Sai Empire 02
RAYALA BUILDERS & DEVELOPERS · Medchal-Malkajgiri · RERA P02200004674
SAI EMPIRE 02 is a residential apartment project in SURARAM VILLAGE, Qutballapur, Medchal-Malkajgiri. The registered promoter is RAYALA BUILDERS & DEVELOPERS. The project comprises one residential building on a 743.04 sq. m. site, with 1 Stilt + 5 upper floors and 20 homes: 9 2BHK and 11 3BHK units. It is registered under TG-RERA **P02200004674**, and the GHMC permit states construction is to be completed before **06 April, 2025**.
More from Rayala Builders & Developers · 11 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 6 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | SAI EMPIRE 02. RERA record |
| Project type | Residential apartment project. RERA filing |
| Phase / registered portion | Described as a single residential building; no separate phase name is disclosed. The RERA certificate covers the project on the identified site. |
| TG-RERA registration | P02200004674, granted 27/06/2022; the certificate states validity from 27/06/2022 to 07/04/2025. The supplied registration record shows no extension. Registration validity is distinct from the project completion deadline and from occupancy certification. Approvals record |
| Registered promoter | RAYALA BUILDERS & DEVELOPERS, a partnership. RERA record Parties record Corporate record |
| RERA / project status | RERA filing labels the project “New Project.” The supplied evidence does not establish current on-site construction progress or an occupancy certificate. RERA filing Document index |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | RERA filing: SURARAM VILLAGE; the building permit identifies SURARAM / Suraram Village-1. RERA record RERA filing |
| Mandal / district / PIN | Qutballapur (permit: Qutubullapur Mandal); Medchal-Malkajgiri (permit: MEDCHAL District); 500055. RERA record |
| Project survey numbers | 95 Part and 96 Part. The building permit records 95PART and 96PART; the RERA certificate records 95 Part and 96 Part. Land records |
| Subdivisions | No project-specific subdivision numbers are identified in the RERA filing or permit. Land records |
| Site extent | RERA land details and the permit state 743.04 sq. m. total plot area and 743.04 sq. m. net plot area; the permit records road-affected area 0.0 and nala-affected area 0.0. RERA filing |
| Boundaries (RERA filing) | East: Neighbours Land; West: Road; North: Plot No 2; South: Plot No 4p. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building approval | Building Permit Order 0856/GHMC/KPL/2022-BP, approved 06 April, 2022; file no. 002488/GHMC/1256/KPL2/2022-BP. Approvals record |
| Approved built-up area | 1,943.75 Sq.Mt. residential upper-floor area, as recorded in the permit parameters and RERA filing. RERA filing |
| Building count | One residential building / one tower is recorded. RERA filing RERA unit table |
| Sanctioned floors | 1 Stilt + 5 upper floors; the permit parameters also list Ground: 1 floor; upper floors: 5. Building height is recorded as 14.95 (the supplied extract does not specify a unit). |
| Parking provision in permit | Stilt area 441 and “Total Parking Area 441” are recorded; the supplied extract does not state a number of parking bays. |
| Unit counts | GHMC permit says the number of units sanctioned must not be increased, but the supplied permit extract does not give the sanctioned unit count. RERA unit schedule records 20 units. RERA unit table |
Offering and status
| Item | Record |
|---|---|
| RERA-filed configurations | 2BHK: 9 units; 3BHK: 11 units. RERA unit table |
| RERA-filed saleable area | 2BHK: 110.23 sq. m.; 3BHK: 131.49 sq. m. RERA unit table |
| Booked / available | Portal-derived counts show 0 booked and 9 available 2BHK units; 0 booked and 11 available 3BHK units. The portal record carries no as-of date, so these counts are indicative, not a current availability confirmation. RERA unit table |
| Completion deadline | GHMC permit states construction to be completed before 06 April, 2025. The registration certificate states validity ending 07/04/2025. These are separate recorded dates and neither establishes completion. |
| Construction stage | Current construction stage is not established by the supplied records. RERA amenity-progress fields show 0% for the listed infrastructure items; those entries do not independently verify the site’s overall construction stage. RERA amenities |
| Occupancy / completion certificate | No occupancy certificate or completion certificate is supplied for this building. The permit requires an occupancy certificate before occupation. Document index |
2. The project story
SAI EMPIRE 02 is registered as a residential apartment project on land identified in the RERA filing as Survey Nos. 95 Part and 96 Part, at SURARAM VILLAGE, Qutballapur, Medchal-Malkajgiri, PIN 500055. GHMC’s permit describes a single residential building on a 743.04 sq. m. plot, with a stilt and five upper floors. RERA record Land records
The RERA unit schedule lists 20 homes: nine 2BHK and eleven 3BHK apartments. The available portal-derived schedule shows all 20 as available and none booked, but has no as-of date. The supplied evidence does not establish whether construction is underway or complete, and it does not include an occupancy certificate. Accordingly, the permit and registration describe the approved and registered project; they do not, by themselves, establish current construction or occupation status. RERA unit table Document index
3. Master plan, architecture & building design
The supplied GHMC Building Permit Order sanctions one residential building, identified as 1 Stilt + 5 upper floors, on a plot and net plot area of 743.04 Sq. Mtrs. It records 1,943.75 Sq.Mt. residential upper-floor area, a building height of 14.95 (unit not stated in the supplied extract), and setbacks of Front 3 m, Rear 3 m, Side I 3 m and Side II 3 m.
The permit lists Plot No. 3, 4PART, Survey Nos. 95PART and 96PART, TDR DRC No. 01461/TDR/2022, TDR area 129.8 Sq. Yds, and “No of Additional Floor: 1.” It also records the approved stilt for parking. No detailed building-plan extraction is supplied for footprint, flats per floor, lift or stair configuration, internal circulation, or residential/common-area distribution; these details are therefore not described here.
The RERA-filed built-up area is reported separately from the RERA saleable areas: 1,943.75 Sq.Mt. approved residential upper-floor area versus 110.23 sq. m. per 2BHK and 131.49 sq. m. per 3BHK saleable area. The supplied information does not provide a distinct FSI-counted area or a RERA-filed carpet area. RERA filing RERA unit table
4. Homes, configurations & floor plans
The RERA unit schedule lists 20 apartments across two configurations. Carpet-area figures below are software measurements from the supplied approved floor-plan drawing extraction, not RERA-filed disclosures. One of the two drawing sheets is recorded as measured and one as pending scan; the 3BHK measurements cover two designs and are marked as needing review. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 9 | 0 | 9 | 110.23 sq. m. | 65.4 sq. m. (software-measured; one design) | 41% (drawing-based calculation) |
| 3BHK | 11 | 0 | 11 | 131.49 sq. m. | 70.3–83.8 sq. m.; median 77.0 sq. m. (software-measured; two designs, review flagged) | 41% (drawing-based calculation) |
The plan extraction for the measured 2BHK shows a living/drawing room, kitchen/dining, two bedrooms and two toilets. The measured 3BHK example shows a living/drawing room, kitchen/dining, three bedrooms, two toilets, a utility and a balcony. Room measurements are software-extracted from drawing geometry; they are not independent site measurements. Balcony and utility areas are excluded from the supplied carpet calculation. RERA unit details
Carpet area is the usable apartment floor area measured from the drawings; saleable area is the area disclosed in the RERA schedule and includes the home’s share of common areas. The drawing-derived loading figure is not a separate RERA disclosure. Verify drawing measurements against the approved plan and the specific unit before purchase. Floor plans RERA unit table
5. Parking & vehicle circulation
The GHMC permit records one stilt with 441 area and “Total Parking Area 441”; it does not state a number of parking spaces in the supplied extract. The permit says the approved stilt parking is to be used exclusively for vehicle parking and not partitioned or repurposed.
A RERA filing field records 196.82 Sq. Mtrs. as mortgage area, and the permit extract identifies 196.82 m2 against “5th Floor handed over” as a mortgage. These records do not establish a buyer’s allocated parking space. No resident/visitor/accessible-space counts, parking-bay allocation schedule, basement or podium parking, ramp arrangement, EV charging provision, or parking-space ownership documentation is supplied. RERA filing Land records
6. Amenities, recreation & open spaces
The permit lists specific site-related items and conditions. The RERA progress entries show 0% against the listed infrastructure items; no independent completion verification is supplied. Other facilities advertised in a third-party vendor listing are not treated as RERA-declared or sanctioned facilities. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot | Permit requires the tot-lot to be fenced and maintained as greenery, and a strip of greenery around the site. No area is stated. | RERA amenity field: available “YES,” 0%; no independent verification. RERA amenities | |
| Aggregate recreational open space | No size or facility detail supplied. | RERA amenities | 0%; completion not independently verified. |
| Community buildings | No size or facility detail supplied. | RERA amenities | 0%; completion not independently verified. |
7. Utilities, building services & safety
The permit and RERA amenity fields provide the following project-level information. These are approval conditions or filed availability/progress entries, not evidence that the items have been installed or are operational. RERA amenities
| Evidence in the supplied record | RERA amenity entry says “YES”; the permit says public water connections will be provided only on production of an occupancy certificate. No source or storage capacity is stated. |
|---|---|
| Status / limitation | Filed availability; no independent operational verification. RERA amenities |
| Evidence in the supplied record | RERA records sewerage (chambers, lines, septic tank, STP) as “YES”; storm-water drains and treatment/disposal of sewage and sullage are listed at 0%. |
|---|---|
| Status / limitation | Filed entries; no system design, capacity or completion evidence supplied. RERA amenities |
| Evidence in the supplied record | Permit requires a rainwater-harvesting structure and lists 7 Rain Water Harvesting Pits; the RERA amenity entry says “YES.” |
|---|---|
| Status / limitation | Approved/required and RERA-listed; completion not independently verified. RERA amenities |
| Evidence in the supplied record | Permit requires space for a transformer and states public electricity connections will be provided only on production of an occupancy certificate. The RERA electrical meter room/sub-station/receiving station entry is 0%. |
|---|---|
| Status / limitation | No supply capacity or completed connection evidence supplied. RERA amenities |
| Evidence in the supplied record | Permit requires a garbage house within the premises; RERA solid-waste management and disposal entry is 0%. |
|---|---|
| Status / limitation | Requirement recorded; delivery and operating arrangements not verified. RERA amenities |
| Evidence in the supplied record | Permit makes the owner/developer and technical professionals responsible for fire-fighting installations under the stated National Building Code requirements and requires an occupancy Fire NOC before issue of the occupancy certificate. |
|---|---|
| Status / limitation | No Fire NOC or completion evidence supplied. |
| Evidence in the supplied record | Permit refers to lifts among services to be supervised by qualified technical personnel. No lift count, capacity, accessibility layout or completed installation is supplied. |
|---|---|
| Status / limitation | Not established beyond the permit reference. |
| Evidence in the supplied record | No project-filed provision or capacity is supplied. |
|---|---|
| Status / limitation | Not disclosed in the supplied RERA evidence. |
8. Location, access & connectivity
The registered location is SURARAM VILLAGE, Qutballapur, Medchal-Malkajgiri, PIN 500055; the GHMC permit describes the site as Suraram Village-1. The filing’s stated site boundaries include a road on the west. The permit refers to an 18 mt. road in a condition concerning sites abutting roads of that width; the supplied extract does not establish that this project’s road frontage is that road. RERA record RERA filing
The location record gives these nearby places and distances: Location record
| Place | Type | Supplied distance |
|---|---|---|
| KPHB Colony | Nearest metro | 6.3 km |
| South Indian Bank | Bank | 2.1 km |
| Malla Reddy Institute of Engineering & Technology | College | 2.6 km |
| Suguna Sree Nursing Home | Hospital | 0.1 km |
| Transguard Electrical Systems | IT office | 2.9 km |
| Store World | Mall | 2.2 km |
| (unnamed park) | Park | 0.6 km |
| North City High School | School | 0.3 km |
These are location-record distances; no travel times or route conditions are supplied. The RERA filing does not identify public-transport services, approach-road details beyond the west-boundary road, or project-specific access arrangements. Location record RERA filing
9. Developer & development status
The registered promoter is RAYALA BUILDERS & DEVELOPERS, identified in the RERA filing as a partnership, with GSTIN 36AALFR4919C1Z5. The filing names RAYALA MOHAN RAO as authorized signatory and RAYALA RADHA MADHAVI as partner. The supplied evidence does not establish a registered office address beyond the project/promoter address fields, or an official website or contact details. Parties record Corporate record RERA filing
In Form B, dated 7 October, 2020, the authorized signatory declares that the promoter has legal title and an agreement for development, that the land is free from encumbrances, and that the project would be completed within three years from the permit date. This is a promoter declaration, not an independent confirmation of current title or construction status.
The supplied records show one registered building and no separate phase-wise completion schedule. The permit’s completion deadline is 06 April, 2025; the RERA certificate validity ended 07/04/2025 and the supplied certificate records no extension. No current construction progress or occupancy certificate is established in the supplied evidence. Document index
10. Approvals, official records & documents
| Identifier / date | P02200004674, issued 27/06/2022; validity recorded to 07/04/2025 |
|---|---|
| What the supplied record establishes | Form C registration for SAI EMPIRE 02, identifying the promoter, location and survey numbers. No extension is recorded in the supplied certificate. |
| Identifier / date | 0856/GHMC/KPL/2022-BP, approved 06 April, 2022; file no. 002488/GHMC/1256/KPL2/2022-BP |
|---|---|
| What the supplied record establishes | Conditional permit for a residential building on the identified site, with a stilt and five upper floors and listed conditions. |
| Identifier / date | LRS/5236/C-15/NZ/GHMC/2009 |
|---|---|
| What the supplied record establishes | Identified as an approved-layout/LRS/subdivision reference in the permit; no separate layout-plan document is supplied. |
| Identifier / date | Doc 237066, dated 25.04.2022 |
|---|---|
| What the supplied record establishes | Advocate’s title opinion tracing title for plots in Survey Nos. 95/Part and 96/Part and concluding that the promoter had clear and marketable title; this is the opinion’s stated conclusion. |
| Identifier / date | Docs 230478, 230479, 237065 |
|---|---|
| What the supplied record establishes | Extracts identify gift/sale instruments and a 2022 sale deed relating to land in Survey Nos. 95 Part and 96 Part. |
| Identifier / date | Doc 230470, dated 7 October, 2020 |
|---|---|
| What the supplied record establishes | Promoter affidavit and declarations, including the stated development agreement and completion undertaking. |
| Identifier / date | Doc 230469 |
|---|---|
| What the supplied record establishes | Template agreement with allottee and unit particulars left unfilled; it is not evidence of an executed agreement for a particular apartment. |
| Identifier / date | Doc 230484 |
|---|---|
| What the supplied record establishes | Drawing material used for software measurement of selected apartment layouts; one of two drawings is recorded as pending scan. |
The permit requires an occupancy certificate before occupation and an occupancy Fire NOC before the occupancy certificate is issued. No occupancy or completion certificate is included among the supplied project documents. Document index
1. Project at a glance
Project identity
Registered project name: SAI EMPIRE 02.
Project type: Residential apartment project.
Phase / registered portion: Described as a single residential building; no separate phase name is disclosed. The RERA certificate covers the project on the identified site.
TG-RERA registration: P02200004674, granted 27/06/2022; the certificate states validity from 27/06/2022 to 07/04/2025. The supplied registration record shows no extension. Registration validity is distinct from the project completion deadline and from occupancy certification.
Registered promoter: RAYALA BUILDERS & DEVELOPERS, a partnership.
RERA / project status: RERA filing labels the project “New Project.” The supplied evidence does not establish current on-site construction progress or an occupancy certificate.
Land and geographic identity
Locality / revenue village: RERA filing: SURARAM VILLAGE; the building permit identifies SURARAM / Suraram Village-1.
Mandal / district / PIN: Qutballapur (permit: Qutubullapur Mandal); Medchal-Malkajgiri (permit: MEDCHAL District); 500055.
Project survey numbers: 95 Part and 96 Part. The building permit records 95PART and 96PART; the RERA certificate records 95 Part and 96 Part.
Subdivisions: No project-specific subdivision numbers are identified in the RERA filing or permit.
Site extent: RERA land details and the permit state 743.04 sq. m. total plot area and 743.04 sq. m. net plot area; the permit records road-affected area 0.0 and nala-affected area 0.0.
Boundaries (RERA filing): East: Neighbours Land; West: Road; North: Plot No 2; South: Plot No 4p.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building approval: Building Permit Order 0856/GHMC/KPL/2022-BP, approved 06 April, 2022; file no. 002488/GHMC/1256/KPL2/2022-BP.
Approved built-up area: 1,943.75 Sq.Mt. residential upper-floor area, as recorded in the permit parameters and RERA filing.
Building count: One residential building / one tower is recorded.
Sanctioned floors: 1 Stilt + 5 upper floors; the permit parameters also list Ground: 1 floor; upper floors: 5. Building height is recorded as 14.95 (the supplied extract does not specify a unit).
Parking provision in permit: Stilt area 441 and “Total Parking Area 441” are recorded; the supplied extract does not state a number of parking bays.
Unit counts: GHMC permit says the number of units sanctioned must not be increased, but the supplied permit extract does not give the sanctioned unit count. RERA unit schedule records 20 units.
Offering and status
RERA-filed configurations: 2BHK: 9 units; 3BHK: 11 units.
RERA-filed saleable area: 2BHK: 110.23 sq. m.; 3BHK: 131.49 sq. m.
Booked / available: Portal-derived counts show 0 booked and 9 available 2BHK units; 0 booked and 11 available 3BHK units. The portal record carries no as-of date, so these counts are indicative, not a current availability confirmation.
Completion deadline: GHMC permit states construction to be completed before 06 April, 2025. The registration certificate states validity ending 07/04/2025. These are separate recorded dates and neither establishes completion.
Construction stage: Current construction stage is not established by the supplied records. RERA amenity-progress fields show 0% for the listed infrastructure items; those entries do not independently verify the site’s overall construction stage.
Occupancy / completion certificate: No occupancy certificate or completion certificate is supplied for this building. The permit requires an occupancy certificate before occupation.
2. The project story
SAI EMPIRE 02 is registered as a residential apartment project on land identified in the RERA filing as Survey Nos. 95 Part and 96 Part, at SURARAM VILLAGE, Qutballapur, Medchal-Malkajgiri, PIN 500055. GHMC’s permit describes a single residential building on a 743.04 sq. m. plot, with a stilt and five upper floors.
The RERA unit schedule lists 20 homes: nine 2BHK and eleven 3BHK apartments. The available portal-derived schedule shows all 20 as available and none booked, but has no as-of date. The supplied evidence does not establish whether construction is underway or complete, and it does not include an occupancy certificate. Accordingly, the permit and registration describe the approved and registered project; they do not, by themselves, establish current construction or occupation status.
3. Master plan, architecture & building design
The supplied GHMC Building Permit Order sanctions one residential building, identified as 1 Stilt + 5 upper floors, on a plot and net plot area of 743.04 Sq. Mtrs. It records 1,943.75 Sq.Mt. residential upper-floor area, a building height of 14.95 (unit not stated in the supplied extract), and setbacks of Front 3 m, Rear 3 m, Side I 3 m and Side II 3 m.
The permit lists Plot No. 3, 4PART, Survey Nos. 95PART and 96PART, TDR DRC No. 01461/TDR/2022, TDR area 129.8 Sq. Yds, and “No of Additional Floor: 1.” It also records the approved stilt for parking. No detailed building-plan extraction is supplied for footprint, flats per floor, lift or stair configuration, internal circulation, or residential/common-area distribution; these details are therefore not described here.
The RERA-filed built-up area is reported separately from the RERA saleable areas: 1,943.75 Sq.Mt. approved residential upper-floor area versus 110.23 sq. m. per 2BHK and 131.49 sq. m. per 3BHK saleable area. The supplied information does not provide a distinct FSI-counted area or a RERA-filed carpet area.
4. Homes, configurations & floor plans
The RERA unit schedule lists 20 apartments across two configurations. Carpet-area figures below are software measurements from the supplied approved floor-plan drawing extraction, not RERA-filed disclosures. One of the two drawing sheets is recorded as measured and one as pending scan; the 3BHK measurements cover two designs and are marked as needing review.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 9 | 0 | 9 | 110.23 sq. m. | 65.4 sq. m. (software-measured; one design) | 41% (drawing-based calculation) |
| 3BHK | 11 | 0 | 11 | 131.49 sq. m. | 70.3–83.8 sq. m.; median 77.0 sq. m. (software-measured; two designs, review flagged) | 41% (drawing-based calculation) |
The plan extraction for the measured 2BHK shows a living/drawing room, kitchen/dining, two bedrooms and two toilets. The measured 3BHK example shows a living/drawing room, kitchen/dining, three bedrooms, two toilets, a utility and a balcony. Room measurements are software-extracted from drawing geometry; they are not independent site measurements. Balcony and utility areas are excluded from the supplied carpet calculation.
Carpet area is the usable apartment floor area measured from the drawings; saleable area is the area disclosed in the RERA schedule and includes the home’s share of common areas. The drawing-derived loading figure is not a separate RERA disclosure. Verify drawing measurements against the approved plan and the specific unit before purchase.
5. Parking & vehicle circulation
The GHMC permit records one stilt with 441 area and “Total Parking Area 441”; it does not state a number of parking spaces in the supplied extract. The permit says the approved stilt parking is to be used exclusively for vehicle parking and not partitioned or repurposed.
A RERA filing field records 196.82 Sq. Mtrs. as mortgage area, and the permit extract identifies 196.82 m2 against “5th Floor handed over” as a mortgage. These records do not establish a buyer’s allocated parking space. No resident/visitor/accessible-space counts, parking-bay allocation schedule, basement or podium parking, ramp arrangement, EV charging provision, or parking-space ownership documentation is supplied.
6. Amenities, recreation & open spaces
The permit lists specific site-related items and conditions. The RERA progress entries show 0% against the listed infrastructure items; no independent completion verification is supplied. Other facilities advertised in a third-party vendor listing are not treated as RERA-declared or sanctioned facilities.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot | Permit requires the tot-lot to be fenced and maintained as greenery, and a strip of greenery around the site. No area is stated. | RERA amenity field: available “YES,” 0%; no independent verification. | |
| Aggregate recreational open space | No size or facility detail supplied. | 0%; completion not independently verified. | |
| Community buildings | No size or facility detail supplied. | 0%; completion not independently verified. |
7. Utilities, building services & safety
The permit and RERA amenity fields provide the following project-level information. These are approval conditions or filed availability/progress entries, not evidence that the items have been installed or are operational.
| Evidence in the supplied record | RERA amenity entry says “YES”; the permit says public water connections will be provided only on production of an occupancy certificate. No source or storage capacity is stated. |
|---|---|
| Status / limitation | Filed availability; no independent operational verification. |
| Evidence in the supplied record | RERA records sewerage (chambers, lines, septic tank, STP) as “YES”; storm-water drains and treatment/disposal of sewage and sullage are listed at 0%. |
|---|---|
| Status / limitation | Filed entries; no system design, capacity or completion evidence supplied. |
| Evidence in the supplied record | Permit requires a rainwater-harvesting structure and lists 7 Rain Water Harvesting Pits; the RERA amenity entry says “YES.” |
|---|---|
| Status / limitation | Approved/required and RERA-listed; completion not independently verified. |
| Evidence in the supplied record | Permit requires space for a transformer and states public electricity connections will be provided only on production of an occupancy certificate. The RERA electrical meter room/sub-station/receiving station entry is 0%. |
|---|---|
| Status / limitation | No supply capacity or completed connection evidence supplied. |
| Evidence in the supplied record | Permit requires a garbage house within the premises; RERA solid-waste management and disposal entry is 0%. |
|---|---|
| Status / limitation | Requirement recorded; delivery and operating arrangements not verified. |
| Evidence in the supplied record | Permit makes the owner/developer and technical professionals responsible for fire-fighting installations under the stated National Building Code requirements and requires an occupancy Fire NOC before issue of the occupancy certificate. |
|---|---|
| Status / limitation | No Fire NOC or completion evidence supplied. |
| Evidence in the supplied record | Permit refers to lifts among services to be supervised by qualified technical personnel. No lift count, capacity, accessibility layout or completed installation is supplied. |
|---|---|
| Status / limitation | Not established beyond the permit reference. |
| Evidence in the supplied record | No project-filed provision or capacity is supplied. |
|---|---|
| Status / limitation | Not disclosed in the supplied RERA evidence. |
8. Location, access & connectivity
The registered location is SURARAM VILLAGE, Qutballapur, Medchal-Malkajgiri, PIN 500055; the GHMC permit describes the site as Suraram Village-1. The filing’s stated site boundaries include a road on the west. The permit refers to an 18 mt. road in a condition concerning sites abutting roads of that width; the supplied extract does not establish that this project’s road frontage is that road.
The location record gives these nearby places and distances:
| Place | Type | Supplied distance |
|---|---|---|
| KPHB Colony | Nearest metro | 6.3 km |
| South Indian Bank | Bank | 2.1 km |
| Malla Reddy Institute of Engineering & Technology | College | 2.6 km |
| Suguna Sree Nursing Home | Hospital | 0.1 km |
| Transguard Electrical Systems | IT office | 2.9 km |
| Store World | Mall | 2.2 km |
| (unnamed park) | Park | 0.6 km |
| North City High School | School | 0.3 km |
These are location-record distances; no travel times or route conditions are supplied. The RERA filing does not identify public-transport services, approach-road details beyond the west-boundary road, or project-specific access arrangements.
9. Developer & development status
The registered promoter is RAYALA BUILDERS & DEVELOPERS, identified in the RERA filing as a partnership, with GSTIN 36AALFR4919C1Z5. The filing names RAYALA MOHAN RAO as authorized signatory and RAYALA RADHA MADHAVI as partner. The supplied evidence does not establish a registered office address beyond the project/promoter address fields, or an official website or contact details.
In Form B, dated 7 October, 2020, the authorized signatory declares that the promoter has legal title and an agreement for development, that the land is free from encumbrances, and that the project would be completed within three years from the permit date. This is a promoter declaration, not an independent confirmation of current title or construction status.
The supplied records show one registered building and no separate phase-wise completion schedule. The permit’s completion deadline is 06 April, 2025; the RERA certificate validity ended 07/04/2025 and the supplied certificate records no extension. No current construction progress or occupancy certificate is established in the supplied evidence.
10. Approvals, official records & documents
| Identifier / date | P02200004674, issued 27/06/2022; validity recorded to 07/04/2025 |
|---|---|
| What the supplied record establishes | Form C registration for SAI EMPIRE 02, identifying the promoter, location and survey numbers. No extension is recorded in the supplied certificate. |
| Identifier / date | 0856/GHMC/KPL/2022-BP, approved 06 April, 2022; file no. 002488/GHMC/1256/KPL2/2022-BP |
|---|---|
| What the supplied record establishes | Conditional permit for a residential building on the identified site, with a stilt and five upper floors and listed conditions. |
| Identifier / date | LRS/5236/C-15/NZ/GHMC/2009 |
|---|---|
| What the supplied record establishes | Identified as an approved-layout/LRS/subdivision reference in the permit; no separate layout-plan document is supplied. |
| Identifier / date | Doc 237066, dated 25.04.2022 |
|---|---|
| What the supplied record establishes | Advocate’s title opinion tracing title for plots in Survey Nos. 95/Part and 96/Part and concluding that the promoter had clear and marketable title; this is the opinion’s stated conclusion. |
| Identifier / date | Docs 230478, 230479, 237065 |
|---|---|
| What the supplied record establishes | Extracts identify gift/sale instruments and a 2022 sale deed relating to land in Survey Nos. 95 Part and 96 Part. |
| Identifier / date | Doc 230470, dated 7 October, 2020 |
|---|---|
| What the supplied record establishes | Promoter affidavit and declarations, including the stated development agreement and completion undertaking. |
| Identifier / date | Doc 230469 |
|---|---|
| What the supplied record establishes | Template agreement with allottee and unit particulars left unfilled; it is not evidence of an executed agreement for a particular apartment. |
| Identifier / date | Doc 230484 |
|---|---|
| What the supplied record establishes | Drawing material used for software measurement of selected apartment layouts; one of two drawings is recorded as pending scan. |
The permit requires an occupancy certificate before occupation and an occupancy Fire NOC before the occupancy certificate is issued. No occupancy or completion certificate is included among the supplied project documents.
Frequently asked questions
Is SAI EMPIRE 02 registered with Telangana RERA?
Yes. SAI EMPIRE 02 is registered with the Telangana Real Estate Regulatory Authority as P02200004674; the registration status is New Project.
Who is the developer of SAI EMPIRE 02?
The promoter named in the RERA registration is RAYALA BUILDERS & DEVELOPERS.
Where is SAI EMPIRE 02 located?
SAI EMPIRE 02 is in SURARAM VILLAGE, Suraram Villege, Qutballapur, Medchal-Malkajgiri, Telangana (500055).
When will SAI EMPIRE 02 be completed?
The promoter's proposed date of completion filed with RERA is 07/04/2025. This is the promoter's declaration, not a guarantee.