GOLDEN HOMES MARUTHI RESIDENCY is a residential apartment project in Ameenapur, Ameenpur mandal, Sangareddy district, developed by the registered promoter GOLDEN HOMES BUILDERS AND DEVELOPERS. The project has a land area of 483.76 sq. m and one building described as 1Stilt + 5, with 15 homes: 11 1BHK, one 2BHK and three 3BHK. The TG-RERA registration number is P01100002798, and the proposed completion date is 04/02/2026.

More from Golden Homes Builders And Developers · 8 projects →

01What we found

Period endedTG-RERA registration ran to 4 Feb 2026 - check its extension on TG-RERA
11documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

ItemRecord
Registered project nameGOLDEN HOMES MARUTHI RESIDENCY RERA record
Project type / registered portionResidential apartment project; the RERA record describes one project and one building, not a separately identified phase. RERA record RERA filing
TG-RERA registrationP01100002798; granted under section 5, issued 30/04/2021. Approvals record
Registration validityCertificate states 30/04/2021 to 04/02/2026; no extension is shown in the supplied certificate. This is registration validity, not the same as the completion date. Approvals record
Registered promoterGOLDEN HOMES BUILDERS AND DEVELOPERS; partnership. RERA filing Parties record
RERA status in supplied recordRegistration certificate supplied; current portal status is not established by the supplied record.

Land and geographic identity

ItemRecord
LocalityAmeenpur / Ameenapur as recorded in the project materials. RERA record
Revenue villageAMEENAPUR; the HMDA approval also says Ameenapur Village. RERA record RERA filing
Mandal / district / PINAmeenpur; Sangareddy; 502032. RERA record
Project survey numbers343/6 (NEW) and 343/5 (OLD). RERA record
Plot reference131 & 132 PART. RERA filing
Site extentRERA land details state total and net area of 483.76 sq. m; the HMDA technical approval describes an extent of 462.53 Sq. Mt. RERA filing
BoundariesNorth: ROAD WIDTH; South, East and West: OTHER LAND. RERA filing

Development identity

ItemRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); approval record states building plans are to be sanctioned by the Executive Authority in conformity with HMDA’s technical approval. Approvals record
Principal approvalTechnical approval 027132/SKP/R1/U6/HMDA/21082019, dated 04/02/2021. Approvals record
RERA-filed plan approval reference027132/SKP/R1/U6/HMD. RERA filing Approvals record
Approved built-up areaRERA project fields state 1268.50 sq. m. The technical approval extraction separately records “1239.8 built up area” and “Proposed Built-up Area 1515.2”; these are reproduced as stated in the approval record, without treating them as interchangeable area measures. RERA filing
Building and floorsOne building is recorded. The approval describes a residential building as 1Stilt + 5. Basement/cellar configuration and floor-by-floor unit distribution are not established in the supplied extracts. RERA filing
RERA-declared units15 total units in one building: 11 1BHK, 1 2BHK and 3 3BHK. The approval condition says sanctioned unit numbers must not be increased without prior approval. RERA unit table

Offering and status

ItemRecord
Unit configurations and RERA saleable areas1BHK: 39.45 sq. m; 2BHK: 123.98 sq. m; 3BHK: 123.98 sq. m. RERA unit table RERA unit table
Booked / availablePortal-derived figures show 0 booked and 15 available (11, 1 and 3 respectively). The booking record has no as-of date, so these figures are indicative. RERA unit table
Completion datesRERA project fields state proposed completion 04/02/2026. The Form B declaration states a completion undertaking of 02/02/2025. RERA filing
Construction stageNo independently verified site-progress evidence is supplied. The RERA amenity-progress entries show 0% for listed items, but do not establish overall building construction progress. RERA amenities
Occupancy / completion certificateNo occupancy certificate or completion certificate is included in the supplied documents. HMDA approval states an occupancy certificate is compulsory before occupation.

The project story

Golden Homes Maruthi Residency is registered as a residential apartment project in Ameenapur village, Ameenpur mandal, Sangareddy district. Its registered site is identified by survey numbers 343/6 (NEW) and 343/5 (OLD) and plot numbers 131 & 132 PART. The registration record describes one building with 15 proposed units; the HMDA technical approval describes a residential building of 1Stilt + 5. RERA record RERA filing

The RERA filing lists 11 1BHK, one 2BHK and three 3BHK units. The supplied portal-derived counts show all 15 as available and none booked, but do not carry an as-of date. No independent construction inspection or verified progress percentage is supplied. The filing’s amenity progress fields are 0% for the listed items; that is not a verified measure of overall construction progress. RERA unit table RERA unit details RERA amenities

The RERA record gives a proposed completion date of 04/02/2026, while the Form B declaration records 02/02/2025 as the promoter’s completion undertaking. These are reported as distinct filed statements; the supplied material does not establish a revised completion order or current project completion status. No OC or completion certificate is supplied. RERA filing

Master plan, architecture & building design

The supplied HMDA technical approval describes one residential building on plot numbers 131 and 132 part, with a floor configuration of 1Stilt + 5. The RERA filing records approved built-up area as 1268.50 sq. m. The technical approval extraction also contains the figures “1239.8 built up area” and “Proposed Built-up Area 1515.2”; the supplied record does not specify enough context to reconcile or classify these figures further. RERA filing

The filing identifies a building-plan approval reference but does not provide a readable floor-by-floor schedule, building footprint, height in storeys beyond the stated configuration, flats per floor, lift or stair count, entrance/exit arrangement, internal circulation plan, or phase-wise building organization. Two measured flat designs are available for each of the 2BHK and 3BHK types, but the floor-plan extract is not a complete architectural schedule. RERA filing

The technical approval lists a tot-lot and requires it to be fenced and maintained as greenery before an occupancy certificate. It also refers to setbacks and parking use in the approved stilt/cellar areas. The supplied extracts do not quantify the building footprint, landscaped/open-space area, or residential/common-area distribution.

Homes, configurations & floor plans

RERA-filed unit counts and saleable areas are shown below. Carpet areas and loading for 2BHK and 3BHK are software-measured from the approved floor-plan drawing geometry, not RERA-filed disclosures; the measurement record itself says the geometry needs review. The 1BHK has no supplied measured carpet area. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
1BHK1101139.45 sq. mNot suppliedNot supplied
2BHK101123.98 sq. m66.0 sq. m (software-measured)47% (software-derived)
3BHK303123.98 sq. m88.1 sq. m (software-measured)29% (software-derived)

The measured 2BHK drawing includes a hall, dining area, kitchen, two bedrooms, toilets and a utility area; the measured 3BHK drawing includes living and hall areas, three bedrooms, a kitchen, toilets and a utility area. Room dimensions are available in the drawing-derived extract for one example of each type, but the measurements require review against the drawing. Utility areas are marked as excluded from the measured carpet area. RERA unit details

Carpet area is a drawing-derived measurement of the interior space counted by the software; RERA saleable area is the figure filed for the unit and may include a share of common areas. They should not be treated as equivalent measures. The measured drawing set covers two designs each for 2BHK and 3BHK; two of the five available drawings remain scans pending measurement. Floor plans

Parking & vehicle circulation

The HMDA technical approval states that the approved stilt and cellar areas for parking must be used exclusively for vehicle parking and not partitioned, shuttered, converted or misused. It also prohibits parking or construction in setback areas. The approval extract does not establish parking-space counts, visitor or accessible spaces, a parking-level layout, ramp or driveway arrangements, EV charging, or unit-wise parking allocations. A parking area shown or described in an approval does not by itself establish exclusive ownership or allocation to a particular unit.

The RERA filing records 123.98 sq. m as mortgage area, and the HMDA approval describes 10.00% of Built Up Area, 123.98 sq. mts in First Floor, mortgaged in favour of the Metropolitan Commissioner, HMDA. The supplied material does not identify this as parking provision. RERA filing

Amenities, recreation & open spaces

The following are listed in the RERA amenity record or HMDA technical approval. RERA progress fields show 0% for each listed item where a percentage is recorded; no independent completion verification is supplied. RERA amenities

Green strip / tot-lot / park
Description / sizeTot-lot; no size supplied
Evidence sourceRERA amenity record; HMDA technical approval
Declared progress / verified statusRERA entry says 0%; HMDA requires fencing and maintenance as greenery before OC. No independent verification.
Community buildings
Description / sizeListed; no size or facility details supplied
Evidence sourceRERA amenity record
Declared progress / verified status0%; no independent verification.
Water conservation / rainwater harvesting
Description / sizeRERA lists rainwater harvesting; HMDA specifies a rainwater-harvesting structure (percolation pit)
Evidence sourceRERA amenity record; HMDA technical approval
Declared progress / verified statusRERA entry says “YES” and 0%; no independent verification.
Indoor/recreational facilities
Description / sizeNo RERA-filed facility details supplied in the project amenity list
Evidence sourceRERA amenity record
Declared progress / verified statusNot established.

The supplied RERA amenity list also includes internal roads and footpaths, water supply, sewerage, storm-water drains, street lighting, sewage and sullage treatment/disposal, solid-waste management, energy management, fire protection, an electrical meter room/sub-station/receiving station, and aggregate recreational open space; it supplies no facility sizes or verified completion evidence. RERA amenities

Utilities, building services & safety

The HMDA technical approval lists a transformer, generator, garbage house, rainwater-harvesting percolation pit, ETP, septic tank, fire extinguishers, and water storage tanks. It specifies an underground static water-storage tank of 25,000 lts. and a residential terrace tank of 25,000 lts. The record does not state a water source, treatment capacity, generator capacity, or fire-system design details.

The RERA amenity record marks water supply, sewerage and storm-water-related facilities, waste management, fire protection, energy management and electrical/sub-station facilities as project items, but does not establish their capacity or completion. The technical approval separately requires an ETP and septic tank to standard specification, and states that an occupancy certificate is required before occupation. No occupancy or completion certificate is supplied. RERA amenities

No evidence is supplied on lift numbers or capacities, accessible circulation, CCTV, access-control systems, or detailed escape-stair arrangements. The approval’s reference to fire extinguishers does not by itself establish that all statutory fire-safety requirements have been completed or certified.

Location, access & connectivity

The official project record places the development in AMEENAPUR, Ameenpur mandal, Sangareddy district, PIN 502032, at plot numbers 131 & 132 PART in survey numbers 343/6 (NEW) and 343/5 (OLD). The RERA certificate gives the locality as “AMEENAPUR, AMEENPUR.” RERA record RERA filing

The location data supplies one approximate measured connectivity point: the nearest sampled Outer Ring Road interchange is 8.4 km away. The measurement is approximate and does not identify a route or travel time. No project-specific public-transport or approach-road network is established in the supplied location record. Location record

Developer & development status

The registered promoter is GOLDEN HOMES BUILDERS AND DEVELOPERS, recorded as a partnership, with GSTIN 36AATFG5135B1ZG. The RERA registration certificate lists its promoter office as Village Neknapur, Mandal Gandipet, District Ranga Reddy, PIN 500089. A project-site address is separately recorded at Golden Homes Residency, Road no. 20, Ameenapur, Ameenpur, Sangareddy, PIN 502032. Parties record Corporate record RERA filing

The supplied party record identifies partners Ambati Sirisha, Lukalapu Ravikumar and Mandalapu Srinivasa Reddy, and authorized signatory Ambati Venkata Narasa Reddy. The Form B declaration is made by Venkata Narasa Reddy Ambati and includes a completion undertaking of 02/02/2025; the project fields state 04/02/2026 as the proposed completion date. These are promoter/RERA-record statements, not independent confirmation of progress or completion. Parties record RERA filing

One building and 15 units are recorded. No independently verified construction-progress report, OC, or completion certificate is supplied. RERA unit table RERA amenities Document index

Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationFORM C for GOLDEN HOMES MARUTHI RESIDENCY, registration P01100002798, issued 30/04/2021; certificate states validity through 04/02/2026.
Principal HMDA technical approval027132/SKP/R1/U6/HMDA/21082019, dated 04/02/2021; residential building approval record covering survey numbers 343/6 (NEW) and 343/5 (OLD).
RERA-filed plan reference027132/SKP/R1/U6/HMD. RERA filing
Commencement / building approval evidenceThe supplied HMDA technical approval document is titled “Commencement Certificates for each building in each phase”; its extraction describes technical approval and conditions, including further action by the local Executive Authority.
Title and promoter declarationForm B affidavit-cum-declaration dated 06 Feb 2021, including the promoter’s declarations on title, encumbrances, project funds, audits and pending approvals.
Floor-plan evidenceDrawing document 150820 supplied for software measurement of 2BHK and 3BHK configurations; two of five drawings remain scans pending measurement. Floor plans
Occupancy/completion certificateNot present in the supplied documents. The HMDA approval states an occupancy certificate is compulsory before occupation.

Frequently asked questions

Is GOLDEN HOMES MARUTHI RESIDENCY registered with Telangana RERA?

Yes. GOLDEN HOMES MARUTHI RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P01100002798; the registration status is New Project.

Who is the developer of GOLDEN HOMES MARUTHI RESIDENCY?

The promoter named in the RERA registration is GOLDEN HOMES BUILDERS AND DEVELOPERS.

Where is GOLDEN HOMES MARUTHI RESIDENCY located?

GOLDEN HOMES MARUTHI RESIDENCY is in AMEENPUR, AMEENAPUR, Sangareddy, Telangana (502032).

When will GOLDEN HOMES MARUTHI RESIDENCY be completed?

The promoter's proposed date of completion filed with RERA is 04/02/2026. This is the promoter's declaration, not a guarantee.