Sign in

VBR Lakeview Apartments

VENNAVARAM · Sangareddy · RERA P01100001346

VBR Lakeview Apartments is a residential apartment project in Ramachandrapuram, RC PURAM mandal, Sangareddy district, developed by registered promoter Vennavaram Chandrashekar Reddy. The project has a land area of 2022.91 m² and one residential building with 1 Cellar + Stilt + 5 upper floors. Its RERA unit schedule records 35 3BHK apartments, each with a saleable area of 87.01 sqm. It is registered under TG-RERA number P01100001346, with proposed completion on 20/05/2025.

01What we found

Period endedTG-RERA registration ran to 20 May 2025 - check its extension on TG-RERA
19documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Ramachandrapuram, Rc Puram, Sangareddy · geocoded — approximate.

1. Project at a glance

Project identity

FieldRecord
Registered project nameVBR Lakeview Apartments
Project typeResidential apartment project RERA record
Phase / registered portionThe registration record identifies the project as a whole; no separate phase name or phase boundary is disclosed. RERA record
TG-RERA registration numberP01100001346
Registration validity11/11/2019 to 20/05/2025; the supplied certificate records no extension. Validity is separate from the completion deadline and does not establish occupancy status.
Registered promoterVennavaram Chandrashekar Reddy
RERA statusThe supplied certificate records registration under section 5. The available record shows the stated validity ending 20/05/2025, with no extension recorded in that certificate.

Land and geographic identity

FieldRecord
Locality / streetRamachandrapuram; Old Ramachandrapuram is stated in the GHMC building permit. RERA record
Revenue villageRamachandrapuram RERA record
MandalRC PURAM RERA record
DistrictSangareddy RERA record
PIN502032 RERA record
Project survey numbers and subdivisions126/AA1, 126/AA2, 126/AA3 and 127
Registered site extent2022.91 m²
Total / net areaRERA land details record total area 2022.91 sqmts and net area 2022.91 sqmts. The building-permit extraction separately records a net area of 1727.74 m². RERA filing
BoundariesEast: ROAD WIDTH 9; West: PLOT NO M RAJAIAH; North: LAND OF SWAMY; South: PLOT NO V NARASAIAK. RERA filing

Development identity

FieldRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Principal building permissionPermit No. 1/C22/07926/2019, dated 20 May, 2019; file no. 1/C22/11527/2018.
Approved building descriptionBuilding - A (CHANDRASHEKAR): 1 Cellar + Stilt + 5 upper floors; stated height 14.95 m.
Approved area figures as recordedResidential upper floors area: 4,322.85 m2; cellar area: 947.89 m2; stilt area: 969.36 m2. The permit extraction also lists “Proposed Covered builtup area 345,829.00”; the underlying figure’s unit/format is not made clear in the supplied extraction.
Building countOne residential building is recorded in the RERA project information. RERA filing
Parking levelsCellar and stilt are approved for parking in the permit conditions.
Unit count35 units are recorded in the RERA unit schedule; the GHMC permit condition says the sanctioned number of units must not be increased, but the supplied permit extraction does not state a numeric sanctioned unit count. RERA unit table

Offering and status

FieldRecord
RERA-filed configuration3BHK; 35 units. RERA unit details
RERA-filed saleable area87.01 sqm per 3BHK, as recorded in the supplied unit schedule. RERA unit details
Booked / availablePortal snapshot: 0 booked / 35 available; the supplied record has no as-of date, so these counts are indicative. RERA unit table
Construction stageArchitect’s certificates report progress for Building 1 through 31-03-2023; they are progress certificates, not completion or occupancy certificates.
Completion datesRERA project information gives proposed completion 20/05/2025. The Form B declaration dated 01 August 2019 states the project shall be completed in 2 years. RERA record
Occupancy / completion certificateNo occupancy certificate or completion certificate is included in the supplied records. The GHMC permit requires an occupancy certificate before occupation. Document index

2. The project story

VBR Lakeview Apartments is a residential apartment project registered with TG-RERA as P01100001346, on a site recorded in Ramachandrapuram village, RC PURAM mandal, Sangareddy district. Its registered land identification covers survey numbers 126/AA1, 126/AA2, 126/AA3 and 127.

The GHMC permit describes one residential building, Building - A (CHANDRASHEKAR), with a cellar, stilt and five upper floors. The RERA unit schedule records 35 3BHK apartments. RERA unit table Architect’s certificates filed for 2019–2023 report construction and development-work progress for Building 1; the supplied extracts do not establish current on-site progress or completion.

The supplied record does not include an occupancy or completion certificate. The building permit states that an occupancy certificate is required before occupation. Document index

3. Master plan, architecture & building design

The GHMC permit records a 2022.91 m² site and authorizes one residential building with 1 Cellar + Stilt + 5 upper floors, height 14.95 m. It lists residential upper floors area as 4,322.85 m2, cellar area as 947.89 m2, and stilt area as 969.36 m2. These are permit-extracted area descriptions; the supplied record does not identify them as carpet area or saleable area. The permit extraction also lists “Proposed Covered builtup area 345,829.00”; the underlying figure’s unit/format is not made clear in the supplied extraction.

The RERA land-details entry gives net and total area as 2022.91 sqmts. The building-permit extraction separately states net area 1727.74 m². RERA filing

The permit’s conditions refer to a tot-lot of 179.38 m2, periphery greenery and tree planting; the permit extraction also lists 100 Trees. It does not provide a detailed, legible drawing-derived account here of unit arrangement, flats per floor, lift count, stairs, entrances, internal circulation or open-space distribution.

The sanctioned drawing number is recorded in the RERA filing as 1/C22/07926/2019; architect certificates refer to sanctioned drawing No. 1. Approvals record

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK3503587.01 sqmNot measured / not reported for this configurationNot supplied

The 3BHK count, booking status and saleable area are from the RERA unit record; booking figures have no as-of date and should be treated as indicative. RERA unit details RERA unit table

The supplied plan-measurement record does not provide a measured carpet area for the RERA-filed 3BHK configuration. It reports software-measured areas for other configurations identified in drawing data, but those are not RERA-filed configurations in the supplied unit schedule and are not presented here as the project’s offering. Floor plans RERA unit details

Carpet area, where measured, is a drawing-based measurement rather than a RERA disclosure; saleable area is a separately filed figure and may include the home’s share of common areas. The supplied data does not provide a 3BHK room schedule or dimensions for this configuration. Floor plans RERA unit details

5. Parking & vehicle circulation

The GHMC permit describes both the cellar and stilt as approved parking areas and requires them to be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use.

The supplied records do not establish the number of sanctioned car or two-wheeler spaces, visitor or accessible spaces, parking allocation by apartment, ramp arrangement, or a project-specific parking allotment to any buyer. A permit’s parking designation does not by itself establish exclusive ownership or allocation. Document index

6. Amenities, recreation & open spaces

The table below distinguishes RERA-filed progress information from permit conditions. The supplied records do not provide independent site verification of completed facilities.

Tot-lot
Description / size179.38 m2; permit condition requires it to be fenced and maintained as greenery before occupancy certificate.
Evidence sourceGHMC building permit
Declared progress / verified statusRequired by permit; completion not independently verified.
Periphery greenery / tree planting
Description / sizePermit extraction lists 100 Trees and requires tree planting along the site periphery and in front of the premises.
Evidence sourceGHMC building permit
Declared progress / verified statusPermit condition; completion not independently verified.
Water supply
Description / sizeListed in architect’s certificates; the 31-03-2020 and 31-03-2022 extracts state “Yes” and show 0% in the corresponding progress entry.
Evidence sourceArchitect certificates / RERA amenity record
Declared progress / verified statusRERA amenity record shows 100%; not independently verified. RERA amenities
Sewerage / sewage treatment and disposal
Description / sizeThe RERA amenity record lists sewerage and treatment/disposal as available. The architect-certificate extracts describe sewerage and related services as municipal, with 0% shown in those progress entries.
Evidence sourceRERA amenity record / architect certificates
Declared progress / verified statusRERA amenity record shows 100%; not independently verified. RERA amenities
Rainwater harvesting
Description / sizeListed in architect’s certificates and the RERA amenity record; the GHMC permit requires a rainwater-harvesting percolation pit.
Evidence sourceGHMC building permit / architect certificates / RERA amenity record
Declared progress / verified statusRERA amenity record shows 100%; completion not independently verified. RERA amenities
Fire protection and fire-safety requirements
Description / sizeListed in architect’s certificates and the RERA amenity record; permit assigns responsibility for structural and fire safety to the project’s responsible parties.
Evidence sourceGHMC building permit / architect certificates / RERA amenity record
Declared progress / verified statusRERA amenity record shows 100%; does not establish independent inspection or clearance. RERA amenities
Electrical meter room / sub-station / receiving station
Description / sizeListed in architect’s certificates and the RERA amenity record; permit requires space for a transformer.
Evidence sourceGHMC building permit / architect certificates / RERA amenity record
Declared progress / verified statusRERA amenity record shows 100%; not independently verified. RERA amenities
Other common/open-space items
Description / sizeRERA amenity record lists internal roads and footpaths, storm-water drains, green strip/tot-lot/park, street lighting, community buildings, solid-waste management, energy management and aggregate recreational open space.
Evidence sourceRERA amenity record
Declared progress / verified statusEach is recorded at 0%; not independently verified. RERA amenities

7. Utilities, building services & safety

The RERA amenity record lists water supply, sewerage, sewage/sullage treatment and disposal, rainwater harvesting, fire protection and electrical meter-room/sub-station/receiving-station facilities at 100% declared progress. The architect-certificate extracts also list these services, but the 2020 and 2022 progress schedules show 0% against several service entries. These are filed declarations and certificates, not independent verification of current operating status. RERA amenities

The GHMC permit requires a rainwater-harvesting structure, space for a transformer, a garbage house within the premises, and execution of sanitation, plumbing, fire-safety, lift and electrical installations under qualified technical supervision. It also requires an occupancy certificate before occupation. The supplied evidence does not specify water source or storage capacity, STP capacity or reuse, backup power, lift count or capacity, fire-system equipment details, CCTV/security provisions, or accessibility arrangements.

8. Location, access & connectivity

The official project location in the supplied RERA record is Ramachandrapuram village, RC PURAM mandal, Sangareddy district, Telangana, PIN 502032. The project parcel centroid is recorded at 17.41528, 78.35459. RERA record Location record

The supplied connectivity record lists Financial District (Nanakramguda) — 1.2 km as an anchor distance. Location record The supplied data does not give measured distances to other landmarks, approach-road details, public-transport routes or travel times.

9. Developer & development status

TG-RERA identifies Vennavaram Chandrashekar Reddy as the registered promoter. The certificate records the promoter’s office as “House No.: 25-35/2, Village: Mandal: RC PURAM, District: Sangareddy, Pin: 502032 State of Telangana.” The legal entity type and corporate identifiers are not disclosed in the supplied records. Corporate record

A Form B declaration dated 01 August 2019, signed by V Chandrashekar Reddy as promoter or an authorized representative, states that the project shall be completed in 2 years and includes declarations about title, encumbrances, approvals and project funds. These are promoter declarations.

The RERA project information gives a proposed completion date of 20/05/2025. The registration certificate states validity through 20/05/2025 and records no extension. Architect certificates filed for dates from 31-03-2019 to 31-03-2023 report progress for the building and project works; they are not occupancy or completion certificates, and the supplied material does not independently establish the current construction stage. RERA record

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C certificate for VBR Lakeview Apartments, registration P01100001346, issued 11/11/2019; stated validity to 20/05/2025.
Principal building permitGHMC Building Permit Order 1/C22/07926/2019, dated 20 May, 2019; file no. 1/C22/11527/2018.
RERA-filed land and promoter declarationForm B affidavit-cum-declaration dated 01 August 2019.
Architect’s progress certificatesCertificates dated 31-03-2019, 31-03-2020, 31-03-2021, 31-03-2022 and 31-03-2023, identifying Building 1 and referring to sanctioned drawing No. 1. They report progress and are not completion or occupancy certificates.
Occupancy / completion documentationNo occupancy or completion certificate is included in the supplied document set. The GHMC permit states an occupancy certificate is compulsory before occupation. Document index
Layout drawingA layout-plan document is listed in the RERA file, but the supplied record does not include an extracted plan description. Document index

Frequently asked questions

Is VBR Lakeview Apartments registered with Telangana RERA?

Yes. VBR Lakeview Apartments is registered with the Telangana Real Estate Regulatory Authority as P01100001346; the registration status is New Project.

Who is the developer of VBR Lakeview Apartments?

The promoter named in the RERA registration is VENNAVARAM.

Where is VBR Lakeview Apartments located?

VBR Lakeview Apartments is in RAMACHANDRAPURAM, RC PURAM, Sangareddy, Telangana (502032).

When will VBR Lakeview Apartments be completed?

The promoter's proposed date of completion filed with RERA is 20/05/2025. This is the promoter's declaration, not a guarantee.

More projects in Ramachandrapuram