Sign in

Sai Gurusthan

S V INFRA PROJECTS · Medchal-Malkajgiri · RERA P02200002387

Sai Gurusthan is a residential apartment project in SIMHAPURI COLONY, Dundigal Gandimaisamma, Medchal-Malkajgiri. The registered promoter is S V INFRA PROJECTS. It occupies 619.96 sq. m. and comprises 1 building with 1 Stilt + 5 upper floors and 15 homes: 10 2BHK units of 106.38 sq. m. and 5 3BHK units of 132.85 sq. m. Its TG-RERA registration is P02200002387, and the proposed completion date is 31/10/2022.

More from S V Infra Projects · 4 projects →

01What we found

Period endedTG-RERA registration ran to 31 Oct 2022 - check its extension on TG-RERA
9documents on file - each fact links to its page
0court cases on this project's land in the court records searched
11items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from nobroker.in

1. Project at a glance

Project identity

FieldProject record
Registered nameSai Gurusthan RERA record
Project typeResidential apartment project RERA record
Phase / registered portionNo phase name or phase number is disclosed. The registration and approval describe the building on plots E-114(PART), E-115, E-118 and E-119/PART.
TG-RERA registrationP02200002387, granted under section 5; certificate issued 17/12/2020. Approvals record
Registration validityCertificate states validity from 17/12/2020 to 31/10/2022; it records no extension. This is the registration period, not a statement that construction was completed by that date. Approvals record
Registered promoterS V INFRA PROJECTS (also styled “S.V. Infra Projects” in filed documents). RERA record
RERA record statusRegistration certificate located. Current registration status beyond the certificate’s stated validity is not established by the supplied record. Approvals record

Land and geographic identity

FieldProject record
LocalitySIMHAPURI COLONY; the filed technical approval describes Simhapuri Colony, Bowrampet. RERA record RERA filing
Revenue villageBowrampet. RERA record
MandalDundigal Gandimaisamma in the RERA record. RERA record
DistrictMedchal-Malkajgiri. RERA record
PIN500043. RERA record
Project survey and plot identifiersSurvey No. 538; plots E-114(PART), E-115, E-118 and E-119/PART. No survey subdivision is specified in the supplied project record. Land records
Registered site extent619.96 sq. m. Land records
Total / net land areaRERA land details state total area 619.96 sq. m., affected area 0 sq. m., and net area 619.96 sq. m. Land records
Boundaries in RERA land detailsNorth: Road Width-9; South: Road Width-12; East: Plot No-E-117 and E-116; West: Plot No-E-119 part and E-114 part. Land records

Development identity

FieldProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); the technical approval identifies delegation to Dundigal Muncipality. Approvals record
Principal approvalTechnical building approval 031670/MED/R1/U6/HMDA/11122019, approved 15/07/2020. The RERA filing also uses plan approval number 031670/MED/R1/U6/HMD. Approvals record
Approved built-up area1,412.8 sq. m. The technical approval separately states Total Built up Area: 1,730.41 Sq.mts; these are separately reported figures in that approval. RERA filing
Building count / configurationRERA land details record 1 building. The technical approval describes 1 Stilt + 5 upper floors. Land records
Basement / podium / parking levelsNot disclosed in the supplied record. The approval refers to the stilt/cellar for vehicle parking.
Units15 total units in the RERA filing: 10 2BHK and 5 3BHK. The RERA land details state one proposed building unit. RERA unit table Land records

Offering and status

FieldProject record
RERA-filed configurations and saleable areas2BHK: 106.38 sq. m.; 3BHK: 132.85 sq. m. RERA unit table RERA unit details
Booked / availablePortal figures read for the RERA record show 0 booked and 15 available (10 2BHK, 5 3BHK). The portal record supplies no as-of date, so these counts are indicative, not a current availability confirmation. RERA unit table RERA unit details
Construction stageThe project is labelled “New Project” in the RERA filing. No independently verified site-progress assessment is supplied. RERA record RERA filing
Completion timelineThe promoter’s Form B declaration gives 31/10/2022 as the project completion undertaking; the registration certificate also ends on that date.
OC / completion certificateNo occupancy certificate or completion certificate is included in the supplied project documents. The technical approval says an occupancy certificate is compulsory before occupation.

2. The project story

Sai Gurusthan is a RERA-registered residential apartment development on a 619.96 sq. m. site in Simhapuri Colony, Bowrampet, identified in the filing as Survey No. 538, comprising plots E-114(PART), E-115, E-118 and E-119/PART. The filed building approval describes one proposed residential building with 1 stilt + 5 upper floors. RERA record Land records

The RERA unit schedule lists 15 homes: ten 2BHK units and five 3BHK units. The promoter declared a completion date of 31/10/2022. The supplied materials do not establish actual completion, current construction progress, or an issued occupancy certificate; the RERA “New Project” label is a filing status, not independent evidence of present site conditions. RERA unit table RERA filing

3. Master plan, architecture & building design

The HMDA technical approval describes a proposed residential building on plots E-114 (part), E-115, E-118 and E-119 (part) in Survey No. 538, on 619.96 sq. m. of land. It specifies 1 Stilt + 5 floors. The RERA filing separately records approved built-up area of 1,412.80 sq. m.; the technical approval also states Total Built up Area: 1,730.41 Sq.mts. These are the figures as labelled in the respective records and should not be treated as interchangeable area measures. RERA filing

The technical approval includes a tot-lot and rainwater-harvesting structures, and requires provision for a transformer and garbage house within the premises. It also states that no parking or construction is permitted in setback areas and that the stilt/cellar is to be used exclusively for vehicle parking without partition walls or rolling shutters. The supplied drawing records do not provide a verified building footprint, floor-by-floor unit arrangement, number of flats per floor, lift or stair details, internal circulation plan, or open-space measurements. RERA amenities

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK10010106.38 sq. m.Not measured; drawing scans pending reviewNot supplied
3BHK505132.85 sq. m.Not measured; drawing scans pending reviewNot supplied

Unit counts, booking figures and saleable areas are from the TG-RERA filing; the portal record has no as-of date for the booking figures. The two available floor-plan drawings have not yet been software-measured. Accordingly, no drawing-based carpet area, room dimensions, balcony or utility dimensions, or typical floor arrangement can be reported. RERA saleable area is not a measured carpet-area figure. RERA unit table RERA unit details Floor plans

5. Parking & vehicle circulation

The RERA record reports 212.29 sq. m. as mortgage area. The HMDA technical approval identifies 212.29 sq. m., equal to 15.00% of built-up area, as mortgaged built-up area on the first floor in favour of HMDA; it describes this as 10% regular and 5% for NALA. This is an authority mortgage provision, not evidence of parking allocation to buyers. RERA filing

The approval directs that the stilt/cellar be used exclusively for vehicle parking and that setbacks remain free of parking and construction. No sanctioned parking-space count, visitor or accessible-space count, two-wheeler provision, ramp or driveway details, EV charging provision, or unit-specific parking allocation is established in the supplied project record.

6. Amenities, recreation & open spaces

Tot-lot
Description / sizeSize not stated; approval requires it to be fenced and maintained as greenery before issue of OC.
Evidence sourceHMDA technical approval; RERA amenity schedule RERA amenities
Declared progress / verified statusRequired/provided for in the approval; completion not verified.
Rainwater harvesting
Description / sizeSize and capacity not stated.
Evidence sourceHMDA technical approval; RERA amenity schedule RERA amenities
Declared progress / verified statusRequired/provided for in the approval; completion not verified.
Internal roads and footpaths
Description / sizeNo dimensions supplied.
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusRERA schedule records 0% progress; independently verified status unavailable.
Green strip / tot-lot / park
Description / sizeNo area supplied.
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusRERA schedule records 0% progress; independently verified status unavailable.
Community buildings
Description / sizeNo facility details or size supplied.
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusRERA schedule records 0% progress; independently verified status unavailable.

No clubhouse, indoor facility, sports facility, or other recreation feature is established in the supplied RERA or approval evidence. The RERA amenity schedule reports 0% for the listed items; this is a filed progress figure, not an independent site inspection. RERA amenities

7. Utilities, building services & safety

The RERA amenity schedule marks Water Supply, Sewerage (Chamber, Lines, Septic Tank, STP), Water Conservation, Rain water Harvesting, and Electrical Meter Room, Sub-Station, Receiving Station as available, while recording 0% progress for those entries. The HMDA technical approval requires rainwater-harvesting structures, a transformer and a garbage house, and includes conditions on water-source and sewerage-disposal siting. The supplied evidence does not establish water source, storage or treatment capacity, an operational STP, sewer connection, electrical capacity, or completed utility services. RERA amenities

The approval requires services including sanitation, plumbing, fire-safety requirements, lifts and electrical installations to be carried out under qualified technical personnel’s supervision. It also requires compliance with the National Building Code and states that an occupancy certificate is compulsory before occupation. These approval conditions do not, by themselves, establish that the systems are installed, tested, or completed. No lift count or capacity, backup-power specification, fire-system details, waste-segregation arrangements, CCTV/security provision, or accessibility features are documented in the supplied materials.

8. Location, access & connectivity

The registered project location is Simhapuri Colony, Bowrampet, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana, PIN 500043. The RERA land record gives road-width boundary labels of Road Width-9 to the north and Road Width-12 to the south; it does not provide named approach-road details. RERA record RERA filing Land records

The supplied location data lists these nearby places and distances: an unnamed park 0.5 km, Creek School 0.6 km, DRK Institute of Higher Studies 0.9 km, Testing Centre (hospital category) 1.4 km, ICICI Bank 1.6 km, Dr. Reddy’s Laboratories Limited 1.7 km, Sai Nagar Bus Stop 1.8 km, and nearest metro, JNTU College, 5.4 km. These are location-record distances; no travel times are supplied. Location record

9. Developer & development status

The registered promoter is S V INFRA PROJECTS, recorded in the RERA filing as a partnership. The named partners are Harsha Vardhan Penmethsa, P V N Shakervarma, P Vijay N Raju, and Srinu N; P Vijay N Raju is also identified as authorized signatory. The supplied record does not establish a company-style corporate registration identifier or verified official contact details. RERA record Corporate record RERA filing

The promoter’s Form B declaration identifies 31/10/2022 as the project completion undertaking and declares that 70% of amounts realized from allottees would be deposited in a separate scheduled-bank account for land and construction costs. These are promoter declarations. The supplied evidence does not verify current construction progress, current unit availability, or completion. RERA unit table

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200002387; issued 17/12/2020; stated validity to 31/10/2022
What the supplied record establishesForm C certificate for Sai Gurusthan; includes project conditions, including the separate-account requirement.
HMDA technical building approval
Identifier / date031670/MED/R1/U6/HMDA/11122019; approved 15/07/2020
What the supplied record establishesTechnical approval for the residential building on Survey No. 538 and the specified plots; describes 1 stilt + 5 floors and approval conditions. It states that local-authority sanction and an occupancy certificate are required.
Registered mortgage cited in approval
Identifier / date11338/2020; 07/07/2020
What the supplied record establishesApproval records a mortgage to HMDA of 212.29 sq. m. of first-floor built-up area.
Commencement / building approval document
Identifier / dateDocument 138019
What the supplied record establishesFiled as “Commencement Certificates for each building in each phase”; extracted content describes the HMDA technical approval. No separate commencement-notice evidence is supplied.
Promoter Form B declaration
Identifier / date26 September 2020 (date transcribed as “26tSeptember, 2020”)
What the supplied record establishesPromoter declaration concerning title basis, encumbrances, project completion and fund management.
Occupancy / completion certificate
Identifier / dateNot provided
What the supplied record establishesNo OC or completion certificate appears in the supplied project documents. The technical approval requires an OC before occupation.
Layout-plan document
Identifier / dateDocument 137963
What the supplied record establishesThe RERA filing requests a stamped layout approval or layout plan, or a declaration/equivalent document; no extracted approved-layout details are available. Document index
Floor plans
Identifier / dateTwo drawings; scans pending measurement
What the supplied record establishesNo software-measured floor-plan areas or room dimensions are available. Floor plans

Frequently asked questions

Is Sai Gurusthan registered with Telangana RERA?

Yes. Sai Gurusthan is registered with the Telangana Real Estate Regulatory Authority as P02200002387; the registration status is New Project.

Who is the developer of Sai Gurusthan?

The promoter named in the RERA registration is S V INFRA PROJECTS.

Where is Sai Gurusthan located?

Sai Gurusthan is in SIMHAPURI COLONY, Bowrampet, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana (500043).

When will Sai Gurusthan be completed?

The promoter's proposed date of completion filed with RERA is 31/10/2022. This is the promoter's declaration, not a guarantee.

More projects in Bowrampet