Sign in

West County

TUPILI · Rangareddy · RERA P02400007135

WEST COUNTY is a plotted development / open-plot layout in Dhobipet(Mahalingapuram), Shankarpalle Mandal, Ranga Reddy District. The registered promoter is Tupili Avanish. The project has a total site area of 18947.82 sq.m, a net site area of 18477.2 sq.m, and is a plotted layout; the supplied record does not establish a plot count or plot-size range. It is registered under TG-RERA number P02400007135, and the promoter declared completion by 21st August, 2026.

01What we found

Period endedTG-RERA registration ran to 21 Aug 2026 - check its extension on TG-RERA
18documents on file - each fact links to its page
0court cases on this project's land in the court records searched
10items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Dhobipet, Shankarpalle, Ranga Reddy · geocoded — approximate.

1. Project at a glance

Project identity

ItemRecord
Registered projectWEST COUNTY RERA record
Project typePlotted development / open-plot layout RERA record
Phase or registered portionNot separately described; the registration is for the plotted layout on Survey Nos. 52/P and 56/P
TG-RERA registrationP02400007135
Registration validity21/10/2023 to 21/08/2026; certificate records no extension
Registered promoterTupili Avanish; Form B identifies the declarant as AVANISH TUPILI
RERA status in supplied recordRegistered project. The supplied record does not establish current status after the stated validity end date.

Land and geographic identity

ItemRecord
LocalityDhobipet / Dhobipet(Mahalingapuram) RERA record
Revenue villageDhobipet; the registration certificate also gives Dhobipet(Mahalingapuram) RERA record
Mandal / district / PINShankarpalle / Ranga Reddy / 501203 RERA record
Project survey numbers and subdivisionsSurvey Nos. 52/P and 56/P are the registered project identifiers. The title records also describe subdivisions in Surveys 52 and 56; see Land & Title for the deed-by-deed schedule. Land records
Site areaTotal site area: 18947.82 sq.m; master-plan road-affected area: 470.62 sq.m; net site area: 18477.2 sq.m.
BoundariesNorth: OTHERS LAND; South: EXSTING ROAD 33 FEET; East: OTHERS LAND; West: OTHERS LAND. RERA filing

Development identity

ItemRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA)
Principal layout permissionLayout Permit No. 000162/LO/Plg/HMDA/2023, dated 21 August 2023; application No. 061409/SKP/LT/U6/HMDA/01072023
Development typeOpen-plot layout; no tower or apartment-building configuration is recorded.
Approved built-up areaThe project record lists approved built-up area of 11461.96 sq.m; the layout document labels the same figure “Plotted area.” It is not identified here as residential building floor area. RERA filing
Plot count / plot sizesThe drawing extraction does not provide a complete plot schedule or reliable plot-size/count list. Layout record
ParkingNo project-wide parking-space count or allocation is established in the supplied record. RERA amenities

Offering and status

ItemRecord
OfferingPlots; no RERA-filed unit-type schedule, plot-size range, or booked/available inventory is supplied in this evidence. RERA record RERA unit table
Declared completionForm B undertakes completion by 21st August, 2026.
Registration validity vs completionRegistration certificate validity is stated as 21/10/2023–21/08/2026; Form B gives 21st August, 2026 as the promoter’s completion undertaking. These are distinct records of validity and declared completion.
Occupancy certificateAn architect’s Form–1A records an HMDA occupancy certificate numbered 000162/LO/Plg/HMD, dated 05/07/2024, and certifies overall completion of the registered project. The evidence does not state a separate tower or phase scope.
Development statusHMDA’s supplied layout letter describes a draft layout permission and lists required layout works. The supplied record does not independently verify current on-site progress.

2. The project story

WEST COUNTY is a plotted-layout project in Dhobipet, Shankarpalle Mandal, Ranga Reddy District, registered under TG-RERA number P02400007135. The registered land identifiers are Survey Nos. 52/P and 56/P. The HMDA layout record describes an open-plot development, rather than apartment blocks or villas. RERA record

The layout document records 18947.82 sq.m of total site area, including 470.62 sq.m affected by a master-plan road, and a net site area of 18477.2 sq.m. Its stated land-use schedule allocates space to plots, layout roads, parks/open space and social infrastructure.

The promoter declared completion by 21st August, 2026. Separately, the architect’s Form–1A certifies overall completion and records an HMDA occupancy certificate dated 05/07/2024. These are the statements in the supplied filed documents; current site conditions and the scope of the certificate are not independently verified here.

3. Master plan, architecture & building design

The approved layout drawing and HMDA letter concern a plotted layout on Survey Nos. 52/P and 56/P. The drawing-extracted land-use figures are:

Layout componentAreaShare or noteEvidence
Total site area18947.82 sq.m—HMDA layout letter
Master-plan road-affected area470.62 sq.m—HMDA layout letter
Net site area18477.2 sq.m—HMDA layout letter
Plotted area11461.96 sq.mShown as “Plotted area”HMDA layout letter
Layout roads4884.97 sq.m26.44% in the approval conditionsHMDA layout letter
Park / open space1656.08 sq.m8.96% in the approval conditionsHMDA layout letter
Social infrastructure473.95 sq.m2.57% in the approval conditionsHMDA layout letter
Amenities area0As shown in the layout extractionHMDA layout letter

The letter requires development works including road formation, storm-water drains, underground drainage and a common septic tank/STP, internal water-supply lines and an overhead tank, an assured water-supply source, electrical lines and street lights, transformer, avenue planting, park development and rainwater-harvesting pits. The document describes these as required works, not independently verified completed facilities.

No building count, floors, building footprint, or apartment configuration is applicable or established for this plotted-layout evidence. Plot-by-plot arrangement and dimensions are not completely extracted from the two layout sheets. Layout record Floor plans

4. Homes, configurations & floor plans

This is a plotted development. The supplied TG-RERA record does not provide a usable plot inventory showing plot counts, sizes, bookings or availability; the layout extraction also says the plot schedule is incomplete. RERA record RERA unit table Layout record

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
PlotsNot established in supplied RERA scheduleNot disclosedNot disclosedNot disclosedNot applicableNot supplied

The supplied drawing-based extraction reports two layout sheets and no measured home floor plans. Accordingly, there are no software-measured plot dimensions or carpet-area measurements to report. Floor plans Layout record

5. Parking & vehicle circulation

The supplied evidence does not establish a count of sanctioned resident or visitor parking spaces, accessible parking, or parking allocations to individual plots. The HMDA letter requires roads to be opened for access to neighbouring sites and describes layout road formation as part of the development works; it does not provide detailed driveway, vehicle-entry, pedestrian-separation or EV-charging information. RERA amenities

The layout letter records 15 plots, Nos. 14 to 28, mortgaged to HMDA as security for layout works and related conditions. This is an approval-related mortgage arrangement, not a parking allocation.

6. Amenities, recreation & open spaces

The following items are shown in the RERA amenity record or HMDA layout conditions. The percentages in the status column are reported percentages in the amenity data; they are not independent site verification.

Internal roads and footpaths
Description / sizeLayout roads: 4884.97 sq.m
Evidence sourceRERA amenities; HMDA layout letter
Declared progress / verified statusRERA amenity record: 100%; not independently verified
Park / green open space
Description / sizePark area: 1656.08 sq.m
Evidence sourceRERA amenities; HMDA layout letter
Declared progress / verified statusRERA amenity record: Green Strip/TOT LOT/Park 100%; not independently verified
Social infrastructure
Description / size473.95 sq.m; approval record states it is to be handed over to the Local Body by registered gift deed before final layout plans are released
Evidence sourceHMDA layout letter
Declared progress / verified statusRequired handover stated; completion/handover not independently verified
Street lighting
Description / sizeNo quantity or specification supplied
Evidence sourceRERA amenities; HMDA layout conditions
Declared progress / verified statusRERA amenity record: 100%; not independently verified
Sewerage / septic tank / STP
Description / sizeCommon septic tank/STP and underground drainage lines required by the layout conditions
Evidence sourceHMDA layout letter
Declared progress / verified statusRERA amenity record: sewerage 100%; the separate “Treatment and Disposal of Sewage and Sullage Water” field is 0%; not independently verified
Rainwater harvesting
Description / sizeRainwater-harvesting pits required in the layout conditions
Evidence sourceHMDA layout letter
Declared progress / verified statusRERA amenity record: water conservation/rainwater harvesting 100%; not independently verified

The RERA amenity record lists water supply, storm-water drains, community buildings, sewage-treatment/disposal, solid-waste management and fire-safety requirements at 0%; the evidence does not establish those as completed facilities. RERA amenities

7. Utilities, building services & safety

The HMDA layout conditions call for internal water-supply pipelines, an overhead tank and an assured water-supply source; storm-water drains; underground drainage and a common septic tank/STP; electrical supply lines, street lights and a transformer; and rainwater-harvesting pits. These are approval conditions and should not be read as proof of installation or operation.

The amenity record marks water supply, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, energy management and fire protection/fire-safety requirements at 0%. It marks the electrical meter room/sub-station/receiving station at 100%, but the supplied information does not provide capacity or independently verified completion evidence. RERA amenities

No evidence is supplied on backup power, lifts, fire-system specifications, waste segregation procedures, CCTV, access controls or accessible circulation. RERA amenities Floor plans

8. Location, access & connectivity

The registered location is Dhobipet(Mahalingapuram), Shankarpalle Mandal, Ranga Reddy District, Telangana, PIN 501203. The cadastral parcel centroid supplied for the project is 17.47240, 78.08866. RERA record Cadastral map

The layout boundaries recorded in the RERA fields are “OTHERS LAND” to the north, east and west, and “EXSTING ROAD 33 FEET” to the south. HMDA’s layout conditions require roads to be opened for access to neighbouring sites. RERA filing

The location data lists the nearest sampled Outer Ring Road interchange at approximately 19.3 km. No measured public-transport distance or verified travel time is supplied. Location record

9. Developer & development status

The RERA registration names Tupili Avanish as promoter; the Form-B declaration is by AVANISH TUPILI, dated 29th August, 2023, at Hyderabad. The legal entity type, corporate identifiers, registered office and official project contact details are not established in the supplied evidence. Corporate record

Form B declares a completion undertaking of 21st August, 2026. The architect’s Form–1A records overall project completion and an HMDA occupancy certificate dated 05/07/2024. No independent site inspection record or current progress measurement is supplied in this overview evidence.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400007135; issued 21/10/2023; stated validity to 21/08/2026
Scope and evidenceWEST COUNTY, Survey Nos. 52/P and 56/P; certificate records the 70% separate-account condition and no extension.
HMDA layout permission
Identifier / date000162/LO/Plg/HMDA/2023; 21 August 2023
Scope and evidenceDraft layout letter for an open-plot layout in Survey Nos. 52/P and 56/P; includes area schedule, works and conditions.
HMDA application
Identifier / date061409/SKP/LT/U6/HMDA/01072023; application dated 01 July 2023
Scope and evidenceApplication associated with the layout permission.
Form B promoter declaration
Identifier / date29th August, 2023
Scope and evidencePromoter declaration, including stated title basis and completion undertaking.
HMDA occupancy certificate recorded in architect’s Form–1A
Identifier / date000162/LO/Plg/HMD; 05/07/2024
Scope and evidenceArchitect’s certificate states overall project completion and records the occupancy certificate; scope is not further broken down by phase or portion.
Layout mortgage deed
Identifier / dateDocument No. 3704/2023; 10/08/2023
Scope and evidenceMortgage over Plot Nos. 14 to 28, stated extent 2338.65 sq.m, in favour of HMDA.
Road-affected-area gift deed
Identifier / dateDocument No. 3706/2023; 10.08.2023
Scope and evidenceHMDA letter states road-affected area was handed over by gift deed; the same letter gives differing area figures in its extracted text.

The HMDA DPMS approved-layout lookup is not publicly reachable in the supplied record, so no additional portal lookup result is available here. HMDA

Frequently asked questions

Is WEST COUNTY registered with Telangana RERA?

Yes. WEST COUNTY is registered with the Telangana Real Estate Regulatory Authority as P02400007135; the registration status is New Project.

Who is the developer of WEST COUNTY?

The promoter named in the RERA registration is TUPILI.

Where is WEST COUNTY located?

WEST COUNTY is in Dhobipet, Dhobipet(Mahalingapuram), Shankarpalle, Rangareddy, Telangana (501203).

When will WEST COUNTY be completed?

The promoter's proposed date of completion filed with RERA is 21/08/2026. This is the promoter's declaration, not a guarantee.

More projects in Shankarpalle