Sign in

Viksha Aithra

VIKSHA INFRA PROJECTS PRIVATE LIMITED · Medchal-Malkajgiri · RERA P02200009842

VIKSHA AITHRA is a residential apartment project in KANDLAKOYA, Medchal Mandal, Medchal-Malkajgiri District, developed by the registered promoter VIKSHA INFRA PROJECTS PRIVATE LIMITED. The TG-RERA filing records a total land area of 16,186.55 sq.m and 3 proposed building units; the building permit describes Block A, Block B and a clubhouse, with Block A at 3 Cellars + 1 Ground + 14 upper floors, Block B at 1 Ground + 14 upper floors, and the clubhouse at 1 Ground + 4 upper floors. The RERA-filed homes comprise 194 2BHK units with saleable area of 121.24 sq.m and 340 3BHK units with saleable area of 163.82 sq.m. The project is registered under TG-RERA number P02200009842, valid 16/06/2025–16/06/2030, and the promoter’s declared completion date is 16-Jun-2030.

More from Viksha Infra Projects Pvt Ltd · 2 projects →

01What we found

RegisteredTG-RERA - valid till 16 Jun 2030
29documents on file - each fact links to its page
1court case on this project's land (survey 139, Kandlakoi)
7items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameVIKSHA AITHRA RERA record
Project typeResidential apartment project RERA record
Phase / registered portionNo separate phase name is disclosed; TG-RERA registration is for the project. The filing identifies three proposed building units. RERA record RERA filing
TG-RERA registration numberP02200009842 RERA record
Registration validity16/06/2025–16/06/2030 (five years, unless extended by the Authority) RERA record
Registered promoterVIKSHA INFRA PROJECTS PRIVATE LIMITED RERA record
RERA statusRegistered; the certificate is Form C. Registration validity is distinct from the promoter’s declared completion date. RERA record

Land and geographic identity

ItemRecord
LocalityKANDLAKOYA / Kandlakoya RERA record RERA filing
Revenue villageKandlakoi (also written Kandlakoya in approval records) RERA record
MandalMedchal RERA record
DistrictMedchal-Malkajgiri RERA record
PIN501401 RERA record RERA filing
Project survey identitySY NO 139/P; the building permit specifies 139/P. Other project-related approval records refer to Survey No. 139 Part or Sy.No. 139 part. RERA record
Registered site areaTG-RERA filing: total area 16,186.55 sq.m, affected area 2,522.12 sq.m, net area 13,664.43 sq.m. RERA filing
BoundariesEast: NEIGHBOURS LAND; West: 100 FEET ROAD; North: GOVT LAND; South: 100 FEET ROAD. RERA filing

Development identity

ItemRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA) Approvals record
Principal building-permit number / date013381/BP/HMDA/2991/MED/2023, dated 16 June, 2025 Approvals record
Approved built-up areaThe permit extraction lists total built-up area 108,170.95 sq.m and also lists 108,577.26 sq.m as total built-up area. The approved-plan extraction separately records 108,170.95 including parking and 78,441.21 excluding parking.
Buildings / filing countTG-RERA filing: 3 proposed building units. The building permit describes Block A, Block B and a clubhouse. RERA filing
Sanctioned floor configurationBlock A: 3 Cellars + 1 Ground + 14 upper floors; Block B: 1 Ground + 14 upper floors in the building permit; clubhouse: 1 Ground + 4 upper floors.
Parking provisionApproved-plan extraction: 639 proposed cars; total parking area 27,781.75 (unit as extracted: plan figures are in sq.m); visitor car-parking proposed 1,920.06 (plan figure in sq.m). The environmental-clearance amendment records 4W – 810 No’s; 2W– 200 No’s.
Approved plan recordBuilding permit order and plan details filed with TG-RERA; the public HMDA DPMS lookup is unavailable in this review. HMDA

Offering and status

ItemRecord
RERA-filed homes2BHK: 194 units; 3BHK: 340 units; 534 homes in total. RERA unit table RERA unit details
RERA-filed saleable area2BHK: 121.24 sq.m; 3BHK: 163.82 sq.m. RERA unit table RERA unit details
Booked / availablePortal-derived counts show 0 booked / 194 available for 2BHK and 0 booked / 340 available for 3BHK. Counts are indicative; the portal record has no as-of date. RERA unit table RERA unit details
Construction stageThe project is described as proposed in the permit and approval records. No independently verified site-progress measurement is supplied.
Completion datesPromoter’s Form B declaration: completion by 16-Jun-2030. TG-RERA registration validity ends 16/06/2030; these are separate record fields.
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied records. The permit requires an Occupancy Certificate before occupation.

2. The project story

VIKSHA AITHRA is registered with TG-RERA as a residential apartment project at Kandlakoi, Medchal Mandal, Medchal-Malkajgiri District, on the project land identified in the filing as SY NO 139/P. The HMDA building-permit record describes two residential blocks and a clubhouse; the RERA filing reports three proposed building units. The record is therefore of a multi-building apartment development, not a completed or occupancy-certified project. RERA record RERA filing

The RERA unit schedule lists 194 2BHK and 340 3BHK homes. The portal counts show all 534 as available and none booked, but the source provides no count-read date, so these figures should be treated as indicative rather than a live inventory guarantee. RERA unit table RERA unit details

The permit and fire-service records describe proposed buildings and provisional fire clearances. No construction-progress evidence or occupancy certificate is supplied here; the records do not establish that construction is complete or that any block is ready for occupation. The promoter’s Form B states a completion undertaking of 16-Jun-2030.

3. Master plan, architecture & building design

The RERA-filed land schedule gives a total site area of 16,186.55 sq.m, affected area of 2,522.12 sq.m and net area of 13,664.43 sq.m. The HMDA building-permit extraction gives 13,664.43 Sq. Mt. as the permit extent. The plan extraction also lists 8,455.61 as vacant plot area and identifies a proposed built-up area of 78,441.21 excluding parking and 106,222.96 including parking; it separately records 108,170.95 as total proposed built-up area and 108,170.95 as total built-up area in the permit extraction. These are recorded plan figures, not saleable or carpet areas. RERA filing

The building permit describes Block A at 3 Cellars + 1 Ground + 14 upper floors, Block B at 1 Ground + 14 upper floors, and the clubhouse at 1 Ground + 4 upper floors. It records heights of 44.95 MT. for Blocks A and B and 14.90 MT. for the clubhouse. The environmental-clearance amendment describes Block A as 3B+G+14 Floors, Block B as 2B+G+14 Floors, and the amenities block as 3B+G+4 Floors; these are approval-record descriptions.

The plan extraction includes ground-floor, first-floor, typical 2–14-floor and terrace-floor plan labels. It also records a 7 M WIDE DRIVEWAY, 18.00 M WIDE ROAD, 20.00 MT WIDE EXISTING ROAD, 30.00 MT WIDE PROPOSED ROAD and 30.00 MT WIDE MAINROAD (Access Road). The supplied evidence does not provide a sufficiently complete drawing-derived account of building footprints, apartment count per floor, lift arrangement, landscape area or phase boundaries.

4. Homes, configurations & floor plans

The TG-RERA filing lists 194 2BHK homes and 340 3BHK homes. Its saleable areas are shown below. Separately, software measurement of the approved floor-plan drawings provides carpet-area estimates for measured configurations; those drawing measurements are not RERA disclosures and require review against the drawings. Saleable area and carpet area are different measures: saleable area includes the unit’s share of common areas, while the measured carpet figure reflects the software-measured internal drawing geometry. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK1940194121.24 sq.mSoftware-measured: 69.5–77.2 sq.m; median 71.4 sq.m41%
3BHK3400340163.82 sq.mSoftware-measured: 92.7–125.5 sq.m; median 99.0 sq.m40%

The 2BHK drawing sample includes a drawing room, dining/kitchen, bedrooms, toilets, balcony and utility areas. The 3BHK sample includes living/dining, bedrooms, kitchen, toilets and a utility area. The measured drawing records exclude balcony and utility areas from carpet area where identified. Measurements are drawing-based software outputs, not unit-specific RERA declarations. RERA unit details Floor plans

5. Parking & vehicle circulation

The HMDA plan extraction records 639 proposed car spaces and a proposed parking area of 27,781.75; required parking area is shown as 17,509.68. It records visitor car parking as 1,591.80 required and 1,920.06 proposed. The environmental-clearance amendment separately lists 4W – 810 No’s; 2W– 200 No’s. The supplied records do not establish individual flat parking allocations or exclusive ownership of any bay.

Cellar/stilt areas are designated for vehicle parking in the plan and permit conditions. Fire-service NOC extracts identify vehicle ramps: Block A has ramps connecting Ground to Cellar-3 and Ground to Cellar-2; Block B has three ramps between Cellar-2 and Ground. The permit also records a 20.00 mt. long 3.00 mt. High 5.40 mt. Wide Pedestrian Ramp. These are plan-recorded provisions; delivery and final configuration are not independently verified.

6. Amenities, recreation & open spaces

The RERA filing marks the following common amenities and infrastructure as available in the project schedule, with 0% progress recorded for each listed item. The figures do not establish completed or independently inspected facilities. RERA amenities

Clubhouse / community building
Description / sizeClubhouse is shown in the building-permit and fire-service records; approved-plan extraction describes a clubhouse with ground and four upper floors. No clubhouse floor area is stated here as a RERA-filed amenity size.
Evidence sourceRERA amenities
Declared progress / verified statusRERA schedule: 0%; completion not independently verified
Green strip / tot-lot / park
Description / sizeGreen Strip and Tot-lot named in the plan extraction; RERA schedule groups Green Strip/TOT LOT/Park.
Evidence sourceRERA amenities
Declared progress / verified statusRERA schedule: 0%; completion not independently verified
Internal roads and footpaths
Description / sizeListed as provided in the RERA amenity schedule.
Evidence sourceRERA amenities
Declared progress / verified status0%; completion not independently verified
Community buildings
Description / sizeListed in the RERA amenity schedule.
Evidence sourceRERA amenities
Declared progress / verified status0%; completion not independently verified
Aggregate recreational open space
Description / sizeRERA schedule includes the field, but no area is supplied.
Evidence sourceRERA amenities
Declared progress / verified status0%; area and completion not established

Other facilities advertised in vendor material, including a rooftop swimming pool, multipurpose hall and kids’ play area, are not treated here as RERA-filed or verified delivered amenities. Promoter website

7. Utilities, building services & safety

The RERA amenity schedule lists water supply, sewerage, storm-water drains, street lighting, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, energy management, fire protection, and electrical meter room/sub-station/receiving station; each is recorded at 0% progress. RERA amenities

The building-permit record requires a sewage treatment plant (STP), rainwater-harvesting structures and development of the approach road before release of the Occupancy Certificate. The environmental-clearance amendment specifies an STP capacity of 450 KLD, water requirement of 430.83 KLD, fresh water requirement of 281.86 KLD, recycled water of 148.97 KLD and sewage generation of 370.32 KLD. It also requires arrangements for STP maintenance and reuse of treated sewage to the maximum extent for gardening/avenue plantation. These are approval-record provisions, not evidence that the systems are installed or operating.

The environmental-clearance amendment lists diesel-generator capacity as 1 X 250 KVA & 2 X 750 KVA. The supplied evidence does not establish the project’s domestic electrical-backup arrangements, lift capacities, or installed/operational status.

Revised provisional fire NOCs are in the record for Block A, Block B and the clubhouse. The Block A and Block B extracts specify fire systems including extinguishers, hose reels, wet risers, sprinklers, alarms, fire-fighting shafts/fire lifts and water storage; the clubhouse extract also lists fire extinguishers, hose reels, wet riser, down comer and sprinklers. These are provisional fire-service records and require the stated further inspection/NOC before occupation; they are not occupancy certificates.

8. Location, access & connectivity

The registered location is Kandlakoi/Kandlakoya, Medchal Mandal, Medchal-Malkajgiri District, Telangana, PIN 501401. The RERA filing gives the site boundaries as 100 FEET ROAD to the west and south, government land to the north and neighbours’ land to the east. RERA record RERA filing RERA filing

The location record identifies the nearest sampled Outer Ring Road interchange at approximately 4.2 km. The approved-plan extraction names an existing 20.00 MT road, a proposed 30.00 MT road, a 30.00 MT main access road and an 18.00 M road. The supplied evidence does not provide independently verified public-transport details or measured distances to other landmarks. Location record

9. Developer & development status

The registered promoter is VIKSHA INFRA PROJECTS PRIVATE LIMITED, a private limited company. The project registration certificate identifies the company as promoter; the corporate record gives GSTIN 36AAHCV8460H1ZX. The company’s Form B affidavit-cum-declaration is dated 26-June-2025 and states a completion undertaking of 16-Jun-2030. RERA record Corporate record

The registration record names PADIRE VENU CHANDER REDDY as the promoter’s representative; the project filing lists him as authorized signatory and ANUGULA KAVITHA as director. The supplied company memorandum identifies the company and its objects but does not supply a full registered-office address suitable for verification. A promoter website is listed in the shared record, but contact details are not provided in the evidence for this overview. Parties record Corporate record

TG-RERA records 545 total units including common-area rows; the two home configurations account for 534 homes. The remaining filed rows concern amenity/common-area or ramp entries, not additional homes for sale. The portal’s home booking counts are indicative and undated. No construction progress independently verified at site is supplied. RERA unit table

10. Approvals, official records & documents

TG-RERA registration certificate, Form C
Identifier / dateP02200009842; valid 16/06/2025–16/06/2030
What the supplied record establishesRegistration of VIKSHA AITHRA with VIKSHA INFRA PROJECTS PRIVATE LIMITED as promoter.
HMDA building permit order
Identifier / date013381/BP/HMDA/2991/MED/2023; 16 June, 2025
What the supplied record establishesBuilding permission for Blocks A and B and clubhouse, subject to stated conditions; requires an Occupancy Certificate before occupation.
HMDA plan details filed with RERA
Identifier / dateFile no. CA/2018/97607
What the supplied record establishesPlan extraction includes building configuration, site and built-up figures, parking and internal-road widths.
SEIAA Telangana amendment to Environmental Clearance
Identifier / dateSIA/TG/INFRA2/504223/2024; approved 24/01/2025; EC ID EC24C3801TG5751327A
What the supplied record establishesAmendment record for the residential apartment project at Survey No. 139 Part, Kandlakoi, including environmental conditions and listed project particulars.
Revised provisional Fire NOC — Block A
Identifier / date16/02/2025
What the supplied record establishesProvisional fire clearance record for Block A; further fire inspection/NOC and occupancy requirements apply before occupation.
Revised provisional Fire NOC — Block B
Identifier / date16/02/2025
What the supplied record establishesProvisional fire clearance record for Block B; occupancy requirements are stated in the record.
Revised provisional Fire NOC — clubhouse
Identifier / date15/02/2025
What the supplied record establishesProvisional fire clearance record for the clubhouse.
Telangana State ECBC certificate
Identifier / dateLicence no. 08/TPA-ECBC/GHMC/2024-29; January 2025
What the supplied record establishesDesign-stage, 1 Star certificate record for the proposed clubhouse.
AAI height-clearance NOC
Identifier / dateApproval no. 237 19 HY; issued 13-03-2019; stated validity to 12-03-2027
What the supplied record establishesHeight-clearance record; the document states that it is not a land-ownership document and does not replace other statutory clearances.
Promoter Form B declaration
Identifier / date26-June-2025
What the supplied record establishesPromoter declaration includes title basis, encumbrance statement, project-account commitments and completion undertaking.

The HMDA DPMS approved-layout lookup was not publicly reachable in this review; the supplied HMDA plan/permit records are the available approval evidence. No occupancy or completion certificate was supplied. HMDA

Frequently asked questions

Is VIKSHA AITHRA registered with Telangana RERA?

Yes. VIKSHA AITHRA is registered with the Telangana Real Estate Regulatory Authority as P02200009842; the registration status is New Project.

Who is the developer of VIKSHA AITHRA?

The promoter named in the RERA registration is VIKSHA INFRA PROJECTS PRIVATE LIMITED.

Where is VIKSHA AITHRA located?

VIKSHA AITHRA is in KANDLAKOYA, Kandlakoi, Medchal, Medchal-Malkajgiri, Telangana (501401).

When will VIKSHA AITHRA be completed?

The promoter's proposed date of completion filed with RERA is 16/10/2030. This is the promoter's declaration, not a guarantee.

More projects in Kandlakoi