Nlcb Iris
MEDHA INFRA · Sangareddy · RERA P01100009300
NLCB IRIS is a residential apartment project in Indresham, PATANCHERU Mandal, Sangareddy District, developed by registered promoter MEDHA INFRA. The site area is 2,023.12 sq.mt, with one residential building of 1 Stilt + 5 upper floors and 50 homes: 45 2BHK and 5 3BHK. Its TG-RERA registration number is P01100009300, and the project header lists proposed completion as 29/03/2028.
More from Medha Infra · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | NLCB IRIS RERA record |
| Project type / phase | Residential apartment project; phase or separately registered portion is not disclosed. RERA record RERA filing |
| TG-RERA registration | P01100009300; valid 29/11/2024–29/11/2027. Registration validity is separate from the completion deadline. RERA record |
| Registered promoter | MEDHA INFRA (also stated as M/s. MEDHA INFRA); entity type: Partnership. RERA record RERA filing |
| RERA status | Listed as “New Project”; registration certificate recorded. RERA record |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | Indresham; the building-permit document describes INDRESHAM VILLAGE & G.P. RERA record RERA filing |
| Mandal / district / PIN | PATANCHERU / Sangareddy / 502319. RERA record RERA filing |
| Project survey numbers | 187/E/2 and 187/E/1. RERA record Land records |
| Site extent | 2,023.12 sq.mt; total and net area are each recorded as 2023.12 sq.mt. RERA filing |
| Boundaries (RERA filing) | East and North: Remaining Land of First Party; West and South: Neighbors Land. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning / permitting record | Building permit order issued by Indresham Gram Panchayat under approval no. 007467/BP/HMDA/1799/SKP/2024, dated 29 November 2024; the filed approval materials identify HMDA as the technical approval authority. Approvals record |
| Building configuration | One residential building, 1 Stilt + 5 upper floors; the plan record also states “NO OF FLOORS: 6.” |
| Building height | The plan record gives BLDG HT: 14.75 MT. and Total height 20.05mt. These are the recorded labels and figures. |
| Approved built-up figures | The plan records TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING 4821.00, TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING 5939.86, and GROSS BUA 5987.36. These are distinct recorded figures. |
| Units | 50 dwelling units in the plan; RERA unit record lists 45 2BHK and 5 3BHK. RERA unit table |
| Parking | Parking area recorded as 1118.86; required parking area 1060.62. The plan also lists visitors’ parking but gives no space count. |
Offering and status
| Item | Record |
|---|---|
| Configurations | 2BHK: 45 units; 3BHK: 5 units. RERA unit table |
| RERA-filed saleable area | 2BHK: 104.82 sq.m; 3BHK: 167.22 sq.m. RERA unit table |
| Booked / available | RERA portal-derived record lists 0 booked and 45 available 2BHKs, and 0 booked and 5 available 3BHKs. Counts are indicative: the portal record supplied has no as-of date. RERA unit table |
| Construction stage | No independently verified site-progress status is supplied. RERA amenities progress entries are recorded as 0%; these are not an independent site inspection. RERA amenities |
| Completion timeline | The Form B declaration states completion by 29 November 2027; the project header lists proposed completion 29/03/2028. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied; the building-permit record states that an occupancy certificate is compulsory before occupation. The supplied permit record describes the building as proposed. |
2. The project story
NLCB IRIS is a residential apartment development registered under TG-RERA number P01100009300, on land identified in the filing as Survey Nos. 187/E/2 and 187/E/1, Indresham, Patancheru Mandal, Sangareddy District. The registered site extent is 2,023.12 sq.mt. RERA record Land records
The filed building plan describes one residential building with a stilt level and five upper floors, containing 50 dwelling units: 45 two-bedroom and 5 three-bedroom homes. The approved-plan record includes parking, a tot-lot, green strip, lift and staircase. RERA unit table
The records provide proposed completion dates and a Form B completion undertaking, but no independently verified construction-progress report or occupancy certificate is included in the supplied material. The dates should therefore not be read as evidence that the building is complete or occupied. RERA record RERA amenities
3. Master plan, architecture & building design
The filed plan identifies a residential building on the 2,023.12 sq.mt site and describes 1 Stilt + 5 upper floors. It records 4821.00 as proposed built-up area excluding parking, 5939.86 as proposed built-up area including parking, and 5987.36 as gross BUA; the plan separately records parking area of 1118.86. These labels and figures are reported as filed and are not interchangeable.
The plan lists vacant plot area as 904.26 and includes a green strip and tot-lot. A detailed area schedule for common areas, floor-by-floor apartment distribution, exact building footprint, or phase organization is not available in the supplied extracted information.
The drawing extraction identifies a typical floor plan for floors 1, 3, 4 and 5 and a second-floor plan. It does not provide a complete verified schedule of homes per floor, lifts or stairs beyond the plan’s listing of a lift and staircase.
4. Homes, configurations & floor plans
RERA-filed counts and saleable areas are shown below. Drawing measurements are software-measured from the filed plan and are not RERA-filed carpet-area disclosures; the supplied measurement record says they require review. RERA unit table Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 45 | 0 | 45 | 104.82 sq.m | 48.8–92.4 sq.m; median 67.7 sq.m | 35% |
| 3BHK | 5 | 0 | 5 | 167.22 sq.m | 105.2–105.3 sq.m; median 105.3 sq.m | 37% |
The software-measured 2BHK range covers 18 measured flat designs; 11 are marked as needing review. The 3BHK figures cover 2 measured designs. The record explains that drawing-measured carpet area is distinct from RERA saleable area, which also counts the home’s share of common areas. Floor plans
A sample measured 2BHK plan (flat S-7) labels two bedrooms, two toilets, dining/kitchen and a hall, with a 1.00 m wide balcony. A sample measured 3BHK plan (flat 01) labels three bedrooms, two toilets, a hall, dining, kitchen, wash area and a 1.50 m wide balcony. These are drawing-based measurements and labels, not a guarantee of the delivered unit. RERA unit details
5. Parking & vehicle circulation
The filed plan records 1118.86 as proposed parking area and 1060.62 as required parking area. It identifies the stilt/cellar floor as parking-only and lists visitors’ parking, but the supplied material does not establish a count of resident, visitor, accessible or two-wheeler spaces, nor a unit-wise parking allocation.
The permit conditions state that no parking or construction is to be made in setback areas and that the stilt/cellar is to be used exclusively for vehicle parking. The filed plan lists roads and passages, but the supplied extracted record does not establish the detailed vehicle-entry, ramp or pedestrian-separation arrangements.
The approved-plan conditions call for EV charging infrastructure in building parking places. The supplied records establish this as a plan condition, not as completed or operational charging provision.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Lift and staircase | Listed on the filed building plan; quantities and specifications are not supplied. | Approved plan | No completion verification supplied. |
| Tot-lot / green strip | Listed as plan facilities; sizes and detailed design are not supplied. | Approved plan | RERA amenity entries for green strip/tot-lot show 0%; no independent verification supplied. RERA amenities |
| Visitors’ parking | Listed; no number of spaces supplied. | Approved plan | No completion verification supplied. |
| Community buildings | RERA amenity record lists the category; no building size or facility detail is supplied. | RERA amenity record RERA amenities | Progress recorded as 0%. |
| Internal roads and footpaths | Listed in the RERA amenity record; no dimensions or detailed scope supplied. | RERA amenity record RERA amenities | Progress recorded as 0%. |
| Street lighting | Listed in the RERA amenity record; no specification supplied. | RERA amenity record RERA amenities | Progress recorded as 0%. |
The vendor record mentions kids’ play areas, sand pits and garden view, but these are vendor-supplied claims rather than evidence of sanction or delivery. Promoter website
7. Utilities, building services & safety
The filed records list water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, and an electrical meter room/sub-station/receiving station. These RERA amenity entries are marked 0% progress; no independent verification of installation or operation is supplied. RERA amenities
The building-permit materials specify a separate underground static water storage tank of 25,000 Its. and a separate residential terrace tank of 25,000 Its. They also identify a sump, septic tank, rainwater harvesting and percolation pit in the plan materials. The records do not establish that these systems are complete or in service.
The permit materials call for an STP, transformer, garbage house and EV charging infrastructure. They also contain fire-safety and structural-safety conditions, including responsibility for compliance with applicable requirements. The supplied extracts do not establish installed fire systems, clearances, equipment capacities, or completed safety inspections.
The approved-plan conditions refer to dual piping for specified larger developments and to digital/broadband infrastructure provisions. The supplied data does not establish the installed configuration or service-provider access arrangements for this building.
8. Location, access & connectivity
The registered location is Indresham, PATANCHERU Mandal, Sangareddy District, PIN 502319, on Survey Nos. 187/E/2 and 187/E/1. The building-permit material further describes the site as Indresham Village & G.P., on “OPEN PLACE.” RERA record Land records
The plan record identifies a 9.00 MT wide existing road and a 9.00 MT wide proposed road, as well as a 1.75 M. wide passage. A separate permit extract lists road widths of 4.5mts., 3.0mts. and 1.5mts. No verified public-transport details are supplied.
A supplied location record lists Financial District (Nanakramguda), 1.2 km. The data does not specify a measurement method or route; no travel time is provided. Location record
9. Developer & development status
The registered promoter is MEDHA INFRA, identified in the RERA filing as a partnership. The supplied corporate identifier is GSTIN 36ABIFM0166A1ZO. The promoter’s filing gives an address at Flat No G2, H No 6-1-49 and 62/B, Mumtaz Towers, Bhagyalakshmi Colony, Indresham, PATANCHERU, Sangareddy, 502319. An official website or project contact number is not supplied. RERA record RERA filing RERA filing Corporate record Parties record
The RERA filing identifies two landowners, VADDE CHANDRAN and VADDE BHUPAL, and records an AreaShare arrangement. The Form B declaration states that the landowners’ title documents and a development agreement-cum-GPA are enclosed and gives a completion undertaking of 29 November 2027. Parties record
The project is registered through 29 November 2027; the project header separately lists proposed completion 29/03/2028. No independent construction-progress verification or occupancy certificate is supplied. RERA record
10. Approvals, official records & documents
| Identifier / date | P01100009300; valid 29/11/2024–29/11/2027 |
|---|---|
| What the supplied record establishes | Form C certificate for NLCB IRIS, naming Medha Infra as promoter. |
| Identifier / date | 007467/BP/HMDA/1799/SKP/2024; 29 November 2024 |
|---|---|
| What the supplied record establishes | Permit order for a proposed residential building of 1 Stilt + 5 upper floors on Survey Nos. 187/E/2 and 187/E/1. |
| Identifier / date | File no. TS/034438/2024 |
|---|---|
| What the supplied record establishes | Filed building-plan material with development dimensions, area figures, parking and listed facilities. |
| Identifier / date | 007467/BP/HMDA/1799/SKP/2024; dated 29 November 2024 in the extract |
|---|---|
| What the supplied record establishes | Technical approval record states that building plans are to be sanctioned and released by the Gram Panchayat. |
| Identifier / date | 007467/BP/HMDA/1799/SKP/2024 |
|---|---|
| What the supplied record establishes | The extracted letter states it is not itself approval or permission for development. |
| Identifier / date | December 2024 |
|---|---|
| What the supplied record establishes | Promoter declaration includes the landowners, development arrangement, encumbrance statement, separate-account undertaking and completion undertaking. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No certificate is included in the available project documents. Document index |
The supplied documents include the registration certificate, building-permit/plan materials, Form B declaration, title and development-agreement materials, and an encumbrance statement. A publicly reachable approved-layout lookup is not available in the supplied record; this is a record-availability limitation, not a conclusion about approval. Document index HMDA
1. Project at a glance
Project identity
Registered project name: NLCB IRIS
Project type / phase: Residential apartment project; phase or separately registered portion is not disclosed.
TG-RERA registration: P01100009300; valid 29/11/2024–29/11/2027. Registration validity is separate from the completion deadline.
Registered promoter: MEDHA INFRA (also stated as M/s. MEDHA INFRA); entity type: Partnership.
RERA status: Listed as “New Project”; registration certificate recorded.
Land and geographic identity
Locality / revenue village: Indresham; the building-permit document describes INDRESHAM VILLAGE & G.P.
Mandal / district / PIN: PATANCHERU / Sangareddy / 502319.
Project survey numbers: 187/E/2 and 187/E/1.
Site extent: 2,023.12 sq.mt; total and net area are each recorded as 2023.12 sq.mt.
Boundaries (RERA filing): East and North: Remaining Land of First Party; West and South: Neighbors Land.
Development identity
Sanctioning / permitting record: Building permit order issued by Indresham Gram Panchayat under approval no. 007467/BP/HMDA/1799/SKP/2024, dated 29 November 2024; the filed approval materials identify HMDA as the technical approval authority.
Building configuration: One residential building, 1 Stilt + 5 upper floors; the plan record also states “NO OF FLOORS: 6.”
Building height: The plan record gives BLDG HT: 14.75 MT. and Total height 20.05mt. These are the recorded labels and figures.
Approved built-up figures: The plan records TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING 4821.00, TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING 5939.86, and GROSS BUA 5987.36. These are distinct recorded figures.
Units: 50 dwelling units in the plan; RERA unit record lists 45 2BHK and 5 3BHK.
Parking: Parking area recorded as 1118.86; required parking area 1060.62. The plan also lists visitors’ parking but gives no space count.
Offering and status
Configurations: 2BHK: 45 units; 3BHK: 5 units.
RERA-filed saleable area: 2BHK: 104.82 sq.m; 3BHK: 167.22 sq.m.
Booked / available: RERA portal-derived record lists 0 booked and 45 available 2BHKs, and 0 booked and 5 available 3BHKs. Counts are indicative: the portal record supplied has no as-of date.
Construction stage: No independently verified site-progress status is supplied. RERA amenities progress entries are recorded as 0%; these are not an independent site inspection.
Completion timeline: The Form B declaration states completion by 29 November 2027; the project header lists proposed completion 29/03/2028.
Occupancy / completion certificate: No occupancy or completion certificate is supplied; the building-permit record states that an occupancy certificate is compulsory before occupation. The supplied permit record describes the building as proposed.
2. The project story
NLCB IRIS is a residential apartment development registered under TG-RERA number P01100009300, on land identified in the filing as Survey Nos. 187/E/2 and 187/E/1, Indresham, Patancheru Mandal, Sangareddy District. The registered site extent is 2,023.12 sq.mt.
The filed building plan describes one residential building with a stilt level and five upper floors, containing 50 dwelling units: 45 two-bedroom and 5 three-bedroom homes. The approved-plan record includes parking, a tot-lot, green strip, lift and staircase.
The records provide proposed completion dates and a Form B completion undertaking, but no independently verified construction-progress report or occupancy certificate is included in the supplied material. The dates should therefore not be read as evidence that the building is complete or occupied.
3. Master plan, architecture & building design
The filed plan identifies a residential building on the 2,023.12 sq.mt site and describes 1 Stilt + 5 upper floors. It records 4821.00 as proposed built-up area excluding parking, 5939.86 as proposed built-up area including parking, and 5987.36 as gross BUA; the plan separately records parking area of 1118.86. These labels and figures are reported as filed and are not interchangeable.
The plan lists vacant plot area as 904.26 and includes a green strip and tot-lot. A detailed area schedule for common areas, floor-by-floor apartment distribution, exact building footprint, or phase organization is not available in the supplied extracted information.
The drawing extraction identifies a typical floor plan for floors 1, 3, 4 and 5 and a second-floor plan. It does not provide a complete verified schedule of homes per floor, lifts or stairs beyond the plan’s listing of a lift and staircase.
4. Homes, configurations & floor plans
RERA-filed counts and saleable areas are shown below. Drawing measurements are software-measured from the filed plan and are not RERA-filed carpet-area disclosures; the supplied measurement record says they require review.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 45 | 0 | 45 | 104.82 sq.m | 48.8–92.4 sq.m; median 67.7 sq.m | 35% |
| 3BHK | 5 | 0 | 5 | 167.22 sq.m | 105.2–105.3 sq.m; median 105.3 sq.m | 37% |
The software-measured 2BHK range covers 18 measured flat designs; 11 are marked as needing review. The 3BHK figures cover 2 measured designs. The record explains that drawing-measured carpet area is distinct from RERA saleable area, which also counts the home’s share of common areas.
A sample measured 2BHK plan (flat S-7) labels two bedrooms, two toilets, dining/kitchen and a hall, with a 1.00 m wide balcony. A sample measured 3BHK plan (flat 01) labels three bedrooms, two toilets, a hall, dining, kitchen, wash area and a 1.50 m wide balcony. These are drawing-based measurements and labels, not a guarantee of the delivered unit.
5. Parking & vehicle circulation
The filed plan records 1118.86 as proposed parking area and 1060.62 as required parking area. It identifies the stilt/cellar floor as parking-only and lists visitors’ parking, but the supplied material does not establish a count of resident, visitor, accessible or two-wheeler spaces, nor a unit-wise parking allocation.
The permit conditions state that no parking or construction is to be made in setback areas and that the stilt/cellar is to be used exclusively for vehicle parking. The filed plan lists roads and passages, but the supplied extracted record does not establish the detailed vehicle-entry, ramp or pedestrian-separation arrangements.
The approved-plan conditions call for EV charging infrastructure in building parking places. The supplied records establish this as a plan condition, not as completed or operational charging provision.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Lift and staircase | Listed on the filed building plan; quantities and specifications are not supplied. | Approved plan | No completion verification supplied. |
| Tot-lot / green strip | Listed as plan facilities; sizes and detailed design are not supplied. | Approved plan | RERA amenity entries for green strip/tot-lot show 0%; no independent verification supplied. |
| Visitors’ parking | Listed; no number of spaces supplied. | Approved plan | No completion verification supplied. |
| Community buildings | RERA amenity record lists the category; no building size or facility detail is supplied. | RERA amenity record | Progress recorded as 0%. |
| Internal roads and footpaths | Listed in the RERA amenity record; no dimensions or detailed scope supplied. | RERA amenity record | Progress recorded as 0%. |
| Street lighting | Listed in the RERA amenity record; no specification supplied. | RERA amenity record | Progress recorded as 0%. |
The vendor record mentions kids’ play areas, sand pits and garden view, but these are vendor-supplied claims rather than evidence of sanction or delivery.
7. Utilities, building services & safety
The filed records list water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, and an electrical meter room/sub-station/receiving station. These RERA amenity entries are marked 0% progress; no independent verification of installation or operation is supplied.
The building-permit materials specify a separate underground static water storage tank of 25,000 Its. and a separate residential terrace tank of 25,000 Its. They also identify a sump, septic tank, rainwater harvesting and percolation pit in the plan materials. The records do not establish that these systems are complete or in service.
The permit materials call for an STP, transformer, garbage house and EV charging infrastructure. They also contain fire-safety and structural-safety conditions, including responsibility for compliance with applicable requirements. The supplied extracts do not establish installed fire systems, clearances, equipment capacities, or completed safety inspections.
The approved-plan conditions refer to dual piping for specified larger developments and to digital/broadband infrastructure provisions. The supplied data does not establish the installed configuration or service-provider access arrangements for this building.
8. Location, access & connectivity
The registered location is Indresham, PATANCHERU Mandal, Sangareddy District, PIN 502319, on Survey Nos. 187/E/2 and 187/E/1. The building-permit material further describes the site as Indresham Village & G.P., on “OPEN PLACE.”
The plan record identifies a 9.00 MT wide existing road and a 9.00 MT wide proposed road, as well as a 1.75 M. wide passage. A separate permit extract lists road widths of 4.5mts., 3.0mts. and 1.5mts. No verified public-transport details are supplied.
A supplied location record lists Financial District (Nanakramguda), 1.2 km. The data does not specify a measurement method or route; no travel time is provided.
9. Developer & development status
The registered promoter is MEDHA INFRA, identified in the RERA filing as a partnership. The supplied corporate identifier is GSTIN 36ABIFM0166A1ZO. The promoter’s filing gives an address at Flat No G2, H No 6-1-49 and 62/B, Mumtaz Towers, Bhagyalakshmi Colony, Indresham, PATANCHERU, Sangareddy, 502319. An official website or project contact number is not supplied.
The RERA filing identifies two landowners, VADDE CHANDRAN and VADDE BHUPAL, and records an AreaShare arrangement. The Form B declaration states that the landowners’ title documents and a development agreement-cum-GPA are enclosed and gives a completion undertaking of 29 November 2027.
The project is registered through 29 November 2027; the project header separately lists proposed completion 29/03/2028. No independent construction-progress verification or occupancy certificate is supplied.
10. Approvals, official records & documents
| Identifier / date | P01100009300; valid 29/11/2024–29/11/2027 |
|---|---|
| What the supplied record establishes | Form C certificate for NLCB IRIS, naming Medha Infra as promoter. |
| Identifier / date | 007467/BP/HMDA/1799/SKP/2024; 29 November 2024 |
|---|---|
| What the supplied record establishes | Permit order for a proposed residential building of 1 Stilt + 5 upper floors on Survey Nos. 187/E/2 and 187/E/1. |
| Identifier / date | File no. TS/034438/2024 |
|---|---|
| What the supplied record establishes | Filed building-plan material with development dimensions, area figures, parking and listed facilities. |
| Identifier / date | 007467/BP/HMDA/1799/SKP/2024; dated 29 November 2024 in the extract |
|---|---|
| What the supplied record establishes | Technical approval record states that building plans are to be sanctioned and released by the Gram Panchayat. |
| Identifier / date | 007467/BP/HMDA/1799/SKP/2024 |
|---|---|
| What the supplied record establishes | The extracted letter states it is not itself approval or permission for development. |
| Identifier / date | December 2024 |
|---|---|
| What the supplied record establishes | Promoter declaration includes the landowners, development arrangement, encumbrance statement, separate-account undertaking and completion undertaking. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No certificate is included in the available project documents. |
The supplied documents include the registration certificate, building-permit/plan materials, Form B declaration, title and development-agreement materials, and an encumbrance statement. A publicly reachable approved-layout lookup is not available in the supplied record; this is a record-availability limitation, not a conclusion about approval.
Frequently asked questions
Is NLCB IRIS registered with Telangana RERA?
Yes. NLCB IRIS is registered with the Telangana Real Estate Regulatory Authority as P01100009300; the registration status is New Project.
Who is the developer of NLCB IRIS?
The promoter named in the RERA registration is MEDHA INFRA.
Where is NLCB IRIS located?
NLCB IRIS is in Indresham, PATANCHERU, Sangareddy, Telangana (502319).
When will NLCB IRIS be completed?
The promoter's proposed date of completion filed with RERA is 29/03/2028. This is the promoter's declaration, not a guarantee.