SHAASVAT is a residential apartment project at NAMPALLY STATION ROAD, Nampally Mandal, Hyderabad District, developed by registered promoter AADINATH DEVELOPERS. The project has a total plot area of 3562.18 sq. mtrs and one residential building with 2 cellars, 3 stilts and 13 upper floors. It comprises 91 apartments: 78 3BHK units with a saleable area of 170.09 sq. m and 13 4BHK units with a saleable area of 209.77 sq. m. Its TG-RERA registration number is P02500011386, and the promoter’s proposed completion date is 16-05-2030.

01What we found

RegisteredTG-RERA - valid till 16 May 2030
20documents on file - each fact links to its page
0court cases on this project's land in the court records searched
6items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameSHAASVAT RERA record
Project typeResidential apartment project RERA record
Phase / registered portionPhase is not separately identified in the supplied record; registration is for SHAASVAT
TG-RERA registration numberP02500011386
Registration validity17/05/2025–16/05/2030; registration validity is distinct from the completion undertaking below
Registered promoterAADINATH DEVELOPERS RERA record
RERA statusRegistered under section 5; the certificate records no extension

Land and geographic identity

ItemProject record
LocalityNAMPALLY STATION ROAD RERA record Promoter website
Revenue villageNAMPALLY (also rendered “Nampally” in the building-permit extraction) RERA record
Mandal / district / PINNampally / Hyderabad / 500001 RERA record
Survey numbers and subdivisions5-8-658, 658/4, 5-8-658/4/A, 5-8-658/5 E.P, 5-8-658/5 W.P, 5-8-658/6/1, 5-8-658/6/2, 5-8-658/7/1, 5-8-658/7/2, 5-8-658/4/1, 5-8-658/1
Site areaTotal plot area 3562.18 sq. mtrs; road-affected area 108.2 sq. mtrs; net plot area 3453.98 sq. mtrs
BoundariesEast: neighbours; west: neighbours; north: neighbours; south: 18 MT WIDE EXISTING 24 MT WIDE PROPOSED ROAD RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Building-permit number / date6251/GHMC/KHB/2025-BP, dated 17 May, 2025
Related file number005989/GHMC/2984/KHB1/2023-BP
Approved built-up area18,283.20 sq. mtrs RERA filing
Building countOne residential building in the RERA project record RERA filing
Sanctioned floor configuration2 cellars + 3 stilts + 13 upper floors; the permit extraction records building height as 39.00 m
Parking levels / areaCellars and stilts are approved for parking; permit extraction lists total parking area as 8684.79 (unit not specified in the supplied extract)
Units91 RERA-declared apartments: 78 3BHK and 13 4BHK RERA unit table
Approved versus RERA-declared unit countThe permit conditions refer to the sanctioned number of units and prohibit increases without prior GHMC approval, but the supplied permit extraction does not state a unit count. RERA records 91 units. RERA unit table

Offering and status

ItemProject record
RERA-filed configurations and saleable areas3BHK: 170.09 sq. m; 4BHK: 209.77 sq. m RERA unit table
Booked / availableRERA portal reading: 3BHK 0 booked / 78 available; 4BHK 0 booked / 13 available. The record has no as-of date, so these counts are indicative. RERA unit table
Construction stageThe permit authorizes construction, but no construction-progress percentage or independently verified site-stage evidence is supplied. RERA amenities
Completion datePromoter’s Form B undertaking: 16-05-2030
Occupancy / completion certificateNo completion or occupancy certificate is recorded in the supplied documents; the building permit requires an Occupancy Certificate before occupation.

2. The project story

SHAASVAT is registered as a residential apartment project at Nampally Station Road, in Nampally village, Nampally Mandal, Hyderabad. The RERA record identifies a single building and 91 proposed apartments: 78 three-bedroom and 13 four-bedroom units. The GHMC building permit describes a residential building with two cellars, three stilts and 13 upper floors. RERA record RERA unit table

The permit authorizes construction and specifies requirements that include following the sanctioned plan, providing a sewage treatment plant before release of the Occupancy Certificate, constructing rainwater-harvesting structures, and using the cellar and stilt areas approved for parking exclusively for vehicle parking. These are permit conditions, not evidence that the works have been completed. The supplied material contains no independently verified construction progress and no Occupancy Certificate.

3. Master plan, architecture & building design

The supplied GHMC building-permit extraction describes one residential building with 2 cellars + 3 stilts + 13 upper floors, a stated height of 39.00 m, and approved built-up area of 18,283.20 sq. mtrs. It records a total plot area of 3562.18 sq. mtrs, a 108.2 sq. mtrs road-affected area and a 3453.98 sq. mtrs net plot area. RERA filing

The permit extraction lists areas of 4282.32 for the cellars, 3021.25 for the three stilts, 18,283.20 for the 13 upper floors, and a total parking area of 8684.79; units for these individual area figures are not stated in the supplied extraction. It does not provide a verified building-footprint figure, floor-by-floor apartment schedule, lift or stair details, circulation plans, or a quantified open-space schedule.

The RERA filing includes a layout-plan document entry, but the supplied document record is not extracted. The floor-plan measurements available in this pack are drawing-based measurements and should not be read as RERA-filed areas. Document index

4. Homes, configurations & floor plans

RERA records 91 units in two configurations. The drawing-based carpet measurements below are software-measured from the approved floor-plan drawings, not RERA disclosures; they require review against the drawings. RERA saleable area is shown separately and includes the home’s share of common areas, so it is not interchangeable with carpet area. The supplied material does not provide a RERA-filed carpet area for these units. RERA unit table Floor plans RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK78078170.09 sq. m109.2–127.8 sq. m; median 117.0 sq. m31%
4BHK13013209.77 sq. m144.4 sq. m31%

The floor-plan measurement set also identifies 1BHK and 2BHK designs, but those configurations are not listed as RERA-filed offerings in the supplied unit record; no RERA unit counts or saleable areas are available for them. Drawing measurements give carpet areas of 72.2 sq. m for the measured 1BHK design and 121.2–121.3 sq. m for the measured 2BHK designs. RERA unit details Floor plans

The measured plan examples show living/dining, bedrooms, kitchen, toilets and balconies; some examples also show utility areas. Balcony and utility areas are excluded from the stated software-measured carpet-area calculation. Room labels and dimensions are drawing-derived measurements, not RERA disclosures. RERA unit details

5. Parking & vehicle circulation

The GHMC permit states that the cellars and stilts approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. Its extraction lists 8684.79 as the total parking area, but does not specify a unit for that figure or give a parking-space count.

The supplied evidence does not establish the number of car or two-wheeler spaces, visitor or accessible spaces, parking allocation to individual apartments, parking ramps or access arrangements, or EV-charging provision. A project-level parking-area entry does not establish exclusive parking rights for a purchaser.

6. Amenities, recreation & open spaces

The RERA amenity record lists 14 items. Entries with a stated zero progress are shown as recorded; the permit’s requirements are separately identified below. No independent verification of completed amenities is supplied. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads & footpathsSize not statedRERA amenities RERA amenities0%; completion not independently verified
Water supplyListed as “YES”; details/capacity not statedRERA amenities RERA amenities0%; completion not independently verified
Sewerage (chamber, lines, septic tank, STP)Listed as “YES”; no capacity statedRERA amenities RERA amenities0%; permit requires an STP before release of Occupancy Certificate RERA amenities
Storm-water drainsListed as “YES”; dimensions/capacity not statedRERA amenities RERA amenities0%; completion not independently verified
Green strip / tot lot / parkSize not statedRERA amenities RERA amenities0%; permit requires the tot lot to be fenced and maintained as greenery before Occupancy Certificate RERA amenities
Street lightingDetails not statedRERA amenities RERA amenities0%; completion not independently verified
Community buildingsDetails/size not statedRERA amenities RERA amenities0%; completion not independently verified
Sewage and sullage treatment/disposalDetails/capacity not statedRERA amenities RERA amenities0%; completion not independently verified
Solid-waste management and disposalDetails not statedRERA amenities RERA amenities0%; completion not independently verified
Water conservation / rainwater harvestingListed as “YES”; permit specifies 2 rainwater-harvesting pitsRERA amenities RERA amenities0% in RERA amenity record; permit requires construction, completion not independently verified
Energy managementDetails not statedRERA amenities RERA amenities0%; completion not independently verified
Fire protection and fire safetyDetails not statedRERA amenities RERA amenities0%; permit requires applicable high-rise safety measures and an Occupancy Fire NOC before Occupancy Certificate RERA amenities
Electrical meter room / substation / receiving stationListed as “YES”; permit says space for a transformer is to be providedRERA amenities RERA amenities0%; completion not independently verified
Aggregate recreational open spaceSize not statedRERA amenities RERA amenities0%; completion not independently verified

7. Utilities, building services & safety

The RERA amenity record lists water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/substation/receiving station, each with a recorded progress of 0%. The permit requires a sewage treatment plant before release of the Occupancy Certificate, two rainwater-harvesting pits, transformer space, a garbage house within the premises and a storm-water drain sized to accommodate catchment inflows. These are recorded provisions or requirements; the supplied evidence does not establish installation, operating capacity or completion. RERA amenities

The permit also requires compliance with applicable high-rise safety norms, necessary Fire Services and Airports Authority of India clearances, and an Occupancy Fire NOC before the Occupancy Certificate. The supplied material does not include those clearances, a detailed fire-system schedule, lift specifications, backup-power details, CCTV or access-control information, or accessibility provisions.

8. Location, access & connectivity

The registered project location is Nampally Station Road, NAMPALLY village, Nampally Mandal, Hyderabad District, PIN 500001. The recorded southern boundary is “18 MT WIDE EXISTING 24 MT WIDE PROPOSED ROAD”; the other three boundaries are recorded as neighbours. RERA record RERA filing

A supplied connectivity record gives the nearest sampled Outer Ring Road interchange at approximately 36.8 km. No approach route, public-transport details, local landmark distances or travel-time estimates are supplied. Location record

9. Developer & development status

The registered promoter is AADINATH DEVELOPERS, identified in the supplied record as a partnership. Its GSTIN is 36ABYFA4505D1ZF. The supplied registration-certificate office field gives Hyderabad District and PIN 500001, but does not provide a complete office address or official contact details. RERA record Corporate record Parties record

In Form B, the promoter declares legal title to the project land, states that the land is free from encumbrances, and undertakes to complete the project by 16-05-2030. Those are promoter declarations. The supplied record does not state a construction-progress percentage or independently verify work on site; it also contains no Occupancy Certificate.

10. Approvals, official records & documents

RecordAvailable evidence
TG-RERA registrationForm C certificate for SHAASVAT, P02500011386, valid 17/05/2025–16/05/2030
GHMC building permitBuilding Permit Order 6251/GHMC/KHB/2025-BP, dated 17 May, 2025; related file number 005989/GHMC/2984/KHB1/2023-BP
Permit / commencement documentFiled under “Commencement Certificates for each building in each phase”; extracted content identifies it as a GHMC Building Permit Order
Layout-plan filingRERA document entry exists, but the supplied document is not extracted Document index
Promoter declarationForm B affidavit-cum-declaration, including the promoter’s completion undertaking
Occupancy / completion certificateNo such certificate is included in the supplied evidence; the building permit requires an Occupancy Certificate before occupation

Frequently asked questions

Is SHAASVAT registered with Telangana RERA?

Yes. SHAASVAT is registered with the Telangana Real Estate Regulatory Authority as P02500011386; the registration status is New Project.

Who is the developer of SHAASVAT?

The promoter named in the RERA registration is AADINATH DEVELOPERS.

Where is SHAASVAT located?

SHAASVAT is in NAMPALLY STATION ROAD, NAMPALLY, Hyderabad, Telangana (500001).

When will SHAASVAT be completed?

The promoter's proposed date of completion filed with RERA is 16/05/2030. This is the promoter's declaration, not a guarantee.