Sign in

Avencia

ARR INFRACON · Medchal-Malkajgiri · RERA P02200005028

AVENCIA is a residential apartment project in Bachupally, Bachupally mandal, Medchal-Malkajgiri district, developed by registered promoter ARR INFRACON. The RERA-filed site extent is 7,788.50 sq. m., with Tower A, Tower B, Tower C and an amenities block; Towers A and B have 1 Stilt + 5 upper floors each, Tower C has 1 Cellar + 1 Stilt + 5 upper floors, and the amenities block has 1 Ground + 3 upper floors. The unit table records 79 2BHK homes, 59 3BHK homes, one 2BHJK unit and one 3BHJK unit. TG-RERA registration number P02200005028 was recorded from 13/09/2022 to 16/06/2025, and the proposed completion date is 16/06/2025.

01What we found

Period endedTG-RERA registration ran to 16 Jun 2025 - check its extension on TG-RERA
18documents on file - each fact links to its page
1court case on this project's land (survey 496, Bachupally)
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from estatedekho.comPhoto from navi.com
▦ View all 2 photos
Bachupally, Bachupally, Medchal-Malkajgiri · geocoded — approximate.

1. Project at a glance

Project identity

ItemProject record
Registered project nameAVENCIA RERA record
Project type / useResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied record; the registration concerns AVENCIA on Survey Nos. 496/A/1 and 496/B/1.
TG-RERA registrationP02200005028; Form C states registration from 13/09/2022 to 16/06/2025. The recorded validity end date is not itself evidence of an extension or of current registration status.
Registered promoterARR INFRACON; partnership. RERA record RERA filing Corporate record
RERA status in supplied recordRegistered project; Form C records validity ending 16/06/2025 and says it may be extended by the Authority in accordance with the Act and Rules. No extension is recorded in the supplied certificate.

Land and geographic identity

ItemProject record
Locality / revenue villageBachupally RERA record RERA filing
Mandal / district / PINBachupally mandal; Medchal-Malkajgiri district; 500090 RERA record
Project survey numbers and subdivisions496/A/1 AND 496/B/1 RERA filing
RERA-filed site extent7,788.50 sq. m. total and net area; affected area for road widening/FTL/Nala widening is filed as 0. RERA filing
Boundaries filedEast: WIDE ROAD; West, North and South: OTHERS LAND RERA filing

Development identity

ItemProject record
Principal building-permit authority and numberBuilding Permit Order issued by Nizampet Municipal Corporation, with reference to HMDA proceedings; approval no. 003631/BP/HMDA/0652/MED/2022, dated 16 June 2022. Approvals record
Approved development arrangementThree residential towers—Tower A, Tower B and Tower C—and A (Amenities Block). The permit describes Tower A and B as 1 Stilt + 5 upper floors each, Tower C as 1 Cellar + 1 Stilt + 5 upper floors, and the amenities block as 1 Ground + 3 upper floors.
Approved built-up areaPermit parameters state Total built up area: 68,248.00 Sq.mts. The same document separately lists 23,184.34 Sq.mts. for each of the four blocks; these are reported as recorded, without reconciling the figures here.
HeightPermit parameter states Height of the building: 14.75; the unit is not specified in the supplied extraction.
UnitsRERA unit table records 144 total units, including 4 Club House entries that are not homes for sale; it also records 79 2BHK, 59 3BHK and two unclassified labels, 2BHJK and 3BHJK, with one unit each. RERA unit table RERA unit table
Parking levelsThe permit identifies a cellar in Tower C and stilts in Towers A, B and C, and requires approved cellar/stilt parking areas to be used exclusively for vehicle parking. Parking-space counts are not provided in the supplied record.

Offering and status

ItemProject record
RERA-filed homes79 2BHK homes and 59 3BHK homes; each configuration is recorded as having zero booked and all units available in the portal data supplied. Two further units are filed as 2BHJK and 3BHJK, each with zero booked and one available; their configuration labels are reproduced as filed and are not interpreted here. RERA unit table RERA unit table
RERA-filed saleable area2BHK: 115.87 sq. m.; 3BHK: 142.47 sq. m.; 2BHJK: 114.73 sq. m.; 3BHJK: 144.0 sq. m. RERA unit table RERA unit table
Booking-data contextThe supplied portal counts have no as-of date, so booked/available figures are indicative, not a dated live inventory confirmation. RERA unit table
Completion dateThe Form B declaration gives the promoter’s completion undertaking as 16 June 2025. The project header also records proposed completion 16/06/2025. RERA record
Construction stage / completionThe supplied project documents do not establish the present construction stage. The building permit extract states that it does not certify completion.
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project evidence. The permit says an occupancy certificate is required before occupation.

2. The project story

AVENCIA is a RERA-registered residential apartment project in Bachupally, on the registered land identified as Survey Nos. 496/A/1 and 496/B/1. The filed site extent is 7,788.50 sq. m. The permit describes a four-block arrangement: three residential towers and one amenities block. RERA record RERA filing

The RERA filing lists 2BHK and 3BHK homes, as well as two additional units under the unclassified labels 2BHJK and 3BHJK. It separately includes four Club House entries in the unit table; these are common-area entries, not homes offered for sale. Portal booking and availability figures are recorded without an as-of date. RERA unit table RERA unit table

The promoter’s declared completion date was 16 June 2025. The supplied evidence does not establish current construction progress or that any tower or common facility has been completed or received an occupancy certificate; the building permit is permission to build, not a completion certificate.

3. Master plan, architecture & building design

The building permit identifies a site extent of 7,788.50 Sq. Mt. and a development comprising Towers A, B and C plus an amenities block. The approved floor descriptions are 1 Stilt + 5 upper floors for Towers A and B, 1 Cellar + 1 Stilt + 5 upper floors for Tower C, and 1 Ground + 3 upper floors for the amenities block.

The permit’s stated total built-up area is 68,248.00 Sq.mts. It also lists 23,184.34 Sq.mts. against each of the four blocks. The supplied extract does not explain how those block figures relate to the stated total, so they are retained as recorded rather than combined or recalculated. No separate FSI-counted area, building-footprint area, or tower-height unit is established in the supplied record.

The permit records a provided mortgage area of 1,856.64 Sq.mts. and a required mortgage area of 6,824.80 Sq.mts. It also states that cellar and stilt areas approved for parking must be used exclusively for parking.

The available floor-plan drawing set is identified as approved floor-plan drawings in the measurement data. Software analysis measured two drawings, including 32 2BHK and 18 3BHK flat designs; these measurements are drawing-based, not RERA disclosures. The supplied material does not set out reliable details of tower-specific flat counts per floor, lifts, stairs, entries, internal circulation, landscaping area or phase organization. Floor plans RERA unit details

4. Homes, configurations & floor plans

RERA-filed saleable areas and unit counts are presented below. Drawing-derived carpet measurements are software-measured from the supplied floor-plan drawing geometry; they are not RERA-filed figures and are noted as requiring review. Saleable area is a different measure and includes the home’s share of common areas according to the supplied measurement caveat. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK79079115.87 sq. m.78.8–91.4 sq. m.; median 81.3 sq. m.30%
3BHK59059142.47 sq. m.100.9–106.7 sq. m.; median 103.6 sq. m.27%
Filed as 2BHJK101114.73 sq. m.Not established for this filed configurationNot supplied
Filed as 3BHJK101144.0 sq. m.Not established for this filed configurationNot supplied

The drawing analysis measured one 1BHK design at 75.1 sq. m. carpet area, but 1BHK is not listed as a configuration in the supplied RERA unit table. It is therefore not included as a RERA-filed sale offering. RERA unit details Floor plans

One example 2BHK drawing identifies a bedroom, living area, dining area, kitchen, two toilets, balcony and utility. One example 3BHK drawing identifies bedrooms, a master bedroom, living/dining, kitchen, toilets, balcony and utility. These are drawing-specific examples, not a representation that every unit has the same arrangement. RERA unit details

5. Parking & vehicle circulation

The permit describes a cellar in Tower C and stilt levels in Towers A, B and C. It states that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking and not converted or misused. The supplied evidence does not establish the number of parking spaces, visitor or accessible provision, parking allocation to individual homes, or any EV-charging provision.

The permit calls for the minimum approach-road width indicated in the approved plan and states that the road is to be developed and maintained as a black-topped road with a proper centre before release of occupancy certificate. A stated road-width figure of 4.5mts. also appears in the permit extraction; the supplied data does not clarify its precise scope.

6. Amenities, recreation & open spaces

The RERA amenity table lists the following as available: “YES.” The progress percentage supplied for these entries is 0; this is not evidence that the facilities are complete. The building permit separately requires or identifies some site services, noted below where relevant. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal Roads & FootpathsSize not suppliedRERA amenity table RERA amenitiesAvailable: YES; progress 0; completion not verified
Green Strip/TOT LOT/ParkSize not suppliedRERA amenity table RERA amenitiesAvailable: YES; progress 0; completion not verified
Community BuildingsSize not suppliedRERA amenity table; permit identifies an amenities block RERA amenitiesAvailable: YES; progress 0; completion not verified
Aggregate area of recreational Open SpaceArea not suppliedRERA amenity table RERA amenitiesAvailable: YES; progress 0; completion not verified

The supplied RERA amenity table does not identify specific clubhouse rooms, sports facilities, play equipment, or individual recreation features and sizes. No independent completion verification is supplied.

7. Utilities, building services & safety

The RERA amenity table marks Water Supply, Sewerage (Chamber, Lines, Septic Tank, STP), Storm Water Drains, Treatment And Disposal Of Sewage And Sullage Water, Solid Waste Management And Disposal, Water Conservation, Rain water Harvesting, Fire Protection And Fire Safety Requirements, and Electrical Meter Room, Sub-Station, Receiving Station as available: “YES.” It gives 0 progress for these entries; the data does not establish installation or operational status. RERA amenities

The building permit specifically identifies STP, Transformer and Garbage house among amenities/utilities, and requires rainwater-harvesting structures and an STP as per standard specification. It also requires a completion notice and occupancy certificate after construction, and states that an occupancy certificate is compulsory before occupation. These are permit provisions, not evidence that the works have been completed or that statutory clearances have been issued.

The supplied records do not state water sources or storage capacity, STP capacity or treated-water reuse arrangements, transformer capacity, power-backup provision, lift count or capacity, fire-system details, waste segregation arrangements, CCTV/security systems, or accessibility provisions. RERA amenities

8. Location, access & connectivity

The registered location is Bachupally, Bachupally mandal, Medchal-Malkajgiri district, Telangana, PIN 500090. The RERA filing records the eastern boundary as a WIDE ROAD; the permit refers to an approach road and requires it to be black-topped before occupancy-certificate release. RERA record RERA filing

The supplied location record gives these measured distances:

Nearby place / transportDistance
Nearest Metro: Miyapur5.1 km
New Mallampet Bus Stop2.0 km
Sri Chaitanya Jr. College0.5 km
Sri Swastik Multispeciality Hospital0.3 km
Dr. Reddy's Laboratories Limited1.7 km
PPZ Park0.3 km
Silver Oaks0.2 km
“natonal bank” (as recorded)0.2 km

These are distances in the supplied location dataset; no travel times or independent route verification are provided. Location record

9. Developer & development status

The RERA-registered promoter is ARR INFRACON, recorded as a partnership, with GSTIN 36ABTFA7767L1ZH. The supplied promoter record identifies VENKATA RAMI REDDY ALLU as authorized signatory and lists SRINIVASA REDDY D, JANARDHANA REDDY VENNA and RAMANA REDDY ALLU as partners. RERA filing Corporate record Parties record

The Form B affidavit is made by VENKATA RAMI REDDY ALLU as authorized signatory for ARR INFRACON, dated 07.7.2022 at Hyderabad. It declares a legal-title basis and states that the land is free from encumbrances; these are promoter declarations in the filed affidavit. It gives the completion undertaking as 16 June 2025.

The supplied evidence does not establish the promoter’s current construction progress, a revised completion date, or current occupancy-certificate status. The building permit identifies the owner/applicant as GARUDA ENGINEERS PVT LTD and ARR INFRACON as developer through a DAGPA arrangement; the legal effect and title questions are addressed in the Land & Title section.

10. Approvals, official records & documents

RecordDetails evidenced
TG-RERA registration certificateForm C for AVENCIA, registration P02200005028, issued 13/09/2022; recorded validity through 16/06/2025. No extension is recorded in the supplied certificate.
Building Permit OrderNizampet Municipal Corporation; approval/application no. 003631/BP/HMDA/0652/MED/2022; proceedings no. 000959/BP/HMDA/MED/2022; dated 16 June, 2022. Covers Survey Nos. 496/A/1 and 496/B/1, Bachupally.
Building-permit scopeThree residential towers and an amenities block, with floor descriptions and permit conditions summarized above. The document states that it does not certify completion or confer ownership rights.
Form B declarationPromoter affidavit by VENKATA RAMI REDDY ALLU for ARR INFRACON, verified at Hyderabad on 07.7.2022; includes title-basis, encumbrance, completion and project-fund declarations.
Occupancy/completion evidenceNo occupancy or completion certificate is included in the supplied project documents. The building permit requires an occupancy certificate before occupation.
Approved layout recordNo approved layout plan is available in the supplied document extracts. The listed layout-plan submission item is not extracted as an approval document. Document index

The supplied project extracts do not establish current portal registration status, a registration extension, current construction progress, or an occupancy certificate.

Frequently asked questions

Is AVENCIA registered with Telangana RERA?

Yes. AVENCIA is registered with the Telangana Real Estate Regulatory Authority as P02200005028; the registration status is New Project.

Who is the developer of AVENCIA?

The promoter named in the RERA registration is ARR INFRACON.

Where is AVENCIA located?

AVENCIA is in BACHUPALLY, Medchal-Malkajgiri, Telangana (500090).

When will AVENCIA be completed?

The promoter's proposed date of completion filed with RERA is 16/06/2025. This is the promoter's declaration, not a guarantee.

More projects in Bachupally