The Origin
VISHNU DEVELOPERS · Sangareddy · RERA P01100004889
THE ORIGIN is a residential apartment project in AMEENAPUR, AMEENPUR, Sangareddy, on a registered site of 481.61 sq. m. VISHNU DEVELOPERS is the registered promoter developing the project. The RERA record describes one building with 1 Stilt + 5 upper floors and 10 3BHK apartments, each with a filed saleable area of 152.82 sq. m. The project is registered under TG-RERA number P01100004889, and the promoter’s Form B undertakes completion by 26/04/2025.
More from Vishnu Developers · 12 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | THE ORIGIN RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | No separate phase name is disclosed. TG-RERA records the project against Survey No. 113/PART, Plot Nos. 38 AND 39. RERA record |
| TG-RERA registration | P01100004889 RERA record |
| Registration validity | 29/08/2022–26/04/2025; certificate records a two-year validity period and no extension. Registration validity is distinct from the building’s occupancy certification. The registration certificate states validity ending 26/04/2025 and no extension. A later registration status is not established by the supplied record. Approvals record |
| Registered promoter | VISHNU DEVELOPERS RERA record Corporate record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | AMEENAPUR (also rendered as Ameenpur in approval documents) RERA record |
| Revenue village | AMEENAPUR in the RERA identity; HMDA documents identify Ameenpur village. RERA record RERA filing |
| Mandal / district / PIN | AMEENPUR / Sangareddy / 502032 RERA record |
| Project survey number(s) and subdivision(s) | 113/PART; the cadastral material also records 113/P and identifies subdivision P. RERA record RERA filing Cadastral map |
| Registered site extent | 481.61 sq. m.; RERA land details state total area 481.61 sq. m., affected area 0, and net area 481.61 sq. m. RERA filing |
| Boundaries recorded by RERA | East: part of Plot Nos. 36 and 37; West: 40 ft road; North: Plot No. 351; South: Plot No. 40. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) Approvals record |
| Principal building approval | 005982/BP/HMDA/0906/SKP/2022, approved 26 April 2022; related proceedings 000684/BP/HMDA/SKP/2022. Approvals record |
| Approved use and building form | Residential building, 1 Stilt + 5 upper floors. |
| Approved built-up area | HMDA record states 1,340.65 m² floor area; the building-permit extraction separately lists 1,623.10 Sq.mts. total built up area. These are the approval-record figures as labelled in the supplied documents; the distinction is not resolved here. |
| Building count | One building/tower is recorded in the RERA project summary. RERA unit table |
| Parking | The OC extraction records parking area 278.7 m², matching the sanctioned figure. No number of parking spaces or unit-wise allocation is established in the supplied records. |
| Approved vs RERA-declared homes | Approved plan count: 1 building unit; RERA filing: 10 apartments. RERA filing RERA unit table |
Offering and status
| Field | Record |
|---|---|
| RERA-filed configuration | 3BHK, 10 apartments; filed saleable area 152.82 sq. m. each. RERA unit table RERA unit details |
| Booked / available | Portal-derived count: 10 booked, 0 available, with no as-of date supplied; treat as indicative. RERA unit table RERA unit details |
| Construction stage | An HMDA occupancy certificate is recorded for the residential building at Survey No. 113/PART. The project filing also includes an architect’s completion certificate. |
| Completion dates | Promoter’s Form B undertakes completion by 26/04/2025. HMDA’s OC record states completion notice on 20 May 2023 and OC issued 15 June 2023 for the identified building. |
| Occupancy certificate status and scope | OC 003117/OC/HMDA/SKP/2023, dated 15 June 2023, covers the proposed residential building at Survey No. 113/PART, described as Stilt + 5 Upper Floor. |
2. The project story
THE ORIGIN is a small residential apartment development on Plot Nos. 38 and 39, Survey No. 113/PART, in Ameenapur/Ameenpur, Ameenpur Mandal, Sangareddy District. The registered site is 481.61 sq. m. and the RERA record describes one residential building with ten 3BHK apartments. RERA record RERA filing RERA unit table
HMDA’s building-permit record describes a 1 Stilt + 5 upper floors building. The project record identifies an HMDA occupancy certificate for the building, and an architect’s certificate dated 09/02/2024 states that the registered apartment project was completed in all aspects. These are documentary records; no independent site inspection or current physical-progress verification is supplied.
The RERA portal’s booking figures indicate all ten apartments booked, but the supplied portal-derived data has no as-of date. RERA unit table RERA unit details
3. Master plan, architecture & building design
The sanctioned building is a single residential block on the 481.61 sq. m. site, approved for 1 Stilt + 5 upper floors. The HMDA occupancy record describes zero cellar floors, zero ground floors, one stilt and five upper floors; it records building height 14.99 m.
The supplied approval extracts report floor area 1,340.65 m² and also include 1,623.10 Sq.mts. total built up area in the building-permit data. These labels are retained as stated; the supplied material does not provide enough detail to reconcile the area definitions. No reliable drawing-derived information is supplied here on building footprint, flats per floor, lift or stair configuration, internal circulation, landscaping, or common-area distribution.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 10 | 0 | 152.82 sq. m. | 102.8–103.1 sq. m. (software-measured; median 103.0 sq. m.) | 33% |
RERA records ten 3BHK apartments with a saleable area of 152.82 sq. m. each. Booked and available counts are portal-derived and undated. RERA unit table RERA unit details
The carpet-area range and 33% loading are software measurements from two approved floor-plan designs, not RERA-filed disclosures; the drawing measurement is flagged as requiring review. The measured typical plan identifies a guest room, living/dining, kitchen, wash area, bedrooms, attached toilets and balconies. Balconies are excluded from the reported carpet-area measurement. Carpet area, balcony area, common-area allocation and saleable area are different measures; verify the drawing-based measurement against the approved drawing. RERA unit details Floor plans
5. Parking & vehicle circulation
The building is sanctioned with a stilt level reserved for vehicle parking; the HMDA building-permit conditions state that the stilt/cellar is to be used exclusively for parking and not partitioned or converted. The OC record lists 278.7 m² of parking area.
The supplied evidence does not establish a count of parking bays, visitor or accessible spaces, EV charging, ramp arrangement, or unit-wise parking allocation. A drawn or sanctioned parking area does not by itself establish an exclusive parking right for a particular apartment.
6. Amenities, recreation & open spaces
The RERA filing lists Water Conservation, Rain water Harvesting as available (“YES”); the other listed development-amenity items show 0% progress in the supplied filing data. Those percentages are filing data, not independent verification of current condition. RERA amenities
| Facility | Green Strip/TOT LOT/Park; aggregate recreational open space |
|---|---|
| Description / size | No size supplied |
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA filing shows 0%; no independent completion verification |
| Facility | Community Buildings |
|---|---|
| Description / size | No description or size supplied |
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA filing shows 0%; no independent completion verification |
| Facility | Water conservation / rainwater harvesting |
|---|---|
| Description / size | HMDA approval requires rainwater-harvesting provision; RERA filing marks it available |
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA filing says “YES” with 0% progress; OC extraction lists rainwater harvesting, but no independent inspection is supplied |
A third-party vendor listing mentions a clubhouse, gym, swimming pool, indoor games, children’s play area, park, power backup, water supply, lift, security and covered car parking. These are promoter-marketing/vendor claims, not established as sanctioned or delivered facilities in the supplied RERA evidence. Promoter website
7. Utilities, building services & safety
HMDA’s building-approval record requires an STP and septic tank, rainwater-recycling provision, a transformer and garbage house within the premises, and CC cameras. It also specifies separate underground static water storage of 25,000 litres and a separate terrace tank of 25,000 litres for residential buildings. These are approval conditions or required provisions; the supplied material does not independently verify their installation or operational status.
The RERA filing lists sewerage, storm-water drains, water supply, solid-waste management, energy management, fire protection and electrical meter/substation facilities, but reports 0% progress for those items. The filing marks rainwater harvesting “YES,” also with 0% progress. RERA amenities
The supplied evidence does not establish water source or treatment arrangements, lift count or capacity, backup-power capacity, fire-system installation details, waste-segregation arrangements, CCTV installation, or accessible routes. HMDA’s approval conditions include fire-safety-related requirements and require a minimum of four fire extinguishers per floor; this condition is not evidence of current installation or statutory compliance.
8. Location, access & connectivity
The registered project location is AMEENAPUR, Ameenpur Mandal, Sangareddy District, Telangana 502032, on Survey No. 113/PART, Plot Nos. 38 and 39. The HMDA approval record specifies a minimum approach-road width of 4.5 m and requires the indicated approach road to be developed and maintained as a black-topped road before release of the occupancy certificate. RERA record
A supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 8.4 km. A vendor listing reports VEM Technologies Private Limited at approximately 2.84 km; this is a vendor-provided connectivity claim. No public-transport details or further measured landmark distances are supplied. Location record Promoter website
9. Developer & development status
The registered promoter is VISHNU DEVELOPERS, identified in the filing as a partnership. Its GSTIN is 36AAUFV1334L1ZM. The supplied identity record does not establish a separate entity identification number, registered office address, or official contact details. Corporate record RERA filing
The registration certificate records validity ending 26/04/2025 and no extension. Form B, dated 13-06-2022, contains the promoter’s undertaking to complete the project by 26/04/2025. Separately, HMDA issued an OC for the building on 15 June 2023, and the architect’s certificate dated 09/02/2024 states project completion. The OC and completion statements concern the identified building/project as recorded in those documents; no subsequent RERA registration extension is shown in the supplied evidence.
10. Approvals, official records & documents
| Identifier / date | P01100004889; issued 29/08/2022; validity through 26/04/2025; no extension recorded |
|---|---|
| Scope and source | THE ORIGIN, VISHNU DEVELOPERS; Survey No. 113/PART, Plot Nos. 38 and 39. |
| Identifier / date | 005982/BP/HMDA/0906/SKP/2022; 26 April 2022 |
|---|---|
| Scope and source | Residential building, Survey No. 113/PART; related proceedings 000684/BP/HMDA/SKP/2022. |
| Identifier / date | 003117/OC/HMDA/SKP/2023; issued 15 June 2023; application 005734/OC/HMDA/1235/SKP/2023 |
|---|---|
| Scope and source | Building at Survey No. 113/PART, described as Stilt + 5 Upper Floor; inspected and declared fit for occupation. |
| Identifier / date | Dated 09/02/2024 |
|---|---|
| Scope and source | States the registered apartment project was completed in all aspects and identifies HMDA OC 005734/0C/HMDA/1235/SKP/2023, dated 15/06/2023. |
| Identifier / date | Sale deeds and development agreement/GPA; advocate’s opinion dated 16.06.2022 |
|---|---|
| Scope and source | Filed title documents and opinion concerning Plots 38 and 39, Survey No. 113 part. |
| Identifier / date | Document 242339 |
|---|---|
| Scope and source | Filed as a layout-plan document; the supplied record does not provide a separate layout approval number. |
| Identifier / date | Dated 13-06-2022 |
|---|---|
| Scope and source | Promoter declaration including a completion undertaking to 26/04/2025. |
1. Project at a glance
Project identity
Registered project name: THE ORIGIN
Project type: Residential apartment project
Phase / registered portion: No separate phase name is disclosed. TG-RERA records the project against Survey No. 113/PART, Plot Nos. 38 AND 39.
TG-RERA registration: P01100004889
Registration validity: 29/08/2022–26/04/2025; certificate records a two-year validity period and no extension. Registration validity is distinct from the building’s occupancy certification. The registration certificate states validity ending 26/04/2025 and no extension. A later registration status is not established by the supplied record.
Registered promoter: VISHNU DEVELOPERS
Land and geographic identity
Locality: AMEENAPUR (also rendered as Ameenpur in approval documents)
Revenue village: AMEENAPUR in the RERA identity; HMDA documents identify Ameenpur village.
Mandal / district / PIN: AMEENPUR / Sangareddy / 502032
Project survey number(s) and subdivision(s): 113/PART; the cadastral material also records 113/P and identifies subdivision P.
Registered site extent: 481.61 sq. m.; RERA land details state total area 481.61 sq. m., affected area 0, and net area 481.61 sq. m.
Boundaries recorded by RERA: East: part of Plot Nos. 36 and 37; West: 40 ft road; North: Plot No. 351; South: Plot No. 40.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal building approval: 005982/BP/HMDA/0906/SKP/2022, approved 26 April 2022; related proceedings 000684/BP/HMDA/SKP/2022.
Approved use and building form: Residential building, 1 Stilt + 5 upper floors.
Approved built-up area: HMDA record states 1,340.65 m² floor area; the building-permit extraction separately lists 1,623.10 Sq.mts. total built up area. These are the approval-record figures as labelled in the supplied documents; the distinction is not resolved here.
Building count: One building/tower is recorded in the RERA project summary.
Parking: The OC extraction records parking area 278.7 m², matching the sanctioned figure. No number of parking spaces or unit-wise allocation is established in the supplied records.
Approved vs RERA-declared homes: Approved plan count: 1 building unit; RERA filing: 10 apartments.
Offering and status
RERA-filed configuration: 3BHK, 10 apartments; filed saleable area 152.82 sq. m. each.
Booked / available: Portal-derived count: 10 booked, 0 available, with no as-of date supplied; treat as indicative.
Construction stage: An HMDA occupancy certificate is recorded for the residential building at Survey No. 113/PART. The project filing also includes an architect’s completion certificate.
Completion dates: Promoter’s Form B undertakes completion by 26/04/2025. HMDA’s OC record states completion notice on 20 May 2023 and OC issued 15 June 2023 for the identified building.
Occupancy certificate status and scope: OC 003117/OC/HMDA/SKP/2023, dated 15 June 2023, covers the proposed residential building at Survey No. 113/PART, described as Stilt + 5 Upper Floor.
2. The project story
THE ORIGIN is a small residential apartment development on Plot Nos. 38 and 39, Survey No. 113/PART, in Ameenapur/Ameenpur, Ameenpur Mandal, Sangareddy District. The registered site is 481.61 sq. m. and the RERA record describes one residential building with ten 3BHK apartments.
HMDA’s building-permit record describes a 1 Stilt + 5 upper floors building. The project record identifies an HMDA occupancy certificate for the building, and an architect’s certificate dated 09/02/2024 states that the registered apartment project was completed in all aspects. These are documentary records; no independent site inspection or current physical-progress verification is supplied.
The RERA portal’s booking figures indicate all ten apartments booked, but the supplied portal-derived data has no as-of date.
3. Master plan, architecture & building design
The sanctioned building is a single residential block on the 481.61 sq. m. site, approved for 1 Stilt + 5 upper floors. The HMDA occupancy record describes zero cellar floors, zero ground floors, one stilt and five upper floors; it records building height 14.99 m.
The supplied approval extracts report floor area 1,340.65 m² and also include 1,623.10 Sq.mts. total built up area in the building-permit data. These labels are retained as stated; the supplied material does not provide enough detail to reconcile the area definitions. No reliable drawing-derived information is supplied here on building footprint, flats per floor, lift or stair configuration, internal circulation, landscaping, or common-area distribution.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 10 | 0 | 152.82 sq. m. | 102.8–103.1 sq. m. (software-measured; median 103.0 sq. m.) | 33% |
RERA records ten 3BHK apartments with a saleable area of 152.82 sq. m. each. Booked and available counts are portal-derived and undated.
The carpet-area range and 33% loading are software measurements from two approved floor-plan designs, not RERA-filed disclosures; the drawing measurement is flagged as requiring review. The measured typical plan identifies a guest room, living/dining, kitchen, wash area, bedrooms, attached toilets and balconies. Balconies are excluded from the reported carpet-area measurement. Carpet area, balcony area, common-area allocation and saleable area are different measures; verify the drawing-based measurement against the approved drawing.
5. Parking & vehicle circulation
The building is sanctioned with a stilt level reserved for vehicle parking; the HMDA building-permit conditions state that the stilt/cellar is to be used exclusively for parking and not partitioned or converted. The OC record lists 278.7 m² of parking area.
The supplied evidence does not establish a count of parking bays, visitor or accessible spaces, EV charging, ramp arrangement, or unit-wise parking allocation. A drawn or sanctioned parking area does not by itself establish an exclusive parking right for a particular apartment.
6. Amenities, recreation & open spaces
The RERA filing lists Water Conservation, Rain water Harvesting as available (“YES”); the other listed development-amenity items show 0% progress in the supplied filing data. Those percentages are filing data, not independent verification of current condition.
| Facility | Green Strip/TOT LOT/Park; aggregate recreational open space |
|---|---|
| Description / size | No size supplied |
| Declared progress / verified status | RERA filing shows 0%; no independent completion verification |
| Facility | Community Buildings |
|---|---|
| Description / size | No description or size supplied |
| Declared progress / verified status | RERA filing shows 0%; no independent completion verification |
| Facility | Water conservation / rainwater harvesting |
|---|---|
| Description / size | HMDA approval requires rainwater-harvesting provision; RERA filing marks it available |
| Declared progress / verified status | RERA filing says “YES” with 0% progress; OC extraction lists rainwater harvesting, but no independent inspection is supplied |
A third-party vendor listing mentions a clubhouse, gym, swimming pool, indoor games, children’s play area, park, power backup, water supply, lift, security and covered car parking. These are promoter-marketing/vendor claims, not established as sanctioned or delivered facilities in the supplied RERA evidence.
7. Utilities, building services & safety
HMDA’s building-approval record requires an STP and septic tank, rainwater-recycling provision, a transformer and garbage house within the premises, and CC cameras. It also specifies separate underground static water storage of 25,000 litres and a separate terrace tank of 25,000 litres for residential buildings. These are approval conditions or required provisions; the supplied material does not independently verify their installation or operational status.
The RERA filing lists sewerage, storm-water drains, water supply, solid-waste management, energy management, fire protection and electrical meter/substation facilities, but reports 0% progress for those items. The filing marks rainwater harvesting “YES,” also with 0% progress.
The supplied evidence does not establish water source or treatment arrangements, lift count or capacity, backup-power capacity, fire-system installation details, waste-segregation arrangements, CCTV installation, or accessible routes. HMDA’s approval conditions include fire-safety-related requirements and require a minimum of four fire extinguishers per floor; this condition is not evidence of current installation or statutory compliance.
8. Location, access & connectivity
The registered project location is AMEENAPUR, Ameenpur Mandal, Sangareddy District, Telangana 502032, on Survey No. 113/PART, Plot Nos. 38 and 39. The HMDA approval record specifies a minimum approach-road width of 4.5 m and requires the indicated approach road to be developed and maintained as a black-topped road before release of the occupancy certificate.
A supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 8.4 km. A vendor listing reports VEM Technologies Private Limited at approximately 2.84 km; this is a vendor-provided connectivity claim. No public-transport details or further measured landmark distances are supplied.
9. Developer & development status
The registered promoter is VISHNU DEVELOPERS, identified in the filing as a partnership. Its GSTIN is 36AAUFV1334L1ZM. The supplied identity record does not establish a separate entity identification number, registered office address, or official contact details.
The registration certificate records validity ending 26/04/2025 and no extension. Form B, dated 13-06-2022, contains the promoter’s undertaking to complete the project by 26/04/2025. Separately, HMDA issued an OC for the building on 15 June 2023, and the architect’s certificate dated 09/02/2024 states project completion. The OC and completion statements concern the identified building/project as recorded in those documents; no subsequent RERA registration extension is shown in the supplied evidence.
10. Approvals, official records & documents
| Identifier / date | P01100004889; issued 29/08/2022; validity through 26/04/2025; no extension recorded |
|---|---|
| Scope and source | THE ORIGIN, VISHNU DEVELOPERS; Survey No. 113/PART, Plot Nos. 38 and 39. |
| Identifier / date | 005982/BP/HMDA/0906/SKP/2022; 26 April 2022 |
|---|---|
| Scope and source | Residential building, Survey No. 113/PART; related proceedings 000684/BP/HMDA/SKP/2022. |
| Identifier / date | 003117/OC/HMDA/SKP/2023; issued 15 June 2023; application 005734/OC/HMDA/1235/SKP/2023 |
|---|---|
| Scope and source | Building at Survey No. 113/PART, described as Stilt + 5 Upper Floor; inspected and declared fit for occupation. |
| Identifier / date | Dated 09/02/2024 |
|---|---|
| Scope and source | States the registered apartment project was completed in all aspects and identifies HMDA OC 005734/0C/HMDA/1235/SKP/2023, dated 15/06/2023. |
| Identifier / date | Sale deeds and development agreement/GPA; advocate’s opinion dated 16.06.2022 |
|---|---|
| Scope and source | Filed title documents and opinion concerning Plots 38 and 39, Survey No. 113 part. |
| Identifier / date | Document 242339 |
|---|---|
| Scope and source | Filed as a layout-plan document; the supplied record does not provide a separate layout approval number. |
| Identifier / date | Dated 13-06-2022 |
|---|---|
| Scope and source | Promoter declaration including a completion undertaking to 26/04/2025. |
Frequently asked questions
Is THE ORIGIN registered with Telangana RERA?
Yes. THE ORIGIN is registered with the Telangana Real Estate Regulatory Authority as P01100004889; the registration status is New Project.
Who is the developer of THE ORIGIN?
The promoter named in the RERA registration is VISHNU DEVELOPERS.
Where is THE ORIGIN located?
THE ORIGIN is in AMEENAPUR, AMEENPUR, Sangareddy, Telangana (502032).
When will THE ORIGIN be completed?
The promoter's proposed date of completion filed with RERA is 26/04/2025. This is the promoter's declaration, not a guarantee.