SHAASVAT is a residential apartment project at NAMPALLY STATION ROAD, Nampally Mandal, Hyderabad District, developed by registered promoter AADINATH DEVELOPERS. The project has a total plot area of 3562.18 sq. mtrs and one residential building with 2 cellars, 3 stilts and 13 upper floors. It comprises 91 apartments: 78 3BHK units with a saleable area of 170.09 sq. m and 13 4BHK units with a saleable area of 209.77 sq. m. Its TG-RERA registration number is P02500011386, and the promoter’s proposed completion date is 16-05-2030.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | SHAASVAT RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Phase is not separately identified in the supplied record; registration is for SHAASVAT |
| TG-RERA registration number | P02500011386 |
| Registration validity | 17/05/2025–16/05/2030; registration validity is distinct from the completion undertaking below |
| Registered promoter | AADINATH DEVELOPERS RERA record |
| RERA status | Registered under section 5; the certificate records no extension |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | NAMPALLY STATION ROAD RERA record Promoter website |
| Revenue village | NAMPALLY (also rendered “Nampally” in the building-permit extraction) RERA record |
| Mandal / district / PIN | Nampally / Hyderabad / 500001 RERA record |
| Survey numbers and subdivisions | 5-8-658, 658/4, 5-8-658/4/A, 5-8-658/5 E.P, 5-8-658/5 W.P, 5-8-658/6/1, 5-8-658/6/2, 5-8-658/7/1, 5-8-658/7/2, 5-8-658/4/1, 5-8-658/1 |
| Site area | Total plot area 3562.18 sq. mtrs; road-affected area 108.2 sq. mtrs; net plot area 3453.98 sq. mtrs |
| Boundaries | East: neighbours; west: neighbours; north: neighbours; south: 18 MT WIDE EXISTING 24 MT WIDE PROPOSED ROAD RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) |
| Building-permit number / date | 6251/GHMC/KHB/2025-BP, dated 17 May, 2025 |
| Related file number | 005989/GHMC/2984/KHB1/2023-BP |
| Approved built-up area | 18,283.20 sq. mtrs RERA filing |
| Building count | One residential building in the RERA project record RERA filing |
| Sanctioned floor configuration | 2 cellars + 3 stilts + 13 upper floors; the permit extraction records building height as 39.00 m |
| Parking levels / area | Cellars and stilts are approved for parking; permit extraction lists total parking area as 8684.79 (unit not specified in the supplied extract) |
| Units | 91 RERA-declared apartments: 78 3BHK and 13 4BHK RERA unit table |
| Approved versus RERA-declared unit count | The permit conditions refer to the sanctioned number of units and prohibit increases without prior GHMC approval, but the supplied permit extraction does not state a unit count. RERA records 91 units. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configurations and saleable areas | 3BHK: 170.09 sq. m; 4BHK: 209.77 sq. m RERA unit table |
| Booked / available | RERA portal reading: 3BHK 0 booked / 78 available; 4BHK 0 booked / 13 available. The record has no as-of date, so these counts are indicative. RERA unit table |
| Construction stage | The permit authorizes construction, but no construction-progress percentage or independently verified site-stage evidence is supplied. RERA amenities |
| Completion date | Promoter’s Form B undertaking: 16-05-2030 |
| Occupancy / completion certificate | No completion or occupancy certificate is recorded in the supplied documents; the building permit requires an Occupancy Certificate before occupation. |
2. The project story
SHAASVAT is registered as a residential apartment project at Nampally Station Road, in Nampally village, Nampally Mandal, Hyderabad. The RERA record identifies a single building and 91 proposed apartments: 78 three-bedroom and 13 four-bedroom units. The GHMC building permit describes a residential building with two cellars, three stilts and 13 upper floors. RERA record RERA unit table
The permit authorizes construction and specifies requirements that include following the sanctioned plan, providing a sewage treatment plant before release of the Occupancy Certificate, constructing rainwater-harvesting structures, and using the cellar and stilt areas approved for parking exclusively for vehicle parking. These are permit conditions, not evidence that the works have been completed. The supplied material contains no independently verified construction progress and no Occupancy Certificate.
3. Master plan, architecture & building design
The supplied GHMC building-permit extraction describes one residential building with 2 cellars + 3 stilts + 13 upper floors, a stated height of 39.00 m, and approved built-up area of 18,283.20 sq. mtrs. It records a total plot area of 3562.18 sq. mtrs, a 108.2 sq. mtrs road-affected area and a 3453.98 sq. mtrs net plot area. RERA filing
The permit extraction lists areas of 4282.32 for the cellars, 3021.25 for the three stilts, 18,283.20 for the 13 upper floors, and a total parking area of 8684.79; units for these individual area figures are not stated in the supplied extraction. It does not provide a verified building-footprint figure, floor-by-floor apartment schedule, lift or stair details, circulation plans, or a quantified open-space schedule.
The RERA filing includes a layout-plan document entry, but the supplied document record is not extracted. The floor-plan measurements available in this pack are drawing-based measurements and should not be read as RERA-filed areas. Document index
4. Homes, configurations & floor plans
RERA records 91 units in two configurations. The drawing-based carpet measurements below are software-measured from the approved floor-plan drawings, not RERA disclosures; they require review against the drawings. RERA saleable area is shown separately and includes the home’s share of common areas, so it is not interchangeable with carpet area. The supplied material does not provide a RERA-filed carpet area for these units. RERA unit table Floor plans RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 78 | 0 | 78 | 170.09 sq. m | 109.2–127.8 sq. m; median 117.0 sq. m | 31% |
| 4BHK | 13 | 0 | 13 | 209.77 sq. m | 144.4 sq. m | 31% |
The floor-plan measurement set also identifies 1BHK and 2BHK designs, but those configurations are not listed as RERA-filed offerings in the supplied unit record; no RERA unit counts or saleable areas are available for them. Drawing measurements give carpet areas of 72.2 sq. m for the measured 1BHK design and 121.2–121.3 sq. m for the measured 2BHK designs. RERA unit details Floor plans
The measured plan examples show living/dining, bedrooms, kitchen, toilets and balconies; some examples also show utility areas. Balcony and utility areas are excluded from the stated software-measured carpet-area calculation. Room labels and dimensions are drawing-derived measurements, not RERA disclosures. RERA unit details
5. Parking & vehicle circulation
The GHMC permit states that the cellars and stilts approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. Its extraction lists 8684.79 as the total parking area, but does not specify a unit for that figure or give a parking-space count.
The supplied evidence does not establish the number of car or two-wheeler spaces, visitor or accessible spaces, parking allocation to individual apartments, parking ramps or access arrangements, or EV-charging provision. A project-level parking-area entry does not establish exclusive parking rights for a purchaser.
6. Amenities, recreation & open spaces
The RERA amenity record lists 14 items. Entries with a stated zero progress are shown as recorded; the permit’s requirements are separately identified below. No independent verification of completed amenities is supplied. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | Size not stated | RERA amenities RERA amenities | 0%; completion not independently verified |
| Water supply | Listed as “YES”; details/capacity not stated | RERA amenities RERA amenities | 0%; completion not independently verified |
| Sewerage (chamber, lines, septic tank, STP) | Listed as “YES”; no capacity stated | RERA amenities RERA amenities | 0%; permit requires an STP before release of Occupancy Certificate RERA amenities |
| Storm-water drains | Listed as “YES”; dimensions/capacity not stated | RERA amenities RERA amenities | 0%; completion not independently verified |
| Green strip / tot lot / park | Size not stated | RERA amenities RERA amenities | 0%; permit requires the tot lot to be fenced and maintained as greenery before Occupancy Certificate RERA amenities |
| Street lighting | Details not stated | RERA amenities RERA amenities | 0%; completion not independently verified |
| Community buildings | Details/size not stated | RERA amenities RERA amenities | 0%; completion not independently verified |
| Sewage and sullage treatment/disposal | Details/capacity not stated | RERA amenities RERA amenities | 0%; completion not independently verified |
| Solid-waste management and disposal | Details not stated | RERA amenities RERA amenities | 0%; completion not independently verified |
| Water conservation / rainwater harvesting | Listed as “YES”; permit specifies 2 rainwater-harvesting pits | RERA amenities RERA amenities | 0% in RERA amenity record; permit requires construction, completion not independently verified |
| Energy management | Details not stated | RERA amenities RERA amenities | 0%; completion not independently verified |
| Fire protection and fire safety | Details not stated | RERA amenities RERA amenities | 0%; permit requires applicable high-rise safety measures and an Occupancy Fire NOC before Occupancy Certificate RERA amenities |
| Electrical meter room / substation / receiving station | Listed as “YES”; permit says space for a transformer is to be provided | RERA amenities RERA amenities | 0%; completion not independently verified |
| Aggregate recreational open space | Size not stated | RERA amenities RERA amenities | 0%; completion not independently verified |
7. Utilities, building services & safety
The RERA amenity record lists water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/substation/receiving station, each with a recorded progress of 0%. The permit requires a sewage treatment plant before release of the Occupancy Certificate, two rainwater-harvesting pits, transformer space, a garbage house within the premises and a storm-water drain sized to accommodate catchment inflows. These are recorded provisions or requirements; the supplied evidence does not establish installation, operating capacity or completion. RERA amenities
The permit also requires compliance with applicable high-rise safety norms, necessary Fire Services and Airports Authority of India clearances, and an Occupancy Fire NOC before the Occupancy Certificate. The supplied material does not include those clearances, a detailed fire-system schedule, lift specifications, backup-power details, CCTV or access-control information, or accessibility provisions.
8. Location, access & connectivity
The registered project location is Nampally Station Road, NAMPALLY village, Nampally Mandal, Hyderabad District, PIN 500001. The recorded southern boundary is “18 MT WIDE EXISTING 24 MT WIDE PROPOSED ROAD”; the other three boundaries are recorded as neighbours. RERA record RERA filing
A supplied connectivity record gives the nearest sampled Outer Ring Road interchange at approximately 36.8 km. No approach route, public-transport details, local landmark distances or travel-time estimates are supplied. Location record
9. Developer & development status
The registered promoter is AADINATH DEVELOPERS, identified in the supplied record as a partnership. Its GSTIN is 36ABYFA4505D1ZF. The supplied registration-certificate office field gives Hyderabad District and PIN 500001, but does not provide a complete office address or official contact details. RERA record Corporate record Parties record
In Form B, the promoter declares legal title to the project land, states that the land is free from encumbrances, and undertakes to complete the project by 16-05-2030. Those are promoter declarations. The supplied record does not state a construction-progress percentage or independently verify work on site; it also contains no Occupancy Certificate.
10. Approvals, official records & documents
| Record | Available evidence |
|---|---|
| TG-RERA registration | Form C certificate for SHAASVAT, P02500011386, valid 17/05/2025–16/05/2030 |
| GHMC building permit | Building Permit Order 6251/GHMC/KHB/2025-BP, dated 17 May, 2025; related file number 005989/GHMC/2984/KHB1/2023-BP |
| Permit / commencement document | Filed under “Commencement Certificates for each building in each phase”; extracted content identifies it as a GHMC Building Permit Order |
| Layout-plan filing | RERA document entry exists, but the supplied document is not extracted Document index |
| Promoter declaration | Form B affidavit-cum-declaration, including the promoter’s completion undertaking |
| Occupancy / completion certificate | No such certificate is included in the supplied evidence; the building permit requires an Occupancy Certificate before occupation |
1. Project at a glance
Project identity
Registered project name: SHAASVAT
Project type: Residential apartment project
Phase / registered portion: Phase is not separately identified in the supplied record; registration is for SHAASVAT
TG-RERA registration number: P02500011386
Registration validity: 17/05/2025–16/05/2030; registration validity is distinct from the completion undertaking below
Registered promoter: AADINATH DEVELOPERS
RERA status: Registered under section 5; the certificate records no extension
Land and geographic identity
Locality: NAMPALLY STATION ROAD
Revenue village: NAMPALLY (also rendered “Nampally” in the building-permit extraction)
Mandal / district / PIN: Nampally / Hyderabad / 500001
Survey numbers and subdivisions: 5-8-658, 658/4, 5-8-658/4/A, 5-8-658/5 E.P, 5-8-658/5 W.P, 5-8-658/6/1, 5-8-658/6/2, 5-8-658/7/1, 5-8-658/7/2, 5-8-658/4/1, 5-8-658/1
Site area: Total plot area 3562.18 sq. mtrs; road-affected area 108.2 sq. mtrs; net plot area 3453.98 sq. mtrs
Boundaries: East: neighbours; west: neighbours; north: neighbours; south: 18 MT WIDE EXISTING 24 MT WIDE PROPOSED ROAD
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Building-permit number / date: 6251/GHMC/KHB/2025-BP, dated 17 May, 2025
Related file number: 005989/GHMC/2984/KHB1/2023-BP
Approved built-up area: 18,283.20 sq. mtrs
Building count: One residential building in the RERA project record
Sanctioned floor configuration: 2 cellars + 3 stilts + 13 upper floors; the permit extraction records building height as 39.00 m
Parking levels / area: Cellars and stilts are approved for parking; permit extraction lists total parking area as 8684.79 (unit not specified in the supplied extract)
Units: 91 RERA-declared apartments: 78 3BHK and 13 4BHK
Approved versus RERA-declared unit count: The permit conditions refer to the sanctioned number of units and prohibit increases without prior GHMC approval, but the supplied permit extraction does not state a unit count. RERA records 91 units.
Offering and status
RERA-filed configurations and saleable areas: 3BHK: 170.09 sq. m; 4BHK: 209.77 sq. m
Booked / available: RERA portal reading: 3BHK 0 booked / 78 available; 4BHK 0 booked / 13 available. The record has no as-of date, so these counts are indicative.
Construction stage: The permit authorizes construction, but no construction-progress percentage or independently verified site-stage evidence is supplied.
Completion date: Promoter’s Form B undertaking: 16-05-2030
Occupancy / completion certificate: No completion or occupancy certificate is recorded in the supplied documents; the building permit requires an Occupancy Certificate before occupation.
2. The project story
SHAASVAT is registered as a residential apartment project at Nampally Station Road, in Nampally village, Nampally Mandal, Hyderabad. The RERA record identifies a single building and 91 proposed apartments: 78 three-bedroom and 13 four-bedroom units. The GHMC building permit describes a residential building with two cellars, three stilts and 13 upper floors.
The permit authorizes construction and specifies requirements that include following the sanctioned plan, providing a sewage treatment plant before release of the Occupancy Certificate, constructing rainwater-harvesting structures, and using the cellar and stilt areas approved for parking exclusively for vehicle parking. These are permit conditions, not evidence that the works have been completed. The supplied material contains no independently verified construction progress and no Occupancy Certificate.
3. Master plan, architecture & building design
The supplied GHMC building-permit extraction describes one residential building with 2 cellars + 3 stilts + 13 upper floors, a stated height of 39.00 m, and approved built-up area of 18,283.20 sq. mtrs. It records a total plot area of 3562.18 sq. mtrs, a 108.2 sq. mtrs road-affected area and a 3453.98 sq. mtrs net plot area.
The permit extraction lists areas of 4282.32 for the cellars, 3021.25 for the three stilts, 18,283.20 for the 13 upper floors, and a total parking area of 8684.79; units for these individual area figures are not stated in the supplied extraction. It does not provide a verified building-footprint figure, floor-by-floor apartment schedule, lift or stair details, circulation plans, or a quantified open-space schedule.
The RERA filing includes a layout-plan document entry, but the supplied document record is not extracted. The floor-plan measurements available in this pack are drawing-based measurements and should not be read as RERA-filed areas.
4. Homes, configurations & floor plans
RERA records 91 units in two configurations. The drawing-based carpet measurements below are software-measured from the approved floor-plan drawings, not RERA disclosures; they require review against the drawings. RERA saleable area is shown separately and includes the home’s share of common areas, so it is not interchangeable with carpet area. The supplied material does not provide a RERA-filed carpet area for these units.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 78 | 0 | 78 | 170.09 sq. m | 109.2–127.8 sq. m; median 117.0 sq. m | 31% |
| 4BHK | 13 | 0 | 13 | 209.77 sq. m | 144.4 sq. m | 31% |
The floor-plan measurement set also identifies 1BHK and 2BHK designs, but those configurations are not listed as RERA-filed offerings in the supplied unit record; no RERA unit counts or saleable areas are available for them. Drawing measurements give carpet areas of 72.2 sq. m for the measured 1BHK design and 121.2–121.3 sq. m for the measured 2BHK designs.
The measured plan examples show living/dining, bedrooms, kitchen, toilets and balconies; some examples also show utility areas. Balcony and utility areas are excluded from the stated software-measured carpet-area calculation. Room labels and dimensions are drawing-derived measurements, not RERA disclosures.
5. Parking & vehicle circulation
The GHMC permit states that the cellars and stilts approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. Its extraction lists 8684.79 as the total parking area, but does not specify a unit for that figure or give a parking-space count.
The supplied evidence does not establish the number of car or two-wheeler spaces, visitor or accessible spaces, parking allocation to individual apartments, parking ramps or access arrangements, or EV-charging provision. A project-level parking-area entry does not establish exclusive parking rights for a purchaser.
6. Amenities, recreation & open spaces
The RERA amenity record lists 14 items. Entries with a stated zero progress are shown as recorded; the permit’s requirements are separately identified below. No independent verification of completed amenities is supplied.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | Size not stated | RERA amenities | 0%; completion not independently verified |
| Water supply | Listed as “YES”; details/capacity not stated | RERA amenities | 0%; completion not independently verified |
| Sewerage (chamber, lines, septic tank, STP) | Listed as “YES”; no capacity stated | RERA amenities | 0%; permit requires an STP before release of Occupancy Certificate |
| Storm-water drains | Listed as “YES”; dimensions/capacity not stated | RERA amenities | 0%; completion not independently verified |
| Green strip / tot lot / park | Size not stated | RERA amenities | 0%; permit requires the tot lot to be fenced and maintained as greenery before Occupancy Certificate |
| Street lighting | Details not stated | RERA amenities | 0%; completion not independently verified |
| Community buildings | Details/size not stated | RERA amenities | 0%; completion not independently verified |
| Sewage and sullage treatment/disposal | Details/capacity not stated | RERA amenities | 0%; completion not independently verified |
| Solid-waste management and disposal | Details not stated | RERA amenities | 0%; completion not independently verified |
| Water conservation / rainwater harvesting | Listed as “YES”; permit specifies 2 rainwater-harvesting pits | RERA amenities | 0% in RERA amenity record; permit requires construction, completion not independently verified |
| Energy management | Details not stated | RERA amenities | 0%; completion not independently verified |
| Fire protection and fire safety | Details not stated | RERA amenities | 0%; permit requires applicable high-rise safety measures and an Occupancy Fire NOC before Occupancy Certificate |
| Electrical meter room / substation / receiving station | Listed as “YES”; permit says space for a transformer is to be provided | RERA amenities | 0%; completion not independently verified |
| Aggregate recreational open space | Size not stated | RERA amenities | 0%; completion not independently verified |
7. Utilities, building services & safety
The RERA amenity record lists water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/substation/receiving station, each with a recorded progress of 0%. The permit requires a sewage treatment plant before release of the Occupancy Certificate, two rainwater-harvesting pits, transformer space, a garbage house within the premises and a storm-water drain sized to accommodate catchment inflows. These are recorded provisions or requirements; the supplied evidence does not establish installation, operating capacity or completion.
The permit also requires compliance with applicable high-rise safety norms, necessary Fire Services and Airports Authority of India clearances, and an Occupancy Fire NOC before the Occupancy Certificate. The supplied material does not include those clearances, a detailed fire-system schedule, lift specifications, backup-power details, CCTV or access-control information, or accessibility provisions.
8. Location, access & connectivity
The registered project location is Nampally Station Road, NAMPALLY village, Nampally Mandal, Hyderabad District, PIN 500001. The recorded southern boundary is “18 MT WIDE EXISTING 24 MT WIDE PROPOSED ROAD”; the other three boundaries are recorded as neighbours.
A supplied connectivity record gives the nearest sampled Outer Ring Road interchange at approximately 36.8 km. No approach route, public-transport details, local landmark distances or travel-time estimates are supplied.
9. Developer & development status
The registered promoter is AADINATH DEVELOPERS, identified in the supplied record as a partnership. Its GSTIN is 36ABYFA4505D1ZF. The supplied registration-certificate office field gives Hyderabad District and PIN 500001, but does not provide a complete office address or official contact details.
In Form B, the promoter declares legal title to the project land, states that the land is free from encumbrances, and undertakes to complete the project by 16-05-2030. Those are promoter declarations. The supplied record does not state a construction-progress percentage or independently verify work on site; it also contains no Occupancy Certificate.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for SHAASVAT, P02500011386, valid 17/05/2025–16/05/2030
GHMC building permit: Building Permit Order 6251/GHMC/KHB/2025-BP, dated 17 May, 2025; related file number 005989/GHMC/2984/KHB1/2023-BP
Permit / commencement document: Filed under “Commencement Certificates for each building in each phase”; extracted content identifies it as a GHMC Building Permit Order
Layout-plan filing: RERA document entry exists, but the supplied document is not extracted
Promoter declaration: Form B affidavit-cum-declaration, including the promoter’s completion undertaking
Occupancy / completion certificate: No such certificate is included in the supplied evidence; the building permit requires an Occupancy Certificate before occupation
Frequently asked questions
Is SHAASVAT registered with Telangana RERA?
Yes. SHAASVAT is registered with the Telangana Real Estate Regulatory Authority as P02500011386; the registration status is New Project.
Who is the developer of SHAASVAT?
The promoter named in the RERA registration is AADINATH DEVELOPERS.
Where is SHAASVAT located?
SHAASVAT is in NAMPALLY STATION ROAD, NAMPALLY, Hyderabad, Telangana (500001).
When will SHAASVAT be completed?
The promoter's proposed date of completion filed with RERA is 16/05/2030. This is the promoter's declaration, not a guarantee.
More projects in Nampally