Shailaja Emerald
SHIVA SREE INFRA · Rangareddy · RERA P02400009857
SHAILAJA EMERALD is a residential apartment building in Bagh Hayathnagar, Hayathnagar mandal, Ranga Reddy district, developed by registered promoter SHIVA SREE INFRA. The project occupies 5233.27 sq.m and comprises 1 building with 1 Cellar + 1 Stilt + 5 upper floors and 75 dwelling units. It offers 2BHK and 3BHK homes, with RERA-filed saleable areas of 116.13 sq.m and 171.36 sq.m, respectively. Its TG-RERA registration is P02400009857, and the proposed completion date is 2md May 2028.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | SHAILAJA EMERALD RERA record |
| Project type | Residential apartment building RERA record |
| Phase / registered portion | One registered project/building; the filed plan identifies a single residential building. A separate phase designation is not disclosed. RERA filing |
| TG-RERA registration | P02400009857 |
| Registration validity | 2 May 2025 to 2 May 2028, unless extended by the Authority |
| Registered promoter | SHIVA SREE INFRA, identified in the registration certificate as the promoter |
| RERA status | Registered project; registration certificate captured on 10 September 2026. Approvals record |
| Entity type | Partnership, as recorded in promoter information RERA filing |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | Bagh Hayathnagar RERA record RERA filing |
| Revenue village | HAYATHNAGAR in the project identity and RERA record; the GHMC permit names Bagh Hayathnagar / Bagh Hayathnagar -V. RERA record |
| Mandal / district | Hayathnagar mandal; Ranga Reddy district RERA record |
| PIN | 501505 in the project/RERA filing RERA record RERA filing |
| Project survey references | Survey No. 18/ Part and 19/ Part in the TG-RERA record; the GHMC plan uses 18/PART and 19/PART. RERA record |
| Registered site extent | 5233.27 sq.m RERA filing |
| Total / net plot area | 5233.27 Sq. Mtrs total plot area and 5233.27 Sq. Mtrs net plot area in the permit extraction. |
| Boundaries | East: 40 Feet Wide Road; West: Land in Sy No 20; North: Lands In Sy No 52 and 53; South: Land of K Narahari Reddy and others. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) |
| Principal building permit | 0875/GHMC/LBN/2025-BP, dated 02 May, 2025 Approvals record |
| Other permit file reference | 000948/GHMC/0438/LBN1/2025-BP Approvals record |
| Approved built-up area | The permit extraction lists 10,910.40 Sq.Mt. residential area and also records TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING: 17233.74, TOTAL BUA: 17870.89, and NET BUA: 10910.40. These are distinct figures as labelled in the extracted record. |
| Building count | 1 RERA filing |
| Sanctioned configuration | 1 Cellar + 1 Stilt + 5 upper floors |
| Building height | 14.49 MT. |
| Sanctioned units | 75 dwelling units |
| RERA-declared units | 75 units RERA unit table |
Offering and status
| Field | Record |
|---|---|
| Configurations | 2BHK and 3BHK RERA unit table |
| RERA-filed saleable areas | 2BHK: 116.13 sq.m; 3BHK: 171.36 sq.m RERA unit table |
| Booked / available | 14 booked and 61 available in the portal data read for this report; the portal extract has no as-of date, so counts are indicative. RERA unit table |
| Construction stage | No independently verified construction-progress or site-inspection record is supplied. The project was registered as a new project. RERA record RERA amenities |
| Completion dates | Promoter’s Form-B undertaking: 2md May 2028; GHMC permit: construction to be completed before 02 May, 2028. |
| Registration validity vs. completion | Registration validity ends 2 May 2028, unless extended; the completion date is a separate undertaking/permit deadline. |
| Occupancy / completion certificate | The permit extraction records completion_certified: false; no occupancy or completion certificate is supplied. This relates to the permitted building. |
2. The project story
SHAILAJA EMERALD is registered with TG-RERA as a residential apartment project in Bagh Hayathnagar, Hayathnagar mandal, Ranga Reddy district. The registered land is identified as Survey No. 18/ Part and 19/ Part, and the GHMC building permit covers one residential building on a stated plot area of 5233.27 Sq. Mtrs. RERA record
The sanctioned building is configured as 1 Cellar + 1 Stilt + 5 upper floors, with 75 dwelling units. The RERA filing records 19 2BHK units and 56 3BHK units. The available evidence establishes the sanctioned scope and promoter’s completion undertaking, but does not establish on-site construction progress or that any portion is complete or occupancy-certified. RERA unit table
3. Master plan, architecture & building design
The GHMC permit covers one residential building on a stated plot and net plot area of 5233.27 Sq. Mtrs. It sanctions 1 Cellar + 1 Stilt + 5 upper floors, a building height of 14.49 MT., and 75 dwelling units. The permit extraction separately lists the residential area as 10,910.40 Sq.Mt.; other labelled built-up figures appear in the filed plan extraction and are not interchangeable.
The filed plan records TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING: 10910.40, TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING: 17233.74, TOTAL BUA: 17870.89, and NET BUA: 10910.40. The available evidence does not identify these figures as carpet area or provide a separate FSI-counted-area figure.
The drawings include a typical floor plan for floors 2–5. The evidence supplied does not establish the number of flats per floor, lifts, stairs, or detailed internal circulation arrangements. The permit records a tot-lot and green strip, but does not provide a complete landscape or common-area distribution schedule.
4. Homes, configurations & floor plans
TG-RERA records 75 units: 19 2BHK and 56 3BHK. The portal’s booked and available counts are indicative because the supplied portal extract has no as-of date. The saleable-area figures below are RERA-filed; the 3BHK carpet measurements are software-measured from the filed floor-plan drawing geometry and are not RERA disclosures. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 19 | 6 | 13 | 116.13 sq.m | Not supplied | Not supplied |
| 3BHK | 56 | 8 | 48 | 171.36 sq.m | 104.7–111.1 sq.m; median 105.8 sq.m (software-measured) | 38% (software-measured) |
The 3BHK drawing measurement covers 14 flat designs. For one typical-floor flat labelled “05,” the drawing records two bedrooms, a living/kitchen area, three toilets, a balcony labelled 1.12 M. WIDE BALC, and a utility labelled 1.8 m × 1.0 m. The balcony and utility are excluded from the software-measured carpet area. Drawing-geometry measurements need review; they should not be treated as RERA-filed areas. Saleable area is the filed figure and is not the same measurement as carpet area. RERA unit details Floor plans
5. Parking & vehicle circulation
The GHMC-filed plan records No of Cars Proposed: 121, a PARKING AREA: 6323.34, and a REQUIRED PARKING AREA: 3600.43. The permit extraction separately records Total Parking Area 6541.92. The filed building configuration includes a cellar and stilt; the permit conditions state that these areas approved for parking must be used exclusively for vehicle parking and not partitioned or repurposed.
The plan extraction describes vehicular ramps as 35.00 mt. long 2.50 mt. High 4.90 mt. Wide and 35.00 mt. long 2.50 mt. High 5.16 mt. Wide. It also specifies one entry and one exit, each with minimum width of 4.5mts. and height clearance of 5mts. The evidence does not establish visitor or accessible-space counts, two-wheeler counts, parking allotments to specific units, or exclusive ownership of drawn parking bays. The permit requires parking places to be provided with Electric Vehicle Charging Infrastructure; the supplied record does not verify installation or quantity.
6. Amenities, recreation & open spaces
The following table distinguishes permit/drawing provisions from portal progress entries. Portal percentages are declared progress values, not independent verification of completion. RERA amenities
| Description / size | Filed plan records Tot-lot Area: 452 sqm and Tot-lot Area: 73 sqm; permit extraction records Tot Lot 524.7. The permit requires fencing and maintenance of the tot-lot as greenery before OC. |
|---|---|
| Declared progress / verified status | Portal “Green Strip/TOT LOT/Park”: 0%; no independent completion verification. |
| Description / size | No size supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Portal: 0%; no independent completion verification. |
| Description / size | No quantity or specifications supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Portal: 0%; no independent completion verification. |
| Description / size | No facility or size detail supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Portal: 0%; no independent completion verification. |
| Description / size | Listed in vendor amenity data; no dimensions or capacities supplied. |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Vendor-listed; not established as sanctioned, delivered, or independently verified. |
7. Utilities, building services & safety
The GHMC permit and filed plan record provisions and conditions for building services; they do not establish that these systems have been installed, tested, or commissioned. Portal progress entries are promoter/portal declarations and should not be read as independent verification. RERA amenities
| Evidence in the record | The permit specifies a separate underground static water storage tank of 25,000 litres and a separate residential terrace tank of 25,000 litres. Water supply is marked available in the portal, with 20% progress. |
|---|---|
| Status / limitation | Capacity is a permit/plan provision; construction and commissioning are not independently verified. RERA amenities |
| Evidence in the record | Sewage Treatment Plant (STP), sump, sewerage and storm-water drains are listed. The permit requires an STP. |
|---|---|
| Status / limitation | Portal: sewerage, storm-water drains and sewage/sullage treatment each show 0% progress; no capacity or commissioning evidence supplied. RERA amenities |
| Evidence in the record | Rainwater harvesting is listed; the permit extraction records 18 rainwater harvesting pits and calls for a percolation pit. |
|---|---|
| Status / limitation | Provision recorded; installation not independently verified. |
| Evidence in the record | The filed plan lists a distribution transformer and generator; the permit requires generator backup. |
|---|---|
| Status / limitation | No installed capacity or commissioning record supplied. |
| Evidence in the record | The permit lists hose reel, down corner, fire extinguishers, manual alarm system, emergency lighting, fire-resistant lift swing doors and static water storage. It requires an occupancy fire NOC before OC. |
|---|---|
| Status / limitation | These are permit requirements/provisions, not evidence of completion or statutory clearance. |
| Evidence in the record | A garbage house is required within the premises; construction and demolition waste is to be transferred to the designated collection point identified in the permit. |
|---|---|
| Status / limitation | No completion evidence supplied. |
| Evidence in the record | Permit requires EV charging infrastructure in parking places and records broadband/digital connectivity infrastructure and CTI provisions. |
|---|---|
| Status / limitation | No installed quantity or verification supplied. |
| Evidence in the record | The supplied permit extraction does not establish specific accessible routes, ramps, or accessible parking provision for this residential building. |
|---|---|
| Status / limitation | Not disclosed in the supplied evidence. |
8. Location, access & connectivity
The registered location is Bagh Hayathnagar, HAYATHNAGAR revenue village, Hayathnagar mandal, Ranga Reddy district, PIN 501505. The GHMC permit identifies the site as Bagh Hayathnagar and records a 40ft approach for which the applicant must form a BT road before the Occupancy Certificate. The filed plan also refers to a 40' wide road and other road widths, including a 12.00MT wide main road and a 30' wide road. RERA record RERA filing
A software-derived location record gives the parcel centroid as 17.32670, 78.61866. A sampled connectivity record places the nearest sampled Outer Ring Road interchange at approximately 0.8 km; this is a measured location-data estimate, not a promoter travel-time claim. No public-transport route or independently verified travel-time information is supplied. Location record
9. Developer & development status
The TG-RERA certificate identifies SHIVA SREE INFRA as the registered promoter. Promoter information records the entity type as a partnership and GSTIN 36AFEFS7537M1ZC. The RERA filing lists its address as Plot No 117, Road No 10, Sriram Nagar Colony, Bagh Hayathnagar, Hayathnagar, Ranga Reddy, 501505; the registration certificate separately records Village Mansoorabad, Saroornagar, Ranga Reddy, PIN 500068 as the promoter address. RERA filing Corporate record RERA filing
The RERA record names Gajula Pulla Rao as authorized signatory; the project authorization letter is dated 10 June 2025. The Form-B declaration dated June 2025 undertakes completion by 2md May 2028. No independently verified construction-progress assessment is supplied, and no occupancy or completion certificate is on file for the permitted building. Parties record
10. Approvals, official records & documents
| Identifier / date | P02400009857; valid 2 May 2025–2 May 2028 unless extended |
|---|---|
| What the supplied record establishes | Registration of SHAILAJA EMERALD with SHIVA SREE INFRA as promoter. |
| Identifier / date | 0875/GHMC/LBN/2025-BP; 02 May, 2025 |
|---|---|
| What the supplied record establishes | Permit for one residential building on Survey Nos. 18/PART and 19/PART, with 1 Cellar + 1 Stilt + 5 upper floors. |
| Identifier / date | 000948/GHMC/0438/LBN1/2025-BP |
|---|---|
| What the supplied record establishes | File number recorded in the building-permit extraction. |
| Identifier / date | File No. TS/004920/2025 |
|---|---|
| What the supplied record establishes | Plan extraction records the site, unit count, floor configuration, parking and listed provisions/conditions. |
| Identifier / date | June 2025 |
|---|---|
| What the supplied record establishes | Promoter declaration including the completion undertaking and project disclosures. |
| Identifier / date | Development Agreement-cum-GPA 952/2024, as recited in the project documents |
|---|---|
| What the supplied record establishes | RERA-filed material identifies a development arrangement between the listed landowners and SHIVA SREE INFRA. |
| Identifier / date | Not supplied; permit extraction records completion_certified: false |
|---|---|
| What the supplied record establishes | No occupancy or completion certification is established by the supplied documents. |
The HMDA master-plan material supplied is an image-only area sheet, and the exact zone at the project survey parcel has not been determined from it. The public approved-layout lookup is recorded as unavailable; that limitation does not establish approval or refusal. HMDA
1. Project at a glance
Project identity
Registered project name: SHAILAJA EMERALD
Project type: Residential apartment building
Phase / registered portion: One registered project/building; the filed plan identifies a single residential building. A separate phase designation is not disclosed.
TG-RERA registration: P02400009857
Registration validity: 2 May 2025 to 2 May 2028, unless extended by the Authority
Registered promoter: SHIVA SREE INFRA, identified in the registration certificate as the promoter
RERA status: Registered project; registration certificate captured on 10 September 2026.
Entity type: Partnership, as recorded in promoter information
Land and geographic identity
Locality: Bagh Hayathnagar
Revenue village: HAYATHNAGAR in the project identity and RERA record; the GHMC permit names Bagh Hayathnagar / Bagh Hayathnagar -V.
Mandal / district: Hayathnagar mandal; Ranga Reddy district
PIN: 501505 in the project/RERA filing
Project survey references: Survey No. 18/ Part and 19/ Part in the TG-RERA record; the GHMC plan uses 18/PART and 19/PART.
Registered site extent: 5233.27 sq.m
Total / net plot area: 5233.27 Sq. Mtrs total plot area and 5233.27 Sq. Mtrs net plot area in the permit extraction.
Boundaries: East: 40 Feet Wide Road; West: Land in Sy No 20; North: Lands In Sy No 52 and 53; South: Land of K Narahari Reddy and others.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building permit: 0875/GHMC/LBN/2025-BP, dated 02 May, 2025
Other permit file reference: 000948/GHMC/0438/LBN1/2025-BP
Approved built-up area: The permit extraction lists 10,910.40 Sq.Mt. residential area and also records TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING: 17233.74, TOTAL BUA: 17870.89, and NET BUA: 10910.40. These are distinct figures as labelled in the extracted record.
Building count: 1
Sanctioned configuration: 1 Cellar + 1 Stilt + 5 upper floors
Building height: 14.49 MT.
Sanctioned units: 75 dwelling units
RERA-declared units: 75 units
Offering and status
Configurations: 2BHK and 3BHK
RERA-filed saleable areas: 2BHK: 116.13 sq.m; 3BHK: 171.36 sq.m
Booked / available: 14 booked and 61 available in the portal data read for this report; the portal extract has no as-of date, so counts are indicative.
Construction stage: No independently verified construction-progress or site-inspection record is supplied. The project was registered as a new project.
Completion dates: Promoter’s Form-B undertaking: 2md May 2028; GHMC permit: construction to be completed before 02 May, 2028.
Registration validity vs. completion: Registration validity ends 2 May 2028, unless extended; the completion date is a separate undertaking/permit deadline.
Occupancy / completion certificate: The permit extraction records completion_certified: false; no occupancy or completion certificate is supplied. This relates to the permitted building.
2. The project story
SHAILAJA EMERALD is registered with TG-RERA as a residential apartment project in Bagh Hayathnagar, Hayathnagar mandal, Ranga Reddy district. The registered land is identified as Survey No. 18/ Part and 19/ Part, and the GHMC building permit covers one residential building on a stated plot area of 5233.27 Sq. Mtrs.
The sanctioned building is configured as 1 Cellar + 1 Stilt + 5 upper floors, with 75 dwelling units. The RERA filing records 19 2BHK units and 56 3BHK units. The available evidence establishes the sanctioned scope and promoter’s completion undertaking, but does not establish on-site construction progress or that any portion is complete or occupancy-certified.
3. Master plan, architecture & building design
The GHMC permit covers one residential building on a stated plot and net plot area of 5233.27 Sq. Mtrs. It sanctions 1 Cellar + 1 Stilt + 5 upper floors, a building height of 14.49 MT., and 75 dwelling units. The permit extraction separately lists the residential area as 10,910.40 Sq.Mt.; other labelled built-up figures appear in the filed plan extraction and are not interchangeable.
The filed plan records TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING: 10910.40, TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING: 17233.74, TOTAL BUA: 17870.89, and NET BUA: 10910.40. The available evidence does not identify these figures as carpet area or provide a separate FSI-counted-area figure.
The drawings include a typical floor plan for floors 2–5. The evidence supplied does not establish the number of flats per floor, lifts, stairs, or detailed internal circulation arrangements. The permit records a tot-lot and green strip, but does not provide a complete landscape or common-area distribution schedule.
4. Homes, configurations & floor plans
TG-RERA records 75 units: 19 2BHK and 56 3BHK. The portal’s booked and available counts are indicative because the supplied portal extract has no as-of date. The saleable-area figures below are RERA-filed; the 3BHK carpet measurements are software-measured from the filed floor-plan drawing geometry and are not RERA disclosures.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 19 | 6 | 13 | 116.13 sq.m | Not supplied | Not supplied |
| 3BHK | 56 | 8 | 48 | 171.36 sq.m | 104.7–111.1 sq.m; median 105.8 sq.m (software-measured) | 38% (software-measured) |
The 3BHK drawing measurement covers 14 flat designs. For one typical-floor flat labelled “05,” the drawing records two bedrooms, a living/kitchen area, three toilets, a balcony labelled 1.12 M. WIDE BALC, and a utility labelled 1.8 m × 1.0 m. The balcony and utility are excluded from the software-measured carpet area. Drawing-geometry measurements need review; they should not be treated as RERA-filed areas. Saleable area is the filed figure and is not the same measurement as carpet area.
5. Parking & vehicle circulation
The GHMC-filed plan records No of Cars Proposed: 121, a PARKING AREA: 6323.34, and a REQUIRED PARKING AREA: 3600.43. The permit extraction separately records Total Parking Area 6541.92. The filed building configuration includes a cellar and stilt; the permit conditions state that these areas approved for parking must be used exclusively for vehicle parking and not partitioned or repurposed.
The plan extraction describes vehicular ramps as 35.00 mt. long 2.50 mt. High 4.90 mt. Wide and 35.00 mt. long 2.50 mt. High 5.16 mt. Wide. It also specifies one entry and one exit, each with minimum width of 4.5mts. and height clearance of 5mts. The evidence does not establish visitor or accessible-space counts, two-wheeler counts, parking allotments to specific units, or exclusive ownership of drawn parking bays. The permit requires parking places to be provided with Electric Vehicle Charging Infrastructure; the supplied record does not verify installation or quantity.
6. Amenities, recreation & open spaces
The following table distinguishes permit/drawing provisions from portal progress entries. Portal percentages are declared progress values, not independent verification of completion.
| Description / size | Filed plan records Tot-lot Area: 452 sqm and Tot-lot Area: 73 sqm; permit extraction records Tot Lot 524.7. The permit requires fencing and maintenance of the tot-lot as greenery before OC. |
|---|---|
| Declared progress / verified status | Portal “Green Strip/TOT LOT/Park”: 0%; no independent completion verification. |
| Description / size | No size supplied. |
|---|---|
| Declared progress / verified status | Portal: 0%; no independent completion verification. |
| Description / size | No quantity or specifications supplied. |
|---|---|
| Declared progress / verified status | Portal: 0%; no independent completion verification. |
| Description / size | No facility or size detail supplied. |
|---|---|
| Declared progress / verified status | Portal: 0%; no independent completion verification. |
| Description / size | Listed in vendor amenity data; no dimensions or capacities supplied. |
|---|---|
| Declared progress / verified status | Vendor-listed; not established as sanctioned, delivered, or independently verified. |
7. Utilities, building services & safety
The GHMC permit and filed plan record provisions and conditions for building services; they do not establish that these systems have been installed, tested, or commissioned. Portal progress entries are promoter/portal declarations and should not be read as independent verification.
| Evidence in the record | The permit specifies a separate underground static water storage tank of 25,000 litres and a separate residential terrace tank of 25,000 litres. Water supply is marked available in the portal, with 20% progress. |
|---|---|
| Status / limitation | Capacity is a permit/plan provision; construction and commissioning are not independently verified. |
| Evidence in the record | Sewage Treatment Plant (STP), sump, sewerage and storm-water drains are listed. The permit requires an STP. |
|---|---|
| Status / limitation | Portal: sewerage, storm-water drains and sewage/sullage treatment each show 0% progress; no capacity or commissioning evidence supplied. |
| Evidence in the record | Rainwater harvesting is listed; the permit extraction records 18 rainwater harvesting pits and calls for a percolation pit. |
|---|---|
| Status / limitation | Provision recorded; installation not independently verified. |
| Evidence in the record | The filed plan lists a distribution transformer and generator; the permit requires generator backup. |
|---|---|
| Status / limitation | No installed capacity or commissioning record supplied. |
| Evidence in the record | The permit lists hose reel, down corner, fire extinguishers, manual alarm system, emergency lighting, fire-resistant lift swing doors and static water storage. It requires an occupancy fire NOC before OC. |
|---|---|
| Status / limitation | These are permit requirements/provisions, not evidence of completion or statutory clearance. |
| Evidence in the record | A garbage house is required within the premises; construction and demolition waste is to be transferred to the designated collection point identified in the permit. |
|---|---|
| Status / limitation | No completion evidence supplied. |
| Evidence in the record | Permit requires EV charging infrastructure in parking places and records broadband/digital connectivity infrastructure and CTI provisions. |
|---|---|
| Status / limitation | No installed quantity or verification supplied. |
| Evidence in the record | The supplied permit extraction does not establish specific accessible routes, ramps, or accessible parking provision for this residential building. |
|---|---|
| Status / limitation | Not disclosed in the supplied evidence. |
8. Location, access & connectivity
The registered location is Bagh Hayathnagar, HAYATHNAGAR revenue village, Hayathnagar mandal, Ranga Reddy district, PIN 501505. The GHMC permit identifies the site as Bagh Hayathnagar and records a 40ft approach for which the applicant must form a BT road before the Occupancy Certificate. The filed plan also refers to a 40' wide road and other road widths, including a 12.00MT wide main road and a 30' wide road.
A software-derived location record gives the parcel centroid as 17.32670, 78.61866. A sampled connectivity record places the nearest sampled Outer Ring Road interchange at approximately 0.8 km; this is a measured location-data estimate, not a promoter travel-time claim. No public-transport route or independently verified travel-time information is supplied.
9. Developer & development status
The TG-RERA certificate identifies SHIVA SREE INFRA as the registered promoter. Promoter information records the entity type as a partnership and GSTIN 36AFEFS7537M1ZC. The RERA filing lists its address as Plot No 117, Road No 10, Sriram Nagar Colony, Bagh Hayathnagar, Hayathnagar, Ranga Reddy, 501505; the registration certificate separately records Village Mansoorabad, Saroornagar, Ranga Reddy, PIN 500068 as the promoter address.
The RERA record names Gajula Pulla Rao as authorized signatory; the project authorization letter is dated 10 June 2025. The Form-B declaration dated June 2025 undertakes completion by 2md May 2028. No independently verified construction-progress assessment is supplied, and no occupancy or completion certificate is on file for the permitted building.
10. Approvals, official records & documents
| Identifier / date | P02400009857; valid 2 May 2025–2 May 2028 unless extended |
|---|---|
| What the supplied record establishes | Registration of SHAILAJA EMERALD with SHIVA SREE INFRA as promoter. |
| Identifier / date | 0875/GHMC/LBN/2025-BP; 02 May, 2025 |
|---|---|
| What the supplied record establishes | Permit for one residential building on Survey Nos. 18/PART and 19/PART, with 1 Cellar + 1 Stilt + 5 upper floors. |
| Identifier / date | 000948/GHMC/0438/LBN1/2025-BP |
|---|---|
| What the supplied record establishes | File number recorded in the building-permit extraction. |
| Identifier / date | File No. TS/004920/2025 |
|---|---|
| What the supplied record establishes | Plan extraction records the site, unit count, floor configuration, parking and listed provisions/conditions. |
| Identifier / date | June 2025 |
|---|---|
| What the supplied record establishes | Promoter declaration including the completion undertaking and project disclosures. |
| Identifier / date | Development Agreement-cum-GPA 952/2024, as recited in the project documents |
|---|---|
| What the supplied record establishes | RERA-filed material identifies a development arrangement between the listed landowners and SHIVA SREE INFRA. |
| Identifier / date | Not supplied; permit extraction records completion_certified: false |
|---|---|
| What the supplied record establishes | No occupancy or completion certification is established by the supplied documents. |
The HMDA master-plan material supplied is an image-only area sheet, and the exact zone at the project survey parcel has not been determined from it. The public approved-layout lookup is recorded as unavailable; that limitation does not establish approval or refusal.
Frequently asked questions
Is SHAILAJA EMERALD registered with Telangana RERA?
Yes. SHAILAJA EMERALD is registered with the Telangana Real Estate Regulatory Authority as P02400009857; the registration status is New Project.
Who is the developer of SHAILAJA EMERALD?
The promoter named in the RERA registration is SHIVA SREE INFRA.
Where is SHAILAJA EMERALD located?
SHAILAJA EMERALD is in Bagh Hayathnagar, HAYATHNAGAR, Rangareddy, Telangana (501505).
When will SHAILAJA EMERALD be completed?
The promoter's proposed date of completion filed with RERA is 02/09/2028. This is the promoter's declaration, not a guarantee.