Sign in

Sai Estates

H & M AVENUE PROJECTS PRIVATE LIMITED · Medchal-Malkajgiri · RERA P02200000124

SAI ESTATES is a residential apartment project in Saibaba Nagar Colony, Kukatpally, Kukatpally mandal, Medchal-Malkajgiri district, developed by registered promoter H & M Avenue Projects Private Limited. It covers 1533.2 sq. m and comprises one building with a Cellar + Stilt + 5 configuration and 35 apartments: 25 2BHK and 10 3BHK. The TG-RERA registration number is P02200000124, and the proposed completion date is 08/11/2023.

More from H & M Avenue Projects Pvt Ltd · 2 projects →

01What we found

Period endedTG-RERA registration ran to 8 Nov 2023 - check its extension on TG-RERA
8documents on file - each fact links to its page
1court case on this project's land (survey 454, 474, Kukatpally)
10items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from nobroker.inPhoto from nobroker.in
▦ View all 2 photos
Kukatpally, Kukatpally, Medchal-Malkajgiri · geocoded — approximate.

Project at a glance

Project identity

FieldProject record
Registered project nameSAI ESTATES RERA record
Project typeResidential apartment project RERA record
Phase / registered portionOne building is identified in the supplied record; a separate phase name is not disclosed RERA filing
TG-RERA registrationP02200000124
Registration validity02/01/2019 to 08/11/2023; certificate says four years and “unless extended.” The supplied certificate records no extension
Registered promoterH & M Avenue Projects Private Limited, a company RERA record Corporate record
RERA statusRecorded as “On-Going Project.” Registration validity and completion deadline are separate matters RERA filing RERA record

Land and geographic identity

FieldProject record
Locality / project addressSaibaba Nagar Colony / Kukatpally; plots 80 and 81 RERA filing
Revenue villageKukatpally RERA filing
MandalKukatpally RERA filing
DistrictMedchal-Malkajgiri (also rendered “MEDCHAL - MALKAJGIRI” in the building-permit extraction) RERA filing
PIN500072 RERA record
Survey numbers and subdivisions454/A, 454/AA, 454/E and 474 RERA filing
Site extentTotal area 1533.2 sq. m; net area 1533.20 sq. m in the RERA land details. The building-permit extraction also records site area 1533.2 m² and net area 1533.2 m² RERA filing
BoundariesEast: HOUSE ON PLOT NO 79; West: PROPERTY OF SREEDHAR RAO; North: 30-0 WIDE ROAD; South: NEIGHBOURS PROPERTY RERA filing

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Principal building-permit approval1/C22/10377/2017, approved 08 November 2017; file number 1/C22/12780/2017 Approvals record
Approved built-up area3,791.60 m² (recorded as “Covered builtup area”) RERA filing
Building countOne building is recorded in the RERA land details; the GHMC order describes “BUILDING - PROPOSED (BUILDING)” RERA filing
Sanctioned floor configurationCellar + Stilt + 5
Parking levels / sanctioned parking countCellar is included in the sanctioned floor configuration; a parking space count and detailed allocation are not established in the supplied material RERA filing
Unit count35 units recorded in the RERA unit data: 25 2BHK and 10 3BHK. The GHMC order states that the sanctioned number of units must not be increased without prior approval, but its extracted sanctioned unit count is not separately stated RERA unit table

Offering and status

FieldProject record
Unit types2BHK and 3BHK apartments RERA unit table
RERA-filed saleable area2BHK: 103.5 sq. m; 3BHK: 143.54 sq. m RERA unit table
Booked / available2BHK: 25 booked / 0 available; 3BHK: 10 booked / 0 available. These are portal counts with no supplied as-of date and are indicative RERA unit table
Construction stageThe RERA record labels the project “On-Going Project”; no current site inspection or independently verified construction-progress figure is supplied RERA filing RERA record
Original / revised completion date08/11/2023 / 08/11/2023 RERA filing
Occupancy / completion certificateNo occupancy or completion certificate is supplied in the reviewed project documents. The GHMC permit states that an occupancy certificate is required before occupation

The project story

SAI ESTATES is a residential apartment project registered in Kukatpally, on plots 80 and 81, covering survey numbers 454/A, 454/AA, 454/E and 474 in Kukatpally village, Kukatpally mandal, Medchal-Malkajgiri district. The RERA record identifies one building, and the GHMC permit describes a proposed residential building with a Cellar + Stilt + 5 configuration. RERA filing

The RERA unit record lists 35 apartments—25 2BHK and 10 3BHK—and shows all as booked in the portal data available for this review. The record does not provide a dated booking snapshot, so those counts should be treated as indicative rather than current availability confirmation. RERA unit table

The promoter’s Form B declaration, dated 20 October 2018, undertook completion by 08 NOV 2023; the RERA project fields also give 08/11/2023 as both the proposed and revised completion date. These are declared dates, not evidence that construction was completed. No current independently verified progress report or occupancy/completion certificate is included in the supplied material. RERA filing

Master plan, architecture & building design

The GHMC building-permit order identifies one proposed residential building on a site of 1533.2 m², with a covered built-up area of 3,791.60 m², a recorded height of 14.99 m, and a floor configuration of Cellar + Stilt + 5. These are approval-record figures; the supplied extracts do not describe the building footprint, flats per floor, staircases, lifts, entrances, or internal circulation.

The RERA land record gives total and net site area as 1533.2 / 1533.20 sq. m. The building-permit extraction separately lists “Road affected area (m2): 79.08” while also giving net area as 1533.2 m²; the source text is presented here as recorded, without resolving that entry. RERA filing

No floor-plan drawing measurements are available: the supplied floor-plan processing record lists two drawings, with no flats measured and no flats identified in the extracted drawings. Accordingly, no drawing-based carpet area, typical floor arrangement, apartment orientation, or room dimensions can be reported. The RERA-filed apartment figures are saleable areas, not carpet-area measurements. Floor plans RERA unit details RERA unit table

The GHMC order includes setbacks of Front 4.5 m, Rear 3.5 m, Side I 5 m, Side II 5 m. It also lists 16 rainwater-harvesting structures and 75 Trees among the sanctioned parameters.

Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK25250103.5 sq. mNot measured in supplied drawing reviewNot supplied
3BHK10100143.54 sq. mNot measured in supplied drawing reviewNot supplied

The unit counts, bookings and saleable areas are from the RERA unit record; portal booking data has no supplied as-of date. The available drawing review did not measure any apartments, so software-measured carpet area and room details cannot be stated. Saleable area is the RERA-filed unit measure; the supplied evidence does not give a carpet-area figure or a quantified common-area loading. RERA unit table RERA unit details Floor plans

Parking & vehicle circulation

The sanctioned building configuration includes a Cellar and Stilt, but the supplied record does not establish the number of parking spaces, their type, or their location by level. It also does not document visitor or accessible spaces, ramps, internal driveways, pedestrian separation, EV charging, or parking allocations to particular apartments. A promoter-supplied third-party listing mentions car parking, but the project record provides no count or unit-specific allocation to substantiate it. Promoter website

The GHMC order states that the mortgaged built-up area may be registered only after an occupancy certificate is produced; the project land record also records 379.43 m² as mortgage area. These entries do not specify parking allocation. RERA filing

Amenities, recreation & open spaces

Tot-lot / green strip
Description / sizeGHMC order requires the tot-lot to be fenced and maintained as greenery before issue of the occupancy certificate; no area is supplied
Declared progress / verified statusSanction condition; completion not independently verified
Trees
Description / size75 Trees listed in sanctioned parameters
Declared progress / verified statusListed in permit; planting/completion not independently verified
Indoor games, sports facility, children’s play areas, park/central green, landscaping
Description / sizeListed in third-party vendor information; no sizes or quantities supplied
Evidence sourcePromoter website
Declared progress / verified statusMarketing/vendor listing; not verified as sanctioned or delivered
Community buildings
Description / sizeNo provision is established in the supplied record; the RERA amenity data records 0%
Evidence sourceRERA amenities
Declared progress / verified statusNo completion evidence supplied

Utilities, building services & safety

The GHMC permit requires a rainwater-harvesting structure (percolation pit), space for a transformer, a garbage house within the premises, and an ETP as per standard specification. It lists 16 rainwater-harvesting structures. These are permit-record requirements or parameters, not independent confirmation that the facilities have been installed or are operational.

The RERA amenity data marks water supply, sewerage (chambers, lines, septic tank, STP), storm-water drains, water conservation/rainwater harvesting, energy management, and electrical meter room/sub-station/receiving station as available at 100%; the same data gives no progress percentage for fire protection and fire-safety requirements. The fields are reported as recorded and do not, by themselves, establish independent verification or statutory compliance. RERA amenities

The supplied documents do not state water sources or storage capacity, STP or ETP capacity, reuse arrangements, power-backup capacity, lift count or capacity, fire-system details, security systems, waste-segregation arrangements, or accessibility provisions. The permit requires an occupancy certificate before occupation and specifies that completion notice is to be submitted after building completion.

Location, access & connectivity

The registered location is Kukatpally, Kukatpally mandal, Medchal-Malkajgiri district, Telangana, PIN 500072; the building-permit order places the site at Saibaba Nagar Colony. The RERA land record describes the north boundary as 30-0 WIDE ROAD. The permit records an 18 mt. road-width entry; the supplied material does not identify the road by name. RERA record RERA filing

The supplied location record lists KPHB Colony Metro at 1.8 km, an unnamed hospital at 0.1 km, Vasara Vidyalaya High School at 0.1 km, an unnamed park at 0.3 km, a bank at 0.3 km, CMR Family Mall at 1.5 km, an auto stand at 1.4 km, and Sri Chaitanya Junior College at 1.5 km. These are listed-point distances in the location data; no travel times are supplied. Location record

Developer & development status

The registered promoter is H & M Avenue Projects Private Limited, a company, identified in the RERA registration certificate and project filing. The supplied record lists its project address as Udaya Krishna Apartment, Bhagya Nagar Colony / Sai Baba Nagar Colony, Kukatpally, Medchal-Malkajgiri, PIN 500072. A PAN identifier is partially masked in the record as xxxxxx716Q. No official website or contact number is supplied. Corporate record Parties record

The promoter’s Form B is an affidavit-cum-declaration signed by G. Pulla Rao, Managing Director, on 20 October 2018. It declares legal title, states that the land is free from encumbrances, and undertakes completion by 08 NOV 2023, alongside project-fund, audit and approval-related declarations. These are promoter declarations. The available material does not establish current construction progress or provide an independently verified completion status.

Approvals, official records & documents

TG-RERA registration
Supplied evidenceForm C registration certificate, P02200000124, issued 02/01/2019; valid to 08/11/2023 unless extended
Scope / noteSAI ESTATES; certificate records no extension
GHMC building permit
Supplied evidenceBuilding Permit Order; approval 1/C22/10377/2017, file 1/C22/12780/2017, approved 08 November 2017
Scope / noteProposed building at Saibaba Nagar Colony on survey numbers 454/A, 454/AA, 454/E and 474
RERA promoter declaration
Supplied evidenceForm B affidavit-cum-declaration dated 20 October 2018
Scope / notePromoter’s title, encumbrance and completion declarations
Occupancy / completion certificate
Supplied evidenceNot supplied in the reviewed project material
Scope / noteGHMC permit requires an occupancy certificate before occupation
Approved drawing record
Supplied evidenceDrawing-related RERA filing record identifies approval number 1/C22/10377/2017; the supplied drawing-processing data does not provide measured apartment layouts Approvals record Floor plans
Scope / noteNo extracted floor-plan measurements available

The supplied material does not include a current occupancy certificate, a current site-progress inspection, or floor-plan measurements. RERA record RERA filing Approvals record Floor plans

Frequently asked questions

Is SAI ESTATES registered with Telangana RERA?

Yes. SAI ESTATES is registered with the Telangana Real Estate Regulatory Authority as P02200000124; the registration status is On-Going Project.

Who is the developer of SAI ESTATES?

The promoter named in the RERA registration is H & M AVENUE PROJECTS PRIVATE LIMITED.

Where is SAI ESTATES located?

SAI ESTATES is in Kukatpally, Medchal-Malkajgiri, Telangana (500072).

When will SAI ESTATES be completed?

The promoter's proposed date of completion filed with RERA is 08/11/2023. This is the promoter's declaration, not a guarantee.

More projects in Kukatpally