Sukrithi Saanvi
OLIVE CONSTRUCTIONS · Medchal-Malkajgiri · RERA P02200002934
SUKRITHI SAANVI is a residential apartment project in Bachupally, Bachupally mandal, Medchal-Malkajgiri district. Olive Constructions is the registered promoter developing the project on a site of 1,654.19 sq. m., with one building comprising 1 Cellar + 1 Stilt + 5 Upper floor and 40 2BHK apartments. The TG-RERA registration number is P02200002934, and the promoter-declared completion deadline is 08 JANUARY 2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered name | SUKRITHI SAANVI RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Registration is for the project at Plot Nos. 6, 7 & 8, Survey No. 332; a separate phase name is not disclosed. |
| TG-RERA registration | P02200002934; registered 14/05/2021 and valid through 08/01/2027, subject to extension by the Authority. RERA record |
| Registered promoter | Olive Constructions; partnership. RERA record Corporate record |
| RERA status | Registration certificate issued under section 5. |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / revenue village | Bachupally; the filed approval also describes the village as Bachpalle. RERA record RERA filing |
| Mandal | Bachupally. RERA record |
| District / PIN | Medchal-Malkajgiri / 500090. RERA record |
| Project survey number(s) / subdivision(s) | Survey No. 332; no project subdivision is identified in the filed project records. Land records |
| Registered site extent | 1,654.19 sq. m. in the municipal permission. The RERA land fields separately record total area 1,654.19 sq. m., affected area 1.62 sq. m., and net area 1,652.57 sq. m. RERA filing |
| Boundaries | East: 40 FEET WIDE ROAD; North: 40 FEET WIDE ROAD; West: NEIGHBOURS LAND IN SURVEY NO 332 PART; South: OPEN AREA. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Authorities / principal approvals | HMDA technical approval 039012/MED/R1/U6/HMDA/11092020, approved 08/01/2021; Nizampet Municipal Corporation building permission G1/BP/52/B/NMC/2021, dated 16/03/2021. Approvals record |
| Approved built-up area | Municipal permission records Net BUA Area (m2) 4095.44. HMDA technical approval also lists Total Built up Area (In Sq.mts) 4878.05; these are the figures stated in the respective filed documents. |
| Building count / configuration | One residential building; permission describes 1 Cellar + 1 Stilt + 5 Upper floor. RERA filing |
| Parking levels | Cellar and stilt are designated for parking in the HMDA technical approval; the available record does not provide a car-space count. |
| Units | RERA filing records one building and 40 apartments; the unit schedule lists 40 homes. RERA filing RERA unit table RERA unit details |
Offering and status
| Field | Project record |
|---|---|
| Configuration / RERA saleable area | 2BHK; 113.16 sq. m. RERA unit table RERA unit details |
| Booked / available | 13 booked / 27 available, as last read from the TG-RERA portal; the record has no as-of date, so counts are indicative. RERA unit table RERA unit details |
| Construction stage | HMDA issued an occupancy certificate for the residential flats at Plot Nos. 6, 7 & 8, Survey No. 332, dated 06 April 2023. |
| Promoter-declared completion deadline | Form B states 08 JANUARY 2027. |
| Registration validity | Through 08/01/2027; this is the registration-validity date, not a statement of construction progress. |
| Occupancy certificate scope | The available certificate concerns the residential flats on Plot Nos. 6, 7 & 8, Survey No. 332, and describes a cellar/ground, stilt and five upper floors. |
2. The project story
SUKRITHI SAANVI is registered as a residential apartment project at Plot Nos. 6, 7 & 8 in Survey No. 332, Bachupally, Medchal-Malkajgiri district. The filed building permissions describe one building with a cellar, stilt and five upper floors, and the RERA unit record lists 40 two-bedroom apartments. RERA unit table
The filed record includes an HMDA occupancy certificate for the residential flats at this site. It states that a completion notice was submitted and that the inspected building was fit for occupation; the certificate records a completion date of 02 January 2023 and an occupancy-certificate date of 06 April 2023. This is documentary evidence of the certificate’s scope, not an independent present-day site inspection.
The promoter’s Form B declares a completion undertaking of 08 January 2027, while the registration certificate remains valid through that same date. The project record does not provide independently verified current construction progress.
3. Master plan, architecture & building design
The project is described in the filed approvals as a single residential building on a site of 1,654.19 sq. m. The RERA land fields record net area of 1,652.57 sq. m. after an affected area of 1.62 sq. m. The municipal permission records a net BUA area of 4,095.44 sq. m.; HMDA’s technical-approval document separately states total built-up area of 4,878.05 sq. m. RERA filing
The building configuration in the municipal permission is 1 Cellar + 1 Stilt + 5 Upper floor; the HMDA technical approval describes 1Cellar + 1Stilt + 5 Upper floors. The HMDA document identifies a building height of 14.24 and the municipal permission records height of 14.244 m.
The HMDA approval states that the cellar and stilt approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. It also requires a tot-lot to be fenced and maintained as greenery before issue of an occupancy certificate. The municipal permission records setbacks and a site-deduction area; the supplied material does not include a readable detailed approved floor plan or drawing-derived building layout.
The available floor-plan review reports two drawings, neither with measured flats; both are classified as having no flats. Accordingly, no software-measured room, carpet-area, circulation or floor-layout measurements can be reported. Floor plans
4. Homes, configurations & floor plans
The TG-RERA unit schedule lists 40 2BHK apartments, with 13 booked and 27 available at the last portal read. The filed saleable area is 113.16 sq. m. per unit; booking counts have no stated as-of date and are indicative. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 40 | 13 | 27 | 113.16 sq. m. | Not measured from the supplied drawings | Not supplied |
No software-measured carpet area or room dimensions are available. Carpet area is distinct from saleable area: saleable area can include the apartment’s share of common areas, while carpet area is an internal dwelling measurement. The supplied floor-plan review does not provide measurements for this project’s flats. RERA unit table Floor plans
5. Parking & vehicle circulation
The HMDA technical approval designates the cellar and stilt for vehicle parking and prohibits partition walls and rolling shutters in those levels. The approval also refers to a minimum width of 4.5 m and height clearance of 5 m in its sanctioned parameters. The municipal permission gives no parking-space count in the supplied extraction; no resident/visitor allocation, accessible-space count, EV provision, ramp details, or unit-specific parking allotment is evidenced here.
A drawn or approved parking provision does not by itself establish that a specific bay is exclusively allocated to a buyer. The project documents supplied for this section do not establish individual parking allocations.
6. Amenities, recreation & open spaces
The RERA amenity record gives status fields for project facilities. A “YES” and 100% in that record is a filed status, not independent verification of present condition. The HMDA and municipal approvals also identify certain site provisions and conditions. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Water supply | No capacity or source details supplied | RERA amenities | RERA record: YES, 100%; not independently verified |
| Sewerage | Listed as “Sewerage (Chamber, Lines, Septic Tank, STP)” | RERA amenities | RERA record: YES, 100%; not independently verified |
| Storm-water drains | No size or capacity supplied | RERA amenities | RERA record: YES, 100%; not independently verified |
| Green strip / tot-lot / park | HMDA approval requires tot-lot fencing and maintenance as greenery before occupancy-certificate issue; municipal permission records “No. of Tot-lot 6” | RERA amenities | RERA record: YES, 100%; approval condition and filed amenity status are not independent verification |
| Water conservation / rainwater harvesting | HMDA requires rainwater-harvesting structures; municipal permission records 4 RWHPs; the occupancy certificate lists rainwater harvesting | RERA amenities | RERA record: YES, 100%; certificate lists the feature, without separate present-condition verification |
| Electrical meter room / sub-station / receiving station | Municipal permission includes a provision for a transformer; HMDA also requires transformer provision | RERA amenities | RERA record: YES, 100%; no independent operational verification |
| Internal roads and footpaths | No dimensions supplied | RERA amenities | RERA progress field: 0% |
| Street lighting | No details supplied | RERA amenities | RERA progress field: 0% |
| Community buildings | No description or size supplied | RERA amenities | RERA progress field: 0% |
| Sewage and sullage treatment/disposal | No capacity or reuse details supplied | RERA amenities | RERA progress field: 0% |
| Solid-waste management and disposal | No facility details supplied | RERA amenities | RERA progress field: 0% |
| Energy management | No system details supplied | RERA amenities | RERA progress field: 0% |
| Fire protection and fire safety | No system specifications supplied in the amenity record | RERA amenities | RERA progress field: 0% |
| Recreational open space | Aggregate area not supplied | RERA amenities | RERA progress field: 0% |
7. Utilities, building services & safety
The RERA amenity record lists water supply, sewerage, storm-water drains, rainwater harvesting, and an electrical meter room/sub-station/receiving station as YES at 100%; these are portal-declared statuses, not an independent inspection. RERA amenities
The HMDA technical approval requires rainwater harvesting, a septic tank, a transformer and a garbage house. It specifies separate underground static water storage and terrace tanks of 25,000 Its. capacity each for residential buildings. The municipal permission records four rainwater-harvesting pits/structures. The occupancy certificate lists rainwater harvesting. No supplied record gives an STP capacity, treated-water reuse arrangement, electrical backup capacity, lift number or capacity, or CCTV/security-system specifications.
The municipal permission requires a safe distance of 3.0 m vertically and horizontally from high-tension electrical lines and 1.5 m from low-tension lines, and states that occupancy certification is compulsory before occupation for buildings above 100 sq. m. The HMDA approval also requires compliance with Fire Service department norms; the supplied information does not establish specific fire-system equipment or independently verify compliance.
8. Location, access & connectivity
The registered location is Bachupally, Bachupally mandal, Medchal-Malkajgiri district, Telangana, PIN 500090. The project boundary record identifies 40 FEET WIDE ROAD on the east and north sides. RERA record RERA filing
The supplied location record gives these nearby reference points and distances: Silver Oaks, 0.2 km; Sri Swastik Multispeciality Hospital, 0.3 km; PPZ Park, 0.3 km; Sri Chaitanya Jr. College, 0.5 km; Dr. Reddy's Laboratories Limited, 1.7 km; New Mallampet Bus Stop, 2.0 km; and Miyapur Metro, 5.1 km. These are recorded location-data distances; no travel times are supplied. Location record
9. Developer & development status
The registered promoter is OLIVE CONSTRUCTIONS, recorded as a partnership. The RERA record names NAGI REDDY NITTURU as authorized signatory and GANGADHAR REDDY DEVIREDDY and VAMSIKRISHNA PRASAD NAGUMOTHU as partners. Corporate record Parties record
The promoter’s Form B, signed by its authorized representative, identifies the project and declares a completion undertaking of 08 JANUARY 2027. The same filing describes the land owners and the development agreement-cum-GPA as the basis for development. This is a promoter declaration.
The filed occupancy certificate covers the residential flats on Plot Nos. 6, 7 & 8 in Survey No. 332. The available material does not state a current independently verified site-progress percentage. RERA amenities
10. Approvals, official records & documents
| Identifier / date | P02200002934; issued 14/05/2021; valid through 08/01/2027 |
|---|---|
| What the supplied record establishes | Registration for SUKRITHI SAANVI, Plot Nos. 6, 7 & 8, Survey No. 332, Bachupally. |
| Identifier / date | 039012/MED/R1/U6/HMDA/11092020; 08/01/2021 |
|---|---|
| What the supplied record establishes | Technical approval for the residential apartment building; document directs that building plans be sanctioned by the Executive Authority in conformity with HMDA’s technically approved plans. |
| Identifier / date | G1/BP/52/B/NMC/2021; 16/03/2021 |
|---|---|
| What the supplied record establishes | Building permission for Survey No. 332, Plot Nos. 6, 7 & 8, with 1 cellar, 1 stilt and 5 upper floors. |
| Identifier / date | 002629/OC/HMDA/MED/2023; 06 April 2023 |
|---|---|
| What the supplied record establishes | Occupancy certificate for the residential flats on Plot Nos. 6, 7 & 8, Survey No. 332; the record states the building was inspected and declared fit for occupation. |
| Identifier / date | Dated “5uth day of March 2021” as transcribed in the extraction |
|---|---|
| What the supplied record establishes | Promoter declaration identifying project land owners, development agreement-cum-GPA and completion undertaking. |
| Identifier / date | Document 155398, dated 01 March 2021 |
|---|---|
| What the supplied record establishes | Advocate’s title scrutiny report; the detailed title chain and cited instruments are addressed in the Land & Title section. |
| Identifier / date | Documents 159098 and 159097 |
|---|---|
| What the supplied record establishes | Filed records concerning the sale deed and development agreement-cum-GPA for Plot Nos. 6, 7 & 8, Survey No. 332, Bachupally. |
The supplied record identifies an HMDA technical approval, municipal building permission and HMDA occupancy certificate. A readable approved layout or detailed flat floor plan is not available in the supplied drawing review. Floor plans
1. Project at a glance
Project identity
Registered name: SUKRITHI SAANVI
Project type: Residential apartment project
Phase / registered portion: Registration is for the project at Plot Nos. 6, 7 & 8, Survey No. 332; a separate phase name is not disclosed.
TG-RERA registration: P02200002934; registered 14/05/2021 and valid through 08/01/2027, subject to extension by the Authority.
Registered promoter: Olive Constructions; partnership.
RERA status: Registration certificate issued under section 5.
Land and geographic identity
Locality / revenue village: Bachupally; the filed approval also describes the village as Bachpalle.
Mandal: Bachupally.
District / PIN: Medchal-Malkajgiri / 500090.
Project survey number(s) / subdivision(s): Survey No. 332; no project subdivision is identified in the filed project records.
Registered site extent: 1,654.19 sq. m. in the municipal permission. The RERA land fields separately record total area 1,654.19 sq. m., affected area 1.62 sq. m., and net area 1,652.57 sq. m.
Boundaries: East: 40 FEET WIDE ROAD; North: 40 FEET WIDE ROAD; West: NEIGHBOURS LAND IN SURVEY NO 332 PART; South: OPEN AREA.
Development identity
Authorities / principal approvals: HMDA technical approval 039012/MED/R1/U6/HMDA/11092020, approved 08/01/2021; Nizampet Municipal Corporation building permission G1/BP/52/B/NMC/2021, dated 16/03/2021.
Approved built-up area: Municipal permission records Net BUA Area (m2) 4095.44. HMDA technical approval also lists Total Built up Area (In Sq.mts) 4878.05; these are the figures stated in the respective filed documents.
Building count / configuration: One residential building; permission describes 1 Cellar + 1 Stilt + 5 Upper floor.
Parking levels: Cellar and stilt are designated for parking in the HMDA technical approval; the available record does not provide a car-space count.
Units: RERA filing records one building and 40 apartments; the unit schedule lists 40 homes.
Offering and status
Configuration / RERA saleable area: 2BHK; 113.16 sq. m.
Booked / available: 13 booked / 27 available, as last read from the TG-RERA portal; the record has no as-of date, so counts are indicative.
Construction stage: HMDA issued an occupancy certificate for the residential flats at Plot Nos. 6, 7 & 8, Survey No. 332, dated 06 April 2023.
Promoter-declared completion deadline: Form B states 08 JANUARY 2027.
Registration validity: Through 08/01/2027; this is the registration-validity date, not a statement of construction progress.
Occupancy certificate scope: The available certificate concerns the residential flats on Plot Nos. 6, 7 & 8, Survey No. 332, and describes a cellar/ground, stilt and five upper floors.
2. The project story
SUKRITHI SAANVI is registered as a residential apartment project at Plot Nos. 6, 7 & 8 in Survey No. 332, Bachupally, Medchal-Malkajgiri district. The filed building permissions describe one building with a cellar, stilt and five upper floors, and the RERA unit record lists 40 two-bedroom apartments.
The filed record includes an HMDA occupancy certificate for the residential flats at this site. It states that a completion notice was submitted and that the inspected building was fit for occupation; the certificate records a completion date of 02 January 2023 and an occupancy-certificate date of 06 April 2023. This is documentary evidence of the certificate’s scope, not an independent present-day site inspection.
The promoter’s Form B declares a completion undertaking of 08 January 2027, while the registration certificate remains valid through that same date. The project record does not provide independently verified current construction progress.
3. Master plan, architecture & building design
The project is described in the filed approvals as a single residential building on a site of 1,654.19 sq. m. The RERA land fields record net area of 1,652.57 sq. m. after an affected area of 1.62 sq. m. The municipal permission records a net BUA area of 4,095.44 sq. m.; HMDA’s technical-approval document separately states total built-up area of 4,878.05 sq. m.
The building configuration in the municipal permission is 1 Cellar + 1 Stilt + 5 Upper floor; the HMDA technical approval describes 1Cellar + 1Stilt + 5 Upper floors. The HMDA document identifies a building height of 14.24 and the municipal permission records height of 14.244 m.
The HMDA approval states that the cellar and stilt approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. It also requires a tot-lot to be fenced and maintained as greenery before issue of an occupancy certificate. The municipal permission records setbacks and a site-deduction area; the supplied material does not include a readable detailed approved floor plan or drawing-derived building layout.
The available floor-plan review reports two drawings, neither with measured flats; both are classified as having no flats. Accordingly, no software-measured room, carpet-area, circulation or floor-layout measurements can be reported.
4. Homes, configurations & floor plans
The TG-RERA unit schedule lists 40 2BHK apartments, with 13 booked and 27 available at the last portal read. The filed saleable area is 113.16 sq. m. per unit; booking counts have no stated as-of date and are indicative.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 40 | 13 | 27 | 113.16 sq. m. | Not measured from the supplied drawings | Not supplied |
No software-measured carpet area or room dimensions are available. Carpet area is distinct from saleable area: saleable area can include the apartment’s share of common areas, while carpet area is an internal dwelling measurement. The supplied floor-plan review does not provide measurements for this project’s flats.
5. Parking & vehicle circulation
The HMDA technical approval designates the cellar and stilt for vehicle parking and prohibits partition walls and rolling shutters in those levels. The approval also refers to a minimum width of 4.5 m and height clearance of 5 m in its sanctioned parameters. The municipal permission gives no parking-space count in the supplied extraction; no resident/visitor allocation, accessible-space count, EV provision, ramp details, or unit-specific parking allotment is evidenced here.
A drawn or approved parking provision does not by itself establish that a specific bay is exclusively allocated to a buyer. The project documents supplied for this section do not establish individual parking allocations.
6. Amenities, recreation & open spaces
The RERA amenity record gives status fields for project facilities. A “YES” and 100% in that record is a filed status, not independent verification of present condition. The HMDA and municipal approvals also identify certain site provisions and conditions.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Water supply | No capacity or source details supplied | RERA record: YES, 100%; not independently verified | |
| Sewerage | Listed as “Sewerage (Chamber, Lines, Septic Tank, STP)” | RERA record: YES, 100%; not independently verified | |
| Storm-water drains | No size or capacity supplied | RERA record: YES, 100%; not independently verified | |
| Green strip / tot-lot / park | HMDA approval requires tot-lot fencing and maintenance as greenery before occupancy-certificate issue; municipal permission records “No. of Tot-lot 6” | RERA record: YES, 100%; approval condition and filed amenity status are not independent verification | |
| Water conservation / rainwater harvesting | HMDA requires rainwater-harvesting structures; municipal permission records 4 RWHPs; the occupancy certificate lists rainwater harvesting | RERA record: YES, 100%; certificate lists the feature, without separate present-condition verification | |
| Electrical meter room / sub-station / receiving station | Municipal permission includes a provision for a transformer; HMDA also requires transformer provision | RERA record: YES, 100%; no independent operational verification | |
| Internal roads and footpaths | No dimensions supplied | RERA progress field: 0% | |
| Street lighting | No details supplied | RERA progress field: 0% | |
| Community buildings | No description or size supplied | RERA progress field: 0% | |
| Sewage and sullage treatment/disposal | No capacity or reuse details supplied | RERA progress field: 0% | |
| Solid-waste management and disposal | No facility details supplied | RERA progress field: 0% | |
| Energy management | No system details supplied | RERA progress field: 0% | |
| Fire protection and fire safety | No system specifications supplied in the amenity record | RERA progress field: 0% | |
| Recreational open space | Aggregate area not supplied | RERA progress field: 0% |
7. Utilities, building services & safety
The RERA amenity record lists water supply, sewerage, storm-water drains, rainwater harvesting, and an electrical meter room/sub-station/receiving station as YES at 100%; these are portal-declared statuses, not an independent inspection.
The HMDA technical approval requires rainwater harvesting, a septic tank, a transformer and a garbage house. It specifies separate underground static water storage and terrace tanks of 25,000 Its. capacity each for residential buildings. The municipal permission records four rainwater-harvesting pits/structures. The occupancy certificate lists rainwater harvesting. No supplied record gives an STP capacity, treated-water reuse arrangement, electrical backup capacity, lift number or capacity, or CCTV/security-system specifications.
The municipal permission requires a safe distance of 3.0 m vertically and horizontally from high-tension electrical lines and 1.5 m from low-tension lines, and states that occupancy certification is compulsory before occupation for buildings above 100 sq. m. The HMDA approval also requires compliance with Fire Service department norms; the supplied information does not establish specific fire-system equipment or independently verify compliance.
8. Location, access & connectivity
The registered location is Bachupally, Bachupally mandal, Medchal-Malkajgiri district, Telangana, PIN 500090. The project boundary record identifies 40 FEET WIDE ROAD on the east and north sides.
The supplied location record gives these nearby reference points and distances: Silver Oaks, 0.2 km; Sri Swastik Multispeciality Hospital, 0.3 km; PPZ Park, 0.3 km; Sri Chaitanya Jr. College, 0.5 km; Dr. Reddy's Laboratories Limited, 1.7 km; New Mallampet Bus Stop, 2.0 km; and Miyapur Metro, 5.1 km. These are recorded location-data distances; no travel times are supplied.
9. Developer & development status
The registered promoter is OLIVE CONSTRUCTIONS, recorded as a partnership. The RERA record names NAGI REDDY NITTURU as authorized signatory and GANGADHAR REDDY DEVIREDDY and VAMSIKRISHNA PRASAD NAGUMOTHU as partners.
The promoter’s Form B, signed by its authorized representative, identifies the project and declares a completion undertaking of 08 JANUARY 2027. The same filing describes the land owners and the development agreement-cum-GPA as the basis for development. This is a promoter declaration.
The filed occupancy certificate covers the residential flats on Plot Nos. 6, 7 & 8 in Survey No. 332. The available material does not state a current independently verified site-progress percentage.
10. Approvals, official records & documents
| Identifier / date | P02200002934; issued 14/05/2021; valid through 08/01/2027 |
|---|---|
| What the supplied record establishes | Registration for SUKRITHI SAANVI, Plot Nos. 6, 7 & 8, Survey No. 332, Bachupally. |
| Identifier / date | 039012/MED/R1/U6/HMDA/11092020; 08/01/2021 |
|---|---|
| What the supplied record establishes | Technical approval for the residential apartment building; document directs that building plans be sanctioned by the Executive Authority in conformity with HMDA’s technically approved plans. |
| Identifier / date | G1/BP/52/B/NMC/2021; 16/03/2021 |
|---|---|
| What the supplied record establishes | Building permission for Survey No. 332, Plot Nos. 6, 7 & 8, with 1 cellar, 1 stilt and 5 upper floors. |
| Identifier / date | 002629/OC/HMDA/MED/2023; 06 April 2023 |
|---|---|
| What the supplied record establishes | Occupancy certificate for the residential flats on Plot Nos. 6, 7 & 8, Survey No. 332; the record states the building was inspected and declared fit for occupation. |
| Identifier / date | Dated “5uth day of March 2021” as transcribed in the extraction |
|---|---|
| What the supplied record establishes | Promoter declaration identifying project land owners, development agreement-cum-GPA and completion undertaking. |
| Identifier / date | Document 155398, dated 01 March 2021 |
|---|---|
| What the supplied record establishes | Advocate’s title scrutiny report; the detailed title chain and cited instruments are addressed in the Land & Title section. |
| Identifier / date | Documents 159098 and 159097 |
|---|---|
| What the supplied record establishes | Filed records concerning the sale deed and development agreement-cum-GPA for Plot Nos. 6, 7 & 8, Survey No. 332, Bachupally. |
The supplied record identifies an HMDA technical approval, municipal building permission and HMDA occupancy certificate. A readable approved layout or detailed flat floor plan is not available in the supplied drawing review.
Frequently asked questions
Is SUKRITHI SAANVI registered with Telangana RERA?
Yes. SUKRITHI SAANVI is registered with the Telangana Real Estate Regulatory Authority as P02200002934; the registration status is New Project.
Who is the developer of SUKRITHI SAANVI?
The promoter named in the RERA registration is OLIVE CONSTRUCTIONS.
Where is SUKRITHI SAANVI located?
SUKRITHI SAANVI is in Bachupally, Medchal-Malkajgiri, Telangana (500090).
When will SUKRITHI SAANVI be completed?
The promoter's proposed date of completion filed with RERA is 08/05/2027. This is the promoter's declaration, not a guarantee.