Sign in

Dream City

DREAM CITY · Yadadri Bhuvanagiri · RERA P02000008477

DREAM CITY is a plotted development in Saigudam, Alair mandal, Yadadri Bhuvanagiri district, developed by the registered promoter DREAM CITY. The RERA land record states a total and net area of 10,875.42 sq.mt, and the approved tentative residential layout has 46 plots with plot sizes from 93.34 sq.m to 339.55 sq.m; buildings and floors are not disclosed. Its TG-RERA registration number is P02000008477, and the promoter-declared completion date is 3 June 2026.

01What we found

Period endedTG-RERA registration ran to 3 Jun 2026 - check its extension on TG-RERA
16documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Saigudam, Alair, Yadadri Bhuvanagiri · geocoded — approximate.

1. Project at a glance

Project identity

FieldRecord
Registered project nameDREAM CITY RERA record
Project typePlotted development; the registration certificate describes it as “plotted” RERA record
Phase / registered portionPhase not separately identified in the supplied record; registration covers the plotted project on the stated survey land Land records
TG-RERA registrationP02000008477 RERA record
Registration validity15 July 2024 to 3 June 2026, subject to extension by the Authority RERA record
Registered promoterDREAM CITY RERA record
RERA statusThe supplied record identifies it as a “New Project.” The registration’s stated validity ended on 3 June 2026; the supplied evidence does not establish whether it was extended. RERA record Approvals record

Land and geographic identity

FieldRecord
LocalitySaigudem / Saigudam as recorded in the project materials RERA record Land records
Revenue villageSaigudam is the RERA-recorded village; the layout approval also refers to Alair Revenue Village. The supplied materials use both forms. Land records
MandalAlair RERA record Land records
DistrictYadadri Bhuvanagiri RERA record Land records
PIN508101 RERA record
Project survey numbers / subdivisionsRERA land record: 717/EE, 718/E5. The layout-plan instrument also lists 717EE, 718E5, 718/1 and 717/1; these identifiers are retained as stated in that document. Land records
Site extentRERA land record: 10,875.42 sq.mt total and net area. The layout-plan facts separately state “Total Layout Area 10875.42 sq.mt; Total net layout 10875.91 sq.mt.” Land records
BoundariesNorth: 100 feet wide Alair to Jeedikal Road; West: 33 feet wide road; East and South: land of others. Land records
Road-widening / FTL / nala-widening area recorded on RERA land fields0 sq.mts RERA filing

Development identity

FieldRecord
Sanctioning authorityAlair Municipality/Municipal Corporation, Yadadri-Bhuvanagiri District; the filed layout plan identifies TS-DTCP as authority and records delegation to municipalities/nagar panchayats other than UDA. Approvals record
Principal layout approvalTentative Layout Plan No. 0002/LO/3102/2024, approved 03 June 2024 Approvals record p1
Related application / file referencesApplication No. 003186/LO/DTCP/3102/0003/2024; file reference TS/015649/2024 Approvals record
Approved built-up area0.00 proposed built-up area, both excluding and including parking, in the layout-plan parameters; this is a plotted layout rather than a filed building scheme.
Plot count46 plots, according to the approved layout-plan record
Buildings / floors / parking levelsNot disclosed in the supplied project record; the approval is for a tentative residential plot layout, not a building-floor plan.
Approved versus RERA-declared unitsThe approved layout record states 46 individual sub-plots; a separate RERA unit-count register is not supplied.

Offering and status

FieldRecord
OfferingResidential plots in a tentative layout
Plot sizesThe supplied layout drawing extraction identifies 46 plots with sizes from 93.34 sq.m to 339.55 sq.m; these are software-read drawing figures and should be checked against the drawing. Layout record
Booked / available countsNot disclosed in the supplied evidence. Document index
Construction / development stageThe promoter’s Form B declares completion by 3 June 2026. The approval requires infrastructure and amenities within two years of 3 June 2024; the supplied evidence does not independently verify on-site progress or completion. p1
Original / revised completion datePromoter-declared completion date: 3 June 2026. No revised date is supplied.
Occupancy / completion certificate statusNot supplied. The available sanction is a tentative layout approval, not an occupancy or completion certificate.

2. The project story

DREAM CITY is registered as a plotted residential development in the Saigudem/Saigudam area of Alair mandal, Yadadri Bhuvanagiri district. The registration identifies survey numbers 717/EE and 718/E5; the filed layout instrument additionally records 718/1 and 717/1. The approval describes a 46-plot tentative layout, with land reserved for roads, parks/open space, social infrastructure and utilities. RERA record Land records

This is a land subdivision, not an apartment or villa scheme in the supplied sanctioned record. The layout approval describes proposed infrastructure works, and the promoter’s Form B states a completion undertaking of 3 June 2026. Neither that undertaking nor the tentative approval establishes that works have been completed; no independently verified site-progress evidence or occupancy/completion certificate is supplied. p1

3. Master plan, architecture & building design

The filed plan is a tentative residential layout with 46 plots. Its land-use table records 7,223.37 sq.m (66.42%) as plotted area, 2,290.96 sq.m (21.07%) as roads, 980.50 sq.m (9.02%) as organized open space/park, 271.96 sq.m (2.50%) for social infrastructure and 109.12 sq.m (1.00%) for utilities. The layout-plan facts state a net layout total of 10,875.91 sq.m; the RERA land record gives total and net land area as 10,875.42 sq.mt. Land records Layout record

The plan lists existing and proposed roads of 30.00 MT, 10.00 MT, and an internal road of 9.14 mt. Its sanctioned parameters state “TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING 0.00” and “TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING 0.00”; no buildings, floor configuration, building footprint or parking levels are identified in the supplied plan.

The approval reserves plots 33, 32, 31, 29, 30, 28, 22, 21, 20 and 19 as mortgage security, recorded as 0 Acer 11.38 Gts 1377 Sq. Yds in the approval. The drawing extraction describes the mortgage area as 1,151.66 and the approval facts separately state “1083.51 (15%) required; 1151.66 proposed.”

4. Homes, configurations & floor plans

The RERA-filed offering is plotted development, with 46 individual sub-plots in the layout approval. No RERA unit-type register, booked/available inventory, or RERA-filed saleable-area schedule is supplied.

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading
Residential plots46 plots in the tentative layoutNot disclosedNot disclosedNot disclosedNot applicable / not suppliedNot supplied

The drawing-based layout extraction reports plot areas from 93.34 sq.m to 339.55 sq.m, with a median of 166.7 sq.m. The size bands read from the drawing are: 16 plots in the 100–150 sq.yd band, 7 in 150–200 sq.yd, 19 in 200–250 sq.yd, 2 in 300–400 sq.yd and 2 in 400–500 sq.yd. These are software-measured from the layout drawing, not RERA-filed saleable-area figures. Layout record

The supplied floor-plan review contains three drawings: one scan is pending measurement and two have no flats; no software-measured unit or room areas are available. Floor plans

5. Parking & vehicle circulation

The layout-plan land-use table records 0.00 common parking area, and no parking count, parking level, visitor or accessible-parking provision, or individual plot parking allocation is supplied. The plan records road areas and road widths, but does not establish parking rights for any buyer.

The approval identifies the mortgage plots as security for the Municipality/Municipal Corporation; it also states that roads are to remain open for access to neighbouring sites.

6. Amenities, recreation & open spaces

The layout approval identifies reserved open space and social-infrastructure and utility land, and lists proposed layout works and facilities. The RERA amenities record marks some infrastructure as available (“YES”) but records 0 progress for the listed items; no independent completion verification is supplied. RERA amenities

Clubhouse / indoor
Description / sizeNo clubhouse or indoor recreational facility is identified in the supplied RERA/layout record.
Evidence sourceRERA amenities
Declared progress / verified statusNot disclosed / not verified
Sports / recreation
Description / sizeThe plan lists a Tot-lot; the layout reserves 980.50 sq.m for organized open space/park (9.02%).
Declared progress / verified statusProposed in the layout record; completion not verified
Landscape / open space
Description / sizePark/open space: 980.50 sq.m (9.02%); avenue plantation and park development are included in the proposed development works.
Declared progress / verified statusProposed; completion not verified
Convenience / community
Description / sizeSocial infrastructure: 271.96 sq.m (2.50%). Utility land: 109.12 sq.m (1.00%). The plan lists a utility area; no specific community-building facility is detailed.
Declared progress / verified statusReserved/proposed; completion not verified

7. Utilities, building services & safety

The tentative-layout approval describes proposed infrastructure works including an assured water-supply source, internal water-supply pipelines, an overhead tank/sump, storm-water drains, underground drainage lines, a common septic tank/STP, electrical supply lines, transformer, street lighting, solid-waste management, avenue plantation and rainwater-harvesting pits. It also requires construction of a water tank/sump and septic tank as applicable, and sufficient harvesting pits. These are approval-described works and requirements; the supplied evidence does not verify installation or operating capacity.

The RERA amenities record marks internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/tot-lot/park, street lighting, rainwater harvesting and an electrical meter room/sub-station/receiving station as “YES,” while showing 0 progress for the listed items. No capacities, fire-safety design, backup-power provision, CCTV/security system, accessible circulation details or lift provision are supplied. RERA amenities

8. Location, access & connectivity

The registered location is Saigudam, Alair mandal, Yadadri Bhuvanagiri district, Telangana, PIN 508101. The RERA land record gives the northern boundary as the 100 FEET WIDE ALAIR TO JEEDIKAL ROAD and the western boundary as a 33 FEET WIDE ROAD. The layout plan identifies existing and proposed roads of 30.00 MT and 10.00 MT, plus a 9.14 mt internal road. RERA record Land records

The supplied location data gives a geocode of 17.6349762, 79.0701965 and an approximate sampled distance of 46.2 km to the nearest sampled Outer Ring Road interchange. No public-transport details or other measured landmark distances are supplied. Location record

9. Developer & development status

The TG-RERA record names DREAM CITY as the registered promoter and records the organization type as “Others,” with the description “JOINT DEVELOPMENT.” The supplied corporate identifiers include GSTIN 36AAWFD5990L1ZG; the legal entity type is not established in the supplied structured record. RERA record RERA filing Corporate record

The registration certificate gives the promoter’s registered-office address as Village: Ward No. 6, Mandal: Nalgonda, District: Nalgonda, Pin: 508001. Form B is signed by DOSAPATI SRINIVASULU as an authorized representative of M/s. DOSAPATI CONSTRUCTIONS AND DEVELOPERS and identifies three landowners; it refers to Development Agreement-cum-General Power of Attorney No. 8383/2024. p1

The promoter’s Form B declares completion by 3 June 2026 and undertakings concerning project funds and approvals. The supplied evidence does not include verified construction-progress measurements, a revised completion date, or an occupancy/completion certificate. p1

10. Approvals, official records & documents

RecordSupplied evidence and scope
TG-RERA registrationForm C registration certificate for DREAM CITY, P02000008477, covering the plotted project at Saigudam, Alair, Yadadri Bhuvanagiri; stated validity is 15 July 2024 to 3 June 2026.
Tentative layout approval0002/LO/3102/2024, dated 03 June 2024, issued by Alair Municipality/Municipal Corporation; the filed plan is for a 46-plot residential layout. p1
Related layout referencesFile No. TS/015649/2024 and Application No. 003186/LO/DTCP/3102/0003/2024.
Municipal mortgage recordMortgage Deed No. 8099, dated 29 May 2024, for plots 33, 32, 31, 29, 30, 28, 22, 21, 20 and 19 in favour of Alair Municipality/Municipal Corporation. p1
Promoter declarationForm B affidavit-cum-declaration by DOSAPATI SRINIVASULU as authorized representative of M/s. DOSAPATI CONSTRUCTIONS AND DEVELOPERS, dated June 2024; it refers to the landowners and Development Agreement-cum-GPA No. 8383/2024. p1
Occupancy / completion certificateNot supplied. The available approval is a tentative layout approval.
Building approvals / commencement certificatesNo building approval or building commencement certificate is established in the supplied record; the document list includes an item labelled “Commencement Certificates for each building in each phase,” whose extracted content is a tentative layout approval. Document index
Layout-plan drawingTwo layout sheets are recorded; the drawing extraction reports 46 plots and land-use areas. Plot-size readings are software-measured from the drawing. Layout record

Frequently asked questions

Is DREAM CITY registered with Telangana RERA?

Yes. DREAM CITY is registered with the Telangana Real Estate Regulatory Authority as P02000008477; the registration status is New Project.

Who is the developer of DREAM CITY?

The promoter named in the RERA registration is DREAM CITY.

Where is DREAM CITY located?

DREAM CITY is in SAIGUDEM, Saigudam, Alair, Yadadri Bhuvanagiri, Telangana (508101).

When will DREAM CITY be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.

More projects in Alair