting structure, and specified firefighting provisions. These are permit conditions, not evidence that the systems have been installed or independently inspected.
The permit specifies a separate underground static water-storage tank of 25,000 lits. and a separate terrace tank of 25,000lits capacity for Residential buildings. It also specifies hose reels and down corner, manually operated alarm system, fire extinguishers, and an automatic sprinkler system where the basement area exceeds 200 Sq.mts. It requires fire-safety measures before an occupancy certificate and electrical-installation certification by electrical engineers.
No verified current information is supplied on water source or treatment, sewage-treatment plant, treated-water reuse, storm-water system, electrical backup capacity, lift number or capacity, CCTV/security, waste segregation, or accessible circulation.
Location, access & connectivity
The registered project location is Kapra Village, Kapra Mandal, Medchal-Malkajgiri District, Telangana, 500062. The GHMC permit identifies Survey Nos. 429 and 432 and records a 30 FEET WIDE ROAD on the west boundary.
A location record places the site approximately 6.2 km from the nearest sampled Outer Ring Road interchange. This is a supplied map-based distance, not a travel-time estimate. The available data does not establish project-specific public-transport service or further approach-road details.
Developer & development status
The registered promoter is SRI YAGNA INFRATECH, identified in the RERA filing as a partnership, with GSTIN 36ACIFS8868C2ZM. The listed address is Shashikanth Nagar, Kapra Village, Kapra, Medchal-Malkajgiri, 500062. No official contact details or promoter website are supplied.
The promoter’s Form B affidavit, dated 27, July, 2021, is signed by YARRADODDI REDDAPPA REDDY as authorized signatory and declares a completion date of 16th July, 2026. The GHMC permit also states completion before 16.07.2026. The supplied record does not establish actual construction progress, a revised completion order, or occupancy certification.
Approvals, official records & documents
| Identifier / date | P02200003479, issued 24/09/2021 |
|---|---|
| What the supplied record establishes | Form ‘C’ registration for AKASH BLOCK; validity stated through 16/07/2026, unless extended. |
| Identifier / date | 53607/HO/EZ/Cir-1/2016, dated 17 07 2020; file 74766/21/04/2016/HO |
|---|---|
| What the supplied record establishes | Conditional building permission for a residential building at Survey Nos. 429 and 432, Kapra Village, comprising a cellar, stilt parking and five upper floors for 35 flats. |
| Identifier / date | 53607/HO/EZ/CIR-1/20 |
|---|---|
| What the supplied record establishes | Listed in the RERA project filing as the plan approval number. |
| Identifier / date | 27, July, 2021 |
|---|---|
| What the supplied record establishes | Promoter declaration concerning title basis, encumbrances, project completion and other undertakings. |
| Identifier / date | Documents 177510, 177511, 177512, 177514, 177525 |
|---|---|
| What the supplied record establishes | Title-report and deed documents are filed; the available extraction of document 177514 is too garbled to establish its contents. |
| Identifier / date | Not included in supplied documents |
|---|---|
| What the supplied record establishes | Current certificate status is not established. |
Frequently asked questions
Is AKASH BLOCK registered with Telangana RERA?
Yes. AKASH BLOCK is registered with the Telangana Real Estate Regulatory Authority as P02200003479; the registration status is New Project.
Who is the developer of AKASH BLOCK?
The promoter named in the RERA registration is SRI YAGNA INFRATECH.
Where is AKASH BLOCK located?
AKASH BLOCK is in Kapra, Medchal-Malkajgiri, Telangana (500062).
When will AKASH BLOCK be completed?
The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.
More projects in Kapra