Sign in

Sr Tarun Reddy Residency

SR HOMES · Sangareddy · RERA P01100009490

SR TARUN REDDY RESIDENCY is a residential apartment project in Ameenpur, Ameenpur Mandal, Sangareddy district, developed by registered promoter SR HOMES. The project occupies 334.40 sq.m and comprises one residential building with 1 Stilt + 5 upper floors and 10 2BHK apartments, each with a RERA-filed saleable area of 111.48 sq.m. It is registered with TG-RERA as P01100009490, with proposed completion on 13/06/2028.

More from Sr Homes · 18 projects →

01What we found

RegisteredTG-RERA - valid till 13 Feb 2028
13documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameSR TARUN REDDY RESIDENCY RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified; the registration concerns the residential building on Plot Nos. 206 & 207
TG-RERA registrationP01100009490
Registration validity13/02/2025 to 13/02/2028, unless extended by the Authority
Registered promoterSR HOMES, identified as a partnership in the project filing RERA filing Corporate record
RERA statusRegistered; Form C certificate supplied

Land and geographic identity

ItemProject record
LocalityAmeenpur Municipality / Ameenpur
Revenue villageAMEENAPUR (also stated as Ameenpur Village in the building-permit document) RERA record
MandalAMEENPUR RERA record
DistrictSangareddy (also rendered “Sanga Reddy” in the filed building-permit document) RERA record
PIN502032 RERA record
Project survey number(s)Survey No. 106; no project subdivision is specified in the registration or supplied approval documents
Plot numbers206 & 207
Registered site extent334.40 sq.m
Total / net plot area334.40 sq.m
Boundaries in RERA filingEast: others’ land; west: road; north: others’ land; south: others’ land RERA filing

Development identity

ItemProject record
Sanctioning authorityHMDA; the plan record also identifies Ameenpur Municipality as the delegated/local authority
Principal building permission014717/BP/HMDA/4029/SKP/2025, approved 13 February 2025
Sanctioned building formResidential building: 1 Stilt + 5 upper floors; the plan extraction records 6 floors
Building height14.50 MT. excluding stilt; 20.25mt. total height; also recorded as 17.85 mt. from GL
Approved built-up area942.30 sq.m excluding parking; 1132.11 sq.m including parking; the plan also records TOTAL BUA: 1138.86 and NET BUA: 942.30
Building countOne residential building is recorded in the project filing and approval RERA filing
Parking provision in plan189.81 sq.m parking area; the supplied record does not provide a sanctioned count of parking spaces
Unit count10 units in the RERA filing; the building-plan extraction also states 10 RERA unit table

Offering and status

ItemProject record
Configuration2BHK apartments RERA unit table
RERA-filed saleable area111.48 sq.m per unit RERA unit table
Booked / available0 booked / 10 available, as last read from the TG-RERA portal; no as-of date is supplied, so counts are indicative RERA unit table
Construction stageNo independently verified site-progress record is supplied. The RERA amenity-progress fields report water supply and sewerage at 50%; other listed progress percentages are shown in the amenities section below RERA amenities
Completion datePromoter’s Form B undertaking: 13/02/2028
Proposed completion in project filing13/06/2028 RERA filing
Occupancy / completion certificateNot evidenced as issued. The supplied building permit is a permission for construction, not an occupancy or completion certificate

2. The project story

  • SR TARUN REDDY RESIDENCY is a single-building residential apartment project registered with TG-RERA as P01100009490. The registered portion is located on Plot Nos. 206 & 207 in Survey No. 106, revenue village AMEENAPUR, Ameenpur Mandal, Sangareddy district. The filed building permission describes a residential building with one stilt level and five upper floors, for 10 apartments. RERA record
  • The RERA unit record lists ten 2BHK homes, all shown as available and none booked in the portal snapshot, but that snapshot has no as-of date. The approval and registration documents describe a proposed building and do not establish that construction is complete or that any portion has an occupancy certificate. The only supplied progress figures are the promoter’s RERA progress fields for site infrastructure; they are not independent site verification. RERA unit table RERA amenities

3. Master plan, architecture & building design

  • The building-permit plan describes a single residential building on a 334.40 sq.m plot, comprising 1 Stilt + 5 upper floors. It records 942.30 sq.m as proposed built-up area excluding parking and 1132.11 sq.m including parking; it separately records TOTAL BUA: 1138.86, DEDUCTIONS: 6.75, and NET BUA: 942.30. These are the plan’s stated area figures, not carpet area or saleable area. The plan also lists 144.59 sq.m vacant plot area and 189.81 sq.m parking area.
  • The plan extraction names a lift and staircase and lists greenery, rainwater harvesting, sump, septic tank, STP and a distribution transformer. It records a building height of 14.50 MT. excluding stilt and 20.25mt. total height, with 17.85 mt. from GL also stated. No floor-by-floor apartment arrangement, number of homes per floor, building footprint, lift capacity, or detailed internal-road or landscape plan is supplied.
  • The supplied plan document is an extracted building-permit/layout-plan record; it does not provide a separately established phase plan or a complete set of architectural drawings. The building permit calls for construction in accordance with the technically approved plans.

4. Homes, configurations & floor plans

  • The RERA filing lists 10 2BHK units, with a filed saleable area of 111.48 sq.m per unit. Portal booking figures show 0 booked and 10 available, without an as-of date. RERA unit table
  • Software measurement of the supplied plan drawing gives a median carpet area of 67.3 sq.m, with a measured range of 66.5–68.6 sq.m across four measured flat designs. This is drawing-based software measurement, not a RERA-filed carpet-area disclosure, and the source notes that it needs review. The supplied figure for loading is 40%. Floor plans RERA unit details
ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK10010111.48 sq.m67.3 sq.m median; 66.5–68.6 sq.m range (software-measured)40%
  • The measured typical-plan room schedule identifies a puja room, living room, dining area, kitchen, wash area, two bedrooms, two toilets and a utility. The utility is marked as excluded from the software-measured carpet area. The supplied plan measurement is not a substitute for the RERA saleable-area figure; saleable area includes the home’s share of common areas, whereas carpet area is a different measurement basis. Room dimensions are included in the supplied drawing extraction, but the source advises reviewing the software measurements against the drawing. RERA unit details Floor plans

5. Parking & vehicle circulation

  • The plan records 189.81 sq.m of parking area and states that the stilt floor is to be used for parking. The building-permit document also records a 4.0M WIDE DRIVEWAY in the plan extraction; the permit identifies approach-road width requirements and setbacks. No sanctioned parking-space count, visitor or accessible-space allocation, vehicle-ramp details, or flat-specific parking allocation is supplied. A parking area shown in a plan does not, by itself, establish exclusive parking rights for an individual apartment.
  • The building-permit conditions require electric-vehicle charging infrastructure in building parking places. The supplied documents do not establish that the charging equipment has been installed or specify the number of charging points.

6. Amenities, recreation & open spaces

The RERA progress record contains the following project infrastructure and amenity entries. Percentages are the filed progress values; they do not establish independent verification or completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads & footpathsNo size statedRERA amenity record RERA amenities0%; independent completion not verified
Water supplyNo source, storage capacity or treatment detail stated hereRERA amenity record RERA amenitiesAvailable: YES; 50%; independent completion not verified
Sewerage (chamber, lines, septic tank, STP)No capacity statedRERA amenity record RERA amenitiesAvailable: YES; 50%; independent completion not verified
Storm-water drainsNo details statedRERA amenity record RERA amenities0%; independent completion not verified
Green strip / tot lot / parkNo size stated; plan separately lists greeneryRERA amenity record; building-plan extraction RERA amenities0% in RERA record; independent completion not verified
Street lightingNo details statedRERA amenity record RERA amenities0%; independent completion not verified
Community buildingsNo details statedRERA amenity record RERA amenities0%; independent completion not verified
Treatment and disposal of sewage and sullage waterNo capacity or process statedRERA amenity record RERA amenities0%; independent completion not verified
Solid-waste management and disposalNo system details statedRERA amenity record RERA amenities0%; independent completion not verified
Water conservation / rainwater harvestingPlan lists rainwater harvestingRERA amenity record; building-plan extraction RERA amenities0% in RERA record; independent completion not verified
Energy managementNo details statedRERA amenity record RERA amenities0%; independent completion not verified
Fire protection and fire-safety requirementsNo system details statedRERA amenity record RERA amenities0%; independent completion not verified
Electrical meter room / sub-station / receiving stationPlan lists a distribution transformerRERA amenity record; building-plan extraction RERA amenitiesAvailable: YES; 0%; independent completion not verified
Aggregate recreational open spaceNo area statedRERA amenity record RERA amenities0%; independent completion not verified

7. Utilities, building services & safety

  • The building-plan extraction lists a sump, septic tank, STP, rainwater harvesting, and a distribution transformer. It also lists a lift and staircase. No water source or storage capacity, STP capacity, treated-water reuse arrangements, electrical backup capacity, lift capacity, or detailed service specifications are supplied.
  • The building permit requires an STP, rainwater-harvesting structures, CCTV cameras and EV charging infrastructure in parking places. It also states that an occupancy certificate is compulsory before occupation and that a completion notice is to be submitted after completion. These are stated permit conditions; the supplied material does not establish installation, completion, clearance or compliance.
  • The plan extraction includes fire-safety and structural-stability conditions and refers to sprinkler provision where the basement area exceeds the stated threshold. The supplied record does not establish a fire clearance or the installed fire-protection systems. No accessibility features, such as ramps or accessible circulation, are evidenced in the supplied material.

8. Location, access & connectivity

  • The registered project location is Survey No. 106, Plot Nos. 206 & 207, AMEENAPUR, Ameenpur Mandal, Sangareddy, 502032. The RERA filing identifies the locality as Ameenpur; the project parcel centroid is recorded at 17.53624872623404, 78.32546897369099. RERA record Location record
  • The location data gives the nearest sampled Outer Ring Road interchange as approximately 7.0 km. The supplied record does not provide an independently measured route, a public-transport description or verified travel times. Location record

9. Developer & development status

  • The registered promoter is SR HOMES, identified in the project filing as a partnership. The TG-RERA certificate lists its registered office as Village: Miyapur, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500049. The project filing gives the promoter’s project-address entry as HMT SWARNAPURI COLONY, ROAD NO 24/25, AMEENPUR, AMEENPUR, AMEENPUR, Sangareddy, 502032. The supplied corporate identifier is GSTIN 36AFEFS7525M1ZG. RERA filing Corporate record
  • The RERA filing names KALAGOTLA CHINNA SAIREDDY as authorized signatory and MADDAGARI RAMA KRISHNA as partner. The project has two RERA-listed landowners, UPPIN NARAYAN REDDY and UPPIN REKHA, under an area-share arrangement. Parties record
  • The promoter’s Form B declares a completion date of 13/02/2028. The project filing separately states proposed completion as 13/06/2028. No construction-progress evidence independently verifies the building’s present physical stage, and no occupancy or completion certificate is supplied. RERA filing

10. Approvals, official records & documents

TG-RERA registration
Supplied evidenceForm C certificate; P01100009490, valid 13/02/2025–13/02/2028
Scope / noteSR TARUN REDDY RESIDENCY; SR HOMES
Building permission
Supplied evidenceHMDA Building Permit Order 014717/BP/HMDA/4029/SKP/2025, dated 13 February 2025
Scope / noteProposed residential building on Plot Nos. 206 & 207, Survey No. 106
Plan / building details
Supplied evidencePlan extraction identifies one residential block, 1 Stilt + 5 upper floors, and 10 units
Scope / noteSupplied as the building-plan/layout-plan record
Layout approval record
Supplied evidenceDocument 538801, titled as a layout approval/plan submission
Scope / noteThe supplied extraction describes building-plan details; it does not establish a separate layout-plan approval document
Promoter declaration
Supplied evidenceForm B dated 15 February 2025
Scope / noteIncludes promoter declarations and completion undertaking
Title search report
Supplied evidenceAdvocate’s report dated 13 February 2025
Scope / noteLand & Title section addresses the title record and its qualifications
Title and development documents
Supplied evidence2011 sale-deed records and 2024 Development Agreement-cum-GPA references in title-report documents
Scope / noteListed here as available project-file documents; detailed title analysis is addressed under Land & Title
Encumbrance statement
Supplied evidenceFiled encumbrance statement 187615011, search period 01-01-1983 to 18-02-2025
Scope / noteA current search is not included in the supplied record
Occupancy / completion certificate
Supplied evidenceNot supplied; the building permit states an occupancy certificate is required before occupation
Scope / noteNo certificate is evidenced as issued

Frequently asked questions

Is SR TARUN REDDY RESIDENCY registered with Telangana RERA?

Yes. SR TARUN REDDY RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P01100009490; the registration status is New Project.

Who is the developer of SR TARUN REDDY RESIDENCY?

The promoter named in the RERA registration is SR HOMES.

Where is SR TARUN REDDY RESIDENCY located?

SR TARUN REDDY RESIDENCY is in AMEENPUR, AMEENAPUR, Sangareddy, Telangana (502032).

When will SR TARUN REDDY RESIDENCY be completed?

The promoter's proposed date of completion filed with RERA is 13/06/2028. This is the promoter's declaration, not a guarantee.

More projects in Ameenapur