SRI VEENA TOWNSHIP is a plotted development at Khanapu Revenue Village, Adilabad Urban Mandal, Adilabad district, Telangana 504001. The registered promoter is Alluri Veena Reddy. The layout covers 16,954.15 sq. m and has 69 residential plots, with drawing-derived plot sizes ranging from 125.31 sq. m to 180.14 sq. m; no towers or floors are specified. It is registered with TG-RERA as P00100006352, and the promoter’s Form B states a proposed completion date of 28/12/2025.

01What we found

Period endedTG-RERA registration ran to 28 Dec 2025 - check its extension on TG-RERA
10documents on file - each fact links to its page
0court cases on this project's land in the court records searched
10items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Khanapur, Adilabad Urban, Adilabad · geocoded — approximate.

1. Project at a glance

Project identity

FieldRecord
Registered project nameSRI VEENA TOWNSHIP RERA record
Project typePlotted development / residential open-plot layout RERA record
Phase or registered portionNot identified as a numbered phase; the RERA certificate identifies the registered project and Survey No. 54/1.
TG-RERA registrationP00100006352, issued 07/07/2023; registration certificate states validity through 28/12/2025. Approvals record
RERA status in supplied recordThe registration period shown in the certificate has ended; no extension is recorded in the supplied evidence. Current status should be confirmed with TG-RERA.
Registered promoterAlluri Veena Reddy; RERA identity fields also show “ALLURI.” RERA record Corporate record
Legal entity typeNot disclosed in the supplied project record. Corporate record

Land and geographic identity

FieldRecord
Locality / site descriptionKhanapu Revenue Village, Adilabad Municipality; the RERA record describes the locality as “KHANAPU REVENUE VILLAGE ADILABAD MUNICIPALITY.” RERA record RERA filing
Revenue villageKhanapur (also shown in approval and RERA records as “KHANAPUR” / “KHANAPU”). RERA record
MandalAdilabad Urban in the RERA registration record; the layout approval document says “ADILABAD Mandal.” RERA record
District / PINAdilabad, Telangana 504001. RERA record
Project survey number(s)54/1. The cadastral record also identifies parent Survey No. 54; it is not a separate project survey subdivision in the RERA identity. RERA record Land records Cadastral map
RERA-filed site area16,954.15 sq. m total and net area. RERA filing
Drawing-derived layout area16,953.73 sq. m; the layout area statement identifies the same figure as the net layout area. Layout record
Boundaries filed with RERAEast: ROAD; west, north and south: OTHERS LAND. RERA filing
PIN504001. RERA record

Development identity

FieldRecord
Sanctioning authorityAdilabad Municipality / Municipal Corporation. Approvals record
Principal layout approvalTentative Layout Plan No. 0016/LO/3025/2022, dated 29 December 2022; application No. 009888/LO/DTCP/3025/0026/2022. Approvals record
Approved plot count69 plots in the tentative layout approval.
Approved built-up area9,975.83 sq. m is shown in the RERA project fields; its precise scope is not specified there. RERA filing
Buildings / floorsNot applicable to the plotted layout as described in the supplied approval; no building-count or floor-configuration schedule is provided.
ParkingNo parking-space count or separate parking schedule is provided. The layout approval identifies roads and plots; vendor filing describes parking as “Internal Roads & Footpaths.” Promoter website
Mortgage areaRERA fields show 1,504 sq. m; the layout drawing-derived record gives 1,504.54 sq. m, with the approval identifying specified plots as mortgaged to the Municipality. RERA filing Layout record

Offering and status

FieldRecord
Unit typeResidential plots. RERA record
Plot count and sizesSoftware-read from the approved layout drawing: 69 plots; smallest 125.31 sq. m (149.9 sq. yd), median 137.92 sq. m (165.0 sq. yd) and largest 180.14 sq. m (215.4 sq. yd). These are drawing-derived readings, not RERA-filed unit-level areas. Layout record
Booked / available countsNot supplied. RERA filing
Construction stageThe RERA certificate identifies the project as a “New Project.” No independently verified site-progress record is supplied; amenity progress entries show 0% where recorded. RERA record RERA amenities
Completion deadlineThe promoter’s Form B undertaking states 28/12/2025.
Registration validityCertificate validity is stated as 07/07/2023 to 28/12/2025; this is distinct from a completion certificate or occupancy certificate.
Completion / occupancy certificateNo completion certificate or occupancy certificate is identified in the supplied project documents. Document index

2. The project story

SRI VEENA TOWNSHIP is registered as a plotted residential development at Khanapur Revenue Village, Adilabad Municipality, in Survey No. 54/1. The RERA record identifies 69 plots, and the approval on file is for a tentative layout plan rather than a building scheme. RERA record

The layout’s drawing-derived area statement allocates land to plots, internal roads, park/open space, utilities and social infrastructure. The approval makes the developer responsible for carrying out layout infrastructure and identifies a 60 fts approach road. The approval also says that roads are to remain accessible to neighbouring sites and that open space, utilities and roads are to be handed over to the Municipality by registered gift deed before release of the final layout. Layout record

The promoter’s Form B declares a completion deadline of 28/12/2025. The supplied record does not establish current site progress, final-layout release, or completion/occupancy certification. A vendor description calls the development “completed,” but that is a vendor statement, not proof of completion or an authority-issued certificate. Promoter website Document index

3. Master plan, architecture & building design

This is a plotted layout, not a multi-storey residential building project in the supplied approval. The tentative layout approval covers 69 plots on Survey No. 54/1. The drawing-derived area statement records a net layout area of 16,953.73 sq. m, allocated as follows: Layout record

Layout useAreaShare of net layout area
Plots9,975.28 sq. m58.84%
Roads4,665.42 sq. m27.52%
Parks / open space1,706.04 sq. m10.06%
Utilities180.62 sq. m1.07%
Social infrastructure426.38 sq. m2.51%
Amenities0.00 sq. m0.00%

The plot schedule and areas are software-read from the layout drawing. The drawing record reports 69 plots, with sizes from 125.31 sq. m to 180.14 sq. m; the software-reading caveat applies. Layout record

The RERA filing lists an approved built-up area of 9,975.83 sq. m, but does not state its scope. It should not be treated as a plot-area figure or as a building floor-area schedule. No building footprints, floor configurations, or building-level plans are described in the supplied evidence. RERA filing Document index

4. Homes, configurations & floor plans

The project offers plots rather than apartments. There are no apartment configurations, carpet areas, or floor plans in the supplied records. The approved layout drawing’s plot schedule was software-read; the source states that the plot count and sizes should be verified against the drawing. Layout record Floor plans

Plot informationSupplied figureBasis
Plot count69Tentative layout approval and software-read plot schedule Layout record
Smallest plot125.31 sq. m / 149.9 sq. ydSoftware-measured from layout drawing Layout record
Median plot137.92 sq. m / 165.0 sq. ydSoftware-measured from layout drawing Layout record
Largest plot180.14 sq. m / 215.4 sq. ydSoftware-measured from layout drawing Layout record
Most common drawing-listed size137.92 sq. m / 165.0 sq. yd; 39 plotsSoftware-read from drawing schedule Layout record
Booked / availableNot suppliedNot disclosed in the supplied RERA fields

The floor-plan record contains two layout sheets and no flat floor plans. Apartment carpet-area or loading comparisons therefore do not apply to the evidence supplied. Floor plans

5. Parking & vehicle circulation

No sanctioned parking-space count, visitor or accessible parking allocation, or individual plot parking allocation is shown in the supplied documents. The vendor specification describes parking as “Internal Roads & Footpaths”; this does not establish a dedicated parking inventory or exclusive parking rights. Promoter website

The layout approval identifies a 60 fts approach road and requires roads to be open for access to neighbouring sites. Internal road area is shown as 4,665.42 sq. m in the drawing-derived area statement. No driveway dimensions, pedestrian separation plan, or EV-charging provision is supplied. Layout record

6. Amenities, recreation & open spaces

The approval assigns area for park/open space, utilities and social infrastructure. It also lists layout development works and infrastructure to be provided by the applicant. The amenity record has no reported progress beyond 0% entries; no independent completion verification is supplied. RERA amenities

Landscape / open space
FacilityPark / open space
Description / size1,706.04 sq. m; approval states 10.06%
Evidence sourceLayout record
Declared progress / verified statusPlanned in approval; completion not independently verified
Convenience / community
FacilitySocial infrastructure site
Description / size426.38 sq. m; approval states 2.51%
Evidence sourceLayout record
Declared progress / verified statusReserved in the area statement; specific facility and delivery status not supplied
Landscape / open space
FacilityAvenue plantation and park development
Description / sizeNo further size or planting schedule supplied
Declared progress / verified statusRequired as layout development work; completion not verified
Convenience / community
FacilityInternal roads and footpaths
Description / sizeRoad area 4,665.42 sq. m in drawing-derived area statement
Evidence sourceLayout record Promoter website
Declared progress / verified statusProvided for in the layout; completion not verified

No clubhouse, indoor recreation facilities, or separately specified sports facilities are identified in the supplied record.

7. Utilities, building services & safety

The tentative layout approval lists infrastructure works to be undertaken by the applicant, including water supply arrangements, drainage, electricity and rainwater harvesting. These are approval conditions or specified works, not evidence that the facilities have been completed or commissioned.

Water
What the supplied record saysInternal water-supply pipelines, overhead tank and an assured water-supply source are listed; the approval also refers to a water reservoir.
Status in supplied evidenceRequired / described in approval; capacity and completion not supplied.
Sewerage and drainage
What the supplied record saysUnderground drainage lines, storm-water drains and a common septic tank / STP are listed.
Status in supplied evidenceRequired / described in approval; treatment capacity and completion not supplied.
Electrical
What the supplied record saysElectrical supply lines, transformer and street lights are listed.
Status in supplied evidenceRequired / described in approval; capacity and commissioning status not supplied.
Rainwater
What the supplied record saysRainwater-harvesting pits are listed.
Status in supplied evidenceRequired / described in approval; number, capacity and completion not supplied.
Solid waste
What the supplied record saysSolid-waste management appears in the amenity record and vendor specifications.
Status in supplied evidenceListed; system design and delivery status not supplied. RERA amenities Promoter website
Fire and life safety
What the supplied record saysFire protection and fire-safety requirements appear in the amenity record, but no project-specific system details or clearance are supplied.
Status in supplied evidenceDetails and completion not established. RERA amenities
Accessibility / circulation
What the supplied record saysThe approval requires open roads for access to neighbouring sites; no accessible-route or ramp details are supplied.
Status in supplied evidenceNot specified beyond road-access condition.

8. Location, access & connectivity

The registered location is Khanapu Revenue Village, Adilabad Municipality, Adilabad, Telangana 504001, in Survey No. 54/1. The RERA fields identify the mandal as Adilabad Urban and the district as Adilabad. RERA record RERA filing

The layout approval describes a 60 fts approach road. The supplied location data identifies the nearest sampled Outer Ring Road interchange at approximately 14.3 km; this is a supplied mapped-distance estimate, not a travel-time claim. No public-transport details or other verified landmark distances are provided. Location record

9. Developer & development status

The TG-RERA certificate names Alluri Veena Reddy as promoter; the project identity fields use “ALLURI.” The supplied project record does not identify the promoter’s legal entity type, corporate registration number, registered office, official website, or project contact details beyond the site address. Corporate record RERA record

In Form B dated 14 April 2023, the promoter declared that the project would be completed by 28/12/2025 and made the stated RERA-account, audit and approval undertakings. These are promoter declarations. The supplied evidence does not establish current physical progress, final-layout release, or completion/occupancy certification. Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Supplied detailsFORM ‘C’; project SRI VEENA TOWNSHIP; registration P00100006352; validity 07/07/2023–28/12/2025; promoter Alluri Veena Reddy.
Tentative layout approval
Supplied detailsApproval No. 0016/LO/3025/2022, dated 29 December 2022, issued by Adilabad Municipality / Municipal Corporation; for residential open plots on Survey No. 54/1; records 69 plots.
Layout application
Supplied detailsApplication No. 009888/LO/DTCP/3025/0026/2022; application date 19/09/2022.
Approval-related mortgage
Supplied detailsMortgage Deed No. 9124, dated 21 December 2022; approval identifies Plots 69, 68, 67, 66, 65, 57, 58, 59, 56, 55 and 54 in favour of the Municipality.
Promoter declaration
Supplied detailsForm B by Alluri Veena Reddy, dated 14 April 2023, including the declared completion date 28/12/2025.
Layout drawing
Supplied detailsDrawing-derived layout schedule and area statement; two layout sheets are recorded.
SourceLayout record
Completion / occupancy certificate
Supplied detailsNo such certificate is identified in the supplied evidence.
SourceDocument index

The layout approval itself states that tentative layout approval is not proof of land title and requires the applicant to complete the specified development works and hand over the open space, utilities and roads by registered gift deed before release of the final layout.

Frequently asked questions

Is SRI VEENA TOWNSHIP registered with Telangana RERA?

Yes. SRI VEENA TOWNSHIP is registered with the Telangana Real Estate Regulatory Authority as P00100006352; the registration status is New Project.

Who is the developer of SRI VEENA TOWNSHIP?

The promoter named in the RERA registration is ALLURI.

Where is SRI VEENA TOWNSHIP located?

SRI VEENA TOWNSHIP is in KHANAPU REVENUE VILLAGE ADILABAD MUNICIPALITY, Khanapur, Adilabad Urban, Adilabad, Telangana (504001).

When will SRI VEENA TOWNSHIP be completed?

The promoter's proposed date of completion filed with RERA is 28/12/2025. This is the promoter's declaration, not a guarantee.