SUJAY SIERRA is a residential apartment project in Bachupally, Bachupally mandal, Medchal-Malkajgiri district, developed by registered promoter S S K BUILDERS. The project is on 9510.02 sq.m. and comprises two residential blocks with Cellar + Stilt + 8 upper floors and a separate amenities block with Cellar + Ground + 3 upper floors. It has 224 homes in 2BHK and 3BHK configurations. Its TG-RERA registration is P02200005325, and the promoter’s declared completion target is 12/09/2028.

More from S S K Builders · 2 projects →

01What we found

RegisteredTG-RERA - valid till 12 Sep 2028
35documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from sujayinfra.comPhoto from sujay-sierra.com
▦ View all 2 photos
Bachupally, Bachupally, Medchal-Malkajgiri · geocoded — approximate.

1. Project at a glance

Project identity

ItemProject record
Registered project nameSUJAY SIERRA RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionNot separately identified; the RERA filing and HMDA approval describe the project on Survey Nos. 59 and 58. RERA record
TG-RERA registrationP02200005325 RERA record
Registration validity23 November 2022 to 12 September 2028, as stated in the registration certificate; this is the registration-validity period, not a possession or construction deadline.
Registered promoterS S K BUILDERS, a partnership, as recorded in the project filing. RERA filing Parties record
RERA status in supplied recordNew Project; registration certificate issued. RERA record

Land and geographic identity

ItemProject record
Locality / revenue villageBachupally; the filing identifies the village as Bachupally. RERA record RERA filing
MandalBachupally RERA record
DistrictMedchal-Malkajgiri RERA record
PIN500090 RERA record
Project survey numbersSurvey No. 59 and Survey No. 58; no project subdivision is stated in the supplied filing. RERA filing
Registered site extent9510.02 sq.m. in the HMDA technical approval and RERA land details. RERA filing
Total / net areaTotal area: 9510.02 sq.m.; net area: 9510.02 sq.m. RERA filing
Boundaries recorded in RERA filingEast: neighbours’ land; west: 40 - 0 wide road; north: land belongs to Smt. A. Shalini Reddy; south: neighbours’ land. RERA filing

Development identity

ItemProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA)
Principal approval003092/BP/HMDA/0557/MED/2022, approved 12-09-2022 Approvals record
Approved built-up area30580.68 sq.m., as recorded in the RERA project information. RERA filing
Approved building arrangementThree blocks: Block 1 and Block 2 are residential; a separate amenities block is also shown in the HMDA approval.
Sanctioned floor configurationBlocks 1 and 2: Cellar + Stilt + 8 upper floors. Amenities block: Cellar + Ground + 3 upper floors.
ParkingHMDA approval records parking area of 11751.80 sq.m. and requires approved cellar and stilt floors to be used for parking; a bay count and unit-specific allocation are not supplied.
Approved versus RERA-declared unitsHMDA/RERA land details state 3 building units. The RERA unit schedule separately lists 224 homes in 2BHK and 3BHK configurations, plus 3 rows labelled as floors rather than homes for sale. RERA filing RERA unit table

Offering and status

ItemProject record
Home configurations2BHK and 3BHK RERA unit table
RERA-filed saleable area2BHK: 119.69–123.56 sq.m.; 3BHK: 155.01 sq.m. RERA unit table
Booked / availablePortal-read schedule shows 0 booked and 104 available 2BHKs, and 0 booked and 120 available 3BHKs. Counts are indicative: the supplied portal record has no as-of date. RERA unit table
Construction stageNo independently verified site-progress measurement is supplied. The RERA filing describes the project as “New Project”; the HMDA approval describes the proposed building configuration. RERA record
Completion deadlineThe promoter’s Form B declaration undertakes completion by 12/09/2028.
Occupancy / completion certificateThe supplied HMDA document says occupancy certification is to be sought after construction is completed in accordance with the approved plan; no OC or completion certificate is recorded as issued in the supplied evidence.

2. The project story

Sujay Sierra is a residential apartment development registered with TG-RERA as P02200005325, on the filing’s stated 9510.02 sq.m. site in Bachupally village, Bachupally mandal, Medchal-Malkajgiri district. The registered land description names Survey Nos. 59 and 58. RERA record RERA filing

The HMDA technical approval describes two residential blocks, each with a cellar, stilt and eight upper floors, together with a separate amenities block with a cellar, ground floor and three upper floors. The RERA unit schedule records 104 2BHK and 120 3BHK homes. The project filing also contains three entries labelled “1 ST FLOOR,” “2 ND FLOOR” and “3 RD FLOOR”; these are floor labels, not additional homes on sale. RERA unit table

The available evidence establishes the sanctioned configuration and the promoter’s declared completion undertaking, but does not provide a verified construction-progress assessment or an issued occupancy certificate. The promoter’s Form B states a completion target of 12/09/2028; that target is separate from the registration certificate’s validity end date of 12 September 2028.

3. Master plan, architecture & building design

The HMDA approval is for a three-block multi-storied residential proposal on Survey Nos. 59 and 58, Bachupally, with a stated site extent and net site area of 9510.02 sq.m. The RERA filing records approved built-up area of 30580.68 sq.m.; this is the filed approved built-up figure and is not a carpet-area or saleable-area measurement. RERA filing

Approved elementConfiguration / recorded figure
Block 1Residential; Cellar + Stilt + 8 upper floors
Block 2Residential; Cellar + Stilt + 8 upper floors
Amenities blockCellar + Ground + 3 upper floors
Site area9510.02 sq.m.
Approved built-up area30580.68 sq.m. RERA filing
Parking area11751.80 sq.m.
Tot-lot area952.35 sq.m.

The supplied approval extract does not give a detailed floor-by-floor apartment distribution, building footprints, lift or stair counts, internal circulation drawings, or a measured open-space plan. The supplied floor-plan set contains 23 drawings, but all 23 are recorded as scans pending measurement; no drawing-based carpet-area or room-dimension measurements are available. Floor plans

The approval requires the cellar and stilt floors to be used for parking and identifies the tot-lot/open space as greenery. It also names provisions such as a transformer, garbage house and sewage treatment plant. These are approval conditions or recorded provisions; the evidence supplied does not establish their completion.

4. Homes, configurations & floor plans

TG-RERA records 224 homes across the two filed configurations. Its unit schedule shows 0 booked in each configuration when last read, but the record has no as-of date, so availability should be confirmed directly before relying on it. RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK1040104119.69–123.56 sq.m.Not available; 23 drawings remain unmeasured scans.Not supplied
3BHK1200120155.01 sq.m.Not available; 23 drawings remain unmeasured scans.Not supplied

The 2BHK filing includes two recorded area values: 103 units at 119.69 sq.m. and one 2BHK entry at 123.56 sq.m. The three additional schedule rows labelled “1 ST FLOOR,” “2 ND FLOOR” and “3 RD FLOOR” are floor labels, not homes counted in the 224-home configuration total. RERA unit table RERA unit table

The RERA saleable-area figures should not be read as carpet area. No software-measured carpet areas, room dimensions or configuration-specific floor-plan comparisons are available in the supplied drawing data. Floor plans

5. Parking & vehicle circulation

The HMDA approval records a parking area of 11751.80 sq.m. and requires the approved cellar and stilt floors to be used for parking. The approval also states that visitor parking must be used for its designated purpose and not misused or sold.

The evidence does not provide a count of car or two-wheeler spaces, accessible or visitor-bay quantities, parking levels by individual block, ramp or driveway details, EV charging, or unit-specific parking allocations. A parking-area figure does not establish the number of bays or exclusive parking rights for a particular apartment.

6. Amenities, recreation & open spaces

The project filing lists 14 amenity/infrastructure categories. The percentages supplied for these categories are 0%; “YES” entries indicate availability as recorded in the portal, not independently verified completion. The HMDA approval separately specifies a tot-lot area and certain site provisions. RERA amenities

Internal roads & footpaths
Description / sizeNo size supplied
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified status0%; completion not verified
Green strip / tot-lot / park
Description / sizeHMDA approval records tot-lot area of 952.35 sq.m. and requires open space to be maintained as greenery.
Evidence sourceApproval and RERA amenity schedule RERA amenities
Declared progress / verified statusRERA schedule: 0%; delivery not independently verified
Community buildings
Description / sizeSeparate amenities block: Cellar + Ground + 3 upper floors; no facility-by-facility contents or area supplied.
Evidence sourceHMDA approval
Declared progress / verified statusBuilding configuration sanctioned; completion not verified
Water conservation / rainwater harvesting
Description / sizeRERA schedule records “YES”; HMDA approval requires rainwater-harvesting structures. RERA amenities
Evidence sourceRERA schedule and approval RERA amenities
Declared progress / verified statusRERA schedule: 0%; completion not verified
Sewerage / treatment and disposal
Description / sizeRERA schedule records water supply and sewerage/STP as “YES”; HMDA approval names an STP. RERA amenities
Evidence sourceRERA schedule and approval RERA amenities
Declared progress / verified statusRERA schedule: 0%; completion not verified
Storm-water drains
Description / sizeListed in RERA schedule; HMDA approval refers to storm-water drains. RERA amenities
Evidence sourceRERA schedule and approval RERA amenities
Declared progress / verified statusRERA schedule: 0%; completion not verified
Electrical meter room / sub-station / receiving station
Description / sizeRERA schedule records “YES”; HMDA approval requires a transformer. RERA amenities
Evidence sourceRERA schedule and approval RERA amenities
Declared progress / verified statusRERA schedule: 0%; completion not verified
Solid-waste management and disposal
Description / sizeListed in RERA schedule; HMDA approval requires a garbage house and refuse chute.
Evidence sourceRERA schedule and approval
Declared progress / verified statusRERA schedule: 0%; completion not verified
Street lighting, energy management, fire safety
Description / sizeListed in the RERA amenity schedule; no facility dimensions or completion evidence supplied. RERA amenities
Evidence sourceRERA schedule RERA amenities
Declared progress / verified status0%; completion not verified
Sports, clubhouse and leisure facilities
Description / sizeNo such facilities are established by the project-specific approval or RERA amenity schedule supplied.
Evidence sourceProject-specific records RERA amenities
Declared progress / verified statusNot established in supplied project evidence

7. Utilities, building services & safety

The RERA amenity schedule records water supply, sewerage/STP, storm-water drains, rainwater harvesting and the electrical meter room/sub-station/receiving station as “YES.” Its progress percentages are 0%, so these entries do not establish completed facilities. RERA amenities

The HMDA approval names a transformer, garbage house and sewage treatment plant; requires bulk-supply arrangements to be taken up with HMWS & SB; and includes conditions concerning rainwater harvesting, storm-water drainage, solar water heating, outdoor solar lighting, fire-service and airport clearances, and construction safety. These are approval provisions or conditions, not evidence that the systems have been installed, commissioned or independently inspected.

No project-specific verified capacities are supplied for water storage, STP, electrical backup, lifts, fire systems or waste handling. The vendor’s general listing of features is not treated here as a RERA-filed or independently verified project specification. Floor plans RERA amenities

8. Location, access & connectivity

The registered project location is Bachupally, Bachupally mandal, Medchal-Malkajgiri district, PIN 500090, on Survey Nos. 59 and 58. The project boundary information records a 40 - 0 wide road on the west, neighbours’ land to the east and south, and land belonging to Smt. A. Shalini Reddy to the north. RERA record RERA filing

The cadastral parcel centroid is recorded at 17.54099, 78.36879. The supplied location data gives one measured connectivity distance: HITEC City — 10.9 km. No verified public-transport, road-route or travel-time information is supplied. Cadastral map Location record

9. Developer & development status

The registered promoter is S S K BUILDERS, recorded as a partnership, with GSTIN 36AEBFS0090P1ZP. The RERA filing lists its address as Shubha S K Apartments, Gowlidoddi, Bachupally, Medchal-Malkajgiri, Telangana 500090. The supplied information does not include a verified official website or project contact details. RERA filing Parties record Corporate record

The promoter’s Form B declaration, made by authorized signatory Kunam Subba Reddy, states a completion undertaking of 12/09/2028 and describes the promoter’s declared title basis, separate-account and audit commitments, and pending-approvals undertaking. This is a promoter declaration, not an independent construction-progress certification.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200005325; issued 23/11/2022
What the supplied evidence establishesFORM ‘C’ records registration of SUJAY SIERRA under section 5 and states validity through 12/09/2028.
HMDA technical building approval
Identifier / date003092/BP/HMDA/0557/MED/2022; 12-09-2022
What the supplied evidence establishesTechnical approval for a three-block multi-storied residential proposal on Survey Nos. 59 and 58, with listed conditions.
Promoter Form B declaration
Identifier / dateDocument 263753
What the supplied evidence establishesPromoter declaration on title basis, encumbrance status, fund handling, audit and completion undertaking.
Floor-plan drawing set
Identifier / date23 drawings; 23 scans pending measurement Floor plans
What the supplied evidence establishesNo software-measured carpet areas or room dimensions are available in the supplied record. Floor plans
Occupancy / completion certificate
Identifier / dateNot supplied as issued
What the supplied evidence establishesThe HMDA approval describes OC as to be sought after completion and compliance; no issued certificate appears in the evidence provided.

Frequently asked questions

Is SUJAY SIERRA registered with Telangana RERA?

Yes. SUJAY SIERRA is registered with the Telangana Real Estate Regulatory Authority as P02200005325; the registration status is New Project.

Who is the developer of SUJAY SIERRA?

The promoter named in the RERA registration is S S K BUILDERS.

Where is SUJAY SIERRA located?

SUJAY SIERRA is in BACHUPALLY, Medchal-Malkajgiri, Telangana (500090).

When will SUJAY SIERRA be completed?

The promoter's proposed date of completion filed with RERA is 12/01/2029. This is the promoter's declaration, not a guarantee.