VENKATASAI TOWNSHIP is a residential plotted layout in KHANAPUR Revenue Village, Adilabad Urban Mandal, Adilabad District, developed by registered promoter SRI LAXMI VENKATESHWARA DEVELOPERS. The tentative layout approval states a site extent of 10 Acer 14.5 Gts 50156 Sq. Yds and provides for 146 plots; no tower, block, or floor configuration is stated. Plot sizes are from 109.3 sq. m to 264.2 sq. m, as software-read from the layout drawing. The project is registered with TG-RERA as P00100007247, and its proposed completion date is 30/11/2026.

01What we found

Period endedTG-RERA registration ran to 1 May 2026 - check its extension on TG-RERA
10documents on file - each fact links to its page
1court case on this project's land (survey 60, Khanapur)
7items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Khanapur, Adilabad Urban, Adilabad · geocoded — approximate.

1. Project at a glance

Project identity

FieldRecord
Registered project nameVENKATASAI TOWNSHIP RERA record
Project typePlotted development; the tentative layout approval describes a residential plotted layout. RERA record
Phase / registered portionPhase not separately identified in the supplied record; registration identifies the layout on the survey numbers listed below.
TG-RERA registrationP00100007247
Registration validity11/11/2023 to 01/05/2026, for two years, unless extended by the Authority. The certificate records no extension. This is registration validity, not the completion deadline.
Registered promoterSRI LAXMI VENKATESHWARA DEVELOPERS; partnership. RERA filing Corporate record
RERA status in supplied recordNew Project; certificate issued under section 5. The supplied certificate’s validity ended on 01/05/2026 and states that extension would require Authority action; no extension is recorded in the supplied evidence. RERA record

Land and geographic identity

FieldRecord
Locality / revenue villageKHANAPUR Revenue Village (also recorded as Khanapur).
MandalAdilabad Urban in the RERA certificate; Adilabad Mandal in the tentative layout approval.
District / PINAdilabad / 504001.
Project survey numbers and subdivisions59/3, 59/4/1, 59/4/2 and 60/1/1.
Site extentThe tentative layout approval states 10 Acer 14.5 Gts 50156 Sq. Yds. The RERA land record states total area 41936.8 sq. m and net area 41936.80 sq. m. Land records
Layout-area statementNet layout area 41903.13 sq. m, as read from the approved layout drawing. Layout record
Boundaries in RERA land recordEast: OTHERS LAND; West: ROAD; North: OTHERS LAND; South: OTHERS LAND. Land records

Development identity

FieldRecord
Sanctioning authorityADILABAD Municipality/Municipal Corporation. The RERA record lists DTCP as the authority name. RERA filing
Principal approvalTentative Layout Plan No. 0004/LO/3025/2023, approved 02 May, 2023. Application No. 001953/LO/DTCP/3025/0007/2023.
Approved built-up area22751 sq. m, recorded in the RERA project fields. RERA filing
Layout organizationTentative approval for 146 plots. No tower or block count, floor configuration, or building-specific approval is supplied.
Mortgage areaRERA records 3555 sq. m; the layout drawing reads 3555.01 sq. m. The approval identifies plots reserved under mortgage to the Municipality/Municipal Corporation pending development conditions. RERA filing Layout record
ParkingNo parking-space count or parking layout is established in the supplied records. RERA amenities Document index

Offering and status

FieldRecord
OfferingPlots in a plotted layout; the RERA-filed layout approval states 146 plots.
Plot count and size informationThe layout drawing’s schedule was software-read as 146 plots, with sizes from 109.3 sq. m to 264.2 sq. m. This is drawing-derived and should be checked against the drawing. Layout record
Booked / available countsNot disclosed in the supplied evidence. Document index
Completion datesForm B declaration undertakes completion by 01/05/2026; the project header records proposed completion 30/11/2026. RERA record
Construction / development stageThe supplied amenity records show 0% progress for listed items. No independent site-progress verification is supplied. RERA amenities
Occupancy / completion certificateNo occupancy or completion certificate is supplied. The record concerns a plotted layout; no phase- or plot-specific OC status is established. Document index

2. The project story

VENKATASAI TOWNSHIP is a proposed residential plotted layout in KHANAPUR Revenue Village, Adilabad District, registered with TG-RERA as P00100007247. The registered survey identity is 59/3, 59/4/1, 59/4/2 and 60/1/1. The tentative layout approval is for 146 plots and allocates land among plots, roads, open space, utilities and social infrastructure.

The layout approval places responsibility for infrastructure and amenity works on the applicant. It describes roads, drainage, water-supply infrastructure, electrical works, park development and rainwater-harvesting works as part of layout development. These are approval requirements or proposed works—not evidence that the works have been completed. The supplied RERA amenity progress entries are 0%; no independent site inspection or verified construction-progress report is provided. RERA amenities

The promoter’s Form B declaration states a completion undertaking of 01/05/2026; the project header separately records 30/11/2026 as the proposed completion date. Neither should be read as proof of physical completion. No completion or occupancy certificate is included in the supplied materials. RERA record Document index

3. Master plan, architecture & building design

This is a plotted layout, not a tower or apartment scheme in the supplied approval record. The tentative layout approval covers 146 plots on the stated survey parcels. No apartment-building arrangement, tower heights, floor configuration, number of flats per floor, lifts, stairs or building footprints is established by the supplied evidence.

The approval’s land-use statement gives the following layout allocation:

Layout componentArea stated in tentative approvalShare
Plotted area5 Acer 24.87 Gts; 27210 Sq. Yds54.29%
Road area3 Acer 13.91 Gts; 16204 Sq. Yds32.33%
Open space (park)0 Acer 37.5 Gts; 4537 Sq. Yds9.05%
Social infrastructure0 Acer 10.56 Gts; 1277 Sq. Yds2.55%
Utilities0 Acer 4.18 Gts; 505 Sq. Yds1.01%
Mortgage area of plotted area0 Acer 35.14 Gts; 4252 Sq. Yds15.56% of plotted area, as printed

Separately, software measurement of the layout drawing reports net layout area 41903.13 sq. m, comprising plots, roads, parks/open space, utilities, and social infrastructure. These are drawing-derived figures, not a separate building-area measurement. Layout record No FSI-counted, gross built-up, carpet or saleable area for homes is established for this plotted offering. The RERA field records approved built-up area of 22751 sq. m, without further breakdown in the supplied record. RERA filing

The layout approval identifies specified plots as mortgaged to the Municipality/Municipal Corporation until the approval conditions are met and the mortgage is released. Layout record

4. Homes, configurations & floor plans

The registered offering is plots. The RERA-filed approval states 146 plots; the layout drawing’s plot schedule was software-read as 146 plots, with sizes from 109.3 sq. m (130.7 sq. yd) to 264.2 sq. m (316.0 sq. yd). The software-derived schedule indicates 15 plots in the 100–150 sq. yd band, 127 in the 150–200 sq. yd band, 2 in the 200–250 sq. yd band, 1 in the 250–300 sq. yd band, and 1 in the 300–400 sq. yd band. Verify these drawing reads against the approved schedule. Layout record

Plot-size bandPlot countMeasurement basis
100–150 sq. yd (84–125 sq. m)15Software-read from layout drawing
150–200 sq. yd (125–167 sq. m)127Software-read from layout drawing
200–250 sq. yd (167–209 sq. m)2Software-read from layout drawing
250–300 sq. yd (209–251 sq. m)1Software-read from layout drawing
300–400 sq. yd (251–334 sq. m)1Software-read from layout drawing

No RERA-filed booked or available plot counts, plot-wise saleable areas, or completed unit agreements are supplied. Apartment carpet-area and loading measures do not apply to the plotted offering; no plot-specific carpet or building-area schedule is established. Document index Floor plans

5. Parking & vehicle circulation

The supplied records do not establish parking-space counts, visitor or accessible parking, parking allocation to individual plots, or a separate parking facility. Document index The tentative approval requires roads to be opened for access to neighbouring sites and requires road formation as part of layout development; it does not, in the supplied extract, document completed road works or a parking arrangement.

The approval lists road area of 3 Acer 13.91 Gts (16204 Sq. Yds), or 32.33%, in its land-use statement. This is layout road allocation, not evidence of parking provision or individual parking rights.

6. Amenities, recreation & open spaces

The RERA amenity record lists facilities and shows 0% progress for the entries. The tentative layout approval describes development works and land reserved for public/open-space uses; the record does not establish completion or independent verification of these facilities. RERA amenities

Green strip / park / recreational open space
Description / sizeOpen space: 0 Acer 37.5 Gts (4537 Sq. Yds), 9.05% in the approval; the layout drawing reads 3793.68 sq. m.
Evidence sourceLayout record RERA amenities
Declared progress / verified statusRERA amenity progress 0%; completion not independently verified.
Community buildings
Description / sizeListed in the RERA amenity register; no size or further description supplied.
Evidence sourceRERA amenities
Declared progress / verified statusProgress 0%; no completion verification supplied.
Social infrastructure
Description / size0 Acer 10.56 Gts (1277 Sq. Yds), 2.55% in the approval; the layout drawing reads 1068.03 sq. m.
Evidence sourceLayout record
Declared progress / verified statusReserved area shown; facility delivery not established.
Internal roads and footpaths
Description / sizeInternal roads and footpaths listed; approval also requires road formation with black top.
Evidence sourceRERA amenities
Declared progress / verified statusRERA progress 0%; no independent completion verification.
Avenue plantation
Description / sizeIncluded in the layout development works.
Declared progress / verified statusCompletion not established.

7. Utilities, building services & safety

The tentative layout approval describes the following as development works: water reservoir, internal water-supply pipelines, overhead tank and assured water-supply source; septic tank/common septic tank or STP, underground drainage lines, storm-water drains and rainwater-harvesting pits; electrical supply lines, transformer and street lights; solid-waste management; and park development. It does not provide capacities or evidence that these facilities are complete.

Water
Supplied evidenceWater reservoir, overhead tank, internal supply pipelines and an assured water-supply source are specified in the approval.
Status limitationProposed/required development works; source details, storage capacity and completion are not supplied.
Sewerage and drainage
Supplied evidenceUnderground drainage lines, common septic tank / STP, storm-water drains and rainwater-harvesting pits are specified.
Status limitationNo capacity, treatment details or completion verification supplied.
Electrical
Supplied evidenceElectrical supply lines, transformer and street lights are specified.
Status limitationNo capacity, backup or completion verification supplied.
Solid waste
Supplied evidenceSolid-waste management is specified in the approval and listed in the amenity register.
Status limitationNo operating details or completion verification supplied.
Fire and life safety
Supplied evidenceFire-protection and fire-safety requirements appear in the RERA amenity register.
Status limitationProgress is recorded as 0%; no fire clearance or completed system evidence is supplied.
Accessibility
Supplied evidenceRoads and footpaths are listed as amenities; the approval requires roads to be opened for neighbouring-site access.
Status limitationNo accessible-route or ramp details are supplied.
Lifts / building services
Supplied evidenceNot applicable to the evidenced plotted-layout offering; no building-specific service details supplied.
Status limitationNot established in the supplied record.

8. Location, access & connectivity

The registered project location is KHANAPUR Revenue Village, Adilabad Urban Mandal, Adilabad District, Telangana, PIN 504001. The project’s registered survey numbers are 59/3, 59/4/1, 59/4/2 and 60/1/1.

The location record provides one sampled connectivity point: Outer Ring Road (nearest sampled interchange, approx) — 14.3 km. Location record The supplied data does not identify the approach road, public-transport services, or other nearby landmarks, and does not support travel-time claims.

9. Developer & development status

The registered promoter is SRI LAXMI VENKATESHWARA DEVELOPERS, recorded as a partnership, with GSTIN 36AEVFS4826F1Z1. The supplied promoter address is SHANTINAGAR ROAD, KHANAPUR, KHANAPUR, Adilabad Urban, Adilabad, 504001. RERA filing Corporate record Parties record

The Form B affidavit is sworn by MAHESHWER SINGH and dated 02 day of Nov- 2023. It declares legal title, states that the land is free from encumbrances, and includes undertakings concerning project funds, withdrawals, audit, pending approvals and non-discrimination. These are promoter declarations, not independent verification.

No independently verified construction progress, phase-wise delivery schedule, or completion/occupancy certificate is supplied. The RERA amenity progress entries are 0%. The project header records proposed completion 30/11/2026. RERA amenities RERA record Document index

10. Approvals, official records & documents

TG-RERA registration certificate, Form C
Identifier / dateP00100007247; issued 11/11/2023; valid to 01/05/2026 unless extended
What the supplied record establishesRegisters VENKATASAI TOWNSHIP and lists the project survey numbers, promoter and registration conditions. No extension is recorded in the supplied certificate.
Tentative layout approval
Identifier / date0004/LO/3025/2023, 02 May, 2023; ADILABAD Municipality/Municipal Corporation
What the supplied record establishesApproval for a tentative residential plotted layout of 146 plots, with land-use allocations and development/handover conditions. It expressly states that tentative layout approval is not proof of land title.
Layout application
Identifier / date001953/LO/DTCP/3025/0007/2023
What the supplied record establishesApplication number recorded in the layout approval.
Mortgage deeds listed in approval
Identifier / date4081/2023 and 4080/2023, dated 29 April, 2023
What the supplied record establishesListed in connection with plots reserved under mortgage to the Municipality/Municipal Corporation.
Form B declaration
Identifier / dateDated 02 day of Nov- 2023
What the supplied record establishesPromoter declaration addressing title, encumbrances, completion, funds, approvals and audit.
Occupancy / completion certificate
Identifier / dateNot supplied
What the supplied record establishesNo such certificate is established in the provided project documents. Document index

The supplied project materials also include a title report, an encumbrance statement and a layout plan record; their detailed land and title analysis belongs in the corresponding report sections.

Frequently asked questions

Is VENKATASAI TOWNSHIP registered with Telangana RERA?

Yes. VENKATASAI TOWNSHIP is registered with the Telangana Real Estate Regulatory Authority as P00100007247; the registration status is New Project.

Who is the developer of VENKATASAI TOWNSHIP?

The promoter named in the RERA registration is SRI LAXMI VENKATESHWARA DEVELOPERS.

Where is VENKATASAI TOWNSHIP located?

VENKATASAI TOWNSHIP is in KHANAPUR, Adilabad Urban, Adilabad, Telangana (504001).

When will VENKATASAI TOWNSHIP be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.