Paradise
MODI BUILDERS & INFRASTRUCTURES PRIVATE LIMITED · Rangareddy · RERA P02400000970
PARADISE is a residential apartment project in Hayathnagar, Hayathnagar Mandal, Ranga Reddy District. The registered promoter is Modi Builders & Infrastructures Private Limited. The RERA filing records a site area of 16,212.68 sq.m, three proposed building units, and 310 homes in 2BHK and 3BHK configurations; the GHMC permit describes three residential blocks, each with ground and five upper floors, with one block also having a cellar. The project is registered with TG-RERA as P02400000970, and its proposed completion date in the project information is 01/05/2029.
More from Modi Builders & Infrastructures Pvt Ltd · 7 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Item | TG-RERA record |
|---|---|
| Registered project name | PARADISE |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | The registration certificate names PARADISE; the filed Form B is described as relating to Phase II, but the supplied registration record does not specify a phase in its certificate extract. Registered phase scope is therefore not fully established here. |
| TG-RERA registration | P02400000970, granted under section 5; valid from 02/07/2019 to 01/01/2029. The certificate records a nine-year validity period. |
| RERA status | Registered; the certificate extract says it has not been extended. Its validity is separate from the completion undertaking and from the occupancy-certificate status. |
| Registered promoter | Modi Builders & Infrastructures Private Limited, company. Corporate record |
Land and geographic identity
| Item | Record |
|---|---|
| Locality | Hayathnagar RERA record |
| Revenue village(s) | Hayathnagar in the project identity record; the filed title material identifies Bagh Hayathnagar Village. The GHMC permit extraction says Hayath Nagar Old village. RERA record |
| Mandal / district / PIN | Hayathnagar / Ranga Reddy / 501505 RERA record |
| Survey numbers and subdivisions | 183(P), 203(P); the filed registration certificate renders these as 183(P) and 203(P). RERA record |
| Site area | RERA filing: total 16,212.68 sq.m, affected area 99.17 sq.m, net area 16,113.51 sq.m. RERA filing |
| Boundaries | East: land belonging to vendee; west: road; north: road; south: neighbours’ land. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building permit | 1/C3/05335/2019, approved 30 March 2019; associated GHMC file number L1/H0/10727/2018. Approvals record |
| Approved built-up area | 32,836.17 sq.m in the RERA filing. RERA filing |
| Buildings / towers | Three residential buildings are listed in the GHMC permit extraction: A RESI BLOCK 5, A RESIBLOCK4 and A RESIBLOCK3. The RERA filing also records three proposed building units. RERA filing |
| Sanctioned floor configuration | BLOCK 5: 1 Ground + 5 upper floors; BLOCK4: 1 Cellar + Ground + 5 upper floors; BLOCK3: 1 Ground + 5 upper floors. The permit records each building height as 17.97 m. |
| Approved versus RERA-filed units | RERA records 3 building units in the approved-plan field and 3 proposed building units; the unit schedule separately lists 310 homes across 2BHK and 3BHK configurations. The supplied extracts do not explain the distinction between building-unit and home counts. RERA filing RERA unit table |
Offering and status
| Item | Record |
|---|---|
| RERA-filed configurations | 2BHK and 3BHK RERA unit details |
| RERA-filed saleable area | 2BHK: 19.36 sq.m; 3BHK: 15.2 sq.m RERA unit details |
| Booked / available | 2BHK: 77 booked / 4 available; 3BHK: 125 booked / 104 available. These portal counts have no supplied as-of date and are indicative. RERA unit details |
| Completion dates | RERA project information gives proposed completion as 01/05/2029; the Form B undertaking states 01-01-2029. RERA filing |
| Occupancy certificate (OC) | No OC is identified in the supplied records. The GHMC permit says an OC is compulsory before occupation; the record does not establish an OC for any building or phase. |
The project story
PARADISE is registered with TG-RERA as a residential apartment project in Hayathnagar, on the filed survey portions 183(P) and 203(P). The GHMC building permit describes three residential blocks, including one block with a cellar and all three with ground and five upper floors. The project filing records three proposed building units, while its separate unit schedule lists 310 homes: 81 two-bedroom and 229 three-bedroom apartments. RERA record RERA filing RERA unit table
The documents establish a registration and building permit, not the present construction stage. The supplied records do not provide independently verified site progress, a current construction update, or an OC for any building. The completion timeline is stated in the project information and the Form B declaration; registration validity is recorded separately in the registration certificate. RERA filing
Master plan, architecture & building design
The RERA filing records a total site area of 16,212.68 sq.m, net area of 16,113.51 sq.m, and 99.17 sq.m affected by road widening/FTL/nala widening. Approved built-up area is recorded as 32,836.17 sq.m; this is an approved built-up figure, not a supplied carpet-area or FSI-counted-area figure. RERA filing RERA filing
The GHMC permit identifies three residential blocks and the floor configurations shown in the overview table. It also records a 1,675.67 sq.m tot-lot, 9 rainwater-harvesting percolation pits and a 558.43 RM compound wall. A drawing-level breakdown of flat layouts, flats per floor, lift and stair locations, internal circulation, and building footprints is not available in the supplied extracts.
The RERA filing records three proposed building units, while the unit schedule records 310 apartments. The supplied documents do not provide a phase-by-phase or tower-by-tower allocation of the apartment inventory. RERA filing RERA unit table
Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 81 | 77 | 4 | 19.36 sq.m | Not established from supplied drawing measurements | Not supplied |
| 3BHK | 229 | 125 | 104 | 15.2 sq.m | Not established from supplied drawing measurements | Not supplied |
RERA unit details
The supplied drawing review reports two drawings examined, but no measured flat designs for the RERA-listed 2BHK or 3BHK configurations. It therefore does not establish software-measured carpet areas or room dimensions for these homes. The RERA-filed figures above are expressly recorded as saleable area; carpet area, any balcony or utility area, and a home’s share of common areas are not separately evidenced in the supplied unit data. Floor plans RERA unit details
Parking & vehicle circulation
The GHMC permit extraction lists one cellar in A RESIBLOCK4; it does not provide a parking-space count or show that this is the only parking provision. The RERA unit schedule marks both configurations as mortgaged, but it does not state an individual parking allocation for any apartment. The supplied records do not establish resident, visitor or accessible-space counts, vehicle ramps or driveways, EV charging, or exclusive parking rights. RERA unit table
Amenities, recreation & open spaces
The following items are recorded in the GHMC permit or TG-RERA amenities data. The percentages are the declared progress values in the RERA amenities record; they are not independent site verification. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip / park | Permit records a 1,675.67 sq.m tot-lot and requires it to be fenced and maintained as greenery before OC. | GHMC permit; RERA amenities RERA amenities | RERA record: 90%; not independently verified complete |
| Community buildings | No size or facility breakdown supplied | RERA amenities RERA amenities | 100% declared; not independently verified complete |
| Aggregate recreational open space | No area supplied | RERA amenities RERA amenities | 0% declared |
| Street lighting | No quantity or specification supplied | RERA amenities RERA amenities | 90% declared |
| Internal roads and footpaths | No dimensions supplied | RERA amenities RERA amenities | 90% declared |
| Storm-water drains | No dimensions or capacity supplied | RERA amenities RERA amenities | 90% declared |
The supplied GHMC permit also lists 810 trees, a garbage house, rainwater-harvesting structures and space for a transformer; it does not give a current verified completion status for those items.
Utilities, building services & safety
The GHMC permit lists an ETP, rainwater-harvesting percolation pits, a transformer space and a garbage house. The RERA amenities record lists water supply, sewerage (including chamber, lines, septic tank and STP), sewage and sullage treatment/disposal, solid-waste management, water conservation/rainwater harvesting, energy management, fire protection, and an electrical meter room/sub-station/receiving station. RERA records each of these listed utility/service categories at 100% declared progress; the extracts do not independently verify completion or provide capacities. RERA amenities
The permit says an OC is compulsory before occupation. The supplied records do not state lift numbers or capacities, backup-power arrangements, water source or storage capacity, reuse arrangements, fire-system specifications, emergency access details, CCTV provision, or accessibility features.
Location, access & connectivity
The registered project location is Hayathnagar, Hayathnagar Mandal, Ranga Reddy District, Telangana, PIN 501505. The supplied identity records also identify the revenue village as Hayathnagar and the filed title material as Bagh Hayathnagar Village. RERA record
The location dataset lists these distances, without a supplied measurement date or travel-time estimate: Location record
| Nearby place / point | Category | Supplied distance |
|---|---|---|
| Financial District (Nanakramguda) | Anchor | 1.2 km |
| IndusInd Bank | Bank | 0.4 km |
| Unnamed bus station | Bus station | 2.2 km |
| Manuu Polytechnic Hyderabad | College | 1.6 km |
| Sankaraya Eye Hospital | Hospital | 1.6 km |
| ADP | IT office | 0.0 km |
| South India Shopping Mall | Mall | 2.6 km |
| Unnamed park | Park | 1.2 km |
| Nanakramguda Government Primary School | School | 0.5 km |
The supplied record does not identify the project’s approach road or provide independently measured public-transport routes. Location record
Developer & development status
The registered promoter is Modi Builders & Infrastructures Private Limited, a company. Its supplied corporate identifier is GSTIN 36AAFCM0052Q1Z9. The RERA filing names Sourabh Modi as managing director and authorised signatory and Pranjali Modi as a director. The supplied registered-office details are Ashoka Hitech Chambers, Road No. 2, Hayathnagar, Hayathnagar, Ranga Reddy, Telangana 501505. Corporate record Parties record
The Form B affidavit, dated 1 April 2019, is a promoter declaration by Sourabh Modi. It declares legal title and no encumbrances, undertakes completion by 01-01-2029, and describes the promoter’s separate-account, withdrawal-certification and annual-audit commitments. These are declarations in the filed document. The project information separately gives proposed completion as 01/05/2029; the supplied records do not provide a current construction-progress statement or an OC. RERA filing
Approvals, official records & documents
| Identifier / date | P02400000970, issued 02/07/2019 |
|---|---|
| What the supplied material establishes | Form C records PARADISE as registered from 02/07/2019 to 01/01/2029. |
| Identifier / date | Approval 1/C3/05335/2019; file L1/H0/10727/2018; approved 30 March 2019 |
|---|---|
| What the supplied material establishes | Permit extraction records residential construction for three blocks, floor configurations and conditions including the requirement for an OC before occupation. |
| Identifier / date | Dated 1 April 2019 |
|---|---|
| What the supplied material establishes | Promoter declaration for Phase II, including title, encumbrance and completion statements. |
| Identifier / date | Title report and sale-deed records, including doc. 46203 and docs. 46200–46202 |
|---|---|
| What the supplied material establishes | The supplied extracts identify land and title instruments for the project survey portions; detailed title review is addressed separately. |
| Identifier / date | Not identified in supplied records |
|---|---|
| What the supplied material establishes | No OC or completion certificate is established by the documents supplied for this overview. |
The GHMC permit extraction states that the permit does not itself confer ownership rights, that construction is to follow the sanctioned plan, and that the mortgaged built-up area may be registered only after production of an OC.
Project at a glance
Project identity
Registered project name: PARADISE
Project type: Residential apartment project
Phase / registered portion: The registration certificate names PARADISE; the filed Form B is described as relating to Phase II, but the supplied registration record does not specify a phase in its certificate extract. Registered phase scope is therefore not fully established here.
TG-RERA registration: P02400000970, granted under section 5; valid from 02/07/2019 to 01/01/2029. The certificate records a nine-year validity period.
RERA status: Registered; the certificate extract says it has not been extended. Its validity is separate from the completion undertaking and from the occupancy-certificate status.
Registered promoter: Modi Builders & Infrastructures Private Limited, company.
Land and geographic identity
Locality: Hayathnagar
Revenue village(s): Hayathnagar in the project identity record; the filed title material identifies Bagh Hayathnagar Village. The GHMC permit extraction says Hayath Nagar Old village.
Mandal / district / PIN: Hayathnagar / Ranga Reddy / 501505
Survey numbers and subdivisions: 183(P), 203(P); the filed registration certificate renders these as 183(P) and 203(P).
Site area: RERA filing: total 16,212.68 sq.m, affected area 99.17 sq.m, net area 16,113.51 sq.m.
Boundaries: East: land belonging to vendee; west: road; north: road; south: neighbours’ land.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building permit: 1/C3/05335/2019, approved 30 March 2019; associated GHMC file number L1/H0/10727/2018.
Approved built-up area: 32,836.17 sq.m in the RERA filing.
Buildings / towers: Three residential buildings are listed in the GHMC permit extraction: A RESI BLOCK 5, A RESIBLOCK4 and A RESIBLOCK3. The RERA filing also records three proposed building units.
Sanctioned floor configuration: BLOCK 5: 1 Ground + 5 upper floors; BLOCK4: 1 Cellar + Ground + 5 upper floors; BLOCK3: 1 Ground + 5 upper floors. The permit records each building height as 17.97 m.
Approved versus RERA-filed units: RERA records 3 building units in the approved-plan field and 3 proposed building units; the unit schedule separately lists 310 homes across 2BHK and 3BHK configurations. The supplied extracts do not explain the distinction between building-unit and home counts.
Offering and status
RERA-filed configurations: 2BHK and 3BHK
RERA-filed saleable area: 2BHK: 19.36 sq.m; 3BHK: 15.2 sq.m
Booked / available: 2BHK: 77 booked / 4 available; 3BHK: 125 booked / 104 available. These portal counts have no supplied as-of date and are indicative.
Completion dates: RERA project information gives proposed completion as 01/05/2029; the Form B undertaking states 01-01-2029.
Occupancy certificate (OC): No OC is identified in the supplied records. The GHMC permit says an OC is compulsory before occupation; the record does not establish an OC for any building or phase.
The project story
PARADISE is registered with TG-RERA as a residential apartment project in Hayathnagar, on the filed survey portions 183(P) and 203(P). The GHMC building permit describes three residential blocks, including one block with a cellar and all three with ground and five upper floors. The project filing records three proposed building units, while its separate unit schedule lists 310 homes: 81 two-bedroom and 229 three-bedroom apartments.
The documents establish a registration and building permit, not the present construction stage. The supplied records do not provide independently verified site progress, a current construction update, or an OC for any building. The completion timeline is stated in the project information and the Form B declaration; registration validity is recorded separately in the registration certificate.
Master plan, architecture & building design
The RERA filing records a total site area of 16,212.68 sq.m, net area of 16,113.51 sq.m, and 99.17 sq.m affected by road widening/FTL/nala widening. Approved built-up area is recorded as 32,836.17 sq.m; this is an approved built-up figure, not a supplied carpet-area or FSI-counted-area figure.
The GHMC permit identifies three residential blocks and the floor configurations shown in the overview table. It also records a 1,675.67 sq.m tot-lot, 9 rainwater-harvesting percolation pits and a 558.43 RM compound wall. A drawing-level breakdown of flat layouts, flats per floor, lift and stair locations, internal circulation, and building footprints is not available in the supplied extracts.
The RERA filing records three proposed building units, while the unit schedule records 310 apartments. The supplied documents do not provide a phase-by-phase or tower-by-tower allocation of the apartment inventory.
Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 81 | 77 | 4 | 19.36 sq.m | Not established from supplied drawing measurements | Not supplied |
| 3BHK | 229 | 125 | 104 | 15.2 sq.m | Not established from supplied drawing measurements | Not supplied |
The supplied drawing review reports two drawings examined, but no measured flat designs for the RERA-listed 2BHK or 3BHK configurations. It therefore does not establish software-measured carpet areas or room dimensions for these homes. The RERA-filed figures above are expressly recorded as saleable area; carpet area, any balcony or utility area, and a home’s share of common areas are not separately evidenced in the supplied unit data.
Parking & vehicle circulation
The GHMC permit extraction lists one cellar in A RESIBLOCK4; it does not provide a parking-space count or show that this is the only parking provision. The RERA unit schedule marks both configurations as mortgaged, but it does not state an individual parking allocation for any apartment. The supplied records do not establish resident, visitor or accessible-space counts, vehicle ramps or driveways, EV charging, or exclusive parking rights.
Amenities, recreation & open spaces
The following items are recorded in the GHMC permit or TG-RERA amenities data. The percentages are the declared progress values in the RERA amenities record; they are not independent site verification.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip / park | Permit records a 1,675.67 sq.m tot-lot and requires it to be fenced and maintained as greenery before OC. | GHMC permit; RERA amenities | RERA record: 90%; not independently verified complete |
| Community buildings | No size or facility breakdown supplied | RERA amenities | 100% declared; not independently verified complete |
| Aggregate recreational open space | No area supplied | RERA amenities | 0% declared |
| Street lighting | No quantity or specification supplied | RERA amenities | 90% declared |
| Internal roads and footpaths | No dimensions supplied | RERA amenities | 90% declared |
| Storm-water drains | No dimensions or capacity supplied | RERA amenities | 90% declared |
The supplied GHMC permit also lists 810 trees, a garbage house, rainwater-harvesting structures and space for a transformer; it does not give a current verified completion status for those items.
Utilities, building services & safety
The GHMC permit lists an ETP, rainwater-harvesting percolation pits, a transformer space and a garbage house. The RERA amenities record lists water supply, sewerage (including chamber, lines, septic tank and STP), sewage and sullage treatment/disposal, solid-waste management, water conservation/rainwater harvesting, energy management, fire protection, and an electrical meter room/sub-station/receiving station. RERA records each of these listed utility/service categories at 100% declared progress; the extracts do not independently verify completion or provide capacities.
The permit says an OC is compulsory before occupation. The supplied records do not state lift numbers or capacities, backup-power arrangements, water source or storage capacity, reuse arrangements, fire-system specifications, emergency access details, CCTV provision, or accessibility features.
Location, access & connectivity
The registered project location is Hayathnagar, Hayathnagar Mandal, Ranga Reddy District, Telangana, PIN 501505. The supplied identity records also identify the revenue village as Hayathnagar and the filed title material as Bagh Hayathnagar Village.
The location dataset lists these distances, without a supplied measurement date or travel-time estimate:
| Nearby place / point | Category | Supplied distance |
|---|---|---|
| Financial District (Nanakramguda) | Anchor | 1.2 km |
| IndusInd Bank | Bank | 0.4 km |
| Unnamed bus station | Bus station | 2.2 km |
| Manuu Polytechnic Hyderabad | College | 1.6 km |
| Sankaraya Eye Hospital | Hospital | 1.6 km |
| ADP | IT office | 0.0 km |
| South India Shopping Mall | Mall | 2.6 km |
| Unnamed park | Park | 1.2 km |
| Nanakramguda Government Primary School | School | 0.5 km |
The supplied record does not identify the project’s approach road or provide independently measured public-transport routes.
Developer & development status
The registered promoter is Modi Builders & Infrastructures Private Limited, a company. Its supplied corporate identifier is GSTIN 36AAFCM0052Q1Z9. The RERA filing names Sourabh Modi as managing director and authorised signatory and Pranjali Modi as a director. The supplied registered-office details are Ashoka Hitech Chambers, Road No. 2, Hayathnagar, Hayathnagar, Ranga Reddy, Telangana 501505.
The Form B affidavit, dated 1 April 2019, is a promoter declaration by Sourabh Modi. It declares legal title and no encumbrances, undertakes completion by 01-01-2029, and describes the promoter’s separate-account, withdrawal-certification and annual-audit commitments. These are declarations in the filed document. The project information separately gives proposed completion as 01/05/2029; the supplied records do not provide a current construction-progress statement or an OC.
Approvals, official records & documents
| Identifier / date | P02400000970, issued 02/07/2019 |
|---|---|
| What the supplied material establishes | Form C records PARADISE as registered from 02/07/2019 to 01/01/2029. |
| Identifier / date | Approval 1/C3/05335/2019; file L1/H0/10727/2018; approved 30 March 2019 |
|---|---|
| What the supplied material establishes | Permit extraction records residential construction for three blocks, floor configurations and conditions including the requirement for an OC before occupation. |
| Identifier / date | Dated 1 April 2019 |
|---|---|
| What the supplied material establishes | Promoter declaration for Phase II, including title, encumbrance and completion statements. |
| Identifier / date | Title report and sale-deed records, including doc. 46203 and docs. 46200–46202 |
|---|---|
| What the supplied material establishes | The supplied extracts identify land and title instruments for the project survey portions; detailed title review is addressed separately. |
| Identifier / date | Not identified in supplied records |
|---|---|
| What the supplied material establishes | No OC or completion certificate is established by the documents supplied for this overview. |
The GHMC permit extraction states that the permit does not itself confer ownership rights, that construction is to follow the sanctioned plan, and that the mortgaged built-up area may be registered only after production of an OC.
Frequently asked questions
Is PARADISE registered with Telangana RERA?
Yes. PARADISE is registered with the Telangana Real Estate Regulatory Authority as P02400000970; the registration status is New Project.
Who is the developer of PARADISE?
The promoter named in the RERA registration is MODI BUILDERS & INFRASTRUCTURES PRIVATE LIMITED.
Where is PARADISE located?
PARADISE is in HAYATHNAGAR, Rangareddy, Telangana (501505).
When will PARADISE be completed?
The promoter's proposed date of completion filed with RERA is 01/05/2029. This is the promoter's declaration, not a guarantee.