Sign in

Golden Keys Mayura Sriven

GOLDEN KEY PRIME PROPERTIES LLP · Medchal-Malkajgiri · RERA P02200004426

GOLDEN KEYS MAYURA SRIVEN is a residential apartment project in GOUDAVELLE, Medchal Mandal, Medchal-Malkajgiri District, developed by the registered promoter GOLDEN KEY PRIME PROPERTIES LLP. The project records a land area of 9,920.95 sq. m and one building with 2 Cellar + 1 Stilt + 17 Upper floors and 328 homes: 246 2BHK and 82 3BHK. Its TG-RERA registration number is P02200004426, and the RERA record gives a proposed completion date of 27/09/2028.

01What we found

RegisteredTG-RERA - valid till 27 May 2028
20documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from housing.comPhoto from housing.com
▦ View all 2 photos
Goudavelle, Medchal, Medchal-Malkajgiri · geocoded — approximate.

1. Project at a glance

Project identity

ItemProject record
Registered project nameGOLDEN KEYS MAYURA SRIVEN RERA record
Project typeResidential apartment project RERA record
Phase / registered portionPhase not separately identified in the supplied record; TG-RERA registration is for the project on Survey No. 439 PART
TG-RERA registration numberP02200004426 RERA record
Registration validity02/05/2022 to 27/05/2028, as stated in the certificate
Registered promoterGOLDEN KEY PRIME PROPERTIES LLP Corporate record
RERA statusRegistered; the certificate states six years’ validity, subject to its conditions

Land and geographic identity

ItemProject record
LocalityGOUDAVELLE RERA record
Revenue villageGoudavelle / Goudavelle Village RERA record
MandalMedchal / Medchal Mandal RERA record
DistrictMedchal-Malkajgiri / Medchal-Malkajgiri District RERA record
PIN501401 RERA record
Project survey number and subdivisionSurvey No. 439 PART; also described in the HMDA technical approval as Survey No. 439 (PART) RERA record
Registered site extent9,920.95 Sq. Mt. in the HMDA technical approval
Total / net areaRERA filing records total area and net area as 9,920.95 sq. m, with affected area recorded as 0; HMDA technical approval states 9,920.95 Sq. Mt. RERA filing
BoundariesEast: FULL; West: FULL; North: FULL; South: FULL, as entered in the RERA filing RERA filing

Development identity

ItemProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA) Approvals record
Principal approval number / date046011/MED/R1/U6/HMDA/27052021; HMDA technical approval dated 08/02/2022 Approvals record
Approval status and scopeThe supplied HMDA document is a technical approval for a proposed residential apartment building. It directs that building plans be sanctioned by the Executive Authority in conformity with the technically approved plans
Approved built-up area44,243.5 sq. m, as recorded in the RERA filing and HMDA technical approval parameters RERA filing
Building countOne building recorded in the RERA filing RERA filing
Floor configuration2 Cellar + 1 Stilt + 17 Upper floors in the HMDA technical approval
Parking levels / provisionThe HMDA approval requires the cellars to be used exclusively for vehicle parking; parking-space count is not supplied
UnitsRERA filing records 328 total units in one proposed building; the HMDA document states that sanctioned unit numbers must not be increased without prior approval RERA unit table

Offering and status

ItemProject record
RERA-filed configurations2BHK and 3BHK RERA unit table
RERA-filed saleable area2BHK: 29.56 sq. m; 3BHK: 183.54 sq. m RERA unit table
Booked / available2BHK: 55 booked / 191 available; 3BHK: 23 booked / 59 available. Counts are from the TG-RERA portal record and have no supplied as-of date, so they are indicative RERA unit table
Construction stageThe RERA filing reports progress by facility/infrastructure item; no overall construction-stage percentage or independently verified site inspection is supplied RERA amenities
Completion datesThe RERA header records proposed completion as 27/09/2028; the Form B declaration undertakes completion by 08.02.2028 RERA record
Occupancy / completion certificateNo occupancy or completion certificate is identified in the supplied documents. The HMDA technical approval is not an occupancy certificate

The filing provides a single-building residential development on Survey No. 439 PART in Goudavelle. It records 328 proposed units across two configurations. The unit counts, booking counts and saleable areas above are TG-RERA filing figures; the available booking counts are indicative because the record gives no snapshot date. RERA unit table RERA filing

The project’s registration validity, proposed completion date and occupancy-certificate position are separate matters: the registration certificate runs through 27/05/2028; the project header gives proposed completion of 27/09/2028; and no occupancy or completion certificate is present in the supplied material. RERA record Document index

2. The project story

GOLDEN KEYS MAYURA SRIVEN is a registered residential apartment project at Goudavelle, Medchal Mandal, Medchal-Malkajgiri District, PIN 501401. The registered parcel is Survey No. 439 PART, and the RERA filing records 9,920.95 sq. m of land and one building. RERA record RERA filing

The HMDA technical approval describes a proposed residential building with 2 Cellar + 1 Stilt + 17 Upper floors. The TG-RERA filing lists 328 units: 246 2BHK and 82 3BHK. No separate phase, tower-by-tower delivery schedule, overall percentage-complete figure, or independent site-progress verification is supplied. RERA unit table RERA amenities

The RERA record gives a proposed completion date of 27/09/2028, while the promoter’s Form B declaration undertakes completion by 08.02.2028. No occupancy or completion certificate is included in the supplied project documents; the HMDA technical approval itself is not such a certificate. RERA record

3. Master plan, architecture & building design

The RERA filing records 9,920.95 sq. m as both total and net site area, with zero area recorded as affected by road widening, tank FTL or nala widening. The HMDA technical approval separately records a gift of 869.15 sq. m of road-affected land under a proposed 30m road to the Gowdevelly Gram Panchayat, under registered Gift Deed No. 234 of 2022 dated 04.01.2022. RERA filing

The technical approval describes one proposed residential building with 2 Cellar + 1 Stilt + 17 Upper floors. It records approved built-up area of 44,243.5 sq. m and proposed built-up area of 47,507.76 sq. m; these are distinct figures in the approval and are not saleable or carpet-area measurements. The document also records a building height of 49.98, without a unit stated in the supplied extraction.

The approval refers to a tot-lot/open space and peripheral greenery, and directs that the cellars be used exclusively for vehicle parking. The supplied material does not provide a verified floor-by-floor apartment arrangement, building footprint, flats per floor, lift or stair count, internal circulation plan, or measured open-space area. Six floor-plan drawings are listed, but none has been measured; all six are pending scan review. Floor plans

The approval describes a 10% built-up-area mortgage and a 5% built-up-area mortgage in favour of HMDA, and the RERA filing records mortgage area of 4,429.32 sq. m. These are approval/filing records, not evidence of an allottee’s parking or unit allocation. RERA filing

4. Homes, configurations & floor plans

The TG-RERA record lists 328 homes in two configurations. The RERA-filed saleable areas below are reproduced as supplied; the record does not provide carpet-area measurements or loading figures. Booking and availability counts have no supplied as-of date. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK2465519129.56 sq. mNot measured in supplied drawingsNot supplied
3BHK822359183.54 sq. mNot measured in supplied drawingsNot supplied

The six listed floor-plan drawings are pending scan review, with zero measured. Accordingly, no drawing-based room dimensions, room layouts, balcony or utility details, orientation, or software-measured carpet areas can be reported. Carpet area, balcony/utility areas, common-area share and saleable area are distinct measures; no project-specific breakdown for these components is supplied here. Floor plans RERA unit details

5. Parking & vehicle circulation

The HMDA technical approval specifies two cellar levels and requires the cellars to be used exclusively for vehicle parking, without partition walls or rolling shutters. A minimum width of 4.5m and height clearance of 5m is also recorded in the approval, but the supplied extraction does not identify the feature to which that dimension applies.

No sanctioned car or two-wheeler space count, visitor or accessible-parking count, parking allotment schedule, ramp arrangement, or unit-specific parking allocation is supplied. A vendor record lists car parking, closed car parking and visitor parking, but provides no quantities or project-specific allocation evidence. Promoter website

6. Amenities, recreation & open spaces

The HMDA technical approval includes requirements for a tot-lot, peripheral greenery, rainwater harvesting, a transformer, a garbage house, a sewage treatment plant, refuse chute, solar water heating and solar lighting. These are approval-document requirements or described provisions; the supplied record does not establish that they are complete or independently inspected.

TG-RERA’s amenity record reports availability as “YES” and gives item-level progress percentages. These are filing-reported progress figures, not independent completion verification. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Clubhouse / indoor
Community BuildingsSize not suppliedTG-RERA amenity record RERA amenities70% reported; not independently verified
ClubhouseThe approval refers to a club house in the mortgaged-area description; size not suppliedHMDA technical approvalNo completion status supplied
Gymnasium; indoor games; conference room; business centre; party hall; multipurpose hallNo sizes or capacities suppliedVendor amenity list Promoter websiteVendor-listed; no project-specific completion verification supplied
Sports / recreation
Tot-lot / children’s play areaSize and equipment not supplied; HMDA approval requires fenced tot-lot maintained as greeneryHMDA technical approval Promoter websiteApproval condition; completion not independently verified
Swimming pool; badminton court; recreation facilitiesNo sizes or capacities suppliedVendor amenity list Promoter websiteVendor-listed; no project-specific completion verification supplied
Landscape / open space
Green strip / tot-lot / parkSize not suppliedTG-RERA amenity record RERA amenities98% reported; not independently verified
Aggregate recreational open spaceArea not suppliedTG-RERA amenity record RERA amenities0% reported; not independently verified
Convenience / community
Internal roads & footpathsDimensions not suppliedTG-RERA amenity record RERA amenities90% reported; not independently verified
Street lightingQuantity and specification not suppliedTG-RERA amenity record RERA amenities5% reported; not independently verified
Security; intercom; internet/Wi-FiSpecifications and coverage not suppliedVendor amenity list Promoter websiteVendor-listed; no project-specific completion verification supplied

7. Utilities, building services & safety

TG-RERA’s amenity record reports 10% progress for water supply, 95% for sewerage, 100% for storm-water drains, 95% for water conservation/rainwater harvesting, 50% for treatment and disposal of sewage and sullage water, and 60% for solid-waste management and disposal. These are filing-reported percentages; no independent inspection or completion evidence is supplied. RERA amenities

The HMDA technical approval calls for a sewage treatment plant, refuse chute, garbage house, rainwater-harvesting structures, transformer, solar water heating and solar lighting. It also requires appropriate separation of water-supply and sewerage-disposal sources and states that the local body is to ensure specified requirements before issuing an occupancy certificate. No capacities, water-source details, storage volumes, reuse scheme, electrical backup capacity, lift count or lift capacity are supplied.

For safety, the HMDA document makes the applicant responsible for structural safety and safety requirements, requires worker-safety measures, and refers to conditions in NOCs issued by AAI, Fire and SEIAA. The record also refers to minimum clearances from high- and low-tension electrical lines. No NOC copies, fire-system design details, escape-stair information, accessible-circulation details, or evidence of completed safety systems are supplied in this overview pack.

8. Location, access & connectivity

The registered location is Goudavelle, Medchal Mandal, Medchal-Malkajgiri District, PIN 501401; the project parcel is identified as Survey No. 439 PART. The supplied location record also provides a cadastral parcel centroid of 17.41528, 78.35459. RERA record Location record

The location dataset lists these measured distances: ADP 0.0 km; IndusInd Bank 0.4 km; Nanakramguda Govt primary school 0.5 km; Financial District (Nanakramguda) 1.2 km; an unnamed park 1.2 km; Manuu Polytechnic Hyderabad 1.6 km; Sankaraya Eye Hospital 1.6 km; an unnamed bus station 2.2 km; and South India Shopping Mall 2.6 km. These are supplied location-record distances; no travel times or road-by-road routes are provided. Location record

9. Developer & development status

The registered promoter is GOLDEN KEY PRIME PROPERTIES LLP, an LLP, with GSTIN 36AAVFG8641E1ZZ. The RERA record identifies Satyanarayana Raju Vadapalli as Authorized Signatory and Jhansi Lakshmi V as Partner. Corporate record Parties record The registration certificate lists the promoter office as Village: Gachi Bowli, Mandal: Serilingampally, District: Ranga Reddy, PIN 500032.

The Form B declaration dated 07 April 2022, made through Designated Partner V Satyanarayana Raju, states a completion undertaking of 08.02.2028. The project header records proposed completion of 27/09/2028. The supplied record contains no overall independent construction-progress assessment or occupancy/completion certificate. RERA record Document index

10. Approvals, official records & documents

TG-RERA registration
Supplied evidenceForm C certificate, registration P02200004426, issued 02/05/2022; valid through 27/05/2028
Scope / noteProject registered under the name GOLDEN KEYS MAYURA SRIVEN; Survey No. 439 PART
HMDA technical approval
Supplied evidenceApproval No. 046011/MED/R1/U6/HMDA/27052021, dated 08/02/2022
Scope / noteTechnical approval for a proposed residential building; it directs that the Executive Authority sanction plans in conformity with HMDA’s technical approval
Building / floor-plan material
Supplied evidenceSix floor-plan drawings listed; zero measured and six scans pending Floor plans
Scope / noteDrawing-based room and carpet-area review is unavailable in the supplied extract
Form B declaration
Supplied evidenceDeclaration by GOLDEN KEY PRIME PROPERTIES LLP, dated 07 April 2022
Scope / notePromoter declaration regarding land, encumbrances, project funds and completion undertaking
Title documents filed with RERA
Supplied evidenceTitle reports and deed material, including documents 230667, 230670, 228670, 228671 and 228672 Document index
Scope / noteFull deed-by-deed account and title-chain assessment are addressed in the Land & Title section
HMDA portal layout lookup
Supplied evidenceHMDA DPMS approved-layout lookup is reported unavailable through the public internet HMDA
Scope / noteThe supplied record does not establish whether a separate stamped layout approval is available

The supplied document list does not include an occupancy or completion certificate. The HMDA document expressly identifies itself as a technical approval rather than an occupancy certificate.

Frequently asked questions

Is GOLDEN KEYS MAYURA SRIVEN registered with Telangana RERA?

Yes. GOLDEN KEYS MAYURA SRIVEN is registered with the Telangana Real Estate Regulatory Authority as P02200004426; the registration status is New Project.

Who is the developer of GOLDEN KEYS MAYURA SRIVEN?

The promoter named in the RERA registration is GOLDEN KEY PRIME PROPERTIES LLP.

Where is GOLDEN KEYS MAYURA SRIVEN located?

GOLDEN KEYS MAYURA SRIVEN is in GOUDAVELLE, Medchal, Medchal-Malkajgiri, Telangana (501401).

When will GOLDEN KEYS MAYURA SRIVEN be completed?

The promoter's proposed date of completion filed with RERA is 27/09/2028. This is the promoter's declaration, not a guarantee.

More projects in Gowdavelly