Sign in

Oakmeadows

SRI THIRUMALAVASA DEVELOPERS AND CONSTRUCTIONS · Sangareddy · RERA P01100002833

OAKMEADOWS is a plotted development in WADAKPALLY, Ameenpur Mandal, Sangareddy District, developed by Sri Thirumalavasa Developers And Constructions. The HMDA draft layout letter records a total site area of 57081.71 sq.m and net site area of 53219.5 sq.m; the layout drawing shows plots numbered 1–198. It is a plotted project, and no plot-size range is stated in the supplied data. Its TG-RERA registration is P01100002833, and the promoter-declared completion deadline is 31 August 2021.

01What we found

Period endedTG-RERA registration ran to 31 Aug 2021 - check its extension on TG-RERA
15documents on file - each fact links to its page
0court cases on this project's land in the court records searched
11items to check - 6 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 6 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered nameOAKMEADOWS
Project typePlotted development / open-plot layout RERA record
Phase or registered portionNot separately identified as a phase; the registration covers the listed project survey lands
TG-RERA registrationP01100002833
Registration validity30/04/2021 to 31/08/2021; the supplied certificate says no extension is recorded
Registered promoterSri Thirumalavasa Developers And Constructions
RERA statusRegistration certificate issued under section 5. The certificate’s stated validity ended on 31/08/2021; current registration status is not established by the supplied record.

Land and geographic identity

FieldProject record
Locality / villageWADAKPALLY; the HMDA draft layout letter identifies Wadakpalle Village
MandalAmeenpur
DistrictSangareddy
PIN502319
Survey numbers and subdivisions132, 138/P, 139, 140/P, 141/P, 143/P, 183, 184/P, 185/P
Registered site extentNot stated in the supplied registration-certificate extraction. The HMDA draft layout letter records a total site area of 57081.71 sq.m and net site area of 53219.5 sq.m.
HMDA layout area statementMaster plan road-affected area: 3862.21 sq.m; net site area: 53219.5 sq.m.
BoundariesEast: Existing 40 feet Road; west, north and south: Neighbours Land. RERA filing

Development identity

FieldProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA)
Principal layout approvalDraft Layout Permit No. 000138/LO/Plg/HMDA/2020, approved 24 December 2020 Approvals record
HMDA application reference031104/SKP/LT/U6/HMDA/28112019
Approved built-up area39993.12 sq.m is recorded in the project filing; the supplied material does not identify it as a particular building or unit-area measure. RERA filing
Buildings / floorsNot applicable to the disclosed plotted-layout offering; no building count, floor configuration or parking levels are established in the supplied project record.
Layout area usePlotted area 33437.14 sq.m; layout road area 14084.03 sq.m; park 4362.13 sq.m; open space 1334.02 sq.m; amenities area 0. Social infrastructure area is identified, but its area is not legible in the supplied extraction.
Plots shown on drawingSoftware-read drawing count: 198, based on plot numbers 1–198; plot-size extraction is incomplete and no plot sizes are supplied here. Layout record
HMDA-mortgaged area5025.88 sq.m, identified as 22 plots: 1–5, 23–30, 35, 39–46. Layout record

Offering and status

FieldProject record
Unit typePlots; no RERA unit schedule or plot-size range is available in the supplied data. RERA record
Booked / availableNot established by the supplied RERA record.
Construction / development stageThe RERA amenity schedule contains reported percentage figures for certain layout works, but these are not independent site verification. RERA amenities
Promoter-declared completion deadline31 August 2021 in the Form B declaration.
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied documents. This is a plotted layout, and the supplied record does not establish an OC for the project. Document index

2. The project story

OAKMEADOWS is registered as a plotted development at WADAKPALLY, Ameenpur Mandal, Sangareddy District, on the listed survey lands. The RERA certificate identifies the project and registered promoter; the HMDA document describes the development as a draft open-plot layout.

The HMDA layout letter records a net site area of 53219.5 sq.m, with plots, internal roads, parks and open space, as well as social-infrastructure land. It also sets out layout-development works including roads, drainage, underground sewerage lines and a common septic tank/STP, and calls for potable-water arrangements, street lighting, park development and rainwater-harvesting pits. These are approval requirements or described provisions, not evidence that the works have been completed.

The RERA amenity schedule reports percentages for several works, including internal roads and footpaths, water supply, sewerage, green strip/park, rainwater harvesting, electrical meter room/sub-station and recreational open space. These are filed progress figures, not independently verified construction progress. RERA amenities

3. Master plan, architecture & building design

The available design evidence is for a plotted layout rather than residential buildings. The HMDA draft layout letter states a total site area of 57081.71 sq.m, a road-affected area of 3862.21 sq.m and a net site area of 53219.5 sq.m. Its land-use schedule identifies 33437.14 sq.m of plotted area, 14084.03 sq.m of layout roads, 4362.13 sq.m of park and 1334.02 sq.m of open space; amenities area is recorded as 0. The supplied extraction identifies social infrastructure but does not provide its area.

The approved drawing is reported to show plots numbered 1–198. This count was read from drawing text by software; the plot-size extraction is incomplete, and the drawing-based count should be checked against the drawing. Layout record

HMDA’s draft letter describes road widths including a 100 feet wide road, roads of 18 metres and above, and roads of 60 feet and above. It also specifies roads, storm-water drains, underground drainage lines and a common septic tank/STP among the layout works. The letter refers to a final layout release after completion of specified development works and handover of internal roads, open space, utility and social-infrastructure areas.

No building footprints, floor plans, building heights, apartment configurations or building parking levels are evidenced in the supplied records. The HMDA letter describes 5025.88 sq.m—22 plots—as mortgaged to HMDA; it states that mortgaged plots are not to be sold while under mortgage. Layout record

4. Homes, configurations & floor plans

OAKMEADOWS is a plotted project. The supplied RERA data does not include a plot-wise schedule with individual plot sizes, booked counts, available counts or RERA saleable areas. Layout record

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
PlotsNot established from the supplied RERA schedule; drawing software-read count is 198Not disclosedNot disclosedNot disclosedNot applicableNot supplied

The approved-layout drawing is the basis for the software-read plot count; the plot-size extraction is incomplete. The floor-plan review found two layout sheets and no apartment floor plans or measured carpet areas. Layout record Floor plans

5. Parking & vehicle circulation

The supplied record does not establish a parking-space count, visitor or accessible parking provision, parking allocation to individual plots, or EV charging. No parking levels or building parking arrangements are disclosed for this plotted layout. Document index

HMDA’s draft letter describes internal layout roads and requires roads to remain accessible to neighbouring sites; it also states that no compound wall or fencing is to be constructed around the site under the stated layout conditions. These are approval conditions, not proof of current access or road completion.

6. Amenities, recreation & open spaces

The table below separates HMDA-described layout provisions from RERA-filed progress percentages. A listed percentage is a project filing, not independent verification of completion. RERA amenities

Internal roads and footpaths
Description / sizeLayout roads: 14084.03 sq.m; HMDA letter requires paved footpaths.
Evidence sourceHMDA draft layout letter; RERA amenity schedule
Declared progress / verified statusRERA schedule: 30%; not independently verified. RERA amenities
Park / green open space
Description / sizePark: 4362.13 sq.m; RERA schedule also lists green strip/TOT LOT/Park and aggregate recreational open space.
Evidence sourceHMDA draft layout letter; RERA amenity schedule
Declared progress / verified statusRERA schedule: park/green strip 40% and recreational open space 10%; not independently verified. RERA amenities
Open space
Description / size1334.02 sq.m in the HMDA area schedule.
Evidence sourceHMDA draft layout letter
Declared progress / verified statusNo completion evidence supplied.
Community buildings
Description / sizeNo area or facility description supplied.
Evidence sourceRERA amenity schedule
Declared progress / verified status0% reported. RERA amenities
Social infrastructure
Description / sizeIdentified in the HMDA land-use schedule; area not available in the supplied extraction.
Evidence sourceHMDA draft layout letter
Declared progress / verified statusNo completion evidence supplied.
Amenities area
Description / size0 in the HMDA area schedule.
Evidence sourceHMDA draft layout letter
Declared progress / verified statusNo separate amenities-area provision recorded in that schedule.

7. Utilities, building services & safety

HMDA’s draft layout letter lists or requires internal water-supply pipelines and an overhead tank, potable-water arrangements, a common septic tank/STP, underground drainage, storm-water drainage, rainwater-harvesting pits, a transformer yard in the earmarked utilities area, LED street lighting and space for solid-waste disposal. These are described provisions and approval conditions; the supplied evidence does not establish completion, capacities or operating status.

The RERA amenity schedule reports water supply at 40%, sewerage at 30%, water conservation/rainwater harvesting at 10%, and electrical meter room/sub-station/receiving station at 20%. It reports storm-water drains, treatment/disposal of sewage and sullage water, solid-waste management, energy management and fire-protection/safety requirements at 0%. These are filed progress entries, not independent verification or proof of statutory compliance. RERA amenities

No lift, building fire-system, backup-power, CCTV, security, accessible-circulation or utility-capacity information is established in the supplied project material.

8. Location, access & connectivity

The registered project location is WADAKPALLY, Ameenpur Mandal, Sangareddy District, PIN 502319. The HMDA draft letter describes the site’s eastern boundary as an existing 40 feet road and the other three boundaries as neighbouring land. RERA filing

The location record provides one measured connectivity point: the nearest sampled Outer Ring Road interchange is approximately 0.8 km away. This is a supplied location-data distance, not a travel-time estimate. Location record

The HMDA letter refers to a proposed 100 feet wide road affecting part of the site and records a gift deed of the road-affected area to the Wadakpally Village Panchayath. It also requires internal roads to be opened for access to neighbouring sites.

9. Developer & development status

The TG-RERA certificate names Sri Thirumalavasa Developers And Constructions as the registered promoter. A separate RERA-filed firm-status document identifies the promoter as a partnership and names RAJU PITLA and KUMARASWAMY METTU as partners; the promoter address in that record is in Patancheru.

The promoter’s Form B declaration, dated 09 April 2021, states a project completion deadline of 31 August 2021. No revised completion date or extension is established in the supplied evidence. The registration certificate records validity only through 31/08/2021.

The RERA amenity schedule contains filed progress percentages for selected layout works. These percentages are promoter-filed progress information; the supplied material does not include independent site verification or an occupancy/completion certificate. RERA amenities Document index

10. Approvals, official records & documents

RecordWhat the supplied document establishes
TG-RERA certificate, P01100002833Form C registration for OAKMEADOWS under section 5, with validity from 30/04/2021 to 31/08/2021.
HMDA draft layout letter, 000138/LO/Plg/HMDA/2020Draft open-plot layout letter for the stated land at Wadakpalle Village; approved 24 December 2020. The letter describes the draft layout and conditions for development and final release.
HMDA application reference, 031104/SKP/LT/U6/HMDA/28112019Application reference recorded in the HMDA draft layout letter.
Mortgage documentsMortgage deeds 23266/2020 and 23264/2020, both dated 21/12/2020, are referenced in the HMDA letter; the letter identifies 22 plots mortgaged to HMDA and a gift deed for the road-affected area.
Other HMDA-letter referencesNALA conversion proceedings A2/8684/2019-1 and A2/8684/2019-2; Irrigation Department NOC EE/IB/SRD/HD-1/567, dated 16-6-2018.
RERA Form B declarationPromoter declaration dated 09 April 2021, including the stated completion deadline of 31 August 2021.
Occupancy/completion certificateNone is included in the supplied project documents. Document index

Frequently asked questions

Is OAKMEADOWS registered with Telangana RERA?

Yes. OAKMEADOWS is registered with the Telangana Real Estate Regulatory Authority as P01100002833; the registration status is New Project.

Who is the developer of OAKMEADOWS?

The promoter named in the RERA registration is SRI THIRUMALAVASA DEVELOPERS AND CONSTRUCTIONS.

Where is OAKMEADOWS located?

OAKMEADOWS is in Patancheru, WADAKPALLY, AMEENPUR, Sangareddy, Telangana (502319).

When will OAKMEADOWS be completed?

The promoter's proposed date of completion filed with RERA is 31/08/2021. This is the promoter's declaration, not a guarantee.

More projects in Wadakpally