Ssv S Emperia Block B
SSV INFRA DEVELOPERS · Medchal-Malkajgiri · RERA P02200010123
SSV S EMPERIA BLOCK B is a residential apartment project in Bachupally, Bachupally Mandal, Medchal-Malkajgiri district, developed by registered promoter SSV INFRA DEVELOPERS. It is on a 356.0 sq.m plot and comprises one residential building, Building - 1, with 1 Stilt + 5 Floors and 10 dwelling units. The RERA-filed configuration is 2BHK, with a saleable area of 127.27 sq.m per unit. The project is registered under TG-RERA number P02200010123, and its proposed completion date is 02/07/2028.
More from Ssv Infra Developers · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | SSV S EMPERIA BLOCK B RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Block B; the TG-RERA record identifies this as a registered project. A separate phase description is not disclosed. RERA record |
| TG-RERA registration | P02200010123 RERA record |
| Registration validity | 02/07/2025 to 02/07/2028 (three years, according to the certificate). This is registration validity, not confirmation of completion or occupancy. RERA record |
| Registered promoter | SSV INFRA DEVELOPERS RERA record |
| RERA status | The project is recorded as “New Project”; the certificate records its registration. RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Bachupally; the building-permit record also describes the locality as BACHUPALLY. RERA record |
| Revenue village | Bachupally (also written BACHUPALLY VILLAGE in the filed building-plan material). RERA record |
| Mandal | Bachupally RERA record |
| District | Medchal-Malkajgiri RERA record |
| PIN | 500090 RERA record |
| Project survey number(s) | Survey No. 331; no subdivision is specified in the project identity or building-permit records. RERA record Land records |
| Plot / site | Plot No. 625 |
| Registered site extent | 356.0 sq.m in the filed building-permit record. |
| Approved plot area / net plot area | 356.0 sq.m / 356.0 sq.m |
| Boundaries in RERA filing | East: other land; west: road; north: road; south: other land. Land records |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) Approvals record |
| Principal approval | Building Permit Order; file/application 000472/HMDA/00059/SWBP/MDL1/2025, approval No. 0077/HMDA/SWBP/2025; approved 02/07/2025. Approvals record |
| Approved layout reference | 58866/MP2/HUDA/04, as cited in the building-permit record. |
| Building count and configuration | One residential building, Building - 1, shown as 1 Stilt + 5 Floors. |
| Approved built-up area | 1,034.5 sq.m residential upper-floor area; the plan record separately states total proposed BUA excluding parking 1,034.5 sq.m and including parking 1,241.4 sq.m. These are distinct filed figures. |
| Building height | The filed drawing extraction states 17.45 m building height and 20.36 m total height; the building-permit extraction separately lists 12.0 m. |
| Parking shown in sanction | 8.00 car parking spaces and 206.9 sq.m total parking area. |
| Unit count | 10 dwelling units in the sanctioned-plan extraction; the RERA filing also records 10 units. RERA unit table |
| Basement / podium | Not disclosed in the supplied project record. |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | 2BHK; 10 units, with 0 booked and 10 available in the portal data supplied. Booking counts have no as-of date and should be treated as indicative. RERA unit table RERA unit details |
| RERA-filed saleable area | 127.27 sq.m per 2BHK, as recorded in the supplied unit data. RERA unit table RERA unit details |
| Construction stage | The project is registered as a new project. The supplied records do not establish independently verified construction progress. RERA record RERA amenities |
| Completion deadline | 02/07/2028 in the building-permit record and promoter’s Form B completion undertaking. |
| Occupancy / completion certificate | No completion or occupancy certificate is evidenced in the supplied project documents; the building-permit extraction records that completion is not certified. |
2. The project story
SSV S EMPERIA BLOCK B is a registered residential apartment project in Bachupally, Medchal-Malkajgiri district, on Plot 625 in Survey No. 331. Its filed plan describes one residential building comprising a stilt and five floors, with ten dwelling units. RERA record Land records
The RERA unit record lists ten 2BHK homes, all shown as available and none booked in the portal data supplied; that snapshot has no stated as-of date. The promoter’s Form B declares completion by 02/07/2028. These are registration and promoter-declared timeline records, not evidence of independently verified construction progress or completed/occupied homes. No occupancy or completion certificate is present in the supplied evidence. RERA unit details
3. Master plan, architecture & building design
The project is recorded as a single-building residential development on a 356.0 sq.m plot, with 356.0 sq.m net plot area. The filed building-plan extraction states proposed coverage of 206.9 sq.m (58.00%), total proposed BUA excluding parking of 1,034.5 sq.m, total proposed BUA including parking of 1,241.4 sq.m, and total net BUA of 1,034.50 sq.m. These are plan-extraction figures; the record does not supply a separately identified FSI-counted area.
The building is identified as Building - 1: 1 Stilt + 5 Floors, with 10 dwelling units. The building-permit record lists five residential upper floors and 1,034.5 sq.m residential area. A separate height entry in the plan extraction gives 17.45 m building height and 20.36 m total height; the building-permit extraction lists 12.0 m.
The drawing extraction records setbacks of Front: 3.00 m, Rear: 2.00 m, Side 1: 2.00 m, Side 2: 2.00 m. The supplied extracts identify a lift and staircase, but do not state their number, capacity or detailed circulation arrangement. The plan lists a tot-lot, a rainwater-harvesting pit, space for a transformer and a garbage house; no facility dimensions or open-space area are given.
4. Homes, configurations & floor plans
The RERA-filed configuration is 2BHK, with 10 units, 0 booked and 10 available in the supplied portal data. The recorded saleable area is 127.27 sq.m. RERA unit details
The approved floor-plan geometry was software-measured for four 2BHK designs. The median measured carpet area is 72.7 sq.m; the measured range is 72.3–73.2 sq.m. The measurement record flags the drawing measurements as needing review, so they are not RERA-filed carpet-area disclosures. Floor plans RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 127.27 sq.m | 72.3–73.2 sq.m; median 72.7 sq.m (software-measured from drawing geometry; needs review) | 43% (supplied drawing-measurement record) |
Saleable area and carpet area are different measures in the supplied records: the software-measured carpet area is from drawing geometry, while the RERA-filed saleable area is the filed unit figure and includes the home’s share of common areas according to the floor-plan data note. A drawing example identifies living/dining, kitchen, two bedrooms, two toilets and a balcony; the balcony is identified as excluded from carpet in that example. Floor plans RERA unit details
5. Parking & vehicle circulation
The filed plan states 8.00 car parking spaces and 206.9 sq.m total parking area, and describes the stilt as parking. It also states that the stilt approved for parking is to be used exclusively for vehicle parking. No basement, podium, mechanical-parking, visitor/accessible-parking, EV-charger count, ramp arrangement or vehicle-space allocation by unit is established in the supplied records.
The building-permit record describes a mortgage over 118.20 sq.m of fifth-floor built-up area in favour of the Metropolitan Commissioner, HMDA, under Document No. 13142/2025; this is not a parking allocation.
6. Amenities, recreation & open spaces
The TG-RERA amenity data marks water supply, sewerage, a green strip/tot-lot, rainwater harvesting and an electrical meter room/sub-station/receiving station as available, but records 0% progress for each of the listed infrastructure items. The sanctioned-plan extraction also lists a tot-lot, rainwater-harvesting pit, ten trees, transformer space and a garbage house. These records establish listed or sanctioned provisions, not independent confirmation of delivery. RERA amenities
| Facility | Green strip / tot-lot |
|---|---|
| Description / size | Size not stated; plan extraction also lists 10 trees. |
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenity entry says available: YES, progress 0%; independent completion not verified. |
| Facility | Rainwater harvesting |
|---|---|
| Description / size | 1 rainwater-harvesting pit is listed in the permit extraction. |
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenity entry says available: YES, progress 0%; independent completion not verified. |
| Facility | Community buildings |
|---|---|
| Description / size | No facility description or size supplied. |
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress 0%; no completion verification. |
No clubhouse or indoor-recreation facilities are evidenced in the supplied RERA amenity data. The separately listed water, sewerage, electrical and waste provisions are described under Utilities and building services. RERA amenities
7. Utilities, building services & safety
| Evidence in the project record | RERA amenity data records water supply as available: YES. The building-plan extraction lists a sump. |
|---|---|
| Status / limitation | Amenity progress is 0%; source, storage capacity and treatment arrangements are not supplied. RERA amenities |
| Evidence in the project record | RERA amenity data records sewerage (chambers, lines, septic tank, STP) as available: YES; the plan extraction lists septic/septic tank. |
|---|---|
| Status / limitation | Progress is 0%; the supplied records do not establish an STP installation, capacity or completion. RERA amenities |
| Evidence in the project record | RERA amenity data lists water conservation/rainwater harvesting as available: YES; the plan extraction lists one rainwater-harvesting pit. |
|---|---|
| Status / limitation | Progress is 0%; installation is not independently verified. RERA amenities |
| Evidence in the project record | The RERA amenity data lists an electrical meter room/sub-station/receiving station as available: YES; the plan lists space for a transformer. |
|---|---|
| Status / limitation | Progress is 0%; supply, backup and installed capacity are not stated. RERA amenities |
| Evidence in the project record | Lift and staircase are listed in the plan extraction. |
|---|---|
| Status / limitation | Number, capacity and completed status are not disclosed. |
| Evidence in the project record | The building-permit conditions refer to fire-safety requirements and an occupancy Fire NOC before an occupancy certificate. |
|---|---|
| Status / limitation | No Fire NOC or installed-system evidence is supplied. |
| Evidence in the project record | The plan extraction requires a garbage house; RERA amenity data lists solid-waste management and disposal. |
|---|---|
| Status / limitation | No capacity or completion evidence is supplied; amenity progress is 0%. RERA amenities |
| Evidence in the project record | No project-specific accessible-circulation details are supplied. |
|---|---|
| Status / limitation | Not established by the materials reviewed. |
The building-permit record also lists construction and occupancy-related conditions concerning safety and services. Their presence in the permit is not, by itself, evidence that the relevant systems have been installed or that an occupancy certificate has been issued.
8. Location, access & connectivity
The registered project location is Bachupally, Bachupally Mandal, Medchal-Malkajgiri district, PIN 500090, at Survey No. 331, Plot No. 625. The project location record provides coordinates 17.5410548, 78.3635484. RERA record Land records Location record
The filed boundary description shows roads on the north and west sides, and other land to the east and south. The supplied location dataset identifies HITEC City at 10.9 km as an anchor. No route, travel time, public-transport service details or independently verified landmark-distance set is provided in the project location record. Land records Location record
9. Developer & development status
The registered promoter is SSV INFRA DEVELOPERS, recorded as a partnership. Its GSTIN is 36AFPFS1345J1ZL; the supplied data does not provide a verified corporate registration number, official website or project-specific contact details. RERA record Corporate record Parties record
The promoter’s address in the RERA filing is LAKSHMI'S EMPERIA, MAYURI NAGAR MAIN ROAD, BACHUPALLY, BACHUPALLY, Bachupally, Medchal-Malkajgiri, 500090. The registration certificate lists a promoter address at Village: Miyapur, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500049. The promoter record identifies MUPPARAJU SREENU as authorized signatory and RAYINI LAKSHMI NARAYANA as partner. Parties record
Form B, signed by the promoter’s authorized signatory, declares completion by 02/07/2028. The supplied material does not establish construction progress through an independent site inspection or provide an occupancy certificate.
10. Approvals, official records & documents
| Record | Evidence and scope |
|---|---|
| TG-RERA registration certificate | Form C for SSV S EMPERIA BLOCK B, registration P02200010123, valid 02/07/2025–02/07/2028. |
| HMDA building permit | Building Permit Order dated 02/07/2025, file/application 000472/HMDA/00059/SWBP/MDL1/2025, approval No. 0077/HMDA/SWBP/2025, for Plot 625, Survey No. 331, Bachupally. |
| Layout reference | Approved layout number 58866/MP2/HUDA/04, cited in the building-permit record. The supplied material does not include an independently retrieved public layout-portal record. |
| Building drawings | RERA-filed plan material includes a plan showing the proposed residential building and floor-plan drawing material used for the software-measured unit analysis. |
| Promoter declaration | Form B declaration dated 09-08-2025, including the promoter’s stated completion undertaking and project-fund declarations. |
| Mortgage instrument cited in permit | Mortgage of the fifth-floor built-up area in favour of the Metropolitan Commissioner, HMDA; Document No. 13142/2025, dated 20 June 2025. |
| Completion / occupancy record | No completion certificate or occupancy certificate is included in the supplied project records. The building-permit material directs the applicant to seek an occupancy certificate after construction. |
The building permit and registration certificate identify the project and relevant authority records; the supplied evidence does not establish that construction is complete or that an occupancy certificate has been issued.
1. Project at a glance
Project identity
Registered name: SSV S EMPERIA BLOCK B
Project type: Residential apartment project
Phase / registered portion: Block B; the TG-RERA record identifies this as a registered project. A separate phase description is not disclosed.
TG-RERA registration: P02200010123
Registration validity: 02/07/2025 to 02/07/2028 (three years, according to the certificate). This is registration validity, not confirmation of completion or occupancy.
Registered promoter: SSV INFRA DEVELOPERS
RERA status: The project is recorded as “New Project”; the certificate records its registration.
Land and geographic identity
Locality: Bachupally; the building-permit record also describes the locality as BACHUPALLY.
Revenue village: Bachupally (also written BACHUPALLY VILLAGE in the filed building-plan material).
Mandal: Bachupally
District: Medchal-Malkajgiri
PIN: 500090
Project survey number(s): Survey No. 331; no subdivision is specified in the project identity or building-permit records.
Plot / site: Plot No. 625
Registered site extent: 356.0 sq.m in the filed building-permit record.
Approved plot area / net plot area: 356.0 sq.m / 356.0 sq.m
Boundaries in RERA filing: East: other land; west: road; north: road; south: other land.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal approval: Building Permit Order; file/application 000472/HMDA/00059/SWBP/MDL1/2025, approval No. 0077/HMDA/SWBP/2025; approved 02/07/2025.
Approved layout reference: 58866/MP2/HUDA/04, as cited in the building-permit record.
Building count and configuration: One residential building, Building - 1, shown as 1 Stilt + 5 Floors.
Approved built-up area: 1,034.5 sq.m residential upper-floor area; the plan record separately states total proposed BUA excluding parking 1,034.5 sq.m and including parking 1,241.4 sq.m. These are distinct filed figures.
Building height: The filed drawing extraction states 17.45 m building height and 20.36 m total height; the building-permit extraction separately lists 12.0 m.
Parking shown in sanction: 8.00 car parking spaces and 206.9 sq.m total parking area.
Unit count: 10 dwelling units in the sanctioned-plan extraction; the RERA filing also records 10 units.
Basement / podium: Not disclosed in the supplied project record.
Offering and status
RERA-filed configuration: 2BHK; 10 units, with 0 booked and 10 available in the portal data supplied. Booking counts have no as-of date and should be treated as indicative.
RERA-filed saleable area: 127.27 sq.m per 2BHK, as recorded in the supplied unit data.
Construction stage: The project is registered as a new project. The supplied records do not establish independently verified construction progress.
Completion deadline: 02/07/2028 in the building-permit record and promoter’s Form B completion undertaking.
Occupancy / completion certificate: No completion or occupancy certificate is evidenced in the supplied project documents; the building-permit extraction records that completion is not certified.
2. The project story
SSV S EMPERIA BLOCK B is a registered residential apartment project in Bachupally, Medchal-Malkajgiri district, on Plot 625 in Survey No. 331. Its filed plan describes one residential building comprising a stilt and five floors, with ten dwelling units.
The RERA unit record lists ten 2BHK homes, all shown as available and none booked in the portal data supplied; that snapshot has no stated as-of date. The promoter’s Form B declares completion by 02/07/2028. These are registration and promoter-declared timeline records, not evidence of independently verified construction progress or completed/occupied homes. No occupancy or completion certificate is present in the supplied evidence.
3. Master plan, architecture & building design
The project is recorded as a single-building residential development on a 356.0 sq.m plot, with 356.0 sq.m net plot area. The filed building-plan extraction states proposed coverage of 206.9 sq.m (58.00%), total proposed BUA excluding parking of 1,034.5 sq.m, total proposed BUA including parking of 1,241.4 sq.m, and total net BUA of 1,034.50 sq.m. These are plan-extraction figures; the record does not supply a separately identified FSI-counted area.
The building is identified as Building - 1: 1 Stilt + 5 Floors, with 10 dwelling units. The building-permit record lists five residential upper floors and 1,034.5 sq.m residential area. A separate height entry in the plan extraction gives 17.45 m building height and 20.36 m total height; the building-permit extraction lists 12.0 m.
The drawing extraction records setbacks of Front: 3.00 m, Rear: 2.00 m, Side 1: 2.00 m, Side 2: 2.00 m. The supplied extracts identify a lift and staircase, but do not state their number, capacity or detailed circulation arrangement. The plan lists a tot-lot, a rainwater-harvesting pit, space for a transformer and a garbage house; no facility dimensions or open-space area are given.
4. Homes, configurations & floor plans
The RERA-filed configuration is 2BHK, with 10 units, 0 booked and 10 available in the supplied portal data. The recorded saleable area is 127.27 sq.m.
The approved floor-plan geometry was software-measured for four 2BHK designs. The median measured carpet area is 72.7 sq.m; the measured range is 72.3–73.2 sq.m. The measurement record flags the drawing measurements as needing review, so they are not RERA-filed carpet-area disclosures.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 127.27 sq.m | 72.3–73.2 sq.m; median 72.7 sq.m (software-measured from drawing geometry; needs review) | 43% (supplied drawing-measurement record) |
Saleable area and carpet area are different measures in the supplied records: the software-measured carpet area is from drawing geometry, while the RERA-filed saleable area is the filed unit figure and includes the home’s share of common areas according to the floor-plan data note. A drawing example identifies living/dining, kitchen, two bedrooms, two toilets and a balcony; the balcony is identified as excluded from carpet in that example.
5. Parking & vehicle circulation
The filed plan states 8.00 car parking spaces and 206.9 sq.m total parking area, and describes the stilt as parking. It also states that the stilt approved for parking is to be used exclusively for vehicle parking. No basement, podium, mechanical-parking, visitor/accessible-parking, EV-charger count, ramp arrangement or vehicle-space allocation by unit is established in the supplied records.
The building-permit record describes a mortgage over 118.20 sq.m of fifth-floor built-up area in favour of the Metropolitan Commissioner, HMDA, under Document No. 13142/2025; this is not a parking allocation.
6. Amenities, recreation & open spaces
The TG-RERA amenity data marks water supply, sewerage, a green strip/tot-lot, rainwater harvesting and an electrical meter room/sub-station/receiving station as available, but records 0% progress for each of the listed infrastructure items. The sanctioned-plan extraction also lists a tot-lot, rainwater-harvesting pit, ten trees, transformer space and a garbage house. These records establish listed or sanctioned provisions, not independent confirmation of delivery.
| Facility | Green strip / tot-lot |
|---|---|
| Description / size | Size not stated; plan extraction also lists 10 trees. |
| Declared progress / verified status | RERA amenity entry says available: YES, progress 0%; independent completion not verified. |
| Facility | Rainwater harvesting |
|---|---|
| Description / size | 1 rainwater-harvesting pit is listed in the permit extraction. |
| Declared progress / verified status | RERA amenity entry says available: YES, progress 0%; independent completion not verified. |
| Facility | Community buildings |
|---|---|
| Description / size | No facility description or size supplied. |
| Declared progress / verified status | Progress 0%; no completion verification. |
No clubhouse or indoor-recreation facilities are evidenced in the supplied RERA amenity data. The separately listed water, sewerage, electrical and waste provisions are described under Utilities and building services.
7. Utilities, building services & safety
| Evidence in the project record | RERA amenity data records water supply as available: YES. The building-plan extraction lists a sump. |
|---|---|
| Status / limitation | Amenity progress is 0%; source, storage capacity and treatment arrangements are not supplied. |
| Evidence in the project record | RERA amenity data records sewerage (chambers, lines, septic tank, STP) as available: YES; the plan extraction lists septic/septic tank. |
|---|---|
| Status / limitation | Progress is 0%; the supplied records do not establish an STP installation, capacity or completion. |
| Evidence in the project record | RERA amenity data lists water conservation/rainwater harvesting as available: YES; the plan extraction lists one rainwater-harvesting pit. |
|---|---|
| Status / limitation | Progress is 0%; installation is not independently verified. |
| Evidence in the project record | The RERA amenity data lists an electrical meter room/sub-station/receiving station as available: YES; the plan lists space for a transformer. |
|---|---|
| Status / limitation | Progress is 0%; supply, backup and installed capacity are not stated. |
| Evidence in the project record | Lift and staircase are listed in the plan extraction. |
|---|---|
| Status / limitation | Number, capacity and completed status are not disclosed. |
| Evidence in the project record | The building-permit conditions refer to fire-safety requirements and an occupancy Fire NOC before an occupancy certificate. |
|---|---|
| Status / limitation | No Fire NOC or installed-system evidence is supplied. |
| Evidence in the project record | The plan extraction requires a garbage house; RERA amenity data lists solid-waste management and disposal. |
|---|---|
| Status / limitation | No capacity or completion evidence is supplied; amenity progress is 0%. |
| Evidence in the project record | No project-specific accessible-circulation details are supplied. |
|---|---|
| Status / limitation | Not established by the materials reviewed. |
The building-permit record also lists construction and occupancy-related conditions concerning safety and services. Their presence in the permit is not, by itself, evidence that the relevant systems have been installed or that an occupancy certificate has been issued.
8. Location, access & connectivity
The registered project location is Bachupally, Bachupally Mandal, Medchal-Malkajgiri district, PIN 500090, at Survey No. 331, Plot No. 625. The project location record provides coordinates 17.5410548, 78.3635484.
The filed boundary description shows roads on the north and west sides, and other land to the east and south. The supplied location dataset identifies HITEC City at 10.9 km as an anchor. No route, travel time, public-transport service details or independently verified landmark-distance set is provided in the project location record.
9. Developer & development status
The registered promoter is SSV INFRA DEVELOPERS, recorded as a partnership. Its GSTIN is 36AFPFS1345J1ZL; the supplied data does not provide a verified corporate registration number, official website or project-specific contact details.
The promoter’s address in the RERA filing is LAKSHMI'S EMPERIA, MAYURI NAGAR MAIN ROAD, BACHUPALLY, BACHUPALLY, Bachupally, Medchal-Malkajgiri, 500090. The registration certificate lists a promoter address at Village: Miyapur, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500049. The promoter record identifies MUPPARAJU SREENU as authorized signatory and RAYINI LAKSHMI NARAYANA as partner.
Form B, signed by the promoter’s authorized signatory, declares completion by 02/07/2028. The supplied material does not establish construction progress through an independent site inspection or provide an occupancy certificate.
10. Approvals, official records & documents
TG-RERA registration certificate: Form C for SSV S EMPERIA BLOCK B, registration P02200010123, valid 02/07/2025–02/07/2028.
HMDA building permit: Building Permit Order dated 02/07/2025, file/application 000472/HMDA/00059/SWBP/MDL1/2025, approval No. 0077/HMDA/SWBP/2025, for Plot 625, Survey No. 331, Bachupally.
Layout reference: Approved layout number 58866/MP2/HUDA/04, cited in the building-permit record. The supplied material does not include an independently retrieved public layout-portal record.
Building drawings: RERA-filed plan material includes a plan showing the proposed residential building and floor-plan drawing material used for the software-measured unit analysis.
Promoter declaration: Form B declaration dated 09-08-2025, including the promoter’s stated completion undertaking and project-fund declarations.
Mortgage instrument cited in permit: Mortgage of the fifth-floor built-up area in favour of the Metropolitan Commissioner, HMDA; Document No. 13142/2025, dated 20 June 2025.
Completion / occupancy record: No completion certificate or occupancy certificate is included in the supplied project records. The building-permit material directs the applicant to seek an occupancy certificate after construction.
The building permit and registration certificate identify the project and relevant authority records; the supplied evidence does not establish that construction is complete or that an occupancy certificate has been issued.
Other registrations of Ssv S Emperia
Frequently asked questions
Is SSV S EMPERIA BLOCK B registered with Telangana RERA?
Yes. SSV S EMPERIA BLOCK B is registered with the Telangana Real Estate Regulatory Authority as P02200010123; the registration status is New Project.
Who is the developer of SSV S EMPERIA BLOCK B?
The promoter named in the RERA registration is SSV INFRA DEVELOPERS.
Where is SSV S EMPERIA BLOCK B located?
SSV S EMPERIA BLOCK B is in BACHUPALLY, Medchal-Malkajgiri, Telangana (500090).
When will SSV S EMPERIA BLOCK B be completed?
The promoter's proposed date of completion filed with RERA is 02/11/2028. This is the promoter's declaration, not a guarantee.