Mar Residency
SHIV KRISHNA CONSTRUCTIONS · Medchal-Malkajgiri · RERA P02200001087
MAR RESIDENCY is a residential apartment project in POCHARAM, KV RANGA REDDY, Ghatkesar Mandal, Medchal-Malkajgiri District. The registered promoter is SHIV KRISHNA CONSTRUCTIONS. The project covers 3,134.27 sq. m. and comprises one building with 1 Cellar + 1 Ground + 5 Upper floors and 60 apartments: 24 2BHK units of 115.43 sq. m. and 36 3BHK units of 169.0 sq. m. It is registered with TG-RERA under P02200001087, with proposed and revised completion stated as 12/03/2025.
More from Shiv Krishna Constructions · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | MAR RESIDENCY RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | The available record identifies one registered apartment building; a separate phase name or phase number is not disclosed. RERA filing |
| TG-RERA registration | P02200001087, granted 05/08/2019; the certificate states validity through 12/03/2025. RERA record |
| Registered promoter | SHIV KRISHNA CONSTRUCTIONS; RERA filing describes the entity as a partnership. RERA record RERA filing |
| RERA status | The filing labels the project “On-Going Project.” The registration certificate’s stated validity ended on 12/03/2025; no extension is recorded in the supplied material. These are separate status facts. RERA filing |
| Registration capture | TG-RERA registration data was captured on 10 September 2026. Approvals record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | POCHARAM, KV RANGA REDDY RERA record RERA filing |
| Revenue village | Annojiguda in the project identity and RERA filing; the HMDA technical-approval document describes Pocharam Village. RERA record RERA filing |
| Mandal / district / PIN | Ghatkesar / Medchal-Malkajgiri / 501301 RERA record |
| Project survey identifier | Survey No. 12/P (also rendered “12/p” in the technical approval). RERA record RERA filing |
| Registered site extent | 3,134.27 sq. m. RERA filing |
| Total / net area | Total area 3,134.27 sq. m.; net area 3,134.27 sq. m.; recorded affected area 0 sq. m. RERA filing |
| Boundaries | North: 30 FEET WIDE ROAD; West: 120 FEET WIDE ROAD; East and South: neighbours’ land. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA); the technical approval says building plans require sanction by the local Executive Authority in conformity with HMDA’s technical approval. Approvals record |
| Principal approval | 010275/GHT/R1/U6/HMDA/05042018, approved 12 March 2019; the RERA filing lists 010275/GHT/R1/U6/HMD as the plan approval number. Approvals record RERA filing |
| Approved built-up area | 7,797.7 sq. m. as recorded in the RERA filing and approval extraction. RERA filing |
| Buildings / blocks | One building is recorded in the RERA project information; the technical approval describes a residential building. RERA filing |
| Sanctioned floors | 1 Cellar + 1 Ground + 5 Upper floors. |
| Parking levels / sanctioned parking count | Parking count, parking-level arrangement, and floor-by-floor parking allocation are not established in the supplied material. |
| Unit counts | RERA filing: 60 total units—24 2BHK and 36 3BHK. RERA unit table RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| Unit types and RERA saleable areas | 2BHK: 115.43 sq. m.; 3BHK: 169.0 sq. m. RERA unit table RERA unit table |
| Booked / available | The portal-derived snapshot records 0 booked and 24 available 2BHK units, and 0 booked and 36 available 3BHK units. Counts are indicative: the source record carries no booking “as of” date. RERA unit table RERA unit table |
| Construction stage | The RERA filing labels the project “On-Going Project”; its infrastructure-progress entries report varying percentages. They are filing data, not independent site verification. RERA filing RERA amenities |
| Completion dates | RERA project information states proposed and revised completion as 12/03/2025. The Form B declaration separately records a promoter undertaking to complete by 25-03-2025. RERA record RERA filing |
| Occupancy / completion certificate | The supplied technical-approval extraction records that completion certification is not present. No occupancy or completion certificate is supplied for the building. |
2. The project story
- MAR RESIDENCY is registered with TG-RERA as a residential apartment project by SHIV KRISHNA CONSTRUCTIONS. Its filed site is at Survey No. 12/P, in the project record’s Annojiguda, Ghatkesar, Medchal-Malkajgiri identity, with a recorded site extent of 3,134.27 sq. m. The HMDA technical-approval document refers to Pocharam Village and the same survey identifier. RERA record RERA filing
- The approved proposal describes one residential building with one cellar, a ground floor and five upper floors. The RERA filing lists 60 apartments: 24 two-bedroom and 36 three-bedroom units. Its unit inventory currently shows all 60 as available and none booked, but the portal-derived snapshot has no stated as-of date. RERA unit table
- The project is labelled “On-Going Project” in the RERA filing, and its proposed and revised completion dates are recorded as 12 March 2025. The supplied evidence does not establish independently verified construction completion or an occupancy certificate. RERA-filed infrastructure-progress percentages are declarations in the project record, not a site inspection. RERA filing RERA amenities
3. Master plan, architecture & building design
- The recorded site area is 3,134.27 sq. m., and the HMDA technical approval describes one residential building, with a proposed built-up area of 7,797.7 sq. m. and a floor configuration of 1 Cellar + 1 Ground + 5 Upper floors. The approved built-up area is not the same measure as an apartment’s RERA saleable area. No drawing-derived building footprint, floor-by-floor unit arrangement, flats per floor, tower height, lift or stair count, or internal circulation plan is established by the supplied extracts. RERA filing RERA filing
- The approval specifies one entry and one exit, each with a minimum width of 4.5 meters and height clearance of 5 meters. It also refers to a tot-lot, rainwater-harvesting structures, transformer and garbage house. These are approval/document references; the material does not independently establish that they have been completed.
- The HMDA document records 808.15 sq. m. of built-up area mortgaged in favour of the Metropolitan Commissioner, HMDA, and identifies flats 201, 202, 203, 204, 208, 209 and 210 on the second floor in that description. It also records a gift of 475.74 sq. m. for the proposed 30 ft. north-side road to Pocharam Municipality.
4. Homes, configurations & floor plans
The RERA filing records 60 apartments across two configurations. Saleable areas below are the RERA-filed figures. Carpet area and loading are not established by supplied TG-RERA unit details or measured floor-plan drawings. Six drawing sheets are listed, but none has been software-measured; therefore no drawing-derived carpet or room measurements are reported. RERA unit table RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 24 | 0 | 24 | 115.43 sq. m. | Not measured from supplied drawings | Not supplied |
| 3BHK | 36 | 0 | 36 | 169.0 sq. m. | Not measured from supplied drawings | Not supplied |
Saleable area and carpet area are different measures: the supplied floor-plan note describes RERA saleable area as including the home’s share of common areas, while carpet area is a drawing-based measurement that is smaller. The available drawings are scans pending measurement, so the supplied evidence does not permit room dimensions, balcony or utility details, or a typical-floor arrangement to be stated. Floor plans
5. Parking & vehicle circulation
- The supplied records do not establish the sanctioned number of car or two-wheeler spaces, visitor or accessible parking, parking levels, ramp arrangement, or unit-wise parking allocation. A RERA-linked technical approval records a cellar, but the available extract does not define the parking provision within it.
- The approval specifies one entry and one exit, each with a minimum width of 4.5 meters and height clearance of 5 meters. A third-party listing mentions covered car parking, but the supplied project record does not establish its count, sanctioned arrangement or allocation to particular units; no exclusive ownership is inferred from that claim. Promoter website
6. Amenities, recreation & open spaces
The RERA filing lists infrastructure items and progress percentages. These are filing entries, not independent confirmation of completion. The technical approval refers to a tot-lot, rainwater harvesting, transformer, garbage house and STP, but the supplied extract does not provide facility sizes or independently verified delivery status. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Clubhouse / indoor — Community Buildings | Size and component details not supplied | RERA filing RERA amenities | 5% declared; not independently verified |
| Sports / recreation — Green Strip / TOT LOT / Park | Size and facility details not supplied; technical approval also refers to a tot-lot | RERA filing; HMDA technical approval RERA amenities | 5% declared; not independently verified |
| Landscape / open space — Aggregate recreational open space | Area not supplied | RERA filing RERA amenities | 0% declared; not independently verified |
| Convenience / community — No further RERA-filed facility details established | — | RERA filing RERA amenities | Not established |
7. Utilities, building services & safety
| Evidence in supplied record | RERA infrastructure filing marks water supply “YES”; it reports 0% progress. The technical approval requires appropriate separation of water-supply and sewerage-disposal sources, preferably 100 feet. RERA amenities |
|---|---|
| Status / limitation | No supply source, storage or treatment capacity is established. |
| Evidence in supplied record | RERA filing marks sewerage (including chamber, lines, septic tank and STP) “YES” at 15%; storm-water drains are marked “YES” at 0%. Treatment and disposal of sewage and sullage water is recorded at 0%. RERA amenities |
|---|---|
| Status / limitation | Percentages are filing declarations, not verified completion. |
| Evidence in supplied record | Filing marks water conservation/rainwater harvesting “YES” at 5%; HMDA approval requires rainwater-harvesting structures. RERA amenities |
|---|---|
| Status / limitation | Completion not independently verified. |
| Evidence in supplied record | Filing marks energy management “YES” at 5%; the approval requires provision for a transformer and prohibits placing it in the tot-lot area. Electrical meter room/sub-station/receiving-station progress is recorded at 0%. RERA amenities |
|---|---|
| Status / limitation | Equipment capacity and completed installation are not established. |
| Evidence in supplied record | Solid-waste management and disposal progress is recorded at 0%; the approval refers to a garbage house. RERA amenities |
|---|---|
| Status / limitation | Waste-management arrangement and delivery are not independently verified. |
| Evidence in supplied record | Fire-protection and fire-safety progress is recorded at 0%. The approval requires structural and safety provisions in accordance with the National Building Code of 2005 and refers to fire-service norms. RERA amenities |
|---|---|
| Status / limitation | The supplied evidence does not establish completed systems or a fire clearance. |
| Evidence in supplied record | Not established by the RERA-filed data or supplied approval extraction. |
|---|---|
| Status / limitation | No lift count, capacity, service lift or accessible-circulation details supplied. |
8. Location, access & connectivity
- The project identity places MAR RESIDENCY in POCHARAM, KV RANGA REDDY, revenue village Annojiguda, Ghatkesar Mandal, Medchal-Malkajgiri District, PIN 501301. The site boundaries recorded in the RERA filing include a 30 FEET WIDE ROAD to the north and a 120 FEET WIDE ROAD to the west. RERA record RERA filing RERA filing
- A software location record gives the cadastral parcel centroid as 17.43067, 78.67258 and lists the nearest sampled Outer Ring Road interchange at approximately 2.3 km. This is a sampled-distance figure, not a travel-time estimate. Location record Cadastral map
9. Developer & development status
- The TG-RERA registered promoter is SHIV KRISHNA CONSTRUCTIONS, recorded as a partnership. The supplied RERA record names DUBBAKA RAJESH as authorized signatory and SAMA PADMA REDDY as partner. A GST registration certificate is filed for the partnership, but the available extract does not provide a usable corporate identifier beyond the masked identifier in the project data. RERA filing Parties record
- The promoter’s Form B declaration, signed by DUBBAKA RAJESH on 12 July 2019, states that the promoter has development rights and undertakes to complete the project by 25-03-2025. The RERA project information separately records proposed and revised completion as 12/03/2025. The registration certificate states validity through 12/03/2025; no extension is recorded in the supplied evidence. These are distinct declared completion and registration-validity details. RERA filing
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C for MAR RESIDENCY, P02200001087, issued 05/08/2019; certificate states validity through 12/03/2025. |
| Principal building approval | HMDA technical approval 010275/GHT/R1/U6/HMDA/05042018, dated 12 March 2019; describes one residential building on Survey No. 12/p and requires local Executive Authority sanction in conformity with the technical approval. |
| Registered plan-approval identifier | RERA project information records 010275/GHT/R1/U6/HMD. RERA filing |
| Promoter declaration | Form B affidavit-cum-declaration by DUBBAKA RAJESH, authorized signatory, dated 12 July 2019. |
| Title-related filing | Development Agreement-cum-Specific Power of Attorney dated 15 June 2019, registration number 6478/2019, filed as the project’s title-related document. |
| Other approval-linked records | Approval extraction refers to registered mortgage document 16/2019 dated 02/01/2019, registered gift deed 1887/2019 dated 19.02.2019, and local-body confirmation letter G1/636/2019 dated 25.02.2019. |
| Occupancy / completion record | No occupancy or completion certificate is supplied; the approval extraction records completion certification as not present. |
| Layout-plan documents | RERA-filed layout-plan entries are present, but the supplied document records are not extracted as usable approved drawings. Document index |
The approval document lists construction and safety conditions, including rainwater harvesting, transformer and garbage-house provisions, commencement and completion notices, and an occupancy certificate before occupation. This overview records those references without assessing compliance with the conditions.
1. Project at a glance
Project identity
Registered project name: MAR RESIDENCY
Project type: Residential apartment project
Phase / registered portion: The available record identifies one registered apartment building; a separate phase name or phase number is not disclosed.
TG-RERA registration: P02200001087, granted 05/08/2019; the certificate states validity through 12/03/2025.
Registered promoter: SHIV KRISHNA CONSTRUCTIONS; RERA filing describes the entity as a partnership.
RERA status: The filing labels the project “On-Going Project.” The registration certificate’s stated validity ended on 12/03/2025; no extension is recorded in the supplied material. These are separate status facts.
Registration capture: TG-RERA registration data was captured on 10 September 2026.
Land and geographic identity
Locality: POCHARAM, KV RANGA REDDY
Revenue village: Annojiguda in the project identity and RERA filing; the HMDA technical-approval document describes Pocharam Village.
Mandal / district / PIN: Ghatkesar / Medchal-Malkajgiri / 501301
Project survey identifier: Survey No. 12/P (also rendered “12/p” in the technical approval).
Registered site extent: 3,134.27 sq. m.
Total / net area: Total area 3,134.27 sq. m.; net area 3,134.27 sq. m.; recorded affected area 0 sq. m.
Boundaries: North: 30 FEET WIDE ROAD; West: 120 FEET WIDE ROAD; East and South: neighbours’ land.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA); the technical approval says building plans require sanction by the local Executive Authority in conformity with HMDA’s technical approval.
Principal approval: 010275/GHT/R1/U6/HMDA/05042018, approved 12 March 2019; the RERA filing lists 010275/GHT/R1/U6/HMD as the plan approval number.
Approved built-up area: 7,797.7 sq. m. as recorded in the RERA filing and approval extraction.
Buildings / blocks: One building is recorded in the RERA project information; the technical approval describes a residential building.
Sanctioned floors: 1 Cellar + 1 Ground + 5 Upper floors.
Parking levels / sanctioned parking count: Parking count, parking-level arrangement, and floor-by-floor parking allocation are not established in the supplied material.
Unit counts: RERA filing: 60 total units—24 2BHK and 36 3BHK.
Offering and status
Unit types and RERA saleable areas: 2BHK: 115.43 sq. m.; 3BHK: 169.0 sq. m.
Booked / available: The portal-derived snapshot records 0 booked and 24 available 2BHK units, and 0 booked and 36 available 3BHK units. Counts are indicative: the source record carries no booking “as of” date.
Construction stage: The RERA filing labels the project “On-Going Project”; its infrastructure-progress entries report varying percentages. They are filing data, not independent site verification.
Completion dates: RERA project information states proposed and revised completion as 12/03/2025. The Form B declaration separately records a promoter undertaking to complete by 25-03-2025.
Occupancy / completion certificate: The supplied technical-approval extraction records that completion certification is not present. No occupancy or completion certificate is supplied for the building.
2. The project story
- MAR RESIDENCY is registered with TG-RERA as a residential apartment project by SHIV KRISHNA CONSTRUCTIONS. Its filed site is at Survey No. 12/P, in the project record’s Annojiguda, Ghatkesar, Medchal-Malkajgiri identity, with a recorded site extent of 3,134.27 sq. m. The HMDA technical-approval document refers to Pocharam Village and the same survey identifier.
- The approved proposal describes one residential building with one cellar, a ground floor and five upper floors. The RERA filing lists 60 apartments: 24 two-bedroom and 36 three-bedroom units. Its unit inventory currently shows all 60 as available and none booked, but the portal-derived snapshot has no stated as-of date.
- The project is labelled “On-Going Project” in the RERA filing, and its proposed and revised completion dates are recorded as 12 March 2025. The supplied evidence does not establish independently verified construction completion or an occupancy certificate. RERA-filed infrastructure-progress percentages are declarations in the project record, not a site inspection.
3. Master plan, architecture & building design
- The recorded site area is 3,134.27 sq. m., and the HMDA technical approval describes one residential building, with a proposed built-up area of 7,797.7 sq. m. and a floor configuration of 1 Cellar + 1 Ground + 5 Upper floors. The approved built-up area is not the same measure as an apartment’s RERA saleable area. No drawing-derived building footprint, floor-by-floor unit arrangement, flats per floor, tower height, lift or stair count, or internal circulation plan is established by the supplied extracts.
- The approval specifies one entry and one exit, each with a minimum width of 4.5 meters and height clearance of 5 meters. It also refers to a tot-lot, rainwater-harvesting structures, transformer and garbage house. These are approval/document references; the material does not independently establish that they have been completed.
- The HMDA document records 808.15 sq. m. of built-up area mortgaged in favour of the Metropolitan Commissioner, HMDA, and identifies flats 201, 202, 203, 204, 208, 209 and 210 on the second floor in that description. It also records a gift of 475.74 sq. m. for the proposed 30 ft. north-side road to Pocharam Municipality.
4. Homes, configurations & floor plans
The RERA filing records 60 apartments across two configurations. Saleable areas below are the RERA-filed figures. Carpet area and loading are not established by supplied TG-RERA unit details or measured floor-plan drawings. Six drawing sheets are listed, but none has been software-measured; therefore no drawing-derived carpet or room measurements are reported.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 24 | 0 | 24 | 115.43 sq. m. | Not measured from supplied drawings | Not supplied |
| 3BHK | 36 | 0 | 36 | 169.0 sq. m. | Not measured from supplied drawings | Not supplied |
Saleable area and carpet area are different measures: the supplied floor-plan note describes RERA saleable area as including the home’s share of common areas, while carpet area is a drawing-based measurement that is smaller. The available drawings are scans pending measurement, so the supplied evidence does not permit room dimensions, balcony or utility details, or a typical-floor arrangement to be stated.
5. Parking & vehicle circulation
- The supplied records do not establish the sanctioned number of car or two-wheeler spaces, visitor or accessible parking, parking levels, ramp arrangement, or unit-wise parking allocation. A RERA-linked technical approval records a cellar, but the available extract does not define the parking provision within it.
- The approval specifies one entry and one exit, each with a minimum width of 4.5 meters and height clearance of 5 meters. A third-party listing mentions covered car parking, but the supplied project record does not establish its count, sanctioned arrangement or allocation to particular units; no exclusive ownership is inferred from that claim.
6. Amenities, recreation & open spaces
The RERA filing lists infrastructure items and progress percentages. These are filing entries, not independent confirmation of completion. The technical approval refers to a tot-lot, rainwater harvesting, transformer, garbage house and STP, but the supplied extract does not provide facility sizes or independently verified delivery status.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Clubhouse / indoor — Community Buildings | Size and component details not supplied | RERA filing | 5% declared; not independently verified |
| Sports / recreation — Green Strip / TOT LOT / Park | Size and facility details not supplied; technical approval also refers to a tot-lot | RERA filing; HMDA technical approval | 5% declared; not independently verified |
| Landscape / open space — Aggregate recreational open space | Area not supplied | RERA filing | 0% declared; not independently verified |
| Convenience / community — No further RERA-filed facility details established | — | RERA filing | Not established |
7. Utilities, building services & safety
| Evidence in supplied record | RERA infrastructure filing marks water supply “YES”; it reports 0% progress. The technical approval requires appropriate separation of water-supply and sewerage-disposal sources, preferably 100 feet. |
|---|---|
| Status / limitation | No supply source, storage or treatment capacity is established. |
| Evidence in supplied record | RERA filing marks sewerage (including chamber, lines, septic tank and STP) “YES” at 15%; storm-water drains are marked “YES” at 0%. Treatment and disposal of sewage and sullage water is recorded at 0%. |
|---|---|
| Status / limitation | Percentages are filing declarations, not verified completion. |
| Evidence in supplied record | Filing marks water conservation/rainwater harvesting “YES” at 5%; HMDA approval requires rainwater-harvesting structures. |
|---|---|
| Status / limitation | Completion not independently verified. |
| Evidence in supplied record | Filing marks energy management “YES” at 5%; the approval requires provision for a transformer and prohibits placing it in the tot-lot area. Electrical meter room/sub-station/receiving-station progress is recorded at 0%. |
|---|---|
| Status / limitation | Equipment capacity and completed installation are not established. |
| Evidence in supplied record | Solid-waste management and disposal progress is recorded at 0%; the approval refers to a garbage house. |
|---|---|
| Status / limitation | Waste-management arrangement and delivery are not independently verified. |
| Evidence in supplied record | Fire-protection and fire-safety progress is recorded at 0%. The approval requires structural and safety provisions in accordance with the National Building Code of 2005 and refers to fire-service norms. |
|---|---|
| Status / limitation | The supplied evidence does not establish completed systems or a fire clearance. |
| Evidence in supplied record | Not established by the RERA-filed data or supplied approval extraction. |
|---|---|
| Status / limitation | No lift count, capacity, service lift or accessible-circulation details supplied. |
8. Location, access & connectivity
- The project identity places MAR RESIDENCY in POCHARAM, KV RANGA REDDY, revenue village Annojiguda, Ghatkesar Mandal, Medchal-Malkajgiri District, PIN 501301. The site boundaries recorded in the RERA filing include a 30 FEET WIDE ROAD to the north and a 120 FEET WIDE ROAD to the west.
- A software location record gives the cadastral parcel centroid as 17.43067, 78.67258 and lists the nearest sampled Outer Ring Road interchange at approximately 2.3 km. This is a sampled-distance figure, not a travel-time estimate.
9. Developer & development status
- The TG-RERA registered promoter is SHIV KRISHNA CONSTRUCTIONS, recorded as a partnership. The supplied RERA record names DUBBAKA RAJESH as authorized signatory and SAMA PADMA REDDY as partner. A GST registration certificate is filed for the partnership, but the available extract does not provide a usable corporate identifier beyond the masked identifier in the project data.
- The promoter’s Form B declaration, signed by DUBBAKA RAJESH on 12 July 2019, states that the promoter has development rights and undertakes to complete the project by 25-03-2025. The RERA project information separately records proposed and revised completion as 12/03/2025. The registration certificate states validity through 12/03/2025; no extension is recorded in the supplied evidence. These are distinct declared completion and registration-validity details.
10. Approvals, official records & documents
TG-RERA registration: Form C for MAR RESIDENCY, P02200001087, issued 05/08/2019; certificate states validity through 12/03/2025.
Principal building approval: HMDA technical approval 010275/GHT/R1/U6/HMDA/05042018, dated 12 March 2019; describes one residential building on Survey No. 12/p and requires local Executive Authority sanction in conformity with the technical approval.
Registered plan-approval identifier: RERA project information records 010275/GHT/R1/U6/HMD.
Promoter declaration: Form B affidavit-cum-declaration by DUBBAKA RAJESH, authorized signatory, dated 12 July 2019.
Title-related filing: Development Agreement-cum-Specific Power of Attorney dated 15 June 2019, registration number 6478/2019, filed as the project’s title-related document.
Other approval-linked records: Approval extraction refers to registered mortgage document 16/2019 dated 02/01/2019, registered gift deed 1887/2019 dated 19.02.2019, and local-body confirmation letter G1/636/2019 dated 25.02.2019.
Occupancy / completion record: No occupancy or completion certificate is supplied; the approval extraction records completion certification as not present.
Layout-plan documents: RERA-filed layout-plan entries are present, but the supplied document records are not extracted as usable approved drawings.
The approval document lists construction and safety conditions, including rainwater harvesting, transformer and garbage-house provisions, commencement and completion notices, and an occupancy certificate before occupation. This overview records those references without assessing compliance with the conditions.
Frequently asked questions
Is MAR RESIDENCY registered with Telangana RERA?
Yes. MAR RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02200001087; the registration status is On-Going Project.
Who is the developer of MAR RESIDENCY?
The promoter named in the RERA registration is SHIV KRISHNA CONSTRUCTIONS.
Where is MAR RESIDENCY located?
MAR RESIDENCY is in POCHARAM, KV RANGA REDDY, Annojiguda, Ghatkesar, Medchal-Malkajgiri, Telangana (501301).
When will MAR RESIDENCY be completed?
The promoter's proposed date of completion filed with RERA is 12/03/2025. This is the promoter's declaration, not a guarantee.
More projects in Annojiguda







