SRIJA INFRA DEVELOPERS · Rangareddy · RERA P02400000871

SUDHIKSHA is a residential apartment project in LB NAGAR, Saroornagar Mandal, Ranga Reddy District, developed by registered promoter SRIJA INFRA DEVELOPERS. The registered site covers 836.07 sq m at Plot Nos. 41&42, with one building comprising a cellar, stilt and five upper floors and 10 3BHK homes. Its TG-RERA registration is P02400000871, issued 12/06/2019, and its proposed completion date is 21/06/2023.

01What we found

Period endedTG-RERA registration ran to 21 Jun 2023 - check its extension on TG-RERA
19documents on file - each fact links to its page
30court cases on this project's land (survey 66, L.B. Nagar-I)
10items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from housing.comPhoto from housing.com
▦ View all 2 photos
L B Nagar I, Saroornagar, Ranga Reddy · geocoded — approximate.

Project at a glance

Project identity

FieldRecord
Registered project nameSUDHIKSHA RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionNot identified as a separate phase in the available registration record; the registered site is Plot Nos. 41&42 RERA filing
TG-RERA registrationP02400000871, issued 12/06/2019
Registration validityStated as four years, 12/06/2019 to 21/06/2023; the certificate records no extension
Registered promoterSRIJA INFRA DEVELOPERS, partnership RERA record Parties record Corporate record
RERA project statusListed as On-Going Project in the filing RERA filing

Land and geographic identity

FieldRecord
LocalityLB NAGAR RERA record RERA filing
Revenue villageL.B. Nagar-I in the project identity record; the title documents also use Mansoorabad Village / Mansurabad Village RERA record Land records Document index
Mandal / districtSaroornagar, Ranga Reddy RERA record RERA filing
PIN500074 RERA record
Project survey identity66/14 (NEW.NO.9); title records also identify Survey No. 66/14, New Survey No. 9 RERA record Land records
Plot numbers41&42 RERA filing
Site extent836.07 sq m total and net area; road-affected area recorded as 0 sq m RERA filing
BoundariesEast: ROAD; North: ROAD; South: ROAD; West: PLOT 20 RERA filing

Development identity

FieldRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building approvalPermit No. 1/C3/05665/2017, dated 21 June, 2017 Approvals record
Approved buildingBuilding - A (SHAYAM SUNDAR); residential, Cellar + Stilt + 5
Approved height14.75 m
Approved upper-floor area2,083.35 m2 for five residential upper floors
Occupancy-certificate record areaFloor area 2,613.95 m2 and parking area 854.09 m2, both stated in the GHMC OC record
Building countOne building is recorded in the RERA land details; the GHMC order identifies one Building A RERA filing
Units10 units in one building, as filed on TG-RERA RERA filing RERA unit table
Parking levelsCellar and stilt are identified for parking in the GHMC sanction; parking-space counts are not available in the supplied record

Offering and status

FieldRecord
Filed configuration3BHK RERA unit table
RERA-filed saleable area174.19 sq m per unit RERA unit table
Booked / available10 booked / 0 available; portal record has no stated as-of date, so counts are indicative RERA unit table
Filed construction progressRERA filing records 80% completeness RERA record
Completion deadlineProposed and revised completion date both recorded as 21/06/2023 RERA record
Occupancy certificate statusA GHMC Occupancy Certificate dated 13/12/2019 is in the supplied documents for a building identified as A (SHAYAM SUNDAR), at Survey Nos. 66/14 and 9

The project story

SUDHIKSHA is recorded with TG-RERA as a residential apartment project at Plot Nos. 41&42, identified in the project filing as Survey No. 66/14 (NEW.NO.9), in the LB Nagar / Saroornagar area. The registered site extent is 836.07 sq m. The filing records one building and ten 3BHK units. RERA record RERA filing RERA unit table

The GHMC building permit describes one residential building, Building A, with a cellar, stilt and five upper floors. The registration record gives a proposed and revised completion date of 21/06/2023 and records 80% completeness. These are filed project-status details, not an independent site inspection. The supplied GHMC record includes an occupancy certificate dated 13/12/2019; its specific building and site identifiers are set out in the identity table and evidence index below. RERA record

Master plan, architecture & building design

The GHMC permit records Building A as Cellar + Stilt + 5, with a sanctioned height of 14.75 m and 2,083.35 m2 of residential upper-floor area. The GHMC occupancy-certificate record separately lists a floor area of 2,613.95 m2 and parking area of 854.09 m2.

The building permit identifies a 42.6 m2 tot-lot and requires a percolation-pit rainwater-harvesting structure, a transformer space and an on-site garbage house. It also specifies cellar and stilt use for vehicle parking. The supplied information does not include a reviewable approved floor-plan drawing extract describing floor-by-floor unit arrangement, building footprint, lift or stair layout, or internal circulation.

Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10100174.19 sq mSoftware-measured range: 110.7–116.2 sq m; median: 114.8 sq m34%

The unit count, booking status and saleable area are from the TG-RERA filing; the booking record has no stated as-of date. Carpet-area figures are software measurements from the supplied drawing record, not RERA-filed measurements, and are flagged as needing review. The supplied drawing measurement covers four flat designs. Saleable area and measured carpet area are different measures; the supplied drawing note says saleable area also includes a share of common areas. RERA unit table RERA unit details Floor plans

The measured typical-floor drawing describes a 3BHK arrangement with bedrooms, living room, dining/kitchen, toilets and a wash area. Room dimensions from the measured drawing include a living area of 5.17 m × 7.76 m, dining/kitchen of 4.0 m × 5.17 m, and bedrooms of 4.18 m × 5.0 m, 3.5 m × 4.5 m and 3.5 m × 5.08 m. These are drawing-derived software measurements, not RERA disclosures. RERA unit details

Parking & vehicle circulation

The GHMC permit identifies the cellar and stilt for vehicle parking and states they are to be used exclusively for parking. The occupancy-certificate record lists 854.09 m2 of parking area. The supplied records do not establish the number of parking spaces, their allocation to individual units, visitor or accessible parking provision, or a parking allotment arrangement. A parking area or drawn bay does not by itself establish an exclusive unit entitlement.

Amenities, recreation & open spaces

Tot-lot / recreational open space
Description / size42.6 m2
Evidence sourceGHMC building permit
Declared progress / verified statusIncluded in the permit record; the permit requires it to be fenced and maintained as greenery. Current condition is not independently verified.
Trees and greenery
Description / size40 Trees recorded; peripheral greenery and tree planting are required by the permit
Evidence sourceGHMC building permit
Declared progress / verified statusPermit requirement; current planting and maintenance are not independently verified.
Rainwater harvesting
Description / sizePercolation pit required
Evidence sourceGHMC building permit
Declared progress / verified statusRequired by the permit; installation and operation are not independently verified.

The supplied RERA amenity record marks aggregate recreational open space as available at 100%; this is a project-record status, not independent verification of current condition. No project-specific RERA evidence supplied here establishes a clubhouse, gym, pool or other indoor or sports facilities. RERA amenities

Utilities, building services & safety

The GHMC permit requires a transformer space, on-site garbage house and rainwater-harvesting percolation pit. It also specifies separate underground and terrace water tanks, each with a stated capacity of 25,000 lts., and requires generator backup, emergency lighting, fire extinguishers and fire-safety systems. The permit conditions include a manually operated alarm system, hose reel and down corner; automatic sprinklers are specified for the cellar and where the basement-area condition stated in the permit applies. These are permit requirements; the supplied material does not independently verify installation, capacity in operation or current compliance.

The RERA amenity record marks water supply, sewerage, storm-water drains, solid-waste management and disposal, water conservation/rainwater harvesting, and electrical meter room/sub-station/receiving station as available at 100%. This is a portal-record declaration; the supplied data does not provide operational capacities, inspection results, or independent verification. RERA amenities

Location, access & connectivity

The registered location is LB NAGAR, in L.B. Nagar-I, Saroornagar Mandal, Ranga Reddy District, PIN 500074. The project filing records roads on the north, east and south boundaries and Plot 20 to the west. The TG-RERA location record identifies L. B. Nagar Metro Station at 1.0 km. RERA record RERA filing RERA filing Location record

The supplied connectivity record does not provide a measured route, travel time or further project-specific road-network detail. Location record

Developer & development status

The registered promoter is SRIJA INFRA DEVELOPERS, recorded as a partnership. The promoter record lists the address as BHAIRAMAL GUDA, MANSOORABAD, LB NAGAR, Saroornagar, Ranga Reddy, 500074. The supplied registration certificate identifies the project promoter as Srija Infra Developers. Corporate record Parties record

The RERA filing records a proposed and revised completion date of 21/06/2023, 80% completeness, and ten units, all shown as booked. The supplied evidence does not include an independently verified current construction-status inspection. The Form B declaration in the file leaves its completion-period field blank. RERA record RERA unit table

Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400000871; issued 12/06/2019; stated validity to 21/06/2023
What it recordsForm C registration for SUDHIKSHA; the certificate records a separate-account condition.
GHMC building permit order
Identifier / datePermit No. 1/C3/05665/2017, dated 21 June, 2017; file No. 1/C3/04827/2017
What it recordsBuilding A sanction for the residential building at Survey No. 66/14 (NEW.NO.9), Plot Nos. 41&42.
GHMC occupancy certificate
Identifier / dateApplication No. 2/C3/20741/2019-OC, dated 13/12/2019; file No. 1/C3/12312/2017
What it recordsOccupancy certificate for a building recorded as A (SHAYAM SUNDAR), with the certificate stating the building was inspected and declared fit for occupation.
Layout / subdivision reference in permit
Identifier / dateLRS/11695/CR-3/EAST ZONE/GHMC/2008
What it recordsReference recorded in the GHMC permit; the supplied extract does not include the layout plan itself.
Form B declaration
Identifier / dateDocument 15490
What it recordsPromoter declaration covering title basis and project undertakings; the completion-period field is blank.
Title report and title documents
Identifier / dateDocuments 33780–33787, 34125, 39101 Document index
What it recordsFiled title materials, including sale deeds and a development agreement cum GPA.

The supplied evidence does not include a reviewable approved layout drawing. The publicly accessible HMDA DPMS layout lookup was unavailable in the supplied record; that unavailability does not establish whether a layout approval exists. HMDA

Frequently asked questions

Is SUDHIKSHA registered with Telangana RERA?

Yes. SUDHIKSHA is registered with the Telangana Real Estate Regulatory Authority as P02400000871; the registration status is On-Going Project.

Who is the developer of SUDHIKSHA?

The promoter named in the RERA registration is SRIJA INFRA DEVELOPERS.

Where is SUDHIKSHA located?

SUDHIKSHA is in LB NAGAR, L.B. Nagar-I, Saroornagar, Rangareddy, Telangana (500074).

When will SUDHIKSHA be completed?

The promoter's proposed date of completion filed with RERA is 21/06/2023. This is the promoter's declaration, not a guarantee.