Sign in

Gokul Pride

GOKUL CONSTRUCTIONS · Sangareddy · RERA P01100001738

GOKUL PRIDE is a residential apartment project in Ameenpur, AMEENPUR Mandal, Sangareddy district, developed by registered promoter Gokul Constructions. The project has a land area of 968.42 sq. m and one building with 1 stilt + 5 upper floors, with 25 2BHK apartments. Its TG-RERA registration number is P01100001738, and the proposed completion date is 16th October 2025.

More from Gokul Constructions · 10 projects →

01What we found

Period endedTG-RERA registration ran to 16 Oct 2025 - check its extension on TG-RERA
18documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameGOKUL PRIDE RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionNot separately identified in the supplied record; registration is for GOKUL PRIDE.
TG-RERA registrationP01100001738; valid from 20/03/2020 to 16/10/2025. Registration validity is distinct from the completion deadline. RERA record
Registered promoterGokul Constructions; the registration certificate uses this name. Entity type is recorded as Partnership. Parties record Corporate record
RERA statusThe supplied certificate records registration; it says the registration is not extended. Current portal status beyond the supplied records is not established.

Land and geographic identity

FieldRecord
LocalityAmeenpur / Ameenapur as recorded in the supplied project records RERA record
Revenue villageAMEENAPUR (also written Ameenapur in approval records) RERA record RERA filing
MandalAMEENPUR RERA record
DistrictSangareddy (also written Sanga Reddy in the approval) RERA record
PIN502032 RERA record
Project survey numbers and subdivisions100/E1 and 100/E2 RERA record RERA filing
Registered site extent968.42 Sq. Mt. in the technical approval
RERA land areaTotal area 968.42 sq. m; net area 968.42 sq. m; affected area recorded as 0. RERA filing
Boundaries in RERA filingEast: STORM WATER DRAIN; West: 30 FEET WIDE ROAD; North: 30 FEET WIDE ROAD; South: 40 FEET WIDE ROAD. RERA filing

Development identity

FieldRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); the approval states that building plans are to be sanctioned by the Executive Authority in conformity with the technical approval. Approvals record
Principal technical approval025041/SKP/R1/U6/HMDA/24062019, dated 16/10/2019 Approvals record
Approved built-up areaTechnical approval lists Built up Area 2290.1 and Total Built up Area (In Sq.mts) 2843.21 as separate figures.
Building countOne building is recorded in the RERA filing. RERA filing
Sanctioned configurationResidential building, 1Stilt + 5 Upper floors.
Parking levels / sanctioned parking countStilt is identified; a parking-space count or detailed parking-level schedule is not supplied.
Approved versus RERA-declared homesRERA land details record 1 total building unit; the filed unit schedule records 25 apartments. The approval condition says the number of units sanctioned must not be increased without prior approval. RERA filing RERA unit table

Offering and status

FieldRecord
RERA-filed configuration2BHK RERA unit table
RERA saleable area102.19 sq. m per filed configuration RERA unit table
RERA portal booking figures25 total; 0 booked; 25 available, as read from the portal with no as-of date attached. Treat these counts as indicative, not current confirmed inventory. RERA unit table
Construction stageNo independently verified site-progress report is supplied. RERA amenity disclosures report water supply at 50% and several other listed works at 0%; these are portal-reported percentages, not independent site verification. RERA amenities
Completion deadlinePromoter’s Form B undertaking: 16th October 2025. The registration certificate also ends on 16/10/2025; these are different milestones.
Original/revised completion datesNo separate original or revised completion-date history is supplied.
Occupancy/completion certificateThe supplied technical approval requires an occupancy certificate before occupation. No OC or completion certificate for this project is supplied.

2. The project story

GOKUL PRIDE is recorded as a single-building residential apartment project on the RERA-identified land in revenue village AMEENAPUR, Ameenpur Mandal, Sangareddy district. The project land is identified as Survey Nos. 100/E1 and 100/E2, with a filed area of 968.42 sq. m. The RERA registration certificate identifies plots 222, 223, 224, 225, 259 and 260. RERA record RERA filing

HMDA’s technical approval describes a residential building of 1 stilt + 5 upper floors. The RERA unit schedule lists 25 2BHK apartments. The promoter’s Form B undertaking gives 16th October 2025 as the completion deadline. The supplied materials do not establish the project’s current construction stage through an independent site inspection, or provide an occupancy certificate. RERA-reported progress figures for listed project works are set out in the amenities section below. RERA unit table RERA amenities

3. Master plan, architecture & building design

The technical approval describes a single residential building with 1 stilt + 5 upper floors on a 968.42 Sq. Mt. site. It lists Built up Area 2290.1 and Total Built up Area (In Sq.mts) 2843.21 separately; the supplied material does not further define the measurement basis for those two labels. Neither should be treated as a carpet or saleable-area figure.

The RERA filing records one building and one proposed building unit, while its apartment schedule lists 25 homes. The supplied drawings are identified as approved floor-plan material, but their extracted record does not provide a complete building-level description of floor-by-floor layouts, footprint, lifts, stairs, entrances, exits, or common-area distribution. The site boundaries are roads on the north, west and south, and a storm-water drain on the east. RERA filing RERA unit table

The HMDA approval lists rainwater harvesting structures, a transformer, a garbage house and a tot-lot among site provisions. It also specifies that no parking or construction is to be made in setback areas.

4. Homes, configurations & floor plans

The RERA unit schedule records 25 2BHK apartments, with a filed saleable area of 102.19 sq. m per unit. Booking and availability figures below are portal-read figures without an attached as-of date. RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK25025102.19 sq. m59.1–69.6 sq. m; median 66.0 sq. m (software-measured from drawings)35% (supplied drawing-measurement record)

The software-measured carpet figures come from the floor-plan drawings and are not RERA-filed disclosures; the measurement record says the drawing geometry needs review. Eight 2BHK flat designs were measured. The filed saleable area is a separate figure and includes a share of common areas; the supplied materials do not provide an independently measured carpet area or establish that the drawing measurements have been verified against the original drawings. Floor plans RERA unit details

The typical-floor-plan extraction identifies a living room, dining area, kitchen, master bedroom, children bedroom, two toilets, a sit-out and a 1.07M WIDE UTILITY. The utility is marked as excluded from carpet area in the drawing extraction. No room dimensions or orientation are supplied in the extracted record. RERA unit details

5. Parking & vehicle circulation

The technical approval identifies a stilt level but the supplied records do not state a sanctioned car- or two-wheeler-parking count, visitor or accessible-parking provision, parking allocation by apartment, or the layout of ramps and internal driveways. The RERA unit schedule marks the apartments as mortgaged; that does not establish a parking entitlement or an exclusive parking allocation. RERA unit table

The approval states that no parking or construction may be made in setback areas. The supplied materials do not establish a spaces-per-home ratio or legally documented parking allocation for any individual apartment.

6. Amenities, recreation & open spaces

RERA’s amenity record lists the following works and facilities. Percentages are the portal-recorded progress figures; no independent verification of completion is supplied. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal Roads & FootpathsNo size suppliedRERA amenity record RERA amenities0%; not independently verified
Water SupplyNo source, storage or capacity suppliedRERA amenity record RERA amenitiesAvailable: YES; 50%; not independently verified
Sewerage (Chamber, Lines, Septic Tank, STP)No capacity or system detail suppliedRERA amenity record RERA amenitiesAvailable: YES; 0%; not independently verified
Storm Water DrainsNo size suppliedRERA amenity record RERA amenitiesAvailable: YES; 0%; not independently verified
Green Strip/TOT LOT/ParkNo size or capacity supplied; HMDA approval lists a tot-lotRERA amenity record RERA amenities; HMDA technical approvalAvailable: YES; 0%; not independently verified
Street LightingNo further detail suppliedRERA amenity record RERA amenities0%; not independently verified
Community BuildingsNo facility or size specifiedRERA amenity record RERA amenities0%; not independently verified
Treatment and Disposal of Sewage and Sullage WaterNo treatment capacity or reuse detail suppliedRERA amenity record RERA amenities0%; not independently verified
Solid Waste Management and DisposalNo system details supplied; HMDA approval requires a garbage houseRERA amenity record RERA amenities; HMDA technical approval0%; not independently verified
Water Conservation, Rain Water HarvestingHMDA approval calls for rainwater-harvesting structures, including a percolation pit; no size suppliedRERA amenity record RERA amenitiesAvailable: YES; 0%; not independently verified
Energy managementNo further detail suppliedRERA amenity record RERA amenities0%; not independently verified
Fire Protection and Fire Safety RequirementsNo system detail or clearance suppliedRERA amenity record RERA amenities0%; not independently verified
Electrical Meter Room, Sub-Station, Receiving StationNo capacity supplied; HMDA approval lists a transformer and space for a transformerRERA amenity record RERA amenitiesAvailable: YES; 0%; not independently verified
Aggregate area of recreational Open SpaceNo area suppliedRERA amenity record RERA amenities0%; not independently verified

7. Utilities, building services & safety

The RERA amenity record marks water supply, sewerage, storm-water drains, rainwater harvesting, and an electrical meter room/sub-station/receiving station as available, but records only 50% progress for water supply and 0% for the other listed items. These are recorded progress fields, not independently verified completion findings. No water source, storage volume, treatment capacity, STP capacity, reuse arrangement, electrical capacity or backup provision is supplied. RERA amenities

HMDA’s approval requires construction of rainwater-harvesting structures, a garbage house and an occupancy certificate before occupation. It also includes construction-safety conditions, including safety and insurance for construction workers. No lift details, fire-system specifications, accessibility provisions, CCTV or access-control details are supplied.

8. Location, access & connectivity

The registered location is AMEENAPUR, Ameenpur Mandal, Sangareddy district, Telangana, PIN 502032. The RERA filing gives the project boundary roads as 30 FEET WIDE ROAD to the west and north, 40 FEET WIDE ROAD to the south, and a STORM WATER DRAIN to the east. RERA record RERA filing

The supplied location record gives the nearest sampled Outer Ring Road interchange as approximately 8.4 km from the cadastral parcel centroid. This is a recorded distance, not a travel-time estimate. No public-transport routes, stop distances or additional landmark distances are established in the supplied location data. Location record

9. Developer & development status

The registered promoter is Gokul Constructions, recorded as a Partnership. The RERA filing identifies CHANDRA SRINIVASA RAO as authorized signatory and K PADMAVATHI as partner. The promoter address in the filing is PLOT NO 521, VASANTH NAGAR, AMEENPUR, AMEENPUR, AMEENPUR, Sangareddy, 502032. Parties record Corporate record

The registration certificate lists the promoter office as Village: Mandal: District: Hyderabad, Pin: 500085; the supplied certificate does not provide a more specific office address in that field.

The promoter’s Form B, dated 15 February 2020, records an undertaking to complete the project by 16th October 2025. No later completion-date revision or independent construction-progress assessment is supplied. The supplied records do not establish that an occupancy certificate has been issued.

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C registration certificate for GOKUL PRIDE, P01100001738, issued 20/03/2020, valid through 16/10/2025; the supplied certificate records no extension.
HMDA technical building approvalApproval 025041/SKP/R1/U6/HMDA/24062019, dated 16/10/2019, for a residential building at Survey Nos. 100/E1 and 100/E2.
Building-plan drawing recordRERA-filed plan document 108697; drawing-based measurements are supplied for 2BHK plans.
Commencement / occupancy documentationThe RERA document list names a commencement-certificate document, and the HMDA technical approval sets out commencement and occupancy-certificate requirements. No separate occupancy/completion certificate is supplied. Document index
Promoter declarationForm B dated 15 February 2020, signed by CHANDRA SRINIVASA RAO as authorized signatory for the promoter; includes the completion undertaking.
Encumbrance filingRERA-filed document 110165, titled “Details of encumbrances.” Document index
Title report and title documentsAdvocate’s title search report 108685 and supporting title-document records are available in the project file; details are addressed in the Land & Title section.

The public HMDA DPMS approved-layout lookup is recorded as unavailable through the supplied review, so this overview does not independently verify a separate layout record through that portal. HMDA

Frequently asked questions

Is GOKUL PRIDE registered with Telangana RERA?

Yes. GOKUL PRIDE is registered with the Telangana Real Estate Regulatory Authority as P01100001738; the registration status is New Project.

Who is the developer of GOKUL PRIDE?

The promoter named in the RERA registration is GOKUL CONSTRUCTIONS.

Where is GOKUL PRIDE located?

GOKUL PRIDE is in AMEENPUR, AMEENAPUR, Sangareddy, Telangana (502032).

When will GOKUL PRIDE be completed?

The promoter's proposed date of completion filed with RERA is 16/10/2025. This is the promoter's declaration, not a guarantee.

More projects in Ameenapur