Sign in

Raja Rajeshwari Crystal Arcade

RAJA RAJESHWARI CONSTRUCTIONS · Rangareddy · RERA P02400010975

RAJA RAJESHWARI CRYSTAL ARCADE is a residential apartment project in HAYATHNAGAR, Hayathnagar mandal, Ranga Reddy district, developed by RAJA RAJESHWARI CONSTRUCTIONS. It is on a 501.66 sq. m site and comprises Building A, with 1 Stilt + 5 upper floors and 10 dwelling units, all configured as 3BHK. The project is registered under TG-RERA registration number P02400010975, and the promoter’s Form B declares completion by 12/2/2029.

01What we found

RegisteredTG-RERA - valid till 12 Feb 2029
23documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from nobroker.in

1. Project at a glance

Project identity

ItemProject record
Registered project nameRAJA RAJESHWARI CRYSTAL ARCADE RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionNo separate phase name is disclosed. The registration concerns the apartment project at the site identified below. RERA record
TG-RERA registrationP02400010975 RERA record
Registration validity13 February 2026 to 12 February 2029, unless extended by the Authority. This is registration validity, not an occupancy certificate or evidence of completion. RERA record
Registered promoterRAJA RAJESHWARI CONSTRUCTIONS RERA record Corporate record
RERA statusRecorded as New Project; registration is shown as granted. RERA record Approvals record

Land and geographic identity

ItemProject record
Locality / revenue villageHAYATHNAGAR is the project location stated in the RERA record; the filed plan and permit name Bagh Hayathnagar / Bagh Hayathnagar Village. The evidence supplies these location forms, not a distinct additional project village. RERA record RERA filing
MandalHayathnagar RERA record RERA filing
DistrictRanga Reddy RERA record RERA filing
PIN501505 RERA record RERA filing
Survey number and subdivisionSurvey No. 184; the RERA site description identifies Plot Nos. 38, 37 West Part and 37 East Part. The project record does not state a survey sub-number. RERA filing
Registered site extent501.66 sq. m; the permit records plot area and net plot area as 501.66 sq. m, with road-affected area 0.0 sq. m and nala-affected area 0.0 sq. m. RERA filing
Boundaries as filedEast: OTHERS LAND; West: OTHERS LAND; North: OTHERS LAND; South: 9 14 MT WIDE EXISTING 9 14 MT WIDE PROPOSED ROAD. RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building permitPermit No. 6280/GHMC/LBN/2026-BP, dated 13 February, 2026; file No. 007090/GHMC/3524/LBN2/2023-BP. Approvals record
Earlier filed plan identifierTS/037106/2023, dated 27-05-2023. Approvals record
Approved built-up area1,204.25 sq. m residential upper-floor area; the permit records total parking area 228.3 sq. m. The earlier plan separately states total proposed built-up area 1,204.25 sq. m excluding parking and 1,432.55 sq. m including parking.
Building count and floorsBuilding A; 1 Stilt + 5 upper floors (six floors as the earlier plan’s total-floor count). The permit records building height 15.00 m.
Parking provision in approval recordEarlier plan: proposed number of parkings 0. Later permit: total parking area 228.3 sq. m. A parking-space count is not provided in the permit extraction.
Units10 dwelling units in the building plan and 10 units in the RERA unit record. RERA unit table

Offering and status

ItemProject record
RERA-filed configuration3BHK, 10 units. RERA unit table RERA unit table
RERA-filed saleable area147.99 sq. m per unit. RERA unit table RERA unit table
Portal booking availability0 booked; 10 available, as last read from the TG-RERA portal; the record has no as-of date, so counts are indicative. RERA unit table
Construction stageRERA record labels the project New Project; no independently verified construction-progress measurement or site inspection is supplied. RERA record RERA unit table
Completion datesThe promoter’s Form B declares completion by 12/2/2029; the GHMC permit states construction is to be completed before 13 February, 2029.
Occupancy certificateNo occupancy certificate is included in the supplied project documents. The permit states that an Occupancy Certificate is required before occupation.

2. The project story

RAJA RAJESHWARI CRYSTAL ARCADE is registered as a residential apartment project on a 501.66 sq. m site in Hayathnagar, Ranga Reddy district. The RERA location identifies Survey No. 184 and Plot Nos. 38, 37 West Part and 37 East Part; the filed plan and building permit describe the site as Bagh Hayathnagar. RERA record RERA filing

The approved building is a single residential block, Building A, with 1 Stilt + 5 upper floors and 10 dwelling units. The RERA unit schedule lists 10 3BHK homes. The project is recorded as a new project, but the supplied evidence does not establish construction progress through an independent site inspection or provide an occupancy certificate. RERA unit table RERA record

The permit sets a construction completion deadline before 13 February, 2029; the promoter’s Form B separately declares completion by 12/2/2029. The RERA registration remains valid until 12 February 2029, unless extended. These are completion and registration dates respectively, not evidence that construction is complete or that occupation is authorized.

3. Master plan, architecture & building design

The GHMC building permit describes one residential building, Building A, on a plot and net plot area of 501.66 sq. m. It approves 1 Stilt + 5 upper floors, a building height of 15.00 m, residential upper-floor area of 1,204.25 sq. m, stilt area of 213.25 sq. m, and total parking area of 228.3 sq. m.

The earlier filed plan records proposed coverage area of 240.85 sq. m (48.01%), vacant plot area of 260.81 sq. m, residential net built-up area of 1,204.25 sq. m, total proposed built-up area of 1,204.25 sq. m excluding parking, and 1,432.55 sq. m including parking. These are the areas as labelled in that plan; no FSI-counted area is supplied.

The supplied extracts do not specify the number of homes per floor, lifts, stairs, floor-by-floor circulation, entrance/exit arrangement, internal road layout, or the area and detailed design of common spaces. The earlier plan names a tot-lot and periphery greenery among its conditions and provisions; the later permit lists “Tot Lot NA.” No detailed landscape drawing or phase organization is supplied.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010147.99 sq. m82.5–87.5 sq. m; median 85.0 sq. m43%

The unit count, booking counts and saleable area are from the RERA unit record. Booking figures are indicative because the portal record has no as-of date. RERA unit table RERA unit table

Carpet-area figures are software-measured from approved floor-plan drawing geometry, not RERA-filed measurements, and the drawing-based measurement needs review. Two 3BHK designs were measured. The RERA saleable area includes the home’s share of common areas and is not interchangeable with carpet area; balcony areas are excluded from the stated drawing-based carpet measurement. Floor plans RERA unit details

The extracted second-floor plan for flat 201 shows a living/dining area, kitchen, three bedrooms, toilets and balconies. The measured room dimensions include living/dining 3.69 × 7.95 m, kitchen 2.63 × 2.56 m, and bedrooms 3.41 × 3.17 m, 3.35 × 3.0 m, and 4.3 × 3.65 m. These are drawing-based measurements, not RERA area disclosures. RERA unit details

5. Parking & vehicle circulation

The building permit records a stilt level and 228.3 sq. m of total parking area, but does not provide a count of parking spaces. The earlier plan records “PROPOSED NUMBER OF PARKINGS 0” and states that the cellar and stilts approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. No cellar level is identified in the later permit extract, and no unit-specific parking allocation, visitor or accessible-space count, ramp details, EV provision, or pedestrian/vehicle circulation plan is supplied.

A parking bay shown or an area listed in an approval does not, by itself, establish exclusive parking rights for a particular buyer. The supplied RERA allotment-letter form does not identify any buyer-specific parking allocation.

6. Amenities, recreation & open spaces

Tot-lot
Description / sizeNamed in the earlier plan; it requires fencing and maintenance as greenery before issue of the occupancy certificate. The later permit records “Tot Lot NA.”
Evidence sourceGHMC-filed plan and permit
Declared progress / verified statusApproval-record references only; no completed-status evidence.
Periphery greenery / tree planting
Description / sizeThe earlier plan requires tree planting along the periphery and in front of the premises, and maintenance of a greenery strip. No area is stated.
Evidence sourceGHMC-filed plan
Declared progress / verified statusRequired by the plan; completion not verified.
Recreational open space
Description / sizeThe RERA amenities record lists aggregate recreational open space, without a supplied area.
Evidence sourceRERA amenities record
Declared progress / verified statusListed with 0% progress in the supplied record. RERA amenities
Community buildings
Description / sizeListed in the RERA amenities record; no facility or size is specified.
Evidence sourceRERA amenities record
Declared progress / verified statusListed with 0% progress. RERA amenities
Swimming pool, gym, clubhouse and landscape garden
Description / sizeAppearing in third-party vendor amenity text only; no corresponding facility, size or approval is established in the supplied RERA or GHMC extracts.
Evidence sourceVendor
Declared progress / verified statusMarketing/listing text; delivery or approval not verified. Promoter website

The RERA amenities record also lists internal roads and footpaths, street lighting and solid-waste management, but supplies no dimensions or evidence of completion; those site services are addressed under Utilities below. RERA amenities

7. Utilities, building services & safety

Water supply
Evidence in the project recordListed as available “YES” in the RERA amenities record. The plan refers to public water connections being provided only on production of an occupancy certificate.
Status / limitationNo source, storage capacity, treatment system or completed-service evidence is supplied. RERA amenities
Sewerage and drainage
Evidence in the project recordSewerage and storm-water drains are listed as available “YES”; treatment and disposal of sewage and sullage water is also listed.
Status / limitationNo STP details, capacity, reuse arrangements or completion evidence are supplied; the amenity record shows 0% progress. RERA amenities
Rainwater harvesting
Evidence in the project recordThe plan requires a rainwater-harvesting structure (percolation pit); the later permit lists 3 rainwater-harvesting pits.
Status / limitationApproved/required provision; installation is not independently verified.
Electrical
Evidence in the project recordThe RERA amenities record lists an electrical meter room, sub-station or receiving station as available “YES”; the plan requires transformer space.
Status / limitationNo transformer capacity, backup system or completed electrical-service evidence is supplied. RERA amenities
Lifts and accessibility
Evidence in the project recordThe plan refers to lifts among building services to be executed under qualified technical supervision.
Status / limitationLift count, capacity, accessible routes and ramp provision are not disclosed.
Fire and life safety
Evidence in the project recordFire protection and fire safety requirements are listed in the RERA amenities record. The GHMC permit requires an Occupancy FIRE NOC from the Director (EV&DM) before issue of the Occupancy Certificate.
Status / limitationNo Fire NOC or completed fire-system evidence is supplied. RERA amenities
Waste
Evidence in the project recordThe plan requires a garbage house within the premises; solid-waste management and disposal is listed in the RERA amenities record.
Status / limitationNo waste-segregation arrangement or completion evidence is supplied. RERA amenities
Security
Evidence in the project recordNo project-specific security system is established in the supplied RERA or GHMC extracts.
Status / limitationVendor text mentions security and CCTV; these are not confirmed as approved or delivered project facilities. Promoter website

The supplied approval conditions require an Occupancy Certificate before occupation and state that public amenities such as water and electricity connections will be provided only on production of that certificate. No certificate is supplied for the project.

8. Location, access & connectivity

The RERA-filed location is Hayathnagar, Hayathnagar, Ranga Reddy, 501505, with the site identified as Survey No. 184, Plot Nos. 38, 37 West Part and 37 East Part. The building-plan records use Bagh Hayathnagar. RERA record RERA filing

The filed land boundaries identify a 9 14 MT WIDE EXISTING and 9 14 MT WIDE PROPOSED ROAD on the south. The RERA location record supplies a software-mapped cadastral parcel centroid of 17.33872, 78.60819 and an approximate distance of 2.4 km to the nearest sampled Outer Ring Road interchange. This is a mapped distance, not a stated travel time. RERA filing Location record Cadastral map

The supplied material does not establish public-transport details or measured distances to schools, hospitals or other local landmarks from the project record.

9. Developer & development status

The registered promoter is RAJA RAJESHWARI CONSTRUCTIONS, recorded as a partnership. The supplied promoter record includes GSTIN 36ABBFR4668P1ZG and identifies KOLAN RAMYA as authorized signatory and SADU SANTHOSH REDDY as partner. The promoter address recorded in the project data is RR SAI RESIDENCY, PADMAJA COLONY, BAGH HAYATHNAGAR, HAYATHNAGAR, Hayathnagar, Ranga Reddy, 501505. Corporate record Parties record RERA filing

The project is registered as a new project. The supplied documents do not state a measured construction-completion percentage or provide independent site verification. The promoter declares a completion deadline of 12/2/2029 in Form B; the building permit separately specifies construction completion before 13 February, 2029. The registration certificate records validity through 12 February 2029, unless extended. No occupancy certificate is supplied. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400010975; registration from 13/02/2026 to 12/02/2029
What the supplied record establishesForm C certificate names RAJA RAJESHWARI CONSTRUCTIONS as promoter and identifies the registered project and location.
GHMC building permit order
Identifier / date6280/GHMC/LBN/2026-BP; 13 February, 2026
What the supplied record establishesPermit for Building A, 1 Stilt + 5 upper floors, on a 501.66 sq. m site; requires an Occupancy Certificate before occupation.
Earlier GHMC-filed building plan
Identifier / dateTS/037106/2023; 27-05-2023
What the supplied record establishesPlan for a residential apartment building at Survey No. 184 and the stated plots, recording six floors and 10 dwelling units.
Layout / LRS reference recorded in permit
Identifier / dateC/GHMC/053189/2020
What the supplied record establishesListed in the building permit as the approved layout/LRS proceeding/subdivision number.
Promoter’s Form B declaration
Identifier / dateProject completion declared by 12/2/2029
What the supplied record establishesPromoter declaration concerning project title, encumbrance and completion; it is not an independent verification of those statements.
Contractor’s all-risk policy reference in permit
Identifier / date431190/44/2026/1381; listed as valid to 29 January, 2032
What the supplied record establishesPolicy details are recorded in the permit extract.
Occupancy / completion certificate
Identifier / dateNot supplied
What the supplied record establishesNo OC or completion certificate appears in the reviewed project documents. The permit states that an OC is required before occupation.

Frequently asked questions

Is RAJA RAJESHWARI CRYSTAL ARCADE registered with Telangana RERA?

Yes. RAJA RAJESHWARI CRYSTAL ARCADE is registered with the Telangana Real Estate Regulatory Authority as P02400010975; the registration status is New Project.

Who is the developer of RAJA RAJESHWARI CRYSTAL ARCADE?

The promoter named in the RERA registration is RAJA RAJESHWARI CONSTRUCTIONS.

Where is RAJA RAJESHWARI CRYSTAL ARCADE located?

RAJA RAJESHWARI CRYSTAL ARCADE is in HAYATHNAGAR, Rangareddy, Telangana (501505).

When will RAJA RAJESHWARI CRYSTAL ARCADE be completed?

The promoter's proposed date of completion filed with RERA is 12/06/2029. This is the promoter's declaration, not a guarantee.

More projects in Hayathnagar