Sign in

Esr South Central

KUNDURU · Rangareddy · RERA P02400009479

ESR SOUTH CENTRAL is a Plotted Development in Subhanpur, Maheshwaram Mandal, Ranga Reddy District, developed by registered promoter Kunduru Maheswara Reddy. The site area is 52912.59 sq.m; the layout drawing shows 152 numbered plots, and the building count, floors and plot configurations are not disclosed. The project is registered under TG-RERA **P02400009479**, with completion undertaken by 05/09/2025.

01What we found

Period endedTG-RERA registration ran to 5 Sep 2025 - check its extension on TG-RERA
23documents on file - each fact links to its page
0court cases on this project's land in the court records searched
6items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Subhanpoor, Maheshwaram, Ranga Reddy · geocoded — approximate.

1. Project at a glance

Project identity

ItemRecord
Registered project nameESR SOUTH CENTRAL RERA record
Project typePlotted Development RERA record RERA filing
Phase / registered portionNew Project; the registration covers the plotted layout identified in the filed survey schedule. A separate phase designation is not disclosed. RERA record
TG-RERA registrationP02400009479
Registration validity05/09/2022 to 05/09/2025, as stated on Form C. No extension is recorded on that certificate. Registration validity is distinct from the project completion undertaking and from occupancy/completion certification.
Registered promoterKunduru Maheswara Reddy; the project identity header gives “KUNDURU.” The promoter’s legal-entity type is not disclosed. RERA record
RERA project statusThe filed project information calls this a “New Project.” The certificate records registration for three years; current registration status is not established by that certificate alone. RERA record

Land and geographic identity

ItemRecord
LocalitySubhanpur RERA record
Revenue villageSubhanpoor (also rendered “Subhanpur” in the filed approval and certificate) RERA record RERA filing
MandalMaheshwaram (the filed approval also spells it “Maheswaram”) RERA record
DistrictRanga Reddy RERA record
PIN509325 RERA filing
Project surveys / subdivisions163/P, 164/P, 167/P, 224/P, 225/P, 228/P and 229/P RERA record
Total site area52912.59 sq.m
Master-plan road-affected area1861.7 sq.m RERA filing
Net site area51050.89 sq.m RERA filing
Boundaries in RERA filingNorth: EXISTING 12M WIDE ROAD; South, East and West: OTHERS LAND RERA filing

Development identity

ItemRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA) Approvals record
Principal layout approvalDraft Layout Permit No. 000172/LO/Plg/HMDA/2022, approved 05 September, 2022 Approvals record
Approved built-up area32838.97 sq.m is the figure in the RERA-filed project information; the project is a plotted layout, and a building floor configuration is not disclosed. RERA filing
Building / tower count and floorsNot disclosed in the RERA material supplied for this plotted development. RERA filing
Parking levels / countNot established in the supplied project record.
Plot count152 plot numbers (1 to 152) read by software from the layout drawing; drawing-based count, not a separately verified RERA inventory count. Layout record
RERA-declared unit inventoryUnit counts, booked counts, available counts and filed plot-size bands are not supplied in the available records. RERA record

Offering and status

ItemRecord
OfferingOpen plots in a plotted layout; individual RERA-filed plot sizes are not available in the supplied data. RERA record RERA filing Layout record
Declared completion date05/09/2025, as undertaken in the promoter’s Form B declaration.
Revised completion dateNot disclosed.
Construction / development stageRERA data describes a new project, but the supplied material contains no independently verified current site-progress assessment. The layout-drawing-derived project completeness figure is 80%; its basis and as-of date are not provided here, so it should not be treated as an independent site inspection. RERA record Layout record
Occupancy / completion certificateNo occupancy or completion certificate is identified in the supplied evidence. The project is a plotted layout; the supplied record does not establish an OC status for the layout or any phase. Document index Approvals record

2. The project story

ESR SOUTH CENTRAL is registered as a plotted development in the Subhanpur/Subhanpoor revenue location, Maheshwaram Mandal, Ranga Reddy District. Its registered land schedule covers seven subdivisions: 163/P, 164/P, 167/P, 224/P, 225/P, 228/P and 229/P. The project is organized as numbered plots within a layout rather than as a residential tower or apartment block. RERA record RERA filing

The filed HMDA draft layout record describes a net site area of 51050.89 sq.m, with 32838.97 sq.m shown as plotted area, 12629.23 sq.m as layout roads, 4215.64 sq.m as park, and 1366.68 sq.m as social infrastructure/open space. The drawing-derived count is 152 plots, but the available RERA inventory does not provide plot-by-plot sizes, sales status or bookings. Layout record

The promoter’s Form B undertakes completion by 5th September, 2025. That is a promoter declaration, not confirmation that the works were completed by that date. The supplied evidence does not establish current site completion or an occupancy/completion certificate. Document index

3. Master plan, architecture & building design

The filed HMDA document is a Draft Layout Letter for permit 000172/LO/Plg/HMDA/2022, dated 05 September, 2022. It covers the seven listed survey subdivisions and describes a plotted layout, not a multi-storey building design.

Layout componentArea / figureEvidence and status
Total site area52912.59 sq.mStated in the HMDA filed area statement.
Master-plan road-affected area1861.7 sq.mStated in the HMDA filed area statement.
Net site area51050.89 sq.mStated in the HMDA filed area statement and project record. RERA filing
Plotted area32838.97 sq.mStated in the HMDA filed area statement.
Layout road area12629.23 sq.mStated in the HMDA filed area statement.
Park4215.64 sq.mStated in the HMDA filed area statement.
Social infrastructure / open space1366.68 sq.m (2.68%)Stated in the HMDA filed document.
Amenities area0 sq.mStated in the HMDA filed area statement.
Plot count152Software-read from plot numbers 1 to 152 on the layout drawing; not a verified RERA inventory count. Plot sizes are not available in the supplied drawing extraction. Layout record

The HMDA document specifies internal road widths including “60ft,” “100 ft” and “18 mts,” and also refers to “60 feet and above.” The supplied extraction does not map each width to specific road segments.

The submitted layout conditions refer to park development, avenue planting, internal water-supply pipelines, an overhead tank, common septic tank/STP, rainwater-harvesting pits, underground storm-water drainage, cycling tracks, a bio-compost unit, street lighting and a transformer yard. These are approval-filed development requirements; the supplied evidence does not establish that each item has been completed.

No building count, floor configuration, building footprint, apartment arrangement, lift or stair layout is established for this plotted project in the supplied RERA material. The project’s approved built-up-area figure is recorded separately as 32838.97 sq.m in the RERA-filed project information; it should not be read as a plot-size, carpet-area or saleable-area figure. RERA filing

4. Homes, configurations & floor plans

This is a plotted development, so apartment configuration counts and apartment carpet-area measurements are not applicable based on the supplied project record. Plot-by-plot RERA saleable areas and booked/available counts are not supplied. RERA record RERA filing

Numbered plots
Figure152 (plot numbers 1 to 152)
BasisSoftware-read from the layout drawing; not independently verified. Layout record
RERA-filed plot-size range
FigureNot disclosed in supplied records
BasisNo plot-size schedule is provided. Document index Layout record
Booked / available plots
FigureNot disclosed
BasisNo current plot inventory schedule is supplied. Document index
Drawing-measured carpet area
FigureNot available
BasisThe two supplied drawings were not measured; the drawing record states that no flats are present. Floor plans

The plot numbers and count are drawing-derived information, not proof of the current saleable inventory or of any particular plot’s allocation. Layout record

5. Parking & vehicle circulation

The supplied project evidence does not establish a sanctioned parking-space count, visitor or accessible parking provision, parking allotments, or exclusive parking rights. No parking levels, parking structures, vehicle entry/exit arrangement, ramps, EV charging provision or pedestrian/vehicle separation are documented for this plotted layout. Document index

The HMDA layout filing identifies internal roads and specifies road widths, but does not provide a verified parking schedule or plot-specific parking allocation in the supplied material.

6. Amenities, recreation & open spaces

The HMDA-filed layout material identifies open-space and development items. The RERA amenity schedule marks some items “YES” but reports 0% progress in the supplied extract; that is a filed progress entry, not independent confirmation of completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Park4215.64 sq.mHMDA filed area statement.Provided for in the filed layout; completion not independently verified.
Social infrastructure / open space1366.68 sq.m (2.68%)HMDA filed document.Provided for in the filed layout; completion not independently verified.
Green strip / tot lot / parkSize not separately statedRERA amenity schedule. RERA amenities“YES”; progress shown as 0%.
Community buildingsNo size or facility detail suppliedRERA amenity schedule. RERA amenitiesProgress shown as 0%; completion not established.
Recreational open spaceSize not separately stated in the RERA amenity rowRERA amenity schedule. RERA amenities“YES”; progress shown as 0%.
Internal roads and footpathsLayout road area 12629.23 sq.m; road widths include “60ft,” “100 ft” and “18 mts”HMDA filed area statement and conditions.“YES” in RERA amenity schedule; progress shown as 0%. No independent completion verification.
Cycling tracksNo size suppliedHMDA filed development condition.Required in the filed conditions; completion not verified.
Avenue plantationNo quantity or size suppliedHMDA filed development condition.Required in the filed conditions; completion not verified.

The supplied project-specific RERA amenity schedule does not evidence a clubhouse, swimming pool, gym or children’s play area as a sanctioned or delivered facility. RERA amenities

7. Utilities, building services & safety

The filed HMDA conditions and RERA amenity schedule identify proposed or required site infrastructure, but do not establish current installation, operating capacity or completion. RERA amenities

Water
What the supplied project record statesHMDA conditions refer to potable/drinking-water connectivity, internal water-supply pipelines and an overhead tank; the RERA amenity schedule lists Water Supply as “YES.” RERA amenities
Status limitationSource, storage capacity, treatment arrangements and current operating status are not supplied.
Sewerage / drainage
What the supplied project record statesHMDA conditions list a common septic tank / STP and underground storm-water drainage; the RERA schedule lists sewerage and treatment/disposal items. RERA amenities
Status limitationDesign capacity, reuse details and completion status are not supplied.
Rainwater harvesting
What the supplied project record statesHMDA conditions refer to rainwater-harvesting pits; the RERA schedule lists water conservation/rainwater harvesting as “YES.” RERA amenities
Status limitationQuantity, capacity and completed status are not established.
Electrical supply
What the supplied project record statesHMDA conditions refer to a transformer yard in the utilities area and LED street lighting; the RERA schedule lists an electrical meter room, sub-station and receiving station as “YES.” RERA amenities
Status limitationCapacity, power-backup arrangement and current commissioning status are not supplied.
Fire and life safety
What the supplied project record statesThe RERA amenity schedule includes fire-protection/fire-safety requirements. RERA amenities
Status limitationNo project-specific fire-system design, clearance or completion evidence is supplied.
Waste
What the supplied project record statesHMDA conditions refer to a bio-compost unit; the RERA amenity schedule includes solid-waste management and disposal. RERA amenities
Status limitationSystem capacity and completion status are not established.
Lifts, accessibility and security
What the supplied project record statesNot documented for the plotted layout in the supplied RERA material. Document index
Status limitationNo lift, accessible-circulation, CCTV or access-control specifications are established.

8. Location, access & connectivity

The registered location is Subhanpur/Subhanpoor, Maheshwaram Mandal, Ranga Reddy District, Telangana, PIN 509325. The filed land boundaries identify an existing 12M wide road to the north and “OTHERS LAND” on the other three sides. RERA record RERA filing RERA filing

The HMDA layout document refers to internal roads with listed widths of “60ft,” “100 ft” and “18 mts,” and requires roads to be opened for accessibility to neighbouring sites. The supplied evidence does not identify which road segments have each width or verify their current condition.

A location record gives the nearest sampled Outer Ring Road interchange as 10.6 km; it is an approximate anchor distance, not a travel-time estimate. Location record The supplied project evidence does not provide verified public-transport routes or a project-specific schedule of nearby landmarks.

9. Developer & development status

The TG-RERA certificate names Kunduru Maheswara Reddy as promoter; the project header uses “KUNDURU.” The promoter’s legal entity type, corporate identifier, registered office and official contact details are not established in the supplied evidence. RERA record Corporate record

The project is registered as a new plotted development, with the promoter’s Form B undertaking completion by 5th September, 2025. The supplied materials do not provide an independently verified site-progress report, a current plot-sale inventory or evidence of a revised completion date. The layout drawing’s 80% completeness figure is drawing-derived and does not establish independent physical completion. RERA record Layout record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400009479; validity 05/09/2022–05/09/2025
What the supplied material establishesForm C registration for ESR SOUTH CENTRAL under section 5; the certificate records the listed validity and conditions. No extension is recorded on the supplied certificate.
HMDA draft layout letter
Identifier / date000172/LO/Plg/HMDA/2022; 05 September, 2022
What the supplied material establishesDraft layout permit for a proposed open-plot layout over 51050.89 sq.m in the listed project surveys. The document states that the permission is not proof of title.
HMDA application
Identifier / date051325/SMD/LT/U6/HMDA/27122021; application date 27 December, 2021
What the supplied material establishesApplication identifier and date stated in the filed HMDA document.
Promoter Form B declaration
Identifier / dateVerified 2nd, January, 2025
What the supplied material establishesPromoter declaration for ESR SOUTH CENTRAL, including the 5th September, 2025 completion undertaking.
RERA-filed layout drawing
Identifier / dateDocument 526740
What the supplied material establishesTwo layout sheets are identified; drawing-derived plot count and area readings are available, but the plot-size extraction is incomplete. Layout record Floor plans
Title-report layout extract
Identifier / dateDocument 527653
What the supplied material establishesOCR extract states “51050.89 Layout Plan”; it does not show an approval authority, parties or title opinion.
Occupancy / completion certificate
Identifier / dateNot identified in supplied evidence
What the supplied material establishesThe supplied documents do not establish an occupancy or completion certificate for the layout. Document index

The HMDA filing also cites mortgage deeds 19926/2021 and 19925/2021, and gift deed 19924/2021, each dated 04/10/2021, as part of its layout record. Their detailed treatment belongs with the land and approval evidence.

Frequently asked questions

Is ESR SOUTH CENTRAL registered with Telangana RERA?

Yes. ESR SOUTH CENTRAL is registered with the Telangana Real Estate Regulatory Authority as P02400009479; the registration status is New Project.

Who is the developer of ESR SOUTH CENTRAL?

The promoter named in the RERA registration is KUNDURU.

Where is ESR SOUTH CENTRAL located?

ESR SOUTH CENTRAL is in Subhanpur, Subhanpoor, Maheshwaram, Rangareddy, Telangana (509325).

When will ESR SOUTH CENTRAL be completed?

The promoter's proposed date of completion filed with RERA is 05/09/2025. This is the promoter's declaration, not a guarantee.

More projects in Subhanpoor