Seshadri
JAYA BALAJI NIRMAN · Medchal-Malkajgiri · RERA P02200010489
SESHADRI is a residential apartment project at Plot Nos. 445 and 446, Block No. 21, Lahari Green Park, Bowrampet Village, Dundigal Gandimaisamma Mandal, Medchal-Malkajgiri District. The registered promoter is JAYA BALAJI NIRMAN, partnership. The project covers 445.67 sq. m. and comprises one proposed residential building with 1 stilt + 5 upper floors and 15 2BHK apartments. It is registered under TG-RERA number P02200010489, with a proposed completion date of 08/09/2028.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | SESHADRI RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Phase not separately identified in the supplied record; the registration concerns the project on Plot Nos. 445 and 446, Block No. 21 RERA filing |
| TG-RERA registration number | P02200010489 RERA record |
| Registration validity | 8 May 2025 to 8 May 2028 (three years, unless extended) RERA record |
| Registered promoter | JAYA BALAJI NIRMAN, partnership RERA record RERA filing |
| RERA status | Recorded as an on-going project; the registration certificate is on file RERA record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / site description | Plot Nos. 445 and 446, Block No. 21, Lahari Green Park RERA filing |
| Revenue village | Bowrampet Village RERA record |
| Mandal | Dundigal Gandimaisamma RERA record |
| District | Medchal-Malkajgiri RERA record |
| PIN | 500043 RERA record RERA filing |
| Project survey numbers / subdivisions | 541/A, 542, 543, 545, 546, 547, 548 and 560 RERA record |
| Registered site extent | 445.67 sq. m. RERA filing |
| Total / net land area | Total area 445.67 sq. m.; net area 445.67 sq. m.; recorded affected area 0 sq. m. RERA filing |
| Boundaries | East: Plot Nos. 461 and 462 in Block No. 21; west: 40 feet wide road; north: Plot No. 447 in Block No. 21; south: open space RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA); building-permit order issued by Dundigal Municipality / Municipal Corporation Approvals record |
| Principal approval | Building permission 001481/BP/HMDA/0416/MED/2025, approved 8 May 2025 Approvals record |
| Building count | One proposed residential building |
| Sanctioned configuration | 1 stilt + 5 upper floors; the filed plan describes the fifth floor as TDR |
| Height | Building height recorded as 14.99 m; total height is also stated as 20.49 m in the plan extraction |
| Approved built-up area | 1,238.40 sq. m. excluding parking; 1,486.08 sq. m. including parking |
| Parking provision in the extracted plan | 247.68 sq. m. recorded as parking area; a parking-space count is not supplied |
| Unit counts | 15 units in the RERA configuration record; 15 proposed units in the extracted plan RERA unit table |
Offering and status
| Field | Project record |
|---|---|
| Unit type | 2BHK apartments RERA unit table |
| RERA-filed saleable area | 102.5 sq. m. per unit RERA unit table |
| Booked / available | 3 booked and 12 available, as last read from TG-RERA; the portal record supplied has no as-of date, so counts are indicative RERA unit table |
| Construction stage | RERA status is “On-Going Project”; the supplied evidence does not provide an independently verified site-progress assessment RERA record RERA amenities |
| Completion dates | Promoter-declared completion date: 08/09/2028; Form B undertaking: completion on or before 08/05/2028 RERA record |
| Occupancy certificate | No occupancy certificate is supplied; the building-permit documents state that an OC is required before occupation. The supplied record does not establish an OC for any tower or phase |
2. The project story
SESHADRI is registered as a residential apartment project by JAYA BALAJI NIRMAN. The RERA-filed site is Plot Nos. 445 and 446 in Block No. 21, Lahari Green Park, Bowrampet Village, Dundigal Gandimaisamma Mandal, Medchal-Malkajgiri District. The project land is recorded as 445.67 sq. m. across survey numbers 541/A, 542, 543, 545, 546, 547, 548 and 560. RERA record RERA filing
The building-permit record describes one residential building, with 1 stilt and 5 upper floors, including a fifth floor identified as TDR in the plan extraction. The RERA configuration is 15 two-bedroom apartments. Three are recorded as booked and 12 as available; the portal snapshot has no stated as-of date. RERA unit table
The project is recorded as on-going. The supplied materials do not establish a site-verified construction percentage, completed portion, or occupancy-certified tower or phase. Registration validity, the promoter’s declared completion date and occupancy certification are separate matters; the supplied registration is valid through 8 May 2028, while the header lists completion as 8 September 2028 and the Form B undertaking says on or before 8 May 2028. RERA record
3. Master plan, architecture & building design
- The filed building-permit plan relates to a new residential building on Plot Nos. 445 and 446. It records 445.67 sq. m. as both minimum plot area and net plot area, 1.44 sq. m. as accessory-use area, and 196.55 sq. m. as vacant plot area. The approved built-up area is recorded as 1,238.40 sq. m. excluding parking and 1,486.08 sq. m. including parking; parking area is recorded as 247.68 sq. m. These are plan-extracted figures, not carpet or saleable area.
- The plan describes 1 stilt + 5 upper floors, with a fifth floor identified as TDR. It records a building height of 14.99 m and also states a total height of 20.49 m. Floor levels are listed at +0.00 m, +2.50 m, +5.50 m, +8.50 m, +11.50 m and +14.50 m, with a lift machine room at +17.49 m.
- The building-permit conditions specify stilt/cellar use for parking and require an occupancy certificate before occupation. The supplied plan information does not establish a basement, apartment count per floor beyond the separate unit schedule, lift capacity, stair arrangement, or detailed building circulation. Although road widths and a green strip/passage are mentioned in the plan extraction, a complete site-layout drawing establishing their arrangement is not supplied here.
4. Homes, configurations & floor plans
- The TG-RERA record lists 15 2BHK units, each with saleable area of 102.5 sq. m.; 3 are booked and 12 available in the supplied portal snapshot. RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 15 | 3 | 12 | 102.5 sq. m. | Software-measured range: 55.6–77.3 sq. m.; median 56.0 sq. m. | 45% RERA unit table Floor plans |
- The carpet measurements are software-derived from approved floor-plan drawing geometry, not RERA-filed disclosures, and the supplied analysis says they need review. The drawing-based measurement set covers six flat designs. Saleable area and carpet area are distinct measures; the drawing-analysis note says saleable area includes the home’s share of common areas. A RERA-filed carpet figure is not established in the supplied record. Floor plans RERA unit details
- The extracted typical plan identifies a living/kitchen, two bedrooms, two toilets, a wash area and a utility area. For the measured example, the utility is marked excluded from carpet area. The sample room dimensions are drawing measurements, not independent site measurements. RERA unit details
5. Parking & vehicle circulation
- The plan extraction records 247.68 sq. m. of parking area and states that the stilt/cellar floor is to be used for parking. The building-permit condition also says the approved stilt/cellar parking is to remain exclusively for vehicle parking. No number of parking spaces, resident or visitor allocation, accessible-parking count, ramp arrangement, or unit-specific parking allocation is established in the supplied evidence. A drawn parking provision does not establish exclusive ownership or allocation to a particular apartment.
- The building-permit record lists Electric Vehicle Charging Infrastructure as a project provision, and the plan conditions refer to EV charging requirements. The supplied evidence does not specify charger count, capacity, locations, or completion status.
6. Amenities, recreation & open spaces
The RERA progress record gives percentages for listed common infrastructure and amenities. These are declared progress figures, not independent verification of completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Water supply | Size, source and storage details not established in this progress table | RERA amenities | Available: YES; 10% declared progress |
| Sewerage (chamber, lines, septic tank, STP) | Size and capacity not supplied | RERA amenities | Available: YES; 10% declared progress |
| Green strip / tot lot / park | Size and detailed layout not supplied | RERA amenities | Available: YES; 10% declared progress |
| Water conservation / rainwater harvesting | Capacity and system details not supplied | RERA amenities | Available: YES; 10% declared progress |
| Electrical meter room / sub-station / receiving station | Equipment capacity not supplied | RERA amenities | Available: YES; 10% declared progress |
| Internal roads and footpaths | Details not supplied | RERA amenities | 0% declared progress |
| Storm-water drains | Details not supplied | RERA amenities | 0% declared progress |
| Street lighting | Details not supplied | RERA amenities | 0% declared progress |
| Community buildings | No size or facility details supplied | RERA amenities | 0% declared progress |
| Treatment and disposal of sewage and sullage water | Treatment/reuse details not supplied | RERA amenities | 0% declared progress |
| Solid-waste management and disposal | Details not supplied | RERA amenities | 0% declared progress |
| Energy management | Details not supplied | RERA amenities | 0% declared progress |
| Fire protection and fire-safety requirements | System details not supplied | RERA amenities | 0% declared progress |
| Aggregate recreational open space | Area not supplied | RERA amenities | 0% declared progress |
No clubhouse, indoor recreation, sports facility, or independently verified completed amenity is evidenced in the supplied amenity record.
7. Utilities, building services & safety
- The building-permit documents list an STP, transformer, garbage house, rainwater-harvesting structures and EV charging infrastructure. They also specify a 25,000-litre underground static water-storage tank and a separate 25,000-litre terrace tank. These are approval-document provisions; the supplied evidence does not establish installation, commissioning or operating status.
- The plan extraction also lists a sump, septic tank, lift and STP, and states that the developer should construct the sump, septic tank and underground drainage. No lift capacity, number of lifts, water source, STP capacity, sewage-reuse arrangement, backup-power capacity, CCTV/security provision, or accessibility details are supplied.
- The building-permit order places responsibility for structural and fire-safety requirements on the owner, builder/developer, architect and structural engineer. The plan conditions include sprinkler provision if basement area exceeds 200 sq. m. and require electrical fire-safety certification. These are recorded conditions, not evidence that the systems have been installed or that statutory clearances have been obtained.
8. Location, access & connectivity
- The registered project location is Bowrampet Village, Dundigal Gandimaisamma Mandal, Medchal-Malkajgiri District, Telangana 500043; the site is identified as Plot Nos. 445 and 446, Block No. 21, Lahari Green Park. RERA record RERA filing
- The plan extraction refers to existing and proposed 12.00 m-wide roads and also records a 12 m-wide road. The building-permit order requires the approach road indicated in the plan to be developed and maintained as a black-topped road before occupancy. A supplied location record places the nearest sampled Outer Ring Road interchange approximately 11.1 km away; no travel time is supplied. Location record
9. Developer & development status
The registered promoter is JAYA BALAJI NIRMAN, identified in the RERA filing as a partnership, with GSTIN 36AASFJ6958Q1Z2. Its project address in the supplied filing is Plot No. 142, Sy. No. 25 Part, Vaishali Nagar, Bowrampet Village, under Dundigal Municipality, Medchal-Malkajgiri District, Telangana 500043. The supplied evidence does not provide an official contact number, email address or website. RERA filing RERA filing Corporate record
The Form B declaration, dated 6 January 2026, undertakes completion on or before 8 May 2028. The project header separately records a proposed and revised completion date of 8 September 2028. The supplied documents do not provide an independently verified construction-progress assessment, and no OC is supplied. RERA record
10. Approvals, official records & documents
| Identifier / date | P02200010489; valid 8 May 2025–8 May 2028 |
|---|---|
| What the supplied record establishes | Certificate for SESHADRI, naming JAYA BALAJI NIRMAN as promoter and identifying the registered location and survey numbers. |
| Identifier / date | 001481/BP/HMDA/0416/MED/2025; 8 May 2025 |
|---|---|
| What the supplied record establishes | Technical approval for a proposed residential building on Plot Nos. 445 and 446, with specified plans, conditions and HMDA mortgage requirements. |
| Identifier / date | 001481/BP/HMDA/0416/MED/2025; 8 May 2025 |
|---|---|
| What the supplied record establishes | Permit order for the proposed 1-stilt-plus-5-upper-floor residential building; it requires an occupancy certificate before occupation. |
| Identifier / date | Drawing and plan extraction, doc. 641140 |
|---|---|
| What the supplied record establishes | Extracted plan data for the proposed building, site extent, floors, area figures, parking and stated conditions. The supplied record does not establish a separate approved-layout certificate. |
| Identifier / date | 6 January 2026 |
|---|---|
| What the supplied record establishes | Promoter affidavit identifying the land and recording title, encumbrance and completion declarations. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No project OC or completion certificate is established in the supplied documents. |
| Identifier / date | Not established in the supplied material |
|---|---|
| What the supplied record establishes | No project-specific clearance record is supplied for this overview. |
1. Project at a glance
Project identity
Registered project name: SESHADRI
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified in the supplied record; the registration concerns the project on Plot Nos. 445 and 446, Block No. 21
TG-RERA registration number: P02200010489
Registration validity: 8 May 2025 to 8 May 2028 (three years, unless extended)
Registered promoter: JAYA BALAJI NIRMAN, partnership
RERA status: Recorded as an on-going project; the registration certificate is on file
Land and geographic identity
Locality / site description: Plot Nos. 445 and 446, Block No. 21, Lahari Green Park
Revenue village: Bowrampet Village
Mandal: Dundigal Gandimaisamma
District: Medchal-Malkajgiri
PIN: 500043
Project survey numbers / subdivisions: 541/A, 542, 543, 545, 546, 547, 548 and 560
Registered site extent: 445.67 sq. m.
Total / net land area: Total area 445.67 sq. m.; net area 445.67 sq. m.; recorded affected area 0 sq. m.
Boundaries: East: Plot Nos. 461 and 462 in Block No. 21; west: 40 feet wide road; north: Plot No. 447 in Block No. 21; south: open space
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA); building-permit order issued by Dundigal Municipality / Municipal Corporation
Principal approval: Building permission 001481/BP/HMDA/0416/MED/2025, approved 8 May 2025
Building count: One proposed residential building
Sanctioned configuration: 1 stilt + 5 upper floors; the filed plan describes the fifth floor as TDR
Height: Building height recorded as 14.99 m; total height is also stated as 20.49 m in the plan extraction
Approved built-up area: 1,238.40 sq. m. excluding parking; 1,486.08 sq. m. including parking
Parking provision in the extracted plan: 247.68 sq. m. recorded as parking area; a parking-space count is not supplied
Unit counts: 15 units in the RERA configuration record; 15 proposed units in the extracted plan
Offering and status
Unit type: 2BHK apartments
RERA-filed saleable area: 102.5 sq. m. per unit
Booked / available: 3 booked and 12 available, as last read from TG-RERA; the portal record supplied has no as-of date, so counts are indicative
Construction stage: RERA status is “On-Going Project”; the supplied evidence does not provide an independently verified site-progress assessment
Completion dates: Promoter-declared completion date: 08/09/2028; Form B undertaking: completion on or before 08/05/2028
Occupancy certificate: No occupancy certificate is supplied; the building-permit documents state that an OC is required before occupation. The supplied record does not establish an OC for any tower or phase
2. The project story
SESHADRI is registered as a residential apartment project by JAYA BALAJI NIRMAN. The RERA-filed site is Plot Nos. 445 and 446 in Block No. 21, Lahari Green Park, Bowrampet Village, Dundigal Gandimaisamma Mandal, Medchal-Malkajgiri District. The project land is recorded as 445.67 sq. m. across survey numbers 541/A, 542, 543, 545, 546, 547, 548 and 560.
The building-permit record describes one residential building, with 1 stilt and 5 upper floors, including a fifth floor identified as TDR in the plan extraction. The RERA configuration is 15 two-bedroom apartments. Three are recorded as booked and 12 as available; the portal snapshot has no stated as-of date.
The project is recorded as on-going. The supplied materials do not establish a site-verified construction percentage, completed portion, or occupancy-certified tower or phase. Registration validity, the promoter’s declared completion date and occupancy certification are separate matters; the supplied registration is valid through 8 May 2028, while the header lists completion as 8 September 2028 and the Form B undertaking says on or before 8 May 2028.
3. Master plan, architecture & building design
- The filed building-permit plan relates to a new residential building on Plot Nos. 445 and 446. It records 445.67 sq. m. as both minimum plot area and net plot area, 1.44 sq. m. as accessory-use area, and 196.55 sq. m. as vacant plot area. The approved built-up area is recorded as 1,238.40 sq. m. excluding parking and 1,486.08 sq. m. including parking; parking area is recorded as 247.68 sq. m. These are plan-extracted figures, not carpet or saleable area.
- The plan describes 1 stilt + 5 upper floors, with a fifth floor identified as TDR. It records a building height of 14.99 m and also states a total height of 20.49 m. Floor levels are listed at +0.00 m, +2.50 m, +5.50 m, +8.50 m, +11.50 m and +14.50 m, with a lift machine room at +17.49 m.
- The building-permit conditions specify stilt/cellar use for parking and require an occupancy certificate before occupation. The supplied plan information does not establish a basement, apartment count per floor beyond the separate unit schedule, lift capacity, stair arrangement, or detailed building circulation. Although road widths and a green strip/passage are mentioned in the plan extraction, a complete site-layout drawing establishing their arrangement is not supplied here.
4. Homes, configurations & floor plans
- The TG-RERA record lists 15 2BHK units, each with saleable area of 102.5 sq. m.; 3 are booked and 12 available in the supplied portal snapshot.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 15 | 3 | 12 | 102.5 sq. m. | Software-measured range: 55.6–77.3 sq. m.; median 56.0 sq. m. | 45% |
- The carpet measurements are software-derived from approved floor-plan drawing geometry, not RERA-filed disclosures, and the supplied analysis says they need review. The drawing-based measurement set covers six flat designs. Saleable area and carpet area are distinct measures; the drawing-analysis note says saleable area includes the home’s share of common areas. A RERA-filed carpet figure is not established in the supplied record.
- The extracted typical plan identifies a living/kitchen, two bedrooms, two toilets, a wash area and a utility area. For the measured example, the utility is marked excluded from carpet area. The sample room dimensions are drawing measurements, not independent site measurements.
5. Parking & vehicle circulation
- The plan extraction records 247.68 sq. m. of parking area and states that the stilt/cellar floor is to be used for parking. The building-permit condition also says the approved stilt/cellar parking is to remain exclusively for vehicle parking. No number of parking spaces, resident or visitor allocation, accessible-parking count, ramp arrangement, or unit-specific parking allocation is established in the supplied evidence. A drawn parking provision does not establish exclusive ownership or allocation to a particular apartment.
- The building-permit record lists Electric Vehicle Charging Infrastructure as a project provision, and the plan conditions refer to EV charging requirements. The supplied evidence does not specify charger count, capacity, locations, or completion status.
6. Amenities, recreation & open spaces
The RERA progress record gives percentages for listed common infrastructure and amenities. These are declared progress figures, not independent verification of completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Water supply | Size, source and storage details not established in this progress table | Available: YES; 10% declared progress | |
| Sewerage (chamber, lines, septic tank, STP) | Size and capacity not supplied | Available: YES; 10% declared progress | |
| Green strip / tot lot / park | Size and detailed layout not supplied | Available: YES; 10% declared progress | |
| Water conservation / rainwater harvesting | Capacity and system details not supplied | Available: YES; 10% declared progress | |
| Electrical meter room / sub-station / receiving station | Equipment capacity not supplied | Available: YES; 10% declared progress | |
| Internal roads and footpaths | Details not supplied | 0% declared progress | |
| Storm-water drains | Details not supplied | 0% declared progress | |
| Street lighting | Details not supplied | 0% declared progress | |
| Community buildings | No size or facility details supplied | 0% declared progress | |
| Treatment and disposal of sewage and sullage water | Treatment/reuse details not supplied | 0% declared progress | |
| Solid-waste management and disposal | Details not supplied | 0% declared progress | |
| Energy management | Details not supplied | 0% declared progress | |
| Fire protection and fire-safety requirements | System details not supplied | 0% declared progress | |
| Aggregate recreational open space | Area not supplied | 0% declared progress |
No clubhouse, indoor recreation, sports facility, or independently verified completed amenity is evidenced in the supplied amenity record.
7. Utilities, building services & safety
- The building-permit documents list an STP, transformer, garbage house, rainwater-harvesting structures and EV charging infrastructure. They also specify a 25,000-litre underground static water-storage tank and a separate 25,000-litre terrace tank. These are approval-document provisions; the supplied evidence does not establish installation, commissioning or operating status.
- The plan extraction also lists a sump, septic tank, lift and STP, and states that the developer should construct the sump, septic tank and underground drainage. No lift capacity, number of lifts, water source, STP capacity, sewage-reuse arrangement, backup-power capacity, CCTV/security provision, or accessibility details are supplied.
- The building-permit order places responsibility for structural and fire-safety requirements on the owner, builder/developer, architect and structural engineer. The plan conditions include sprinkler provision if basement area exceeds 200 sq. m. and require electrical fire-safety certification. These are recorded conditions, not evidence that the systems have been installed or that statutory clearances have been obtained.
8. Location, access & connectivity
- The registered project location is Bowrampet Village, Dundigal Gandimaisamma Mandal, Medchal-Malkajgiri District, Telangana 500043; the site is identified as Plot Nos. 445 and 446, Block No. 21, Lahari Green Park.
- The plan extraction refers to existing and proposed 12.00 m-wide roads and also records a 12 m-wide road. The building-permit order requires the approach road indicated in the plan to be developed and maintained as a black-topped road before occupancy. A supplied location record places the nearest sampled Outer Ring Road interchange approximately 11.1 km away; no travel time is supplied.
9. Developer & development status
The registered promoter is JAYA BALAJI NIRMAN, identified in the RERA filing as a partnership, with GSTIN 36AASFJ6958Q1Z2. Its project address in the supplied filing is Plot No. 142, Sy. No. 25 Part, Vaishali Nagar, Bowrampet Village, under Dundigal Municipality, Medchal-Malkajgiri District, Telangana 500043. The supplied evidence does not provide an official contact number, email address or website.
The Form B declaration, dated 6 January 2026, undertakes completion on or before 8 May 2028. The project header separately records a proposed and revised completion date of 8 September 2028. The supplied documents do not provide an independently verified construction-progress assessment, and no OC is supplied.
10. Approvals, official records & documents
| Identifier / date | P02200010489; valid 8 May 2025–8 May 2028 |
|---|---|
| What the supplied record establishes | Certificate for SESHADRI, naming JAYA BALAJI NIRMAN as promoter and identifying the registered location and survey numbers. |
| Identifier / date | 001481/BP/HMDA/0416/MED/2025; 8 May 2025 |
|---|---|
| What the supplied record establishes | Technical approval for a proposed residential building on Plot Nos. 445 and 446, with specified plans, conditions and HMDA mortgage requirements. |
| Identifier / date | 001481/BP/HMDA/0416/MED/2025; 8 May 2025 |
|---|---|
| What the supplied record establishes | Permit order for the proposed 1-stilt-plus-5-upper-floor residential building; it requires an occupancy certificate before occupation. |
| Identifier / date | Drawing and plan extraction, doc. 641140 |
|---|---|
| What the supplied record establishes | Extracted plan data for the proposed building, site extent, floors, area figures, parking and stated conditions. The supplied record does not establish a separate approved-layout certificate. |
| Identifier / date | 6 January 2026 |
|---|---|
| What the supplied record establishes | Promoter affidavit identifying the land and recording title, encumbrance and completion declarations. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No project OC or completion certificate is established in the supplied documents. |
| Identifier / date | Not established in the supplied material |
|---|---|
| What the supplied record establishes | No project-specific clearance record is supplied for this overview. |
Frequently asked questions
Is SESHADRI registered with Telangana RERA?
Yes. SESHADRI is registered with the Telangana Real Estate Regulatory Authority as P02200010489; the registration status is On-Going Project.
Who is the developer of SESHADRI?
The promoter named in the RERA registration is JAYA BALAJI NIRMAN.
Where is SESHADRI located?
SESHADRI is in BOWRAMPET VILLAGE, Bowrampet, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana (500043).
When will SESHADRI be completed?
The promoter's proposed date of completion filed with RERA is 08/09/2028. This is the promoter's declaration, not a guarantee.
More projects in Bowrampet