Sumas Park View is a residential apartment building in Ameenpur, Ameenpur Mandal, Sangareddy District, developed by registered promoter LAASRITHA INFRA. On a land area of 334.4 sq. metres, it comprises one building with 1 Stilt + 5 upper floors and 10 homes, all filed as 2BHK units with a saleable area of 78.28 sq. metres per unit. The project is registered under TG-RERA number P01100009618, with the promoter’s declared proposed completion date of 25.11.2027.

01What we found

RegisteredTG-RERA - valid till 25 Nov 2027
16documents on file - each fact links to its page
0court cases on this project's land in the court records searched
5items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

5 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from housing.com

1. Project at a glance

Project identity

ItemProject record
Registered nameSumas Park View RERA record
Project typeResidential apartment building RERA record RERA filing
Phase / registered portionNo separate phase is identified in the supplied record. The registration concerns the site and building at Plot No. 306, Survey No. 113/P.
TG-RERA registrationP01100009618
Registration validity25/11/2024 to 25/11/2027, unless extended by the Authority. This is the registration period, not a statement of the project’s completion date.
Registered promoterLAASRITHA INFRA, identified in the filing as a partnership. RERA filing Parties record
RERA statusRegistered; the certificate states the validity period above.

Land and geographic identity

ItemProject record
Locality / sitePlot No. 306, Ameenpur / Ameenapur
Revenue villageAMEENAPUR; the filed records also use Ameenpur.
MandalAMEENPUR
DistrictSangareddy (also rendered “Sanga Reddy”)
PIN502032
Project survey number / subdivisionSurvey No. 113/P
Registered site extent334.4 sq. metres
Sanctioned plot area / net site area334.40 sq. metres
BoundariesEast: MAIN ROAD; West, North and South: OTHERS LAND. RERA filing

Development identity

ItemProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); the commencement approval records building plans to be sanctioned and released by the municipal authority.
Principal building-permit number / date010129/BP/HMDA/2639/SKP/2024, approved 25 November 2024.
Approved built-up area949.10 sq. metres excluding parking; the approval also records total proposed built-up area including parking of 1138.92 sq. metres, parking area 189.82 sq. metres, and total BUA 1151.26 with deductions of 12.34 and net BUA 949.10. These are the distinct area labels recorded in the filed plan.
Building count / configurationOne residential building, 1 Stilt + 5 upper floors; the plan records 6 floors and building height 14.99 MT.
Units10 units in the plan and RERA unit record. RERA unit table
ParkingStilt parking is specified in the approval; sanctioned parking area is 189.82 sq. metres. A space count and individual allotments are not supplied.
Other building levelsNo basement or podium is identified in the supplied approval.

Offering and status

ItemProject record
RERA-filed configuration2BHK, 10 units RERA unit table
RERA-filed saleable area78.28 sq. metres per unit RERA unit table
Booked / available0 booked / 10 available, as last read from the TG-RERA portal; the record does not provide an as-of date, so counts are indicative. RERA unit table
Promoter-declared completion undertaking25.11.2027 in the Form B declaration.
Occupancy certificate status and scopeAn occupancy certificate for the building at Plot No. 306, Survey No. 113/P is recorded as issued by Cyberabad Municipal Corporation, with approval date 16/09/2026. It identifies a 1 stilt + 5 upper floors building.
Completion evidenceThe filed architect’s Form–1A is dated 30/09/26 and identifies the occupancy certificate dated 16-09-26.

2. The project story

Sumas Park View is a single-building residential apartment development on Plot No. 306 in Survey No. 113/P, in the Ameenapur/Ameenpur revenue location, Ameenpur Mandal, Sangareddy District. The filed plan describes a residential building of one stilt level and five upper floors, with 10 apartments.

The project record includes an occupancy certificate for the building and an architect’s completion certificate filed for the registered project. The occupancy certificate states that the building was inspected and declared fit for occupation; the supplied documents identify the certificate’s scope as the Plot No. 306 building. These documents establish the recorded certification, not an independent site inspection for this report.

3. Master plan, architecture & building design

The filed building plan is for a residential use on a 334.40 sq. metre plot, with 949.10 sq. metres recorded as proposed built-up area excluding parking and 189.82 sq. metres as parking area. The plan describes one building, 1 Stilt + 5 upper floors. It also records vacant plot area of 144.58; the supplied plan extract does not further define that figure.

The plan identifies a 1.00 M WIDE GREEN BELT and roads/passages labelled 9.00MT WIDE MAINROAD, 12.00MT WIDE MAINROAD, 12.0M WIDE ROAD, 9.0M WIDE ROAD and 2.50 M. WIDE PASSAGE. The supplied extract does not establish the detailed internal circulation or which labels describe the approach versus adjacent road network.

The filed completion record lists 989.97 sq. metres as total built-up area in the completion plan and 40.87 as total deviated built-up area for the block. These are completion-record figures, distinct from the sanctioned-plan area labels above.

4. Homes, configurations & floor plans

The RERA-filed offering is 10 two-bedroom apartments, each recorded with a saleable area of 78.28 sq. metres. The portal-derived booking counts show 0 booked and 10 available, but no as-of date is supplied. RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK1001078.28 sq. metres60.6 sq. metres median; range 59.0–62.0 sq. metres23%

The carpet-area figures are software measurements from the approved floor-plan drawing geometry, not RERA-filed area disclosures, and are flagged for review. The RERA figure is saleable area; the two measurements are different area categories and should not be treated as interchangeable. Floor plans

The measured sample drawing shows a master bedroom, bedroom, two toilets, dining/kitchen, living area, wash area and two balconies. For the measured flat shown, the balconies are 5.8 sq. metres and 3.52 sq. metres; balcony area is excluded from the software-measured carpet area. These are drawing-based measurements for the identified plan, not a separate RERA area declaration. RERA unit details

5. Parking & vehicle circulation

The approved plan specifies stilt parking, with the stilt floor to be used for parking, and records parking area of 189.82 sq. metres. The occupancy-certificate record lists parking area of 198.0 sq. metres in the completion plan. The supplied records do not state the number of car or two-wheeler spaces, visitor or accessible parking provision, ramp details, or unit-wise parking allocation.

The building-permit conditions require Electric Vehicle Charging Infrastructure in parking places. The documents do not establish the installed charging equipment or its completion status.

6. Amenities, recreation & open spaces

The RERA amenities record lists several facilities as available, but gives 0% progress for each listed item. The completion certificate separately records four rainwater-harvesting pits in both the sanctioned and completion plans. The supplied evidence does not independently verify the operating status of the listed facilities. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green strip / tot lot / parkNo size suppliedRERA amenities record RERA amenitiesListed as available; 0% progress recorded
Aggregate recreational open spaceNo area suppliedRERA amenities record RERA amenitiesListed as available; 0% progress recorded
Community buildingsNo size or facility detail suppliedRERA amenities record RERA amenitiesNo availability stated; 0% progress recorded
Internal roads and footpathsNo dimensions beyond the plan’s road/passage labelsRERA amenities record RERA amenities; filed plan0% progress recorded
Street lightingNo detail suppliedRERA amenities record RERA amenities0% progress recorded

7. Utilities, building services & safety

The filed plan lists a bore well, sump, water-supply line, sewerage line, septic tank, storm-water line, rainwater harvesting, distribution transformer, lift, parking, P.PIT and dust bin. The building approval also specifies a separate underground static water-storage tank of 25,000 lts. and a separate terrace tank of 25,000 lts. for residential buildings, and requires provision for an STP. The supplied records do not state treatment capacity, water-source yield, lift capacity, backup-power capacity or the operating status of these systems.

The approval includes fire-fighting installations and requires fire-safety and structural-stability provisions. It also states that sprinkler provision is required if basement area exceeds 200 sq. metres; the supplied plan identifies stilt parking rather than a basement. These are approval conditions and do not, by themselves, establish that equipment has been installed or independently tested.

The plan lists a transformer, garbage house and rainwater-harvesting structures; the occupancy certificate records 4 rainwater-harvesting pits in both the sanctioned and completion plans. The RERA amenities record lists sewerage, storm-water drainage, sewage/sullage treatment and disposal, solid-waste management, water conservation, fire safety, and electrical meter room/substation/receiving station, each with 0% progress recorded. RERA amenities

8. Location, access & connectivity

The registered site is Plot No. 306, Survey No. 113/P, in revenue village AMEENAPUR/Ameenpur, Ameenpur Mandal, Sangareddy District, PIN 502032. The filed boundary description identifies the east boundary as MAIN ROAD. The plan labels nearby road and passage widths, including 9.00MT WIDE MAINROAD and 12.00MT WIDE MAINROAD. RERA filing

The supplied location record gives an approximate distance of 6.8 km to the nearest sampled Outer Ring Road interchange. It is a location-data estimate, not a promoter travel-time claim. Location record

9. Developer & development status

The registered promoter is LAASRITHA INFRA, identified in the project filing as a partnership; its GSTIN is 36AALFL5882C1Z3. The project documents identify Muppa Siva Krishna as managing partner/representative and authorized signatory. RERA filing Corporate record

The supplied project record gives the promoter’s address as SS PARKVIEW, HUDA COLONY, HUDA COLONY, AMEENPUR, AMEENPUR, Sangareddy, 502032. No official website or project contact details are supplied here. Parties record

The promoter’s Form B declaration undertakes completion by 25.11.2027. Separately, the registration certificate remains valid through 25/11/2027, unless extended. The occupancy certificate and architect’s completion certificate are filed for the building; the supplied evidence does not provide an independently observed construction-progress assessment.

10. Approvals, official records & documents

TG-RERA registration certificate
Reference and scopeP01100009618, Sumas Park View; validity 25/11/2024–25/11/2027
HMDA building approval
Reference and scope010129/BP/HMDA/2639/SKP/2024, approved 25 November 2024; residential building at Plot No. 306, Survey No. 113/P
Filed plan / layout drawing record
Reference and scopePlan identifies Plot No. 306, Survey No. 113/P; sheet date 02-09-2024; LTP licence 47/SURVEYOR-I/TP10/GHMC
Mortgage recorded in approval
Reference and scopeMortgage deed 30375/2024, dated 14 November 2024; the approval identifies 97.01 Sq.Mt., including Flat Nos. 501 and 502, in favour of the Metropolitan Commissioner, HMDA
Form B promoter declaration
Reference and scopeProject-fund, approval and completion undertakings; completion undertaking 25.11.2027
Occupancy certificate
Reference and scopeCyberabad Municipal Corporation proceedings 020530/CMC/01641/SWOC/SLP2/2026, dated 16/09/2026; identifies Plot No. 306, Survey No. 113/P and 1 stilt + 5 upper floors
Architect’s completion certificate
Reference and scopeForm–1A dated 30/09/26; identifies occupancy certificate dated 16-09-26 and TG-RERA registration P01100009618

Frequently asked questions

Is Sumas Park View registered with Telangana RERA?

Yes. Sumas Park View is registered with the Telangana Real Estate Regulatory Authority as P01100009618; the registration status is New Project.

Who is the developer of Sumas Park View?

The promoter named in the RERA registration is LAASRITHA INFRA.

Where is Sumas Park View located?

Sumas Park View is in AMEENPUR, AMEENAPUR, Sangareddy, Telangana (502032).

When will Sumas Park View be completed?

The promoter's proposed date of completion filed with RERA is 25/03/2028. This is the promoter's declaration, not a guarantee.