Sign in

Navya Pinnacle

S S CONSTRUCTIONS · Medchal-Malkajgiri · RERA P02200008598

NAVYA PINNACLE is a residential apartment project in Surya Nagar Colony, Uppal, Uppal Mandal, Medchal-Malkajgiri District. The registered promoter developing it is S S CONSTRUCTIONS. The project occupies 745.69 sq. m and comprises one residential building with 1 Stilt + 5 upper floors and 20 3BHK apartments, each with a filed saleable area of 135.45 sq. m. It is registered with TG-RERA under P02200008598, with proposed completion on 05/11/2027.

More from S S Constructions · 33 projects →

01What we found

RegisteredTG-RERA - valid till 5 Jul 2027
12documents on file - each fact links to its page
9court cases on this project's land (survey 1, 282, Uppal)
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from squareyards.com

1. Project at a glance

Project identity

FieldProject record
Registered nameNAVYA PINNACLE RERA record
Project type / phaseResidential apartment project; registered phase or separately identified portion: not disclosed. RERA record RERA filing
TG-RERA registrationP02200008598; certificate states validity from 06/08/2024 to 05/07/2027. Registration validity is separate from the completion deadline. RERA record
Registered promoter / entity typeS S CONSTRUCTIONS; RERA filing identifies the organization as a Proprietorship. RERA record RERA filing
TG-RERA statusRegistered; certificate grants registration. The evidence supplied does not state a later extension or current portal status.

Land and geographic identity

FieldProject record
Locality / addressSurya Nagar Colony, Uppal; the plan extract also describes the site as part of Plot No. 1393 in the HMDA Layout, Uppal Circle. RERA filing
Revenue villageUppal in the registration record; the building-permit and layout-plan extracts identify Uppal Bhagath / Uppal Bhagayath. RERA record
Mandal / district / PINUppal / Medchal-Malkajgiri / 500039. RERA record
Survey numbers and subdivisions1 TO 40, 282 TO 368, 369(P), 370 TO 373, 374(P), 375 TO 387, 395 TO 401, 454, 456 TO 459, 505(P), 510 TO 564. RERA record
Site extentRegistered land details: 745.69 sq. m total and net area; the building-permit extract also records 0.0 sq. m road-affected and nala-affected area. RERA filing
Boundaries in RERA filingEast: PART OF PLOT NO 1393; West: PLOT NO-1394; North: PLOT NO-1390; South: 80 FEET WIDE ROAD. RERA filing

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC). Approvals record
Principal building approvalGHMC Building Permit Order 2030/GHMC/LBN/2024-BP, approved 05 July, 2024; file no. 005203/GHMC/2523/LBN2/2024-BP. Approvals record
Layout reference71563/HMDA/DEVELOPMENT/PD-1/UPPAL BHAGATH/17, as recorded in the building-permit extract.
Approved built-up areaPermit extract lists residential built-up area 1,915.60 Sq.Mt., stilt area 356.19 Sq.Mt., and total parking area 369 (unit not stated in that field). A separate plan extract lists proposed built-up area excluding parking 1915.60, including parking 2284.60, total BUA 2299.02, deductions 28.59, net BUA 1915.60, and parking area 369.00. These are differently labelled extracted plan figures; no single area definition should be inferred across them.
Building / floorsOne residential building, described as 1 Stilt + 5 upper floors. The plan extract states NO OF FLOORS: 6 and lists building height as 14.95 MT.; another extracted plan parameter states Total height: 20.93mt.
UnitsGHMC permit extract states 20 units; RERA unit record lists 20 apartments. RERA unit table RERA unit details
Parking provisionParking is shown in the permit/plan record, including a Total Parking Area of 369 in the permit extract and PARKING AREA: 369.00 in the plan extract. A sanctioned parking-space count is not supplied.

Offering and status

FieldProject record
RERA-filed configuration3BHK; filed saleable area 135.45 sq. m. RERA unit table RERA unit details
Booked / available8 booked; 12 available, as last read from the TG-RERA portal; the record gives no as-of date, so these counts are indicative. RERA unit table RERA unit details
Construction stageCurrent construction stage or percentage complete is not supplied. Amenity-progress fields are recorded at 0%; this is not independent site verification. RERA amenities
Completion datesThe Form B declaration states completion by 05s July 2027; the GHMC permit states construction shall be completed before 05 July, 2027. The project header lists proposed completion as 05/11/2027. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied records. The GHMC permit requires an Occupancy Certificate before occupation or delivery of possession.

2. The project story

NAVYA PINNACLE is a single-building residential apartment development registered with TG-RERA under P02200008598. The site is identified in the project record as Surya Nagar Colony, Uppal, within the survey schedule and land extent shown above; the filed boundaries include an 80-foot-wide road to the south. RERA record RERA filing

The GHMC building-permit extract describes a residential building of 1 Stilt + 5 upper floors. The RERA unit schedule lists 20 3BHK apartments, with 8 booked and 12 available in the portal record, which has no stated snapshot date. The available evidence does not establish a current construction stage or independently verified progress. RERA unit table

The permit and RERA certificate both set out requirements concerning completion and occupancy. No OC or completion certificate is supplied; therefore, the project is not presented here as completed or occupancy-certified. The certificate’s registration validity runs to 05/07/2027, while the supplied completion-date records are separately stated above. RERA record

3. Master plan, architecture & building design

The filed plan describes construction of residential flats on part of Plot No. 1393, with one building and a 1 Stilt + 5 upper floors arrangement. The building-permit extract identifies the residential built-up area as 1,915.60 Sq.Mt. and the stilt area as 356.19 Sq.Mt.

The plan extract records TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING: 1915.60, TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING: 2284.60, TOTAL BUA: 2299.02, DEDUCTIONS: 28.59, NET BUA: 1915.60, and PARKING AREA: 369.00. These are reproduced with their supplied labels; the available material does not establish a common measurement basis for all of these figures.

The plan extract lists one entry and one exit, each with a minimum width of 4.5mts. and height clearance of 5mts. It identifies a 24.00MT WIDE MAIN ROAD, an 18 mt. road width, and a 4.5mts. minimum width for entry and exit. Detailed floor-by-floor circulation, flats per floor, lift count, stair configuration, building footprint, landscape/open-space area and phase organization are not established by the supplied extracts.

The recorded layout reference is 71563/HMDA/DEVELOPMENT/PD-1/UPPAL BHAGATH/17. A layout-plan document is present in the RERA filing, but the supplied data does not provide a complete drawing-derived account of plot arrangement, roads, parks or land-use allocations.

4. Homes, configurations & floor plans

The TG-RERA unit record lists 20 3BHK apartments, with 8 booked and 12 available. Its filed saleable area is 135.45 sq. m. RERA unit details RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK20812135.45 sq. mSoftware-measured: median 69.1 sq. m; range 67.7–70.5 sq. m49% (software-derived from drawing data)

The carpet-area range and loading are software measurements from the approved floor-plan drawing geometry, not RERA-filed disclosures; the drawing measurement record notes that review is needed. The filed saleable area includes a different area basis and should not be treated as carpet area. Floor plans RERA unit details

The measured sample covers 8 flat designs. One fifth-floor-plan flat (Flat 03) shows a hall, kitchen, three bedrooms, two toilets, foyer, utility and balcony; the utility and balcony are excluded from the software-measured carpet area. The supplied material does not establish that every unit has an identical arrangement. RERA unit details

5. Parking & vehicle circulation

Parking is identified in the building-permit and plan extracts: the permit lists a Total Parking Area of 369, and the plan extract lists PARKING AREA: 369.00. The supplied data does not specify a parking-space count, visitor or accessible provision, parking levels, mechanical parking, EV-charger count, or unit-specific parking allocations.

The plan extract records one entry and one exit, each with a minimum width of 4.5mts. and height clearance of 5mts. It also states that approved cellar and stilt parking is to be used exclusively for vehicle parking and not converted or misused; the supplied extracts do not establish whether a cellar is present in this project.

The GHMC permit requires parking places in buildings to provide electric-vehicle charging infrastructure under the cited requirements. This is a permit condition, not evidence that charging equipment has been installed or is operational. No exclusive parking ownership or allotment to a particular apartment is established by the supplied material.

6. Amenities, recreation & open spaces

The RERA amenity record lists project amenities and progress fields; the listed progress values are 0% where provided. These are recorded portal fields, not independent observations of site completion. The permit extract also specifies certain facilities or conditions. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads & footpathsListed; no size suppliedRERA amenities RERA amenities0%; not independently verified
Water supplyListed as available: YESRERA amenities RERA amenities0%; not independently verified
SewerageRecord names chambers, lines, septic tank and STP in the amenity label; no specific installed system or capacity is establishedRERA amenities RERA amenities0%; not independently verified
Storm-water drainsListed; no size suppliedRERA amenities RERA amenities0%; not independently verified
Green strip / tot lot / parkListed as available: YES; permit extract separately records Tot Lot as NA and requires a fenced, maintained tot-lot before OCRERA amenities RERA amenities0% in amenity record; completion not verified
Street lightingListed; no detail suppliedRERA amenities RERA amenities0%; not independently verified
Community buildingsListed; no description suppliedRERA amenities RERA amenities0%; not independently verified
Sewage and sullage treatment/disposalListed; no capacity or reuse details suppliedRERA amenities RERA amenities0%; not independently verified
Solid-waste management/disposalListed; permit extract requires a garbage house and identifies a garbage pit in plan amenitiesRERA amenities RERA amenities0%; not independently verified
Water conservation / rainwater harvestingListed as available: YES; plan extract specifies rainwater harvesting and percolating well; permit extract records Rain Water Harvesting Pits 1RERA amenities RERA amenities0% in amenity record; installation not verified
Energy managementListed; no system details suppliedRERA amenities RERA amenities0%; not independently verified
Fire protection and fire safetyListed; plan extract lists hose reel, down corner, automatic sprinkler system and firefighting installationsRERA amenities RERA amenities0%; installation or clearance not verified
Electrical meter room / substation / receiving stationListed as available: YES; plan extract specifies a distribution transformer and transformer spaceRERA amenities RERA amenities0% in amenity record; installation not verified
Recreational open spaceListed; no aggregate area suppliedRERA amenities RERA amenities0%; not independently verified

The supplied RERA amenity record does not provide sizes, capacities or completion evidence for these facilities. A separate vendor record lists additional marketed amenities, but the Overview does not treat those as RERA-declared or delivered facilities. RERA amenities Promoter website

7. Utilities, building services & safety

Water and drainage: The plan extract specifies separate underground and terrace water storage tanks of 25,000 litres each for residential buildings. It also lists rainwater harvesting, septic tank, percolating well and sump. The RERA amenity record marks water supply and water conservation/rainwater harvesting as available, while its progress fields are 0%; no source-of-water details, storage verification, STP capacity, reuse arrangement or installed-status confirmation is supplied. RERA amenities

Electrical and backup: The plan extract lists a distribution transformer, transformer space, generator and emergency lighting. The permit requires EV-charging infrastructure in parking places and broadband/digital connectivity sections in buildings and rooftops. These are recorded design or permit requirements; installed capacities and operational status are not provided.

Vertical transport and fire/life safety: A lift is listed in the plan extract, but lift count and capacity are not supplied. The plan extract lists hose reel, down corner, automatic sprinkler system and firefighting installations. The GHMC permit assigns responsibility for structural and means-of-escape safety and states that an Occupancy Fire NOC is to be obtained before issue of the Occupancy Certificate. The supplied record does not establish that these systems have been installed, tested or cleared.

Waste and access: The plan extract lists a garbage pit and the permit requires a garbage house within the premises; the permit also specifies transfer of construction and demolition waste to the designated collection point. One entry and one exit are recorded, but no accessibility details, security system or CCTV provision is established in the project-specific plan extracts.

8. Location, access & connectivity

The registered location is Uppal, Uppal Mandal, Medchal-Malkajgiri District, PIN 500039; project and permit records place the site in Surya Nagar Colony and identify Uppal Bhagath / Uppal Bhagayath village. The site is part of Plot No. 1393 in the stated HMDA Layout, with an 80-foot-wide road recorded on its southern boundary. RERA record RERA filing

The permit-plan extract references a 24.00MT WIDE MAIN ROAD, an 18 mt. road width, and a minimum 4.5mts. entry/exit width. The supplied location record lists Financial District (Nanakramguda): 2.0 km as an anchor distance. The evidence does not provide verified public-transport details or measured distances to other landmarks. Location record

9. Developer & development status

The registered promoter is S S CONSTRUCTIONS, identified in the RERA filing as a proprietorship. The named proprietor and authorized signatory is MADHU YARABARLA. The landowner is identified in the project records as BERUVAR AJAY KUMAR SINGH; the GHMC permit identifies the promoter as the developer/builder and the landowner as applicant/D.A.G.P.A. holder. RERA filing Parties record

The promoter’s Form B declaration, dated 16 JUL 2024, states a completion period ending 05s July 2027. The GHMC permit states completion before 05 July, 2027. These are declared/approved record dates; no current construction progress or independent site verification is supplied. The registered office address appears in the promoter information as Vavya Estates, Industrial Estate, Moula Ali, Uppal, Surya Nagar Colony, Medchal-Malkajgiri, 500039. No official website or contact details are supplied in the project record. Parties record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200008598; validity stated as 06/08/2024–05/07/2027
What the supplied record establishesRegistration of NAVYA PINNACLE in the name of S S Constructions.
GHMC Building Permit Order
Identifier / date2030/GHMC/LBN/2024-BP; 05 July, 2024
What the supplied record establishesBuilding permit for the residential development; the extracted record describes one building of 1 Stilt + 5 upper floors.
GHMC file number
Identifier / date005203/GHMC/2523/LBN2/2024-BP
What the supplied record establishesFile reference recorded on the permit extract.
Layout reference
Identifier / date71563/HMDA/DEVELOPMENT/PD-1/UPPAL BHAGATH/17
What the supplied record establishesLayout reference quoted in the permit extract; the separate RERA-filed layout document is identified as a layout-plan document.
Form B declaration
Identifier / dateDated 16 JUL 2024
What the supplied record establishesPromoter declaration identifying the landowner, development agreement and promoter undertakings, including the stated completion date.
Occupancy / completion certificate
Identifier / dateNot supplied
What the supplied record establishesThe GHMC permit extract states OC-related requirements; no issued OC or completion certificate is present in the supplied evidence.
Other permit references
Identifier / dateMortgage registration reference Bk-1, CS No.8690/2024; handed-over area reference 8136/2024
What the supplied record establishesReferences recorded in the permit extract.

The HMDA DPMS approved-layout lookup is reported as unavailable through the public channel in the supplied evidence; this does not establish refusal or approval status beyond the layout reference appearing in the GHMC permit extract. HMDA

Frequently asked questions

Is NAVYA PINNACLE registered with Telangana RERA?

Yes. NAVYA PINNACLE is registered with the Telangana Real Estate Regulatory Authority as P02200008598; the registration status is New Project.

Who is the developer of NAVYA PINNACLE?

The promoter named in the RERA registration is S S CONSTRUCTIONS.

Where is NAVYA PINNACLE located?

NAVYA PINNACLE is in SURYA NAGAR COLONY, Uppal, Medchal-Malkajgiri, Telangana (500039).

When will NAVYA PINNACLE be completed?

The promoter's proposed date of completion filed with RERA is 05/11/2027. This is the promoter's declaration, not a guarantee.

More projects in Uppal