GAMUT s GATEWAY BHASKARA is a residential apartment project in Ameenapur, Ameenpur Mandal, Sangareddy District, developed by the registered promoter GAMUT INDIA PROJECTS, a partnership. The project covers 1,513.93 Sq. Mt. and has one building with 1 Cellar + 1 Stilt + 5 upper floors. It comprises 30 homes: 10 2BHK and 20 3BHK apartments. Its TG-RERA registration number is P01100005445, and the promoter’s declared completion date is 19/07/2025.

More from Gamut India Projects · 3 projects →

01What we found

Period endedTG-RERA registration ran to 19 Jul 2025 - check its extension on TG-RERA
14documents on file - each fact links to its page
0court cases on this project's land in the court records searched
12items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

12 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameGAMUT s GATEWAY BHASKARA RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionNo phase name or separate phase scope is stated in the supplied record. The registration covers the project associated with Survey No. 343/16.
TG-RERA registrationP01100005445
Registration validityIssued 07/12/2022; certificate states valid through 19/07/2025 for “2 years.” No extension is recorded in the supplied certificate. Registration validity is separate from the stated completion deadline.
Registered promoterGAMUT INDIA PROJECTS, a partnership Corporate record RERA filing
RERA status in supplied recordRERA filing identifies the project as “New Project”; the certificate records the registration dates above. Current registration status is not established by the supplied material. RERA record

Land and geographic identity

FieldRecord
LocalityAmeenpur / Ameenapur, as recorded in the project information RERA record RERA filing
Revenue villageAMEENAPUR in the project identity and land record; the building-permit documents refer to Ameenpur Village. RERA record Land records
Mandal / district / PINAmeenpur Mandal; Sangareddy District; PIN 502032 RERA record
Project survey number(s)343/16 RERA record Land records
Subdivision stated for the projectNo separate subdivision beyond 343/16 is stated in the project filing. Land records
Registered site extent1,513.93 Sq. Mt. RERA filing
Total / net land areaTotal: 1513.93 sq m; net: 1513.93 sq m; road-widening/FTL/Nala-widening area recorded as 0 sq m in the filing. RERA filing
BoundariesNorth: 40 - WIDE ROAD; South: OPEN LAND; East: PART OF THIS OPEN LAND; West: OPEN LAND RERA filing

Development identity

FieldRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); building-permit order records delegation to Ameenpur Municipality / Municipal Corporation Approvals record
Principal building approval001965/BP/HMDA/0336/SKP/2022, approved 19 July, 2022 Approvals record
Related proceedings number001160/BP/HMDA/SKP/2022 Approvals record
Approved built-up areaTotal Built up Area (In Sq.mts) 5,402.77; the approval also lists Proposed Built-up Area 3,467.75. These are figures as stated in the permit extraction and are not interchangeable area measures.
Building countOne building/unit recorded in the project filing RERA filing
Sanctioned floor configuration1 Cellar + 1 Stilt + 5 upper floors
Building height14.5 as extracted in the approval record; the supplied extraction does not state a unit.
Parking level / mortgagePermit requires the cellar/stilt to be used exclusively for vehicle parking. It records 347.11 sq mts of built-up area on the first floor mortgaged to HMDA under document 23518/2022.
Approved versus RERA-declared homesThe project filing records 30 total units: 20 3BHK and 10 2BHK. The supplied approval extraction does not give a separate sanctioned apartment count. RERA unit table RERA filing

Offering and status

FieldRecord
RERA-filed configurations2BHK and 3BHK RERA unit table
RERA-filed saleable areas2BHK: 107.77 sq m; 3BHK: 139.81 sq m RERA unit table
Booked / available2BHK: 0 booked / 10 available; 3BHK: 0 booked / 20 available. The portal-derived counts have no supplied as-of date and are indicative. RERA unit table
Construction stageNo independently verified or dated construction-progress figure is supplied. The RERA amenity record marks water supply, sewerage, storm-water drains, rainwater harvesting and electrical meter/sub-station provision at 100%; those entries are not an independent site inspection. RERA amenities
Completion datePromoter’s Form B declares completion by 19/07/2025; the registration certificate also ends on that date. No revised completion date is supplied.
OC / completion certificateThe building-permit extraction says completion is not certified; no occupancy or completion certificate is supplied for the building. The permit requires an OC before occupation and before delivery of possession.

2. The project story

GAMUT s GATEWAY BHASKARA is registered as a residential apartment project on Survey No. 343/16 in Ameenapur, Ameenpur Mandal, Sangareddy District. Its filed site area is 1513.93 sq m, with a single building recorded in the project information. RERA record RERA filing

The HMDA building-permit record describes a proposed residential building with one cellar, one stilt and five upper floors. The RERA filing lists 30 homes—10 two-bedroom and 20 three-bedroom apartments—with the portal-derived record showing all 30 as available and none booked; that inventory snapshot has no stated as-of date. RERA unit table

The supplied records establish approval and registration, but do not establish independently verified construction progress, completed portions, or an issued OC. The permit requires an occupancy certificate before occupation and possession; the permit extraction itself records that completion is not certified.

3. Master plan, architecture & building design

The available building-permit extraction describes a single residential building on the 1,513.93 sq m site, with 1 Cellar + 1 Stilt + 5 upper floors. It records total built-up area of 5,402.77 sq m and separately lists proposed built-up area of 3,467.75; the latter figure’s unit is not shown in the supplied extracted line. The approval also records a building height of 14.5, without a stated unit.

The extracted material does not provide a reliable account of floor-by-floor apartment arrangement, number of flats per floor, lifts, stairs, building footprint, internal circulation, landscaped open areas, or residential/common-area distribution. A layout document was filed, but its supplied record does not include extracted layout details.

The permit identifies a 4.5-metre road-width entry in its extracted road-width data and requires the approach road indicated in the plan to be developed and maintained as a black-topped road before release of the OC.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK10010107.77 sq m61.7–93.3 sq m; median 83.4 sq m (software-measured)23% (software-measured)
3BHK20020139.81 sq m92.9–111.1 sq m; median 104.7 sq m (software-measured)25% (software-measured)

The unit counts, booking figures and saleable areas are RERA-filed or portal-derived; the booking snapshot has no stated as-of date. Carpet-area ranges and medians were measured by software from approved floor-plan drawings and are not RERA disclosures; the measurements are noted as requiring review. Saleable area includes a home’s share of common areas, so it is not the same measure as carpet area. RERA unit table Floor plans RERA unit details

The drawings include a 2BHK plan showing bedroom, living/drawing room, dining/kitchen, toilets, wash area and a balcony marked 1.02 M. WIDE BALC. A typical 3BHK plan shows three bedrooms, living/dining, kitchen, toilets, wash area and balconies marked 0.66 M. WIDE BALC and 1.50 M. WIDE BALC. These are drawing labels, not a complete specification of every unit. RERA unit details

5. Parking & vehicle circulation

The building approval states that the cellar and stilt are to be used exclusively for vehicle parking, without partition walls or rolling shutters, and that parking or construction must not be placed in setback areas. The approved parking count, visitor or accessible-space provision, two-wheeler count, ramp arrangement, EV charging provision and individual-unit parking allocations are not established in the supplied material. A drawn or designated parking area does not by itself establish exclusive ownership or allocation.

The approval records a 347.11 sq m first-floor built-up area mortgaged to HMDA under deed 23518/2022. The permit states that the mortgaged area may be registered only after an OC is produced.

6. Amenities, recreation & open spaces

The RERA amenity schedule lists the following project items. Percentages are the supplied schedule entries, not independent verification of delivery. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Water supplySize/source/storage not specified in this scheduleRERA amenity scheduleYES; 100% declared; not independently verified
Sewerage (Chamber, Lines, Septic Tank, STP)No size or capacity statedRERA amenity scheduleYES; 100% declared; not independently verified
Storm Water DrainsNo size statedRERA amenity scheduleYES; 100% declared; not independently verified
Water Conservation, Rain water HarvestingNo capacity statedRERA amenity schedule; building-permit conditionsYES; 100% declared; not independently verified
Electrical Meter Room, Sub-Station, Receiving StationNo capacity statedRERA amenity scheduleYES; 100% declared; not independently verified
Internal Roads & FootpathsNo dimensions statedRERA amenity schedule0% recorded
Green Strip/TOT LOT/ParkNo area statedRERA amenity schedule0% recorded
Street LightingNo details statedRERA amenity schedule0% recorded
Community BuildingsNo description or size statedRERA amenity schedule0% recorded
Treatment and Disposal of Sewage and Sullage WaterNo capacity statedRERA amenity schedule0% recorded
Solid Waste Management and DisposalNo details statedRERA amenity schedule0% recorded
Energy managementNo details statedRERA amenity schedule0% recorded
Fire Protection and Fire Safety RequirementsNo systems or details stated in the scheduleRERA amenity schedule0% recorded
Aggregate area of recreational Open SpaceNo area statedRERA amenity schedule0% recorded

The building-permit extraction also requires provision for a transformer, garbage house, STP and rainwater harvesting. The supplied information does not establish their installed condition or capacity.

7. Utilities, building services & safety

The building-permit record specifies water supply, drainage and sewerage disposal; its extracted details list an underground static water storage tank of 25,000 lts. and a terrace tank of 25,000 lts. It also lists an STP, septic tank, transformer, generator, garbage house and rainwater-harvesting structures. These are approval-record provisions, not evidence that the systems are completed or operational.

The permit requires CCTV cameras, rainwater-harvesting structures and an STP, and states that the stilt/cellar is for vehicle parking. It also requires an approach road to be developed before OC release and requires an OC before occupation. The supplied material does not establish lift count or capacity, fire-system details, backup capacity, waste-segregation arrangements, accessibility provisions, or completed safety-system status.

8. Location, access & connectivity

The registered location is AMEENAPUR, Ameenpur Mandal, Sangareddy District, PIN 502032, on Survey No. 343/16. The project record gives a north boundary of 40 - WIDE ROAD; the building approval also refers to a 4.5mts. road-width entry and requires the approach road shown in the plan to be developed and maintained as black-topped before OC release. RERA record RERA filing

A sampled connectivity record places the nearest sampled Outer Ring Road interchange approximately 8.4 km away. This is a measured-data point, not a promoter travel-time claim. No public-transport details or other landmark distances are supplied. Location record

9. Developer & development status

The registered promoter is GAMUT INDIA PROJECTS, recorded as a partnership, with GSTIN 36AANFG1032F2ZP. Its listed address is KNR GAMUT SQUARE, KHANAMET VILLAGE, AMEENPUR, AMEENPUR, AMEENPUR, Sangareddy, 502032. The supplied record identifies KOMALLA PREMCHANDER REDDY as authorized signatory. Corporate record Parties record

In its Form B, the promoter declares that it will complete the project by 19/07/2025, deposit 70% of amounts realised in a separate account for land and construction costs, withdraw funds proportionately to completion following professional certification, and audit the account within six months after each financial year. These are promoter declarations; the supplied records do not establish their subsequent performance.

The registration certificate is valid through 19/07/2025 and no extension is shown in the supplied certificate. No project completion certificate or OC is supplied. The RERA-filed unit record lists 30 apartments, with booking and availability counts indicative because no as-of date is provided. RERA unit table

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01100005445; issued 07/12/2022; stated validity through 19/07/2025
What the supplied document establishesRegistration of GAMUT s GATEWAY BHASKARA under section 5; conditions include separate-account, agreement-for-sale and conveyance requirements.
Building permit / HMDA approval
Identifier / date001965/BP/HMDA/0336/SKP/2022; 19 July, 2022
What the supplied document establishesBuilding approval for a residential building on Survey No. 343/16, extent 1,513.93 Sq. Mt., with 1 Cellar + 1 Stilt + 5 upper floors.
Related approval proceedings
Identifier / date001160/BP/HMDA/SKP/2022
What the supplied document establishesProceedings number recorded in the building-approval extraction. Approvals record
HMDA mortgage recorded in approval
Identifier / date23518/2022; 29 June, 2022
What the supplied document establishesApproval record describes 347.11 sq mts of first-floor built-up area mortgaged to HMDA and specifies the OC condition for registration of that area.
RERA Form B declaration
Identifier / dateForm B by KOMALLA PREMCHANDER REDDY for GAMUT INDIA PROJECTS
What the supplied document establishesPromoter’s declarations concerning title, encumbrances, completion date and project funds.
Floor-plan/layout filing
Identifier / dateDocument 261648
What the supplied document establishesFiled layout/floor-plan document; supplied drawing-derived measurements are separately identified as software-measured, not RERA-filed. Floor plans
Encumbrance-statement uploads
Identifier / dateDocuments 271622 and 274742
What the supplied document establishesSupplied extractions contain no readable property schedule, search period or transaction result; they do not establish an EC result.

The supplied building-approval record states that completion is not certified. No occupancy or completion certificate is included in the reviewed project material.

Frequently asked questions

Is GAMUT s GATEWAY BHASKARA registered with Telangana RERA?

Yes. GAMUT s GATEWAY BHASKARA is registered with the Telangana Real Estate Regulatory Authority as P01100005445; the registration status is New Project.

Who is the developer of GAMUT s GATEWAY BHASKARA?

The promoter named in the RERA registration is GAMUT INDIA PROJECTS.

Where is GAMUT s GATEWAY BHASKARA located?

GAMUT s GATEWAY BHASKARA is in AMEENPUR, AMEENAPUR, Sangareddy, Telangana (502032).

When will GAMUT s GATEWAY BHASKARA be completed?

The promoter's proposed date of completion filed with RERA is 19/07/2025. This is the promoter's declaration, not a guarantee.