Dream Park
ARRA AMARENDER REDDY · Adilabad · RERA P00100007300
DREAM PARK is a plotted development in ADILABAD MUNICIPALITY ADILABAD, Adilabad Urban Mandal, Adilabad District, developed by registered promoter Arra Amarender Reddy. The registered site extent is 28,794.55 sq. m, and the tentative layout provides 85 plots; buildings, towers or floors are not applicable to the supplied plotted-layout plan. The offering is plots, with a software-measured size range of 126.24–272.54 sq. m (151–326 sq. yd). It is registered with TG-RERA under P00100007300, with proposed completion on 30/11/2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered name | DREAM PARK RERA record |
| Project type | Plotted development RERA record RERA filing |
| Phase / registered portion | No phase designation disclosed; the registration covers the listed survey numbers |
| TG-RERA registration | P00100007300 |
| Registration validity | 24/11/2023 to 23/04/2026; the certificate records a two-year validity, subject to extension by the Authority |
| Registered promoter | Arra Amarender Reddy (also recorded as ARRA AMARENDER REDDY) RERA record |
| RERA status in supplied record | Registered. No extension is recorded in the supplied certificate; the certificate’s stated validity ended on 23/04/2026. |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | ADILABAD MUNICIPALITY ADILABAD RERA record |
| Revenue village | Adilabad Municipality Adilabad in the RERA record; the tentative layout approval describes the site as ADILABAD Revenue Village. RERA record |
| Mandal | Adilabad Urban RERA record |
| District | Adilabad RERA record |
| PIN | 504001 |
| Survey numbers and subdivisions | 112/22, 122/1, 122/2/1/2, 122/2/2, 123, 83/1, 84, 120/1, 121/1, 121/2, 123/1 and 125/1/2 |
| Registered site extent | 28,794.55 sq. m RERA filing |
| Layout drawing area statement | Total site area 28,793.2 sq. m; the drawing’s land-use table totals 27,071.48 sq. m. Layout record |
| Boundaries | East: OTHERS LAND; West: OTHERS LAND; North: ROAD; South: ROAD RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | ADILABAD Municipality/Municipal Corporation |
| Principal layout approval | Tentative Layout Plan No. 0025/LO/3025/2023, approved 08 May 2023 |
| Application number | 013750/LO/DTCP/3025/0043/2022 |
| Approved layout provision | 85 plots |
| Approved built-up area | 13,526 sq. m, as recorded in the RERA filing; not a building-floor or plot-sale area. RERA filing |
| Buildings / floors | Not applicable to the supplied plotted-layout plan; no building count or floor configuration is disclosed. |
| Mortgage area | 2,112 sq. m in the RERA filing; the layout approval identifies 0 Acer 20.87 Gts 2526 Sq. Yds reserved through specified mortgaged plots. RERA filing |
Offering and status
| Field | Record |
|---|---|
| Unit type and count | Plots; 85 plots shown in the tentative layout approval and plot schedule Layout record |
| Plot-size range | Software-measured from the approved layout drawing: 126.24–272.54 sq. m (151–326 sq. yd); verify against the drawing. Layout record |
| Booked / available | Not disclosed in the supplied data. |
| Construction / development stage | RERA status is “New Project”; the supplied record gives no independently verified on-site progress. RERA filing |
| Completion date | RERA record: proposed completion 30/11/2026. The filed Form B separately states completion by 24 April 2026. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied documents; this is a plotted layout, and the supplied approval is tentative. |
2. The project story
- DREAM PARK is a plotted layout in Adilabad, registered with TG-RERA under P00100007300. The RERA record identifies the site as Adilabad Municipality Adilabad, Adilabad Urban Mandal, Adilabad District, and lists 12 survey numbers/subdivisions. The layout approval describes a tentative plan with 85 plots and shared roads, park/open space, utility land and social-infrastructure land. RERA record
- The approved layout conditions place responsibility for infrastructure and amenity works on the applicant and describe roads, storm-water drains, underground drainage, water-supply lines and storage, electrical lines and street lighting, avenue planting, park development and rainwater-harvesting pits. These are approval requirements and specified development works—not evidence that they have been completed. The supplied amenity status records 0% progress for each listed item, and no independent site-progress verification is provided. RERA amenities
3. Master plan, architecture & building design
- This is a plotted development rather than a building or apartment project. The approval identifies 85 plots; the drawing-derived schedule records 85 plots with sizes ranging from 126.24 to 272.54 sq. m. The area schedule read from the approved drawing allocates 13,526.31 sq. m to plots, 8,820.27 sq. m to roads, 2,491.33 sq. m to parks/open space, 274.15 sq. m to utilities and 747.24 sq. m to social infrastructure; amenities are shown as 0 sq. m. These are software-read drawing figures and should be checked against the plan. Layout record
- The RERA filing records an approved built-up area of 13,526 sq. m. The supplied evidence does not provide building footprints, building plans, floors, tower or block organization, or building-level designs. The layout approval is expressly tentative and states that layout approval is not proof of land title. RERA filing
4. Homes, configurations & floor plans
- The offering evidenced here is plots, not apartments or villas. No RERA-filed plot configuration, booked/available inventory breakdown, saleable-area schedule by plot, or unit-specific agreement is supplied. The floor-plan data contains no measured plans or flats. RERA record Floor plans
- The layout drawing’s plot schedule, read by software, identifies 85 plots. Its stated size bands are:
| Plot size band | Number of plots |
|---|---|
| 150–200 sq. yd (125–167 sq. m) | 66 |
| 200–250 sq. yd (167–209 sq. m) | 7 |
| 250–300 sq. yd (209–251 sq. m) | 7 |
| 300–400 sq. yd (251–334 sq. m) | 5 |
- The listed range is software-measured from the drawing, not a RERA-filed saleable-area schedule. The layout approval permits detached dwelling houses designed for occupation by a single family on a site; this is an approval condition, not a description of completed houses. Layout record
5. Parking & vehicle circulation
- The supplied documents do not establish a parking count, visitor or accessible parking provision, or parking allocation to individual purchasers. The layout approval identifies internal roads and requires roads to be opened for access to neighbouring sites; it does not supply road widths, driveway details or vehicle-circulation measurements.
- The approval identifies plots 74, 77, 73, 78, 72, 79, 71, 80, 70, 81, 69, 82, 68 and 83 as mortgaged to the Municipality/Municipal Corporation, pending completion of development works and release of the mortgage. This is an authority mortgage condition, not an individual plot parking allocation.
6. Amenities, recreation & open spaces
The RERA amenity entries show 0% progress for all 14 listed items; the approval separately describes development works or land reservations. No independent completion verification is provided. RERA amenities
| Description / size | Approval: 0 Acer 24.63 Gts 2980 Sq. Yds (8.65%). Drawing-derived area schedule: 2,491.33 sq. m. Layout record |
|---|---|
| Evidence source | Tentative layout approval and drawing |
| Declared progress / verified status | RERA amenity entry records 0%; completion not independently verified. RERA amenities |
| Description / size | 0 Acer 7.39 Gts 894 Sq. Yds (2.6%) |
|---|---|
| Evidence source | Tentative layout approval |
| Declared progress / verified status | Progress/completion not established. |
| Description / size | Approval: 2 Acer 7.18 Gts 10549 Sq. Yds (30.63%). Drawing-derived area schedule: 8,820.27 sq. m. Layout record |
|---|---|
| Evidence source | Tentative layout approval and drawing |
| Declared progress / verified status | RERA amenity entry for internal roads and footpaths records 0%; completion not independently verified. RERA amenities |
| Description / size | 0 Acer 2.71 Gts 328 Sq. Yds (0.95%) |
|---|---|
| Evidence source | Tentative layout approval |
| Declared progress / verified status | Progress/completion not established. |
| Description / size | Required works described in the approval; no quantity or planted area specified |
|---|---|
| Evidence source | Tentative layout approval |
| Declared progress / verified status | Not independently verified; the RERA green-strip/park entry records 0%. RERA amenities |
| Description / size | No size or quantity supplied RERA amenities |
|---|---|
| Evidence source | RERA amenity entry |
| Declared progress / verified status | Progress recorded as 0%. RERA amenities |
No clubhouse, indoor recreation, sports facilities or other sized community amenities are established in the supplied evidence.
7. Utilities, building services & safety
- The tentative layout approval describes the following proposed or required infrastructure: an assured water source, internal water-supply pipelines, an overhead tank and/or sump; underground drainage and a common septic tank/STP; storm-water drains; electrical supply lines, transformer and streetlights; solid-waste management; and rainwater-harvesting pits. These are approval conditions and development-work descriptions, not confirmation of installed or operational services.
- The RERA amenity list includes water supply, sewerage, storm-water drainage, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, energy management, fire protection and fire-safety requirements, and an electrical meter room/sub-station/receiving station. Each has 0% recorded progress; the supplied material provides no capacities, detailed designs, clearances or independent completion evidence. RERA amenities
8. Location, access & connectivity
- The registered location is ADILABAD MUNICIPALITY ADILABAD, Adilabad Urban Mandal, Adilabad District, PIN 504001. The layout approval describes the site as being in ADILABAD Revenue Village, Adilabad Mandal, Adilabad District. The recorded boundaries are road to the north and south, and other land to the east and west. RERA record RERA filing
- The supplied location record lists Financial District (Nanakramguda) at 1.2 km and provides cadastral-parcel-centroid coordinates of 17.41528, 78.35459. No approach-road names, public-transport details or other verified nearby landmarks are supplied. Location record
9. Developer & development status
- The registered promoter is Arra Amarender Reddy, with the RERA record also using ARRA AMARENDER REDDY. The filed Form B is a promoter declaration: it states that the land is free from encumbrances, declares a legal-title basis and gives a completion undertaking of 24 April 2026. The declaration’s OCR records the declarant name as “ARRA AMARENDAR READY”; the supplied data does not establish a separate legal entity type or provide a verified corporate registration identifier. RERA record Corporate record
- The registration certificate states validity from 24/11/2023 through 23/04/2026. The RERA project record gives a proposed completion date of 30/11/2026. No extension order or independently verified construction-progress report is included here. RERA record
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C for DREAM PARK, registration P00100007300; issued 24/11/2023, valid through 23/04/2026 subject to extension. |
| Principal layout approval | Tentative Layout Plan No. 0025/LO/3025/2023, approved 08 May 2023 by ADILABAD Municipality/Municipal Corporation. |
| Layout application | 013750/LO/DTCP/3025/0043/2022. |
| Layout plan / drawing | Four layout sheets are recorded; the drawing-derived schedule identifies 85 plots and land-use areas. Layout record |
| Promoter declaration | Form B affidavit includes declarations on title basis, encumbrances, funds, audits, pending approvals and a completion undertaking; OCR identifies the declarant as “ARRA AMARENDAR READY.” |
| Completion / occupancy certificate | None supplied. The available approval is for a tentative layout plan, not an occupancy or completion certificate. |
The registration certificate requires quarterly updates and records conditions concerning agreements for sale, conveyance and the separate account. This overview does not treat those certificate conditions as evidence of subsequent performance.
1. Project at a glance
Project identity
Registered name: DREAM PARK
Project type: Plotted development
Phase / registered portion: No phase designation disclosed; the registration covers the listed survey numbers
TG-RERA registration: P00100007300
Registration validity: 24/11/2023 to 23/04/2026; the certificate records a two-year validity, subject to extension by the Authority
Registered promoter: Arra Amarender Reddy (also recorded as ARRA AMARENDER REDDY)
RERA status in supplied record: Registered. No extension is recorded in the supplied certificate; the certificate’s stated validity ended on 23/04/2026.
Land and geographic identity
Locality: ADILABAD MUNICIPALITY ADILABAD
Revenue village: Adilabad Municipality Adilabad in the RERA record; the tentative layout approval describes the site as ADILABAD Revenue Village.
Mandal: Adilabad Urban
District: Adilabad
PIN: 504001
Survey numbers and subdivisions: 112/22, 122/1, 122/2/1/2, 122/2/2, 123, 83/1, 84, 120/1, 121/1, 121/2, 123/1 and 125/1/2
Registered site extent: 28,794.55 sq. m
Layout drawing area statement: Total site area 28,793.2 sq. m; the drawing’s land-use table totals 27,071.48 sq. m.
Boundaries: East: OTHERS LAND; West: OTHERS LAND; North: ROAD; South: ROAD
Development identity
Sanctioning authority: ADILABAD Municipality/Municipal Corporation
Principal layout approval: Tentative Layout Plan No. 0025/LO/3025/2023, approved 08 May 2023
Application number: 013750/LO/DTCP/3025/0043/2022
Approved layout provision: 85 plots
Approved built-up area: 13,526 sq. m, as recorded in the RERA filing; not a building-floor or plot-sale area.
Buildings / floors: Not applicable to the supplied plotted-layout plan; no building count or floor configuration is disclosed.
Mortgage area: 2,112 sq. m in the RERA filing; the layout approval identifies 0 Acer 20.87 Gts 2526 Sq. Yds reserved through specified mortgaged plots.
Offering and status
Unit type and count: Plots; 85 plots shown in the tentative layout approval and plot schedule
Plot-size range: Software-measured from the approved layout drawing: 126.24–272.54 sq. m (151–326 sq. yd); verify against the drawing.
Booked / available: Not disclosed in the supplied data.
Construction / development stage: RERA status is “New Project”; the supplied record gives no independently verified on-site progress.
Completion date: RERA record: proposed completion 30/11/2026. The filed Form B separately states completion by 24 April 2026.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied documents; this is a plotted layout, and the supplied approval is tentative.
2. The project story
- DREAM PARK is a plotted layout in Adilabad, registered with TG-RERA under P00100007300. The RERA record identifies the site as Adilabad Municipality Adilabad, Adilabad Urban Mandal, Adilabad District, and lists 12 survey numbers/subdivisions. The layout approval describes a tentative plan with 85 plots and shared roads, park/open space, utility land and social-infrastructure land.
- The approved layout conditions place responsibility for infrastructure and amenity works on the applicant and describe roads, storm-water drains, underground drainage, water-supply lines and storage, electrical lines and street lighting, avenue planting, park development and rainwater-harvesting pits. These are approval requirements and specified development works—not evidence that they have been completed. The supplied amenity status records 0% progress for each listed item, and no independent site-progress verification is provided.
3. Master plan, architecture & building design
- This is a plotted development rather than a building or apartment project. The approval identifies 85 plots; the drawing-derived schedule records 85 plots with sizes ranging from 126.24 to 272.54 sq. m. The area schedule read from the approved drawing allocates 13,526.31 sq. m to plots, 8,820.27 sq. m to roads, 2,491.33 sq. m to parks/open space, 274.15 sq. m to utilities and 747.24 sq. m to social infrastructure; amenities are shown as 0 sq. m. These are software-read drawing figures and should be checked against the plan.
- The RERA filing records an approved built-up area of 13,526 sq. m. The supplied evidence does not provide building footprints, building plans, floors, tower or block organization, or building-level designs. The layout approval is expressly tentative and states that layout approval is not proof of land title.
4. Homes, configurations & floor plans
- The offering evidenced here is plots, not apartments or villas. No RERA-filed plot configuration, booked/available inventory breakdown, saleable-area schedule by plot, or unit-specific agreement is supplied. The floor-plan data contains no measured plans or flats.
- The layout drawing’s plot schedule, read by software, identifies 85 plots. Its stated size bands are:
150–200 sq. yd (125–167 sq. m): 66
200–250 sq. yd (167–209 sq. m): 7
250–300 sq. yd (209–251 sq. m): 7
300–400 sq. yd (251–334 sq. m): 5
- The listed range is software-measured from the drawing, not a RERA-filed saleable-area schedule. The layout approval permits detached dwelling houses designed for occupation by a single family on a site; this is an approval condition, not a description of completed houses.
5. Parking & vehicle circulation
- The supplied documents do not establish a parking count, visitor or accessible parking provision, or parking allocation to individual purchasers. The layout approval identifies internal roads and requires roads to be opened for access to neighbouring sites; it does not supply road widths, driveway details or vehicle-circulation measurements.
- The approval identifies plots 74, 77, 73, 78, 72, 79, 71, 80, 70, 81, 69, 82, 68 and 83 as mortgaged to the Municipality/Municipal Corporation, pending completion of development works and release of the mortgage. This is an authority mortgage condition, not an individual plot parking allocation.
6. Amenities, recreation & open spaces
The RERA amenity entries show 0% progress for all 14 listed items; the approval separately describes development works or land reservations. No independent completion verification is provided.
| Description / size | Approval: 0 Acer 24.63 Gts 2980 Sq. Yds (8.65%). Drawing-derived area schedule: 2,491.33 sq. m. |
|---|---|
| Evidence source | Tentative layout approval and drawing |
| Declared progress / verified status | RERA amenity entry records 0%; completion not independently verified. |
| Description / size | 0 Acer 7.39 Gts 894 Sq. Yds (2.6%) |
|---|---|
| Evidence source | Tentative layout approval |
| Declared progress / verified status | Progress/completion not established. |
| Description / size | Approval: 2 Acer 7.18 Gts 10549 Sq. Yds (30.63%). Drawing-derived area schedule: 8,820.27 sq. m. |
|---|---|
| Evidence source | Tentative layout approval and drawing |
| Declared progress / verified status | RERA amenity entry for internal roads and footpaths records 0%; completion not independently verified. |
| Description / size | 0 Acer 2.71 Gts 328 Sq. Yds (0.95%) |
|---|---|
| Evidence source | Tentative layout approval |
| Declared progress / verified status | Progress/completion not established. |
| Description / size | Required works described in the approval; no quantity or planted area specified |
|---|---|
| Evidence source | Tentative layout approval |
| Declared progress / verified status | Not independently verified; the RERA green-strip/park entry records 0%. |
| Description / size | No size or quantity supplied |
|---|---|
| Evidence source | RERA amenity entry |
| Declared progress / verified status | Progress recorded as 0%. |
No clubhouse, indoor recreation, sports facilities or other sized community amenities are established in the supplied evidence.
7. Utilities, building services & safety
- The tentative layout approval describes the following proposed or required infrastructure: an assured water source, internal water-supply pipelines, an overhead tank and/or sump; underground drainage and a common septic tank/STP; storm-water drains; electrical supply lines, transformer and streetlights; solid-waste management; and rainwater-harvesting pits. These are approval conditions and development-work descriptions, not confirmation of installed or operational services.
- The RERA amenity list includes water supply, sewerage, storm-water drainage, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, energy management, fire protection and fire-safety requirements, and an electrical meter room/sub-station/receiving station. Each has 0% recorded progress; the supplied material provides no capacities, detailed designs, clearances or independent completion evidence.
8. Location, access & connectivity
- The registered location is ADILABAD MUNICIPALITY ADILABAD, Adilabad Urban Mandal, Adilabad District, PIN 504001. The layout approval describes the site as being in ADILABAD Revenue Village, Adilabad Mandal, Adilabad District. The recorded boundaries are road to the north and south, and other land to the east and west.
- The supplied location record lists Financial District (Nanakramguda) at 1.2 km and provides cadastral-parcel-centroid coordinates of 17.41528, 78.35459. No approach-road names, public-transport details or other verified nearby landmarks are supplied.
9. Developer & development status
- The registered promoter is Arra Amarender Reddy, with the RERA record also using ARRA AMARENDER REDDY. The filed Form B is a promoter declaration: it states that the land is free from encumbrances, declares a legal-title basis and gives a completion undertaking of 24 April 2026. The declaration’s OCR records the declarant name as “ARRA AMARENDAR READY”; the supplied data does not establish a separate legal entity type or provide a verified corporate registration identifier.
- The registration certificate states validity from 24/11/2023 through 23/04/2026. The RERA project record gives a proposed completion date of 30/11/2026. No extension order or independently verified construction-progress report is included here.
10. Approvals, official records & documents
TG-RERA registration: Form C for DREAM PARK, registration P00100007300; issued 24/11/2023, valid through 23/04/2026 subject to extension.
Principal layout approval: Tentative Layout Plan No. 0025/LO/3025/2023, approved 08 May 2023 by ADILABAD Municipality/Municipal Corporation.
Layout application: 013750/LO/DTCP/3025/0043/2022.
Layout plan / drawing: Four layout sheets are recorded; the drawing-derived schedule identifies 85 plots and land-use areas.
Promoter declaration: Form B affidavit includes declarations on title basis, encumbrances, funds, audits, pending approvals and a completion undertaking; OCR identifies the declarant as “ARRA AMARENDAR READY.”
Completion / occupancy certificate: None supplied. The available approval is for a tentative layout plan, not an occupancy or completion certificate.
The registration certificate requires quarterly updates and records conditions concerning agreements for sale, conveyance and the separate account. This overview does not treat those certificate conditions as evidence of subsequent performance.
Frequently asked questions
Is DREAM PARK registered with Telangana RERA?
Yes. DREAM PARK is registered with the Telangana Real Estate Regulatory Authority as P00100007300; the registration status is New Project.
Who is the developer of DREAM PARK?
The promoter named in the RERA registration is ARRA AMARENDER REDDY.
Where is DREAM PARK located?
DREAM PARK is in ADILABAD MUNICIPALITY ADILABAD, Adilabad Urban, Adilabad, Telangana (504001).
When will DREAM PARK be completed?
The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.