Sign in

G R Infra

GR INFRA · Medchal-Malkajgiri · RERA P02200004439

G R INFRA is a residential apartment project in Bachupally, Bachupally Mandal, Medchal-Malkajgiri District, developed by the registered promoter GR INFRA, a partnership firm. The project covers 774.13 sq m and has two building units, with a technical approval describing 1 Stilt + 5 Upper floors. It records 20 homes in 1BHK, 2BHK and 3BHK configurations. Its TG-RERA registration number is P02200004439, and the promoter’s Form B declaration states completion by 20 December 2027.

More from Gr Infra · 2 projects →

01What we found

RegisteredTG-RERA - valid till 20 Dec 2027
19documents on file - each fact links to its page
0court cases on this project's land in the court records searched
11items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameG R INFRA RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionNo phase name is disclosed. The RERA record identifies the site as Plot Nos. 32 Part, 33 and 34; the technical approval describes Plot Nos. 30, 31 and 32 Part.
TG-RERA registrationP02200004439
Registration validity02/05/2022 to 20/12/2027; registration certificate states five years. This is the registration period, not an occupancy certificate.
Registered promoterGR INFRA, partnership firm RERA record RERA filing
RERA status in supplied recordNew Project; the registration certificate records registration under section 5. RERA record

Land and geographic identity

FieldProject record
LocalityBachupally / BACHUPLLY RERA record
Revenue villageBachuplly in the project header; Bachupally in the registration certificate; the technical approval says Bachpalle Village. RERA record
MandalBachupally RERA record
DistrictMedchal-Malkajgiri RERA record
PIN500090 RERA record
Survey number(s)Survey No. 311; no subdivision is stated in the registration certificate or land record summary. Land records
Plot identityRegistration certificate: Plot Nos. 32 Part, 33 and 34. Project land fields also state Plot Nos. 30, 31, 32, 33 and 34; the technical approval identifies Plot Nos. 30, 31 and 32 Part. RERA filing
Registered site extent774.13 sq m, also recorded as the net and total area. RERA filing Land records
Boundaries recorded in RERA land detailsEast: others land; west: road; north: others plots; south: others plots. RERA filing

Development identity

FieldProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); the technical approval identifies Nizampet Municipal Corporation as the delegated Executive Authority for sanction. Approvals record
Principal approval041530/MED/R1/U6/HMDA/30122020, approved 20/12/2021. The filed document describes technical approval and says final sanction is to be obtained from the Executive Authority. Approvals record
Approved built-up areaProject fields record 2,128.24 sq m. The technical approval separately lists “Total Built up Area” 1266.23 sq m and “Built up Area” 1048.8; units are not specified for those two extracted figures. RERA filing
Buildings / blocksTwo building units are recorded in the project fields; the approval extraction describes a proposed residential building. RERA filing
Floor configurationTechnical approval: 1 Stilt + 5 Upper floors. Basement, podium and ground-floor designations are not specified in the supplied record.
Parking levels / provisionThe technical approval says the stilt/cellar area is exclusively for vehicle parking, but the supplied extract does not state a parking-space count or identify a cellar level.
Unit count20 units are recorded in the RERA filing, across two buildings. RERA unit table

Offering and status

FieldProject record
RERA-filed configurations1BHK, 2BHK and 3BHK RERA unit table
RERA-filed saleable area1BHK: 116.13 sq m; 2BHK: 116.13 sq m; 3BHK: 153.29 sq m RERA unit table
Booked / available1BHK: 1 / 0; 2BHK: 9 / 0; 3BHK: 10 / 0. These portal counts have no as-of date in the supplied record and are indicative. RERA unit table
Construction stageNo independently verified current construction-stage report is supplied. An architect’s Form 1A dated 14-10-2023 certifies overall completion; see the OC entry below.
Completion deadlinePromoter’s Form B declaration states completion by 20 December 2027.
Occupancy-certificate statusForm 1A records an HMDA occupancy-certificate entry, 001801/OC/HMDA/MEGR INFRA D/2022, and the architect certifies the project complete as of 14-10-2023. The supplied record does not establish the certificate’s exact issue date or the specific building/tower scope covered.

2. The project story

G R INFRA is registered as a residential apartment project on a 774.13 sq m site in Survey No. 311, Bachupally, with 20 RERA-recorded units in two buildings. The RERA filing lists 1BHK, 2BHK and 3BHK homes. RERA record Land records RERA unit table

The HMDA-filed technical approval describes a residential building with one stilt and five upper floors. The project’s Form B gives a completion undertaking of 20 December 2027, while an architect’s Form 1A dated 14-10-2023 certifies overall completion and records an occupancy-certificate entry. The supplied Form 1A does not identify which tower or phase its certificate covers, and no current, independent site-progress verification is provided.

3. Master plan, architecture & building design

The RERA land details record a total/net site area of 774.13 sq m and two building units. The HMDA technical approval describes a proposed residential building with 1 stilt + 5 upper floors; its extracted parameters include a building height of 14.98 and separately list a total built-up area of 1266.23 sq m and built-up area of 1048.8, without units shown for those two figures. The project fields separately record approved built-up area of 2,128.24 sq m. These measures are retained as recorded and are not interchangeable. RERA filing RERA filing

The supplied material does not provide a readable, extracted site layout or detailed floor-plan information sufficient to describe building footprints, flats per floor, circulation, lifts, stairs, open-space areas or phase organization. The HMDA approval lists a tot-lot, transformer, garbage house, rainwater-harvesting structures, septic tank and percolation pit as site provisions.

4. Homes, configurations & floor plans

RERA-filed saleable areas and unit counts are shown below. Carpet measurements are software-measured from the supplied floor-plan drawings, are not RERA disclosures, and are flagged as needing drawing review. Saleable area includes the home’s share of common areas; it should not be read as carpet area. The supplied loading figures are likewise drawing-based measurements, not RERA-filed figures. RERA unit table Floor plans RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
1BHK110116.13 sq m67.1–70.9 sq m; median 70.9 sq m (software-measured)39% (software-measured)
2BHK990116.13 sq m72.3–80.5 sq m; median 73.8 sq m (software-measured)36% (software-measured)
3BHK10100153.29 sq m84.6–115.1 sq m; median 98.4 sq m (software-measured)36% (software-measured)

The extracted typical-floor drawings show living/dining, kitchen, bedrooms and toilets in the measured examples. A 1BHK example includes a balcony and utility; the 2BHK example includes a balcony and utility; the 3BHK example includes a balcony. These are drawing-derived descriptions of sample plans, not a guarantee that every unit of a configuration has the same arrangement.

5. Parking & vehicle circulation

The HMDA technical approval states that the stilt/cellar area is to be used exclusively for vehicle parking and not converted to other uses. It also states that no parking or construction is permitted in setback areas. The supplied records do not give sanctioned car or two-wheeler space counts, visitor or accessible parking provision, ramp and driveway arrangements, EV charging, or unit-specific parking allocations. A drawn or designated parking area should not be treated as proof of exclusive ownership or allocation.

6. Amenities, recreation & open spaces

The RERA amenities record marks several items as available, but the supplied data does not independently verify their completion. The approval document also lists certain site provisions; these are approval-document references, not evidence that the facilities have been delivered. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads & footpathsSize not statedRERA amenities RERA amenitiesDeclared available: YES, 100%; not independently verified
Green strip / tot lot / parkSize not stated; approval also lists “Tot-lot”RERA amenities RERA amenities; HMDA approvalDeclared available: YES, 100%; not independently verified
Street lightingSize / quantity not statedRERA amenities RERA amenitiesDeclared available: YES, 100%; not independently verified
Community buildingsNo details statedRERA amenities RERA amenities0% recorded
Aggregate recreational open spaceArea not statedRERA amenities RERA amenities0% recorded

7. Utilities, building services & safety

The RERA amenities record marks water supply, sewerage and septic-tank-related infrastructure, fire protection, and an electrical meter room/sub-station/receiving station as available. It records storm-water drains, treatment and disposal of sewage and sullage water, solid-waste management and disposal, water conservation/rainwater harvesting, and energy management at 0%. These are filing entries and are not independent completion or compliance verification. RERA amenities

The HMDA technical approval lists a septic tank, percolation pit, rainwater-harvesting structures, transformer and garbage house. It also includes conditions concerning water-supply and sewerage-source locations, drainage discharge, periodic septic-tank cleaning, structural safety, fire-service norms, and transformer provision. The supplied documents do not state water-storage or treatment capacities, STP capacity, backup-power arrangements, lift numbers or capacities, CCTV/security systems, or accessible circulation details.

8. Location, access & connectivity

The registered location is Bachupally, Bachupally Mandal, Medchal-Malkajgiri District, Telangana, PIN 500090. The project fields record a road on the western boundary. The supplied location distances are listed as follows; the record does not specify the route or measurement method, so they should not be read as travel times. RERA record RERA filing Location record

Listed destination / featureRecorded distance
Financial District (Nanakramguda)1.2 km
IndusInd Bank0.4 km
Unnamed bus station2.2 km
Manuu Polytechnic Hyderabad1.6 km
Sankaraya Eye Hospital1.6 km
ADP0.0 km
South india shopping mall2.6 km
Unnamed park1.2 km
Nanakramguda Govt primary school0.5 km

9. Developer & development status

The registered promoter is GR INFRA, identified in the RERA filing as a partnership. The GSTIN recorded for the promoter is 36AAUFG3006E1ZJ. The project record identifies Ramesh Gudapati as an authorized signatory and Gangadhar Rao Bachupally as a partner. The registration certificate gives the promoter office location as Bachupally, Bachupally Mandal, Medchal-Malkajgiri District, PIN 500090; no official website or contact details are supplied. RERA filing Corporate record Parties record

The promoter’s Form B declares a completion target of 20 December 2027. Separately, the architect’s Form 1A dated 14-10-2023 certifies overall completion and contains an HMDA OC entry, but does not state the tower/phase scope. No current independent construction-progress assessment is supplied.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200004439, issued 02/05/2022; valid to 20/12/2027
What the supplied record establishesForm C registration for G R INFRA; records Survey No. 311 and Plot Nos. 32 Part, 33 and 34.
HMDA technical approval / building-permit document
Identifier / date041530/MED/R1/U6/HMDA/30122020, dated 20/12/2021
What the supplied record establishesTechnical approval for a proposed residential building; the document states final sanction is to be obtained from the Executive Authority.
Architect’s completion certificate (Form 1A)
Identifier / dateDated 14-10-2023
What the supplied record establishesArchitect certifies overall project completion and records HMDA OC entry 001801/OC/HMDA/MEGR INFRA D/2022; tower/phase scope and exact OC issue date are not established in the supplied extraction.
Form B declaration
Identifier / dateVerified at Hyderabad, 25 March 2022 (as extracted)
What the supplied record establishesPromoter declaration includes the 20 December 2027 completion undertaking and RERA-related undertakings.
Floor-plan records
Identifier / dateDocuments 226035 and 226036
What the supplied record establishesSupplied as drawing sources for software-measured unit configurations; the measurements are not RERA disclosures.

An approved-layout drawing and a detailed, readable set of building plans are not available in the supplied extracts; detailed design, conditions and approvals should therefore be checked against the filed originals. The project’s registration validity, declared completion deadline and recorded OC information are separate matters, as set out above.

Frequently asked questions

Is G R INFRA registered with Telangana RERA?

Yes. G R INFRA is registered with the Telangana Real Estate Regulatory Authority as P02200004439; the registration status is New Project.

Who is the developer of G R INFRA?

The promoter named in the RERA registration is GR INFRA.

Where is G R INFRA located?

G R INFRA is in BACHUPLLY, Bachupally, Medchal-Malkajgiri, Telangana (500090).

When will G R INFRA be completed?

The promoter's proposed date of completion filed with RERA is 20/12/2027. This is the promoter's declaration, not a guarantee.

More projects in Bachupally