Sikhara Iris
SIKHARA INFRACON · Sangareddy · RERA P01100010518
SIKHARA IRIS is a residential apartment project in Ameenapur, Ameenpur mandal, Sangareddy district, developed by registered promoter SIKHARA INFRACON, a partnership. It covers 394.42 sq. m and comprises one building with 1 Stilt + 5 upper floors and 10 apartments: five 2BHK and five 3BHK. The project is registered under TG-RERA P01100010518, with proposed completion on 23/02/2028.
More from Sikhara Infracon · 7 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | SIKHARA IRIS RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | A single building on Plot No. 47/Part (South Part); no separate phase name is disclosed. RERA filing |
| TG-RERA registration | P01100010518 RERA record |
| Registration validity | 24 October 2024 to 23 October 2027, unless extended by the Authority. This is the registration period, not a completion or occupancy date. RERA record |
| Registered promoter | SIKHARA INFRACON, a partnership RERA record RERA filing |
| RERA status | Registered; the supplied record shows a new project. Registration is not an occupancy certificate. RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / plot | Ameenapur; Plot No. 47/PART (SOUTH PART) RERA filing |
| Revenue village | AMEENAPUR (also rendered “Ameenpur” in the HMDA permit extracts) RERA record RERA filing |
| Mandal | AMEENPUR RERA record RERA filing |
| District | Sangareddy RERA record |
| PIN | 502032 RERA record |
| Project survey number(s) | 109/P in the RERA filing and HMDA building-permit record; drawing title also describes the site as 109/PART. RERA filing |
| Site area | 394.42 sq. m; the filing reports this as both total and net area. RERA filing |
| Boundaries, as filed | North: Part of Plot No. 47; South: Plot No. 48; East: Plot No. 60; West: 12 m wide existing and 12 m wide proposed road. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA); the permit is addressed for release of proceedings/plans through Ameenpur Municipality / Municipal Corporation. Approvals record |
| Principal building-permit reference | 004130/BP/HMDA/0869/SKP/2024, approved 24 October 2024. Approvals record |
| Building count | 1 RERA filing |
| Sanctioned configuration | 1 Stilt + 5 upper floors; the drawing record describes this as residential apartment construction. |
| Height | 14.99 m in the supplied sanctioned parameters. |
| Approved built-up area | 1,413.78 sq. m total, including parking; 1,178.15 sq. m proposed built-up area excluding parking, as stated in the drawing-derived approval record. |
| Parking-area figure in approval-plan extraction | 235.63 sq. m |
| Units | 10 in the RERA-filed unit record: 5 2BHK and 5 3BHK. The approval-plan extraction also records 10 units. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| Configurations | 2BHK and 3BHK apartments RERA unit table |
| RERA-filed saleable area | 2BHK: 140.74 sq. m; 3BHK: 139.35 sq. m RERA unit table |
| Booking availability | Portal-derived counts show 0 booked and 5 available in each configuration (10 available total); the record has no as-of date, so counts are indicative. RERA unit table |
| Construction stage | The supplied evidence identifies the project as a new project and includes an approved building permit and floor-plan drawing. No independently verified site-progress record is supplied. RERA record |
| Completion dates | RERA filing header: 23/02/2028 proposed completion; Form B declaration: 23/10/2027 undertaking. RERA record |
| Occupancy certificate | No occupancy certificate is supplied. The HMDA permit states that occupancy requires an occupancy certificate / “Fit for Occupancy” certificate before occupation. |
2. The project story
SIKHARA IRIS is registered as a residential apartment project on Plot No. 47/Part (South Part), Survey No. 109/P, in Ameenapur village, Ameenpur mandal, Sangareddy district. The registered site extent is 394.42 sq. m. RERA record RERA filing
The approved development is one residential building with a stilt level and five upper floors, offering ten apartments: five 2BHK and five 3BHK units. The RERA portal record lists all ten as available and none as booked, but does not give an as-of date for those counts. RERA unit table
The evidence establishes a building permit and plan documents, not completed construction. No independently verified construction-progress report or occupancy certificate is included. The completion dates are therefore presented separately from registration validity and OC status in the tables above. RERA record
3. Master plan, architecture & building design
The submitted HMDA approval-plan record describes a single residential building on a 394.42 sq. m site, configured as 1 Stilt + 5 upper floors and 14.99 m high. It records total built-up area of 1,413.78 sq. m, including parking, and proposed built-up area excluding parking of 1,178.15 sq. m. The drawing extraction separately identifies 235.63 sq. m as parking area. These are approval-plan figures, not carpet or saleable areas.
The plan record identifies a typical floor plan for floors 2–5 and a total of ten units across the building. It also identifies a lift and parking, but the supplied extraction does not establish lift capacity, number of lifts, the detailed apartment-per-floor arrangement, or the full circulation layout.
The drawing extraction lists a 158.79 sq. m vacant plot area. No detailed breakdown of that area into landscaped open space, access, setbacks or other uses is supplied here. The approval conditions state that setbacks are not to be used for parking or construction.
4. Homes, configurations & floor plans
The TG-RERA filing records five units of each configuration. Its filed saleable areas are shown below. Drawing-based carpet-area measurements are software measurements from the submitted plan, not RERA-filed carpet-area disclosures; the measurement record itself says they need review. Saleable area and carpet area are distinct measures: the supplied drawing analysis notes that saleable area includes a share of common areas, while the drawing-based carpet measurement is smaller. RERA unit table Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 140.74 sq. m | 78.5 sq. m (845 sq. ft), software-measured from drawing | 44% |
| 3BHK | 5 | 0 | 5 | 139.35 sq. m | 90.2 sq. m (971 sq. ft), software-measured from drawing | 35% |
The typical-floor drawing labels two-bedroom and three-bedroom layouts, with living/dining, kitchen, wash area and toilets. It also labels utility areas, which the software measurement excludes from carpet area. Room dimensions are drawing-derived measurements rather than RERA disclosures: the 2BHK drawing includes a 3.0 m × 6.51 m living/dining area and a 3.0 m × 2.2 m kitchen; the 3BHK drawing includes a 6.61 m × 6.67 m living/dining area and a 3.55 m × 2.16 m kitchen. Verify these measured dimensions against the drawing before relying on them. RERA unit details Floor plans
5. Parking & vehicle circulation
The approved drawing extraction records 235.63 sq. m of parking area. The approval conditions state that the stilt/cellar is to be used exclusively for vehicle parking and not converted to another use; they also prohibit parking or construction in setback areas.
The permit extract lists a minimum approach-road width of 4.5 m and a minimum height clearance of 5 m. The filing gives the west boundary as a 12 m wide existing and 12 m wide proposed road. No car or two-wheeler space count, visitor or accessible parking count, parking-allocation schedule, or documented exclusive parking entitlement is supplied. A parking area on a plan does not by itself establish an individual buyer’s exclusive allocation. RERA filing
6. Amenities, recreation & open spaces
The RERA amenity record shows 0% progress for the listed infrastructure items; these are therefore reported as filed project provisions, not completed facilities. The HMDA permit also specifies certain services and conditions. No independent verification of installation or completion is supplied. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot lot / park | Description and size not supplied | RERA amenity record | Marked available: “YES”; progress 0%; completion not independently verified. RERA amenities |
| Internal roads and footpaths | Details not supplied | RERA amenity record | Progress 0%. RERA amenities |
| Street lighting | Details not supplied | RERA amenity record | Progress 0%. RERA amenities |
| Community buildings | Details not supplied | RERA amenity record | Progress 0%. RERA amenities |
| Water supply | Details not supplied in amenity record | RERA amenity record | Marked available: “YES”; progress 0%; completion not independently verified. RERA amenities |
| Sewerage / sewage treatment | RERA record lists chambers, lines, septic tank and STP | RERA amenity record; HMDA permit | Marked available: “YES”; progress 0%. Permit requires an STP; installation is not independently verified. RERA amenities |
| Storm-water drains | Details not supplied | RERA amenity record | Progress 0%. RERA amenities |
| Rainwater harvesting / water conservation | Permit requires rainwater-harvesting structures; RERA record marks water conservation/rainwater harvesting “YES” | RERA amenity record; HMDA permit | Progress 0%; installation not independently verified. RERA amenities |
| Solid-waste management and disposal | Details not supplied | RERA amenity record | Progress 0%. RERA amenities |
| Electrical meter room / sub-station / receiving station | Type and capacity not supplied | RERA amenity record | Marked available: “YES”; progress 0%. RERA amenities |
| Recreation open space | Aggregate area not supplied | RERA amenity record | Progress 0%; no completion verification supplied. RERA amenities |
The RERA amenity register does not provide a clubhouse, indoor recreation or sports-facility schedule with dimensions or capacities. Third-party marketing amenities are not treated here as RERA-filed or verified project provisions.
7. Utilities, building services & safety
The HMDA permit calls for rainwater-harvesting structures and an STP. Its technical-approval extract also lists a transformer, garbage house, separate underground static water-storage tank of 25,000 litres, separate terrace tank of 25,000 litres, and electric-vehicle charging infrastructure. These are approval-record provisions; the supplied evidence does not establish that they have been installed or commissioned.
The second approval-plan extraction lists a septic tank and dual piping system, and describes a sump and lift. It does not give the sump capacity, lift capacity, or number of lifts. The plan notes dual piping as a plumbing arrangement, but does not provide further project-specific performance or commissioning evidence.
For fire and life safety, the permit extract specifies a minimum of four fire extinguishers per floor and requires the approach road and clearance conditions set out in the approval record. The drawing conditions also refer to fire-safety requirements and sprinkler provision if basement area exceeds 200 sq. m. No fire-system completion certificate or independent inspection record is supplied, so these are approval conditions rather than verified installed systems.
The supplied records do not establish power-backup capacity, CCTV or access-control installation, waste-segregation arrangements, accessible circulation, or completed utility connections. The approval-plan conditions state that permanent HMWS&SB and T.S. Transco connections are not to be provided until an occupancy certificate is produced.
8. Location, access & connectivity
The registered location is AMEENAPUR village, AMEENPUR mandal, Sangareddy district, PIN 502032, on Plot No. 47/Part (South Part), Survey No. 109/P. The site boundary record identifies an existing and proposed 12 m wide road on the west. The HMDA approval-plan extraction also identifies 12.00 m wide existing and 12.00 m wide proposed roads. RERA record RERA filing
The supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 8.4 km. No other independently measured local distances or public-transport details are supplied. Location record
9. Developer & development status
The registered promoter is SIKHARA INFRACON, identified in the RERA record as a partnership. Its GSTIN is 36AENFS4605N1ZG. The supplied promoter address is Sai Ambika Phase 2, PNR Colony, Ameenpur Village, Ameenpur Mandal, Sangareddy, PIN 502032. Rajesh Nangineni is identified as authorized signatory and Deepthi Nangineni as partner. RERA record RERA filing Corporate record Parties record
The Form B affidavit is a promoter declaration undertaking completion by 23/10/2027, depositing the stipulated portion of allottee receipts into a separate account, and obtaining pending approvals. The project header separately records proposed completion as 23/02/2028; no revised completion order or explanation is supplied here. Neither date establishes actual progress or occupancy. RERA record
The project is registered and has an HMDA building permit, but the supplied evidence does not include independently verified site progress or an OC. The TG-RERA registration remains valid through 23 October 2027 unless extended. RERA record
10. Approvals, official records & documents
| Record | What the supplied record establishes |
|---|---|
| TG-RERA Form C certificate | Project SIKHARA IRIS, registration P01100010518, promoter SIKHARA INFRACON, land at Survey No. 109/P, Ameenapur; valid 24/10/2024–23/10/2027 unless extended. |
| HMDA building permit order | Reference 004130/BP/HMDA/0869/SKP/2024, approved 24 October 2024; one residential building, 1 stilt + 5 upper floors, on Plot 47/Part (South Part), Survey No. 109/P. |
| HMDA technical approval / plan record | Building-construction approval and plan information for the same approval reference and site; includes the recorded building configuration, site/built-up figures, and conditions. |
| Submitted drawing / approval-plan record | Drawing extract for a proposed residential apartment on Plot No. 47/Part (South Part), 109/PART, including typical-floor plans and project parameters. |
| Form B affidavit-cum-declaration | Promoter declaration concerning title documentation, encumbrance statement, completion undertaking, project-account and other registration obligations. |
| Occupancy / completion certificate | Not supplied. The HMDA permit requires an occupancy certificate / “Fit for Occupancy” certificate before occupation. |
1. Project at a glance
Project identity
Registered name: SIKHARA IRIS
Project type: Residential apartment project
Phase / registered portion: A single building on Plot No. 47/Part (South Part); no separate phase name is disclosed.
TG-RERA registration: P01100010518
Registration validity: 24 October 2024 to 23 October 2027, unless extended by the Authority. This is the registration period, not a completion or occupancy date.
Registered promoter: SIKHARA INFRACON, a partnership
RERA status: Registered; the supplied record shows a new project. Registration is not an occupancy certificate.
Land and geographic identity
Locality / plot: Ameenapur; Plot No. 47/PART (SOUTH PART)
Revenue village: AMEENAPUR (also rendered “Ameenpur” in the HMDA permit extracts)
Mandal: AMEENPUR
District: Sangareddy
PIN: 502032
Project survey number(s): 109/P in the RERA filing and HMDA building-permit record; drawing title also describes the site as 109/PART.
Site area: 394.42 sq. m; the filing reports this as both total and net area.
Boundaries, as filed: North: Part of Plot No. 47; South: Plot No. 48; East: Plot No. 60; West: 12 m wide existing and 12 m wide proposed road.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA); the permit is addressed for release of proceedings/plans through Ameenpur Municipality / Municipal Corporation.
Principal building-permit reference: 004130/BP/HMDA/0869/SKP/2024, approved 24 October 2024.
Building count: 1
Sanctioned configuration: 1 Stilt + 5 upper floors; the drawing record describes this as residential apartment construction.
Height: 14.99 m in the supplied sanctioned parameters.
Approved built-up area: 1,413.78 sq. m total, including parking; 1,178.15 sq. m proposed built-up area excluding parking, as stated in the drawing-derived approval record.
Parking-area figure in approval-plan extraction: 235.63 sq. m
Units: 10 in the RERA-filed unit record: 5 2BHK and 5 3BHK. The approval-plan extraction also records 10 units.
Offering and status
Configurations: 2BHK and 3BHK apartments
RERA-filed saleable area: 2BHK: 140.74 sq. m; 3BHK: 139.35 sq. m
Booking availability: Portal-derived counts show 0 booked and 5 available in each configuration (10 available total); the record has no as-of date, so counts are indicative.
Construction stage: The supplied evidence identifies the project as a new project and includes an approved building permit and floor-plan drawing. No independently verified site-progress record is supplied.
Completion dates: RERA filing header: 23/02/2028 proposed completion; Form B declaration: 23/10/2027 undertaking.
Occupancy certificate: No occupancy certificate is supplied. The HMDA permit states that occupancy requires an occupancy certificate / “Fit for Occupancy” certificate before occupation.
2. The project story
SIKHARA IRIS is registered as a residential apartment project on Plot No. 47/Part (South Part), Survey No. 109/P, in Ameenapur village, Ameenpur mandal, Sangareddy district. The registered site extent is 394.42 sq. m.
The approved development is one residential building with a stilt level and five upper floors, offering ten apartments: five 2BHK and five 3BHK units. The RERA portal record lists all ten as available and none as booked, but does not give an as-of date for those counts.
The evidence establishes a building permit and plan documents, not completed construction. No independently verified construction-progress report or occupancy certificate is included. The completion dates are therefore presented separately from registration validity and OC status in the tables above.
3. Master plan, architecture & building design
The submitted HMDA approval-plan record describes a single residential building on a 394.42 sq. m site, configured as 1 Stilt + 5 upper floors and 14.99 m high. It records total built-up area of 1,413.78 sq. m, including parking, and proposed built-up area excluding parking of 1,178.15 sq. m. The drawing extraction separately identifies 235.63 sq. m as parking area. These are approval-plan figures, not carpet or saleable areas.
The plan record identifies a typical floor plan for floors 2–5 and a total of ten units across the building. It also identifies a lift and parking, but the supplied extraction does not establish lift capacity, number of lifts, the detailed apartment-per-floor arrangement, or the full circulation layout.
The drawing extraction lists a 158.79 sq. m vacant plot area. No detailed breakdown of that area into landscaped open space, access, setbacks or other uses is supplied here. The approval conditions state that setbacks are not to be used for parking or construction.
4. Homes, configurations & floor plans
The TG-RERA filing records five units of each configuration. Its filed saleable areas are shown below. Drawing-based carpet-area measurements are software measurements from the submitted plan, not RERA-filed carpet-area disclosures; the measurement record itself says they need review. Saleable area and carpet area are distinct measures: the supplied drawing analysis notes that saleable area includes a share of common areas, while the drawing-based carpet measurement is smaller.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 140.74 sq. m | 78.5 sq. m (845 sq. ft), software-measured from drawing | 44% |
| 3BHK | 5 | 0 | 5 | 139.35 sq. m | 90.2 sq. m (971 sq. ft), software-measured from drawing | 35% |
The typical-floor drawing labels two-bedroom and three-bedroom layouts, with living/dining, kitchen, wash area and toilets. It also labels utility areas, which the software measurement excludes from carpet area. Room dimensions are drawing-derived measurements rather than RERA disclosures: the 2BHK drawing includes a 3.0 m × 6.51 m living/dining area and a 3.0 m × 2.2 m kitchen; the 3BHK drawing includes a 6.61 m × 6.67 m living/dining area and a 3.55 m × 2.16 m kitchen. Verify these measured dimensions against the drawing before relying on them.
5. Parking & vehicle circulation
The approved drawing extraction records 235.63 sq. m of parking area. The approval conditions state that the stilt/cellar is to be used exclusively for vehicle parking and not converted to another use; they also prohibit parking or construction in setback areas.
The permit extract lists a minimum approach-road width of 4.5 m and a minimum height clearance of 5 m. The filing gives the west boundary as a 12 m wide existing and 12 m wide proposed road. No car or two-wheeler space count, visitor or accessible parking count, parking-allocation schedule, or documented exclusive parking entitlement is supplied. A parking area on a plan does not by itself establish an individual buyer’s exclusive allocation.
6. Amenities, recreation & open spaces
The RERA amenity record shows 0% progress for the listed infrastructure items; these are therefore reported as filed project provisions, not completed facilities. The HMDA permit also specifies certain services and conditions. No independent verification of installation or completion is supplied.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot lot / park | Description and size not supplied | RERA amenity record | Marked available: “YES”; progress 0%; completion not independently verified. |
| Internal roads and footpaths | Details not supplied | RERA amenity record | Progress 0%. |
| Street lighting | Details not supplied | RERA amenity record | Progress 0%. |
| Community buildings | Details not supplied | RERA amenity record | Progress 0%. |
| Water supply | Details not supplied in amenity record | RERA amenity record | Marked available: “YES”; progress 0%; completion not independently verified. |
| Sewerage / sewage treatment | RERA record lists chambers, lines, septic tank and STP | RERA amenity record; HMDA permit | Marked available: “YES”; progress 0%. Permit requires an STP; installation is not independently verified. |
| Storm-water drains | Details not supplied | RERA amenity record | Progress 0%. |
| Rainwater harvesting / water conservation | Permit requires rainwater-harvesting structures; RERA record marks water conservation/rainwater harvesting “YES” | RERA amenity record; HMDA permit | Progress 0%; installation not independently verified. |
| Solid-waste management and disposal | Details not supplied | RERA amenity record | Progress 0%. |
| Electrical meter room / sub-station / receiving station | Type and capacity not supplied | RERA amenity record | Marked available: “YES”; progress 0%. |
| Recreation open space | Aggregate area not supplied | RERA amenity record | Progress 0%; no completion verification supplied. |
The RERA amenity register does not provide a clubhouse, indoor recreation or sports-facility schedule with dimensions or capacities. Third-party marketing amenities are not treated here as RERA-filed or verified project provisions.
7. Utilities, building services & safety
The HMDA permit calls for rainwater-harvesting structures and an STP. Its technical-approval extract also lists a transformer, garbage house, separate underground static water-storage tank of 25,000 litres, separate terrace tank of 25,000 litres, and electric-vehicle charging infrastructure. These are approval-record provisions; the supplied evidence does not establish that they have been installed or commissioned.
The second approval-plan extraction lists a septic tank and dual piping system, and describes a sump and lift. It does not give the sump capacity, lift capacity, or number of lifts. The plan notes dual piping as a plumbing arrangement, but does not provide further project-specific performance or commissioning evidence.
For fire and life safety, the permit extract specifies a minimum of four fire extinguishers per floor and requires the approach road and clearance conditions set out in the approval record. The drawing conditions also refer to fire-safety requirements and sprinkler provision if basement area exceeds 200 sq. m. No fire-system completion certificate or independent inspection record is supplied, so these are approval conditions rather than verified installed systems.
The supplied records do not establish power-backup capacity, CCTV or access-control installation, waste-segregation arrangements, accessible circulation, or completed utility connections. The approval-plan conditions state that permanent HMWS&SB and T.S. Transco connections are not to be provided until an occupancy certificate is produced.
8. Location, access & connectivity
The registered location is AMEENAPUR village, AMEENPUR mandal, Sangareddy district, PIN 502032, on Plot No. 47/Part (South Part), Survey No. 109/P. The site boundary record identifies an existing and proposed 12 m wide road on the west. The HMDA approval-plan extraction also identifies 12.00 m wide existing and 12.00 m wide proposed roads.
The supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 8.4 km. No other independently measured local distances or public-transport details are supplied.
9. Developer & development status
The registered promoter is SIKHARA INFRACON, identified in the RERA record as a partnership. Its GSTIN is 36AENFS4605N1ZG. The supplied promoter address is Sai Ambika Phase 2, PNR Colony, Ameenpur Village, Ameenpur Mandal, Sangareddy, PIN 502032. Rajesh Nangineni is identified as authorized signatory and Deepthi Nangineni as partner.
The Form B affidavit is a promoter declaration undertaking completion by 23/10/2027, depositing the stipulated portion of allottee receipts into a separate account, and obtaining pending approvals. The project header separately records proposed completion as 23/02/2028; no revised completion order or explanation is supplied here. Neither date establishes actual progress or occupancy.
The project is registered and has an HMDA building permit, but the supplied evidence does not include independently verified site progress or an OC. The TG-RERA registration remains valid through 23 October 2027 unless extended.
10. Approvals, official records & documents
TG-RERA Form C certificate: Project SIKHARA IRIS, registration P01100010518, promoter SIKHARA INFRACON, land at Survey No. 109/P, Ameenapur; valid 24/10/2024–23/10/2027 unless extended.
HMDA building permit order: Reference 004130/BP/HMDA/0869/SKP/2024, approved 24 October 2024; one residential building, 1 stilt + 5 upper floors, on Plot 47/Part (South Part), Survey No. 109/P.
HMDA technical approval / plan record: Building-construction approval and plan information for the same approval reference and site; includes the recorded building configuration, site/built-up figures, and conditions.
Submitted drawing / approval-plan record: Drawing extract for a proposed residential apartment on Plot No. 47/Part (South Part), 109/PART, including typical-floor plans and project parameters.
Form B affidavit-cum-declaration: Promoter declaration concerning title documentation, encumbrance statement, completion undertaking, project-account and other registration obligations.
Occupancy / completion certificate: Not supplied. The HMDA permit requires an occupancy certificate / “Fit for Occupancy” certificate before occupation.
Frequently asked questions
Is SIKHARA IRIS registered with Telangana RERA?
Yes. SIKHARA IRIS is registered with the Telangana Real Estate Regulatory Authority as P01100010518; the registration status is New Project.
Who is the developer of SIKHARA IRIS?
The promoter named in the RERA registration is SIKHARA INFRACON.
Where is SIKHARA IRIS located?
SIKHARA IRIS is in AMEENPUR MANDAL, AMEENAPUR, AMEENPUR, Sangareddy, Telangana (502032).
When will SIKHARA IRIS be completed?
The promoter's proposed date of completion filed with RERA is 23/02/2028. This is the promoter's declaration, not a guarantee.