Sign in

Sr Lakshmi Residency

S R CONSTRUCTIONS · Sangareddy · RERA P01100002864

SR LAKSHMI RESIDENCY is a residential apartment project in Ameenpur, Ameenpur mandal, Sangareddy district, developed by registered promoter S R CONSTRUCTIONS. It is on 360.38 Sq. Mt. of land and comprises one proposed residential building with 1 stilt + 5 upper floors and 10 2BHK units. The project is registered under TG-RERA number P01100002864, with proposed completion on 01/06/2027.

More from Sr Constructions · 26 projects →

01What we found

RegisteredTG-RERA - valid till 1 Feb 2027
15documents on file - each fact links to its page
1court case on this project's land (survey 332, Ameenpur)
11items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered nameSR LAKSHMI RESIDENCY RERA record
Project typeResidential apartment project RERA record RERA filing
Registered phase / portionRegistration is for the project identified with Survey No. 332/PART; a separate phase name or phase number is not disclosed.
TG-RERA registrationP01100002864 RERA record
Registration validity30/04/2021 to 01/02/2027; the certificate states five years and that an extension would be subject to Authority approval. Registration validity is not the same as the project completion date.
Registered promoterS R CONSTRUCTIONS; RERA records the organization type as Partnership. RERA record RERA filing
RERA statusRegistration certificate issued; the supplied certificate does not record an extension. The current live status beyond the certificate record is not independently established here.

Land and geographic identity

ItemProject record
LocalityAmeenpur RERA record RERA filing
Revenue villageAmeenpur is the registered project identity; the filed technical-approval documents describe the site as Ameenapur Village. RERA record
MandalAmeenpur RERA record
DistrictSangareddy RERA record
PIN502032
Survey number(s) and subdivision(s)332/PART; no other project survey subdivision is identified in the supplied project registration and approval records. RERA record
Registered site extent360.38 Sq. Mt. in the HMDA technical approval.
Other plan-record site extentThe filed building-plan record states 362.31 SQ.MT.
Net / total areaRERA filing records Total Area: 360.38 sqmts, Net Area: 360.38 sqmts, and road-widening/FTL/Nala-affected area 00. RERA filing
BoundariesEast: ROAD WIDTH-12; West: PLOT NO-42 AND 43; North: PLOT NO 40 P; South: ROAD WIDTH-12. RERA filing

Development identity

ItemProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); the technical approval notes delegation to Ameenpur Municipality for sanctioning plans in conformity with HMDA’s technical approval.
Principal approval034782/SKP/R1/U6/HMDA/01032020, approved 01/02/2021. The RERA filing also identifies plan approval 034782/SKP/R1/U6/HMD. Approvals record
Approved built-up areaThe technical approval lists Built up Area 1058.15 and Total Built up Area (In Sq.mts) 1273.53; these are separate figures as stated in that record.
Building count and nameOne proposed residential building, named SANJEEV REDDY in the technical approval.
Sanctioned floor configuration1 stilt + 5 upper floors. Building height is recorded as 14.99 in the technical approval’s parameters; the plan record also states 20.39 mt. Total Ht. and 17.99 mt. from GL.
Parking levels / provisionStilt is shown; a sanctioned parking count or allocation schedule is not supplied.
Units10 units in the RERA filing and filed plan record. The approval condition says sanctioned unit numbers must not be increased without prior GHMC approval. RERA filing

Offering and status

ItemProject record
RERA-filed configuration2BHK, 10 units. RERA unit table RERA unit details
RERA-filed saleable area120.3 sqm per filed configuration. RERA unit table RERA unit details
Booked / available0 booked; 10 available, as last read from the TG-RERA portal; the record carries no as-of date, so counts are indicative. RERA unit table RERA unit details
Construction stageNo independently verified site-progress figure or stage is supplied. RERA portal amenity/progress entries shown here report 0% for the listed items; those entries do not establish a site inspection or overall construction percentage. RERA amenities
Completion datesRERA project information gives proposed completion 01/06/2027. The registration certificate validity ends 01/02/2027; these are distinct dates in the supplied record. RERA filing RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied for the building. The technical approval states an occupancy certificate is compulsory before occupation.

2. The project story

SR LAKSHMI RESIDENCY is a single-building residential apartment project in Ameenpur, Sangareddy district, associated in the records with the southern part of Plots 40 and 41 in Survey No. 332/PART. The RERA-filed offering is 10 two-bedroom apartments, with the portal’s latest captured inventory indicating 10 available and none booked; the portal record has no as-of date. The proposed building configuration and approval documentation are established in the supplied records, but independently verified construction progress, completion, or occupation certification is not. The RERA project information states a proposed completion date of 01/06/2027. RERA record RERA unit table RERA filing

3. Master plan, architecture & building design

The project records describe one residential building on 360.38 Sq. Mt. of site in the HMDA technical approval, with a filed building-plan record also stating 362.31 SQ.MT. The technical approval lists Built up Area 1058.15 and Total Built up Area (In Sq.mts) 1273.53; the filed plan separately lists Total Proposed Net BUA Area 1078.06 and Proposed Coverage Area (58.41%) 211.63. These are distinct labels and figures in the supplied records, not interchangeable area measures.

The proposed building is shown as 1 stilt + 5 upper floors. The filed plan identifies a 12.00 abutting road width, 12.00 MT wide south and east roads, and a 4.5M WIDE DRIVE WAY. It also shows setbacks of 2.00, 3.00, and 1.25. The supplied drawing extractions do not give a verified floor-by-floor apartment schedule, lifts, stairs, entry/exit details, or a measured carpet-area schedule.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK10010120.3 sqmNot measured in the supplied floor-plan recordsNot supplied

The RERA-filed area is identified as saleable area. The drawing-based review reports two drawings, with no flats measured; therefore no software-measured carpet area or room dimensions are available to report. Carpet area and saleable area are different measures; the supplied records do not provide a project-specific loading figure. Booking and availability figures are indicative because the portal capture has no as-of date. RERA unit table RERA unit details Floor plans

5. Parking & vehicle circulation

The filed plans show a stilt level and identify a 4.5M WIDE DRIVE WAY, but the supplied project records do not establish the number of sanctioned car or two-wheeler spaces, visitor or accessible spaces, parking allocation by unit, or a parking-level schedule. A stilt or drawn parking provision does not by itself establish exclusive ownership or allocation.

6. Amenities, recreation & open spaces

The RERA portal’s amenity entries show the following listed facilities and report 0% progress for each item in that record. “Available: YES” is the portal field value, not independent confirmation that a facility is completed or operational. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads and footpathsNo size suppliedRERA portal amenity record RERA amenities0%; not independently verified
Water supplyPortal field: YESRERA portal amenity record RERA amenities0%; not independently verified
Sewerage (chamber, lines, septic tank, STP)Portal field: YESRERA portal amenity record RERA amenities0%; not independently verified
Storm-water drainsNo size suppliedRERA portal amenity record RERA amenities0%; not independently verified
Green strip / tot-lot / parkNo size suppliedRERA portal amenity record RERA amenities0%; not independently verified
Street lightingNo quantity or size suppliedRERA portal amenity record RERA amenities0%; not independently verified
Community buildingsNo description or size suppliedRERA portal amenity record RERA amenities0%; not independently verified
Treatment and disposal of sewage and sullage waterNo capacity suppliedRERA portal amenity record RERA amenities0%; not independently verified
Solid-waste management and disposalNo system details suppliedRERA portal amenity record RERA amenities0%; not independently verified
Water conservation / rainwater harvestingNo capacity suppliedRERA portal amenity record RERA amenities; technical approval also lists rainwater-harvesting structures0%; not independently verified
Energy managementPortal field: YESRERA portal amenity record RERA amenities0%; not independently verified
Fire protection and fire-safety requirementsPortal field: YESRERA portal amenity record RERA amenities0%; not independently verified
Electrical meter room, sub-station, receiving stationPortal field: YESRERA portal amenity record RERA amenities0%; not independently verified
Recreational open spaceAggregate area not suppliedRERA portal amenity record RERA amenities0%; not independently verified

The vendor listing also names a clubhouse, gym, swimming pool, children’s play area, CCTV, power backup and security, among other facilities. These are vendor-attributed claims, not established here as RERA-filed, sanctioned, or delivered project facilities. Promoter website

7. Utilities, building services & safety

The filed technical approval lists a transformer, garbage house, rainwater-harvesting structures, and ETP. The filed plan record lists a transformer yard, S.T.P., and S U M P; the technical approval also requires provision of an ETP as per standard specification. These records identify proposed or approval-document facilities; no capacities or independent completion evidence are supplied.

The RERA portal amenity record marks water supply, sewerage, energy management, fire protection and an electrical meter room/sub-station/receiving station as YES, while showing 0% progress for those items. No water source or storage capacity, STP/ETP capacity, reuse details, electrical backup capacity, lift details, fire-system specifications, accessibility arrangements, or completed safety inspection is documented in the supplied evidence. RERA amenities

8. Location, access & connectivity

The registered location is Ameenpur, Ameenpur mandal, Sangareddy district, Telangana, PIN 502032, on Survey No. 332/PART. The cadastral parcel centroid is recorded at 17.51403, 78.33831; this is a parcel-centroid location, not a surveyed building entrance coordinate. The location record lists the nearest sampled Outer Ring Road interchange at approximately 8.5 km. The filed plan describes 12.00 MT wide south and east roads and a 4.5M wide driveway. No measured distances to public transport stops or other landmarks are supplied in the project location record. RERA record Location record Cadastral map

9. Developer & development status

The registered promoter is S R CONSTRUCTIONS, recorded as a Partnership. The RERA record names DUVVURI GANGA REDDY as Partner and DUVVURI SANJEEV REDDY as Authorized Signatory. The supplied evidence does not establish a corporate identification number, registered-office address beyond the project/promoter address, or official promoter website/contact details. RERA filing Parties record

The promoter’s Form B contains undertakings concerning project accounts, approvals and other obligations, but its completion-period line is unfilled in the extracted record. The RERA project information states proposed completion 01/06/2027; no independently verified construction-progress percentage or OC status is supplied. RERA filing RERA amenities

10. Approvals, official records & documents

RecordWhat the supplied evidence establishes
TG-RERA certificateForm C registration for SR LAKSHMI RESIDENCY, P01100002864, issued 30/04/2021, valid to 01/02/2027 as stated in the certificate.
HMDA technical approvalApproval 034782/SKP/R1/U6/HMDA/01032020, dated 01/02/2021, for a proposed residential building on Survey No. 332/PART; the approval records 1 stilt + 5 upper floors and conditions concerning local-authority plan sanction and occupancy certification.
Filed building planPlan sheet 01/01; file number 034782/6.3/R1/U6/HMDA/01032020; shows one proposed residential building, 10 dwelling units, stilt plus five upper floors, and the site/road details stated above. The extracted text does not state a sanction date or validity period for this plan record.
Additional filed planFile number 034782/SK3/R1/U6/HMDA/01032020; extracted plan record identifies the same proposed building and 10 units.
Form B promoter declarationPromoter declaration containing undertakings; extracted completion-period field is blank.
Occupancy / completion documentationNo occupancy or completion certificate is included in the supplied documents. The technical approval states that an occupancy certificate is compulsory before occupation.

Frequently asked questions

Is SR LAKSHMI RESIDENCY registered with Telangana RERA?

Yes. SR LAKSHMI RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P01100002864; the registration status is New Project.

Who is the developer of SR LAKSHMI RESIDENCY?

The promoter named in the RERA registration is S R CONSTRUCTIONS.

Where is SR LAKSHMI RESIDENCY located?

SR LAKSHMI RESIDENCY is in AMEENPUR, Sangareddy, Telangana (502032).

When will SR LAKSHMI RESIDENCY be completed?

The promoter's proposed date of completion filed with RERA is 01/06/2027. This is the promoter's declaration, not a guarantee.

More projects in Ameenapur