Sree Nilayam
SPA CONSTRUCTIONS · Medchal-Malkajgiri · RERA P02500001526
SREE NILAYAM is a residential apartment project in Pragathi Nagar, Bachupally mandal, Medchal-Malkajgiri district, developed by registered promoter SPA CONSTRUCTIONS, recorded as a partnership. The registered site extent is 3,115.56 sq. m, with 1 building described in the revised approval as 1Cellar + 1Stilt + 5 Upper floors, and 80 apartments: 60 2BHK and 20 3BHK. The project is registered under TG-RERA number P02500001526, with a proposed completion date of 07/06/2024.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | SREE NILAYAM RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | No separate phase name is disclosed. The registration covers the project recorded on Survey Nos. 165, 166, 167, 178 and 179 |
| TG-RERA registration number | P02500001526 RERA record |
| Registration validity | 27/12/2019 to 07/06/2024; the certificate says four years. This is registration validity, not the completion deadline Approvals record |
| Registered promoter | SPA CONSTRUCTIONS; recorded as a partnership Parties record RERA filing |
| RERA project status | On-Going Project RERA filing |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Pragathi Nagar RERA record RERA filing |
| Revenue village | Bachupally RERA record RERA filing |
| Mandal / district / PIN | Bachupally / Medchal-Malkajgiri / 500072 RERA record |
| Project survey numbers | 165, 166, 167, 178 and 179; no subdivision is stated in the project’s survey-number field RERA filing |
| Registered site extent | 3,115.56 sq. m RERA filing |
| Net / total area and affected area | Net area 3,115.56 sq. m; total area 3,115.56 sq. m; area affected by road widening/FTL/nala widening recorded as 0 sq. m RERA filing |
| Boundaries | North: K K R Residency and Srinivas Sadan; South: 30 feet wide road; East: Om Sairam Residency and Anil Pride; West: independent house and open land RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning / technical approval authority | Hyderabad Metropolitan Development Authority (HMDA); the supplied approval documents describe technical approval and refer to local Executive Authority sanction Approvals record |
| Principal approval numbers and dates | HMDA approval no. 000110/MED/R1/U6/HMDA/25062016, approved 09 February 2017; revised application no. 002939/MED/R1/U6/HMDA/19082017, approved 07-Jun-2018 Approvals record |
| Approved built-up area | The HMDA technical-approval extraction lists “Total Built up Area (In Sq.mts) 9615.54”; it separately lists “Built up Area 7790.42” |
| Building count | 1 building / 1 tower is recorded RERA filing RERA unit table |
| Sanctioned floor configuration | The supplied approval records include 1Stilt + 5 floors and a revised description of 1Cellar + 1Stilt + 5 Upper floors |
| Parking levels | Cellar and stilt are identified in the revised floor configuration. The earlier approval says the cellar/stilt is to be used exclusively for vehicle parking |
| Unit count | Approved-plan total: 1 building unit; RERA-filed offering: 80 apartments RERA filing RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configurations | 2BHK: 60 units, 104.13 sq. m saleable area; 3BHK: 20 units, 132.85 sq. m saleable area RERA unit table |
| Booked / available | 63 booked and 17 available in total: 2BHK 53/7; 3BHK 10/10. Portal counts are indicative; no as-of date is supplied RERA unit table |
| Construction-stage record | RERA filing records 90% completeness; this is a filed status, not an independently verified site measurement RERA record |
| Completion dates | Original and revised proposed completion date: 07/06/2024 RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied in the reviewed records. The revised HMDA approval says to approach HMDA for an occupancy certificate after completion |
The project story
SREE NILAYAM is registered as a residential apartment project in Pragathi Nagar, Bachupally, on land identified in the RERA filing as Survey Nos. 165, 166, 167, 178 and 179. The recorded site extent is 3,115.56 sq. m, and the project is described as one building with 80 apartments: 60 two-bedroom and 20 three-bedroom units. RERA record RERA filing RERA unit table
The RERA record gives a 90% completeness figure and a proposed completion date of 07/06/2024, but those are record disclosures rather than independent verification of current site progress. The supplied material does not include a current site inspection or an occupancy/completion certificate. The revised HMDA technical approval describes a cellar, stilt and five upper floors and says to approach HMDA for an occupancy certificate after construction in accordance with the sanctioned plan. RERA record
Master plan, architecture & building design
The supplied HMDA records describe a residential apartment building on the registered 3,115.56 sq. m site. The first technical-approval extraction describes 1Stilt + 5 floors; the revised approval describes 1Cellar + 1Stilt + 5 Upper floors. The revised record also identifies Survey Nos. 165, 166, 167, 178 and 179 and requires the applicant to approach HMDA for an occupancy certificate after completion as per the sanctioned plan.
The approval extraction lists a total built-up area of 9615.54 sq. m and separately lists built-up area of 7790.42. These are presented as separate figures from the approval record; the supplied material does not provide a drawing-based breakdown of footprint, floor areas, FSI-counted area, common areas or apartment carpet areas.
The approval conditions refer to exclusive vehicle-parking use of the cellar/stilt, one entry and one exit with minimum width of 4.5 metres and height clearance of 5 metres, transformer and garbage-house provision, rainwater harvesting, septic tank, and fire-safety requirements. The available material does not include extracted floor plans sufficient to describe flat distribution per floor, lifts, stairs, internal circulation, landscaping or open-space arrangement.
Homes, configurations & floor plans
The RERA-filed offering comprises 80 apartments in one building. The saleable areas below are RERA-filed figures. No carpet-area measurement is available from the supplied drawings: the floor-plan record says no flats were measured, with one scan pending and two drawings containing no flats. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 60 | 53 | 7 | 104.13 sq. m | Not measured from supplied drawings | Not supplied |
| 3BHK | 20 | 10 | 10 | 132.85 sq. m | Not measured from supplied drawings | Not supplied |
The portal’s booked and available counts are indicative because the record does not give an as-of date. Saleable area is the RERA-filed area; it is not a carpet-area measurement. The supplied documents do not provide measured room dimensions, balcony or utility dimensions, or a drawing-based comparison of carpet and saleable area. RERA unit table Floor plans
Parking & vehicle circulation
The HMDA approval describes a cellar and stilt and states that the cellar/stilt is to be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use. The supplied approval also specifies one entry and one exit, each with a minimum width of 4.5 metres and height clearance of 5 metres.
The RERA configuration data does not provide a parking-space count or unit-by-unit allocation. The available records therefore do not establish resident or visitor bay counts, accessible spaces, two-wheeler provision, EV charging, or exclusive parking rights for any particular apartment. A parking arrangement should be confirmed from the relevant sanctioned plan and the buyer’s registered sale documents. RERA unit table
Amenities, recreation & open spaces
The RERA amenity record lists infrastructure and amenity progress figures. These are recorded percentages, not independent verification of completion. The supplied approval documents additionally refer to certain site provisions. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Water supply | No source, storage capacity or treatment detail stated in the RERA amenity entry | RERA amenity record | Available: YES; 80% recorded; not independently verified RERA amenities |
| Sewerage (chamber, lines, septic tank, STP) | No capacity stated | RERA amenity record | Available: YES; 100% recorded; not independently verified RERA amenities |
| Storm-water drains | No further specification stated | RERA amenity record | Available: YES; 100% recorded; not independently verified RERA amenities |
| Green strip / tot lot / park | Area and facilities not stated | RERA amenity record | Available: YES; 50% recorded; not independently verified RERA amenities |
| Rainwater harvesting / water conservation | HMDA approval also calls for rainwater-harvesting structures; capacity not stated | RERA amenity record; HMDA approval RERA amenities | 100% recorded; not independently verified |
| Electrical meter room / sub-station / receiving station | No capacity or equipment detail stated | RERA amenity record | Available: YES; 100% recorded; not independently verified RERA amenities |
| Internal roads and footpaths | Details not stated | RERA amenity record | 0% recorded RERA amenities |
| Street lighting | Details not stated | RERA amenity record | 0% recorded RERA amenities |
| Community buildings | Details not stated | RERA amenity record | 0% recorded RERA amenities |
| Sewage and sullage treatment/disposal | Details not stated | RERA amenity record | 0% recorded RERA amenities |
| Solid-waste management and disposal | Details not stated | RERA amenity record | 0% recorded RERA amenities |
| Energy management | Details not stated | RERA amenity record | 0% recorded RERA amenities |
| Fire protection and fire-safety requirements | HMDA approval specifies fire-safety requirements; no system schedule or capacity is supplied | RERA amenity record; HMDA approval RERA amenities | 0% recorded in RERA amenity entry; not independently verified |
Utilities, building services & safety
The HMDA technical-approval extraction specifies a separate underground static water-storage tank of 25,000 litres and a separate terrace tank of 25,000 litres for residential buildings. It also calls for a septic tank, rainwater-harvesting structures, a transformer and a garbage house within the premises. The revised approval refers to rainwater harvesting but supplies no capacity. These are approval-document provisions; the evidence does not establish their current operational status.
The approval requires fire-safety requirements to be followed, refers to fire-service clearance for the proposed complex, and specifies one entry and one exit with minimum width of 4.5 metres and height clearance of 5 metres. It also states that the applicant should provide an automatic sprinkler system. No fire-clearance certificate, system commissioning record, lift schedule, backup-power specification, accessibility plan, CCTV/access-control schedule or waste-treatment capacity is supplied here.
Location, access & connectivity
The project is registered at Pragathi Nagar, Bachupally village and mandal, Medchal-Malkajgiri district, PIN 500072. The project filing records a 30-foot-wide road on the southern boundary. RERA record RERA filing
The supplied location record lists these measured distances to nearby points:
| Nearby point | Recorded distance |
|---|---|
| Andhra Bank | 0.1 km |
| People’s Hospital | 0.2 km |
| Spring Board International Pre-School | 0.3 km |
| Narayana junior college | 0.5 km |
| Sai Nagar Bus Stop | 1.5 km |
| CMR shopping Mall | 1.7 km |
| JNTU College / nearest metro entry | 2.5 km |
These are location-record distances; the supplied data does not specify route, measurement method or travel time. Location record
Developer & development status
The registered promoter is SPA CONSTRUCTIONS, recorded as a partnership, with its address stated as Plot Nos. 56 & 57, Matrусri Nagar, Pragathi Nagar, Bachupally, Medchal-Malkajgiri, 500072. The filing names K.V. Prasada Rao as authorized signatory and lists Subbaiah Muppa and Ananda Rao Yarramothu as partners, alongside K.V. Prasada Rao. Parties record RERA filing RERA filing
The Form-B affidavit was made by K.V. Prasada Rao as an authorized representative of SPA CONSTRUCTIONS and includes promoter declarations and undertakings. It states a completion period of 21/July/2018; this is the wording in that affidavit, not the project’s RERA proposed completion field.
The RERA filing records 90% completeness and a proposed completion date of 07/06/2024. Registration was valid through 07/06/2024 according to the certificate. The supplied records do not include an extension certificate, current site inspection or occupancy/completion certificate. RERA record
Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form ‘C’ registration certificate for SREE NILAYAM, P02500001526, issued 27/12/2019; valid to 07/06/2024 |
| HMDA technical approval | Approval no. 000110/MED/R1/U6/HMDA/25062016, dated 09 February 2017; technical approval for a residential apartment building, with conditions referring to local Executive Authority sanction |
| Revised HMDA approval | Application no. 002939/MED/R1/U6/HMDA/19082017, approved 07-Jun-2018; describes 1Cellar + 1Stilt + 5 Upper floors and requires an approach for an occupancy certificate after completion as per the sanctioned plan |
| Building plans / layout | The RERA filing identifies plan approval number 000110/MED/R1/U6/HMD. The supplied documents do not include an extracted, complete approved layout or floor-plan set for detailed architectural review RERA filing Document index |
| Promoter declaration | Form-B affidavit-cum-declaration by K.V. Prasada Rao for SPA CONSTRUCTIONS, dated 21 February 2019 |
| Occupancy / completion certificate | Not present in the supplied material; the revised HMDA approval describes the process to approach HMDA for an occupancy certificate after completion |
Project at a glance
Project identity
Registered project name: SREE NILAYAM
Project type: Residential apartment project
Phase / registered portion: No separate phase name is disclosed. The registration covers the project recorded on Survey Nos. 165, 166, 167, 178 and 179
TG-RERA registration number: P02500001526
Registration validity: 27/12/2019 to 07/06/2024; the certificate says four years. This is registration validity, not the completion deadline
Registered promoter: SPA CONSTRUCTIONS; recorded as a partnership
RERA project status: On-Going Project
Land and geographic identity
Locality: Pragathi Nagar
Revenue village: Bachupally
Mandal / district / PIN: Bachupally / Medchal-Malkajgiri / 500072
Project survey numbers: 165, 166, 167, 178 and 179; no subdivision is stated in the project’s survey-number field
Registered site extent: 3,115.56 sq. m
Net / total area and affected area: Net area 3,115.56 sq. m; total area 3,115.56 sq. m; area affected by road widening/FTL/nala widening recorded as 0 sq. m
Boundaries: North: K K R Residency and Srinivas Sadan; South: 30 feet wide road; East: Om Sairam Residency and Anil Pride; West: independent house and open land
Development identity
Sanctioning / technical approval authority: Hyderabad Metropolitan Development Authority (HMDA); the supplied approval documents describe technical approval and refer to local Executive Authority sanction
Principal approval numbers and dates: HMDA approval no. 000110/MED/R1/U6/HMDA/25062016, approved 09 February 2017; revised application no. 002939/MED/R1/U6/HMDA/19082017, approved 07-Jun-2018
Approved built-up area: The HMDA technical-approval extraction lists “Total Built up Area (In Sq.mts) 9615.54”; it separately lists “Built up Area 7790.42”
Building count: 1 building / 1 tower is recorded
Sanctioned floor configuration: The supplied approval records include 1Stilt + 5 floors and a revised description of 1Cellar + 1Stilt + 5 Upper floors
Parking levels: Cellar and stilt are identified in the revised floor configuration. The earlier approval says the cellar/stilt is to be used exclusively for vehicle parking
Unit count: Approved-plan total: 1 building unit; RERA-filed offering: 80 apartments
Offering and status
RERA-filed configurations: 2BHK: 60 units, 104.13 sq. m saleable area; 3BHK: 20 units, 132.85 sq. m saleable area
Booked / available: 63 booked and 17 available in total: 2BHK 53/7; 3BHK 10/10. Portal counts are indicative; no as-of date is supplied
Construction-stage record: RERA filing records 90% completeness; this is a filed status, not an independently verified site measurement
Completion dates: Original and revised proposed completion date: 07/06/2024
Occupancy / completion certificate: No occupancy or completion certificate is supplied in the reviewed records. The revised HMDA approval says to approach HMDA for an occupancy certificate after completion
The project story
SREE NILAYAM is registered as a residential apartment project in Pragathi Nagar, Bachupally, on land identified in the RERA filing as Survey Nos. 165, 166, 167, 178 and 179. The recorded site extent is 3,115.56 sq. m, and the project is described as one building with 80 apartments: 60 two-bedroom and 20 three-bedroom units.
The RERA record gives a 90% completeness figure and a proposed completion date of 07/06/2024, but those are record disclosures rather than independent verification of current site progress. The supplied material does not include a current site inspection or an occupancy/completion certificate. The revised HMDA technical approval describes a cellar, stilt and five upper floors and says to approach HMDA for an occupancy certificate after construction in accordance with the sanctioned plan.
Master plan, architecture & building design
The supplied HMDA records describe a residential apartment building on the registered 3,115.56 sq. m site. The first technical-approval extraction describes 1Stilt + 5 floors; the revised approval describes 1Cellar + 1Stilt + 5 Upper floors. The revised record also identifies Survey Nos. 165, 166, 167, 178 and 179 and requires the applicant to approach HMDA for an occupancy certificate after completion as per the sanctioned plan.
The approval extraction lists a total built-up area of 9615.54 sq. m and separately lists built-up area of 7790.42. These are presented as separate figures from the approval record; the supplied material does not provide a drawing-based breakdown of footprint, floor areas, FSI-counted area, common areas or apartment carpet areas.
The approval conditions refer to exclusive vehicle-parking use of the cellar/stilt, one entry and one exit with minimum width of 4.5 metres and height clearance of 5 metres, transformer and garbage-house provision, rainwater harvesting, septic tank, and fire-safety requirements. The available material does not include extracted floor plans sufficient to describe flat distribution per floor, lifts, stairs, internal circulation, landscaping or open-space arrangement.
Homes, configurations & floor plans
The RERA-filed offering comprises 80 apartments in one building. The saleable areas below are RERA-filed figures. No carpet-area measurement is available from the supplied drawings: the floor-plan record says no flats were measured, with one scan pending and two drawings containing no flats.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 60 | 53 | 7 | 104.13 sq. m | Not measured from supplied drawings | Not supplied |
| 3BHK | 20 | 10 | 10 | 132.85 sq. m | Not measured from supplied drawings | Not supplied |
The portal’s booked and available counts are indicative because the record does not give an as-of date. Saleable area is the RERA-filed area; it is not a carpet-area measurement. The supplied documents do not provide measured room dimensions, balcony or utility dimensions, or a drawing-based comparison of carpet and saleable area.
Parking & vehicle circulation
The HMDA approval describes a cellar and stilt and states that the cellar/stilt is to be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use. The supplied approval also specifies one entry and one exit, each with a minimum width of 4.5 metres and height clearance of 5 metres.
The RERA configuration data does not provide a parking-space count or unit-by-unit allocation. The available records therefore do not establish resident or visitor bay counts, accessible spaces, two-wheeler provision, EV charging, or exclusive parking rights for any particular apartment. A parking arrangement should be confirmed from the relevant sanctioned plan and the buyer’s registered sale documents.
Amenities, recreation & open spaces
The RERA amenity record lists infrastructure and amenity progress figures. These are recorded percentages, not independent verification of completion. The supplied approval documents additionally refer to certain site provisions.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Water supply | No source, storage capacity or treatment detail stated in the RERA amenity entry | RERA amenity record | Available: YES; 80% recorded; not independently verified |
| Sewerage (chamber, lines, septic tank, STP) | No capacity stated | RERA amenity record | Available: YES; 100% recorded; not independently verified |
| Storm-water drains | No further specification stated | RERA amenity record | Available: YES; 100% recorded; not independently verified |
| Green strip / tot lot / park | Area and facilities not stated | RERA amenity record | Available: YES; 50% recorded; not independently verified |
| Rainwater harvesting / water conservation | HMDA approval also calls for rainwater-harvesting structures; capacity not stated | RERA amenity record; HMDA approval | 100% recorded; not independently verified |
| Electrical meter room / sub-station / receiving station | No capacity or equipment detail stated | RERA amenity record | Available: YES; 100% recorded; not independently verified |
| Internal roads and footpaths | Details not stated | RERA amenity record | 0% recorded |
| Street lighting | Details not stated | RERA amenity record | 0% recorded |
| Community buildings | Details not stated | RERA amenity record | 0% recorded |
| Sewage and sullage treatment/disposal | Details not stated | RERA amenity record | 0% recorded |
| Solid-waste management and disposal | Details not stated | RERA amenity record | 0% recorded |
| Energy management | Details not stated | RERA amenity record | 0% recorded |
| Fire protection and fire-safety requirements | HMDA approval specifies fire-safety requirements; no system schedule or capacity is supplied | RERA amenity record; HMDA approval | 0% recorded in RERA amenity entry; not independently verified |
Utilities, building services & safety
The HMDA technical-approval extraction specifies a separate underground static water-storage tank of 25,000 litres and a separate terrace tank of 25,000 litres for residential buildings. It also calls for a septic tank, rainwater-harvesting structures, a transformer and a garbage house within the premises. The revised approval refers to rainwater harvesting but supplies no capacity. These are approval-document provisions; the evidence does not establish their current operational status.
The approval requires fire-safety requirements to be followed, refers to fire-service clearance for the proposed complex, and specifies one entry and one exit with minimum width of 4.5 metres and height clearance of 5 metres. It also states that the applicant should provide an automatic sprinkler system. No fire-clearance certificate, system commissioning record, lift schedule, backup-power specification, accessibility plan, CCTV/access-control schedule or waste-treatment capacity is supplied here.
Location, access & connectivity
The project is registered at Pragathi Nagar, Bachupally village and mandal, Medchal-Malkajgiri district, PIN 500072. The project filing records a 30-foot-wide road on the southern boundary.
The supplied location record lists these measured distances to nearby points:
Andhra Bank: 0.1 km
People’s Hospital: 0.2 km
Spring Board International Pre-School: 0.3 km
Narayana junior college: 0.5 km
Sai Nagar Bus Stop: 1.5 km
CMR shopping Mall: 1.7 km
JNTU College / nearest metro entry: 2.5 km
These are location-record distances; the supplied data does not specify route, measurement method or travel time.
Developer & development status
The registered promoter is SPA CONSTRUCTIONS, recorded as a partnership, with its address stated as Plot Nos. 56 & 57, Matrусri Nagar, Pragathi Nagar, Bachupally, Medchal-Malkajgiri, 500072. The filing names K.V. Prasada Rao as authorized signatory and lists Subbaiah Muppa and Ananda Rao Yarramothu as partners, alongside K.V. Prasada Rao.
The Form-B affidavit was made by K.V. Prasada Rao as an authorized representative of SPA CONSTRUCTIONS and includes promoter declarations and undertakings. It states a completion period of 21/July/2018; this is the wording in that affidavit, not the project’s RERA proposed completion field.
The RERA filing records 90% completeness and a proposed completion date of 07/06/2024. Registration was valid through 07/06/2024 according to the certificate. The supplied records do not include an extension certificate, current site inspection or occupancy/completion certificate.
Approvals, official records & documents
TG-RERA registration: Form ‘C’ registration certificate for SREE NILAYAM, P02500001526, issued 27/12/2019; valid to 07/06/2024
HMDA technical approval: Approval no. 000110/MED/R1/U6/HMDA/25062016, dated 09 February 2017; technical approval for a residential apartment building, with conditions referring to local Executive Authority sanction
Revised HMDA approval: Application no. 002939/MED/R1/U6/HMDA/19082017, approved 07-Jun-2018; describes 1Cellar + 1Stilt + 5 Upper floors and requires an approach for an occupancy certificate after completion as per the sanctioned plan
Building plans / layout: The RERA filing identifies plan approval number 000110/MED/R1/U6/HMD. The supplied documents do not include an extracted, complete approved layout or floor-plan set for detailed architectural review
Promoter declaration: Form-B affidavit-cum-declaration by K.V. Prasada Rao for SPA CONSTRUCTIONS, dated 21 February 2019
Occupancy / completion certificate: Not present in the supplied material; the revised HMDA approval describes the process to approach HMDA for an occupancy certificate after completion
Frequently asked questions
Is SREE NILAYAM registered with Telangana RERA?
Yes. SREE NILAYAM is registered with the Telangana Real Estate Regulatory Authority as P02500001526; the registration status is On-Going Project.
Who is the developer of SREE NILAYAM?
The promoter named in the RERA registration is SPA CONSTRUCTIONS.
Where is SREE NILAYAM located?
SREE NILAYAM is in PRAGATHI NAGAR, Bachupally, Medchal-Malkajgiri, Telangana (500072).
When will SREE NILAYAM be completed?
The promoter's proposed date of completion filed with RERA is 07/06/2024. This is the promoter's declaration, not a guarantee.