Vasudaika Whistling Woods

VASUDAIKA VENTURES LLP · Rangareddy · RERA P02400005800

VASUDAIKA WHISTLING WOODS is a plotted development in Harshaguda, Maheshwaram Mandal, Ranga Reddy District. It is being developed by the registered promoter VASUDAIKA VENTURES LLP. The project covers **21,194.8 sq. mts** and the HMDA draft layout records **45 plots**; the offering is open plots, with no plot-size configurations stated. Its TG-RERA registration is **P02400005800**, and the promoter’s Form B undertakes completion by **20 APRIL 2025**.

01What we found

Period endedTG-RERA registration ran to 20 Apr 2025 - check its extension on TG-RERA
46documents on file - each fact links to its page
2court cases on this project's land (survey 665, 679, Harshaguda)
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Harshaguda, Maheshwaram, Ranga Reddy · geocoded — approximate.

1. Project at a glance

Project identity

ItemProject record
Registered nameVASUDAIKA WHISTLING WOODS RERA record
Project typePlotted development / open-plots layout RERA record RERA filing
Phase / registered portionNo separate phase is identified in the supplied record; the registration covers the project identified in the certificate.
TG-RERA registrationP02400005800
Registration validityCertificate states valid from 15/03/2023 to 20/04/2025; the supplied certificate records no extension. Registration validity is distinct from the project completion date and occupancy/completion record.
Registered promoterVASUDAIKA VENTURES LLP, an LLP RERA record Corporate record
RERA status in supplied recordRegistered; certificate validity ended 20/04/2025, with extension recorded as false. Current registration status beyond the supplied record is not independently verified.

Land and geographic identity

ItemProject record
Locality / revenue villageHarshaguda; the layout approval describes Harshaguda Village and also refers to Mankhal Revenue Village. The supplied project identity records Harshaguda; the relationship between locality and revenue-village naming is not independently verified here. RERA record
Mandal / district / PINMaheshwaram, Ranga Reddy (approval also says R.R. District), 501359 RERA record
Project survey numbers665/P and 679/P
Total site area21,194.8 sq. mts
Area affected by Master Plan road703.21 sq. mts
Net site area20,491.59 sq. mts
Boundaries in RERA project recordEast: 33 FT WIDE ROAD; west, north and south: NEIGHBOURS LAND RERA filing

Development identity

ItemProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA)
Principal approvalDraft Layout Permit 003719/LO/HMDA/0452/SMD/2021, dated 20.04.2022
Final layout releaseHMDA Final Layout with open plots, approval 003719/LO/HMDA/0452/SMD/2021, dated 14.06.2023
Approved built-up area2,049.59 sq. mts is recorded in the project fields. The supplied layout approvals describe an open-plots development and do not provide a building schedule or building count. RERA filing
Layout scale and land allocationDraft approval records 45 plots. It lists plotted area 12,779.69 sq. mts, park 1,539.72 sq. mts, social infrastructure 514.38 sq. mts, layout roads 5,360.60 sq. mts, amenities area 297.19 sq. mts, and utilities area 0 sq. mts.
Buildings / floors / parking levelsNo tower or block count, floor configuration, parking level schedule, or building parking count is supplied for this plotted layout.

Offering and status

ItemProject record
Offered productOpen plots; the supplied vendor record labels the configuration “Villa Plots,” but RERA approval describes open plots. Promoter website
Plot count45 plots in the HMDA draft layout approval. Plot-size bands, plot-wise dimensions, and booked/available counts are not supplied.
Construction stageArchitect’s Form–1A certifies the project completed in all aspects and records completion as 14/6/2023. This is a filed architect’s certificate; no independent site inspection evidence is supplied.
Completion / registration datesPromoter’s Form B undertakes completion by 20 APRIL 2025; the RERA certificate also ends on 20/04/2025. These are distinct from the architect’s recorded completion date of 14/6/2023.
Occupancy / completion recordThe architect’s certificate records HMDA occupancy certificate number 003719/LO/HMDA/0452/SMD/2021, dated 14/6/2023, and certifies overall project completion. The HMDA final-layout document is dated 14.06.2023; these records concern the open-plots layout, not residential buildings or individual houses.

2. The project story

VASUDAIKA WHISTLING WOODS is a plotted residential layout in Harshaguda, Maheshwaram Mandal, Ranga Reddy District, on project land identified as survey numbers 665/P and 679/P. HMDA’s draft permit describes an open-plots layout with 45 plots; the later HMDA record is a final layout release with open plots. The supplied records do not establish that houses or villas have been constructed, or provide plot-wise sizes, booking status, or availability. RERA record

The draft permit reports a total site area of 21,194.8 sq. mts, including 703.21 sq. mts affected by a Master Plan road, and a net area of 20,491.59 sq. mts. HMDA’s final-layout record states that the identified roads, open-space/park, utilities and social-infrastructure land were handed over to the local body by registered Gift Deed 12003/2022. The architect’s Form–1A records completion on 14/6/2023; this is a filed professional certification, not an independent site inspection.

3. Master plan, architecture & building design

This is a plotted layout, not a multi-storey apartment or villa-building scheme in the supplied approvals. HMDA’s draft permit records 45 plots and the following land allocation: 12,779.69 sq. mts plotted area; 1,539.72 sq. mts park; 514.38 sq. mts social infrastructure; 5,360.60 sq. mts layout roads; 297.19 sq. mts amenities area; and 0 sq. mts utilities area. The final-layout record separately lists 297.19 sq. mts of utilities and 615.19 sq. mts of social infrastructure handed over to the local body. These are the figures stated in the respective filed approval records; no reconciliation is made here.

The supplied approved-layout record identifies internal roads and open-space land, but does not provide plot-size bands, a plot-by-plot schedule, building footprints, building heights, floor configurations, or architectural plans for houses. The 2,049.59 sq. mts approved built-up-area figure appears in the project fields; the supplied approval documents do not explain its scope or provide a building schedule. No FSI-counted area, carpet area, or saleable area is supplied for individual plots. RERA filing

4. Homes, configurations & floor plans

The registered offering is plotted development. The HMDA draft permit records 45 plots, but the supplied data does not include RERA configuration counts by plot size, plot-wise saleable areas, booking or availability figures, or measured plot areas.

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading
Open plots (layout approval records 45 plots)45Not suppliedNot suppliedNot suppliedNot applicable / not suppliedNot supplied

Two drawing sheets are recorded, but neither has been measured; both are pending scan review. The floor-plan data describes any future drawing-based carpet-area measurement as software-measured rather than RERA-filed; no measured result is available. Floor plans

5. Parking & vehicle circulation

The supplied project evidence does not establish a sanctioned parking count, visitor or accessible parking, parking locations, parking allocation to individual plots, or any parking levels. The HMDA draft permit refers to roads within the layout and requires roads to remain open for access to neighbouring sites, but the supplied information does not specify a complete internal vehicle-circulation plan or parking arrangements.

6. Amenities, recreation & open spaces

HMDA’s draft permit and final-layout record describe layout infrastructure and land allocations. The RERA amenity register marks several infrastructure categories “YES” but reports 0% progress for the listed items; this records the filed status, not independently verified completion. RERA amenities

Park / open space
Description / sizeDraft layout: 1,539.72 sq. mts; final-layout record: 1,539.72 sq. mts open-space/park land
Evidence sourceHMDA draft permit and final-layout record
Declared progress / verified statusFinal-layout record states land was handed over to the local body by registered Gift Deed 12003/2022; independent inspection of park development is not supplied.
Social infrastructure
Description / sizeDraft layout: 514.38 sq. mts; final-layout record: 615.19 sq. mts
Evidence sourceHMDA draft permit and final-layout record
Declared progress / verified statusFinal-layout record states land was handed over to the local body by registered Gift Deed 12003/2022; facility details and delivery status are not supplied.
Amenities area
Description / size297.19 sq. mts in the draft layout record
Evidence sourceHMDA draft permit
Declared progress / verified statusLand allocation recorded; facility inventory and completion status not supplied.
Internal roads and footpaths
Description / sizeRoads: 5,360.60 sq. mts in the draft layout; final-layout record also lists 5,360.60 sq. mts
Evidence sourceHMDA draft permit and final-layout record
Declared progress / verified statusFinal-layout record states road land was handed over to the local body; independent condition verification is not supplied.
Water supply and internal water-supply lines
Description / sizeDraft permit calls for protected water supply, overhead tank, sumps and internal pipelines
Evidence sourceHMDA draft permit
Declared progress / verified statusApproval-condition / proposed infrastructure description; independently verified completion is not supplied.
Sewerage, storm-water drainage and rainwater harvesting
Description / sizeDraft permit lists underground drainage, storm-water drains, rainwater-harvesting pits and an independent sewerage-disposal system
Evidence sourceHMDA draft permit
Declared progress / verified statusApproval-condition / proposed infrastructure description; independently verified completion is not supplied.
Street lighting and avenue planting
Description / sizeLED street lights and avenue plantation are specified in the draft permit
Evidence sourceHMDA draft permit
Declared progress / verified statusApproval-condition / proposed infrastructure description; independently verified completion is not supplied.
Other marketed facilities
Description / sizeVendor lists a swimming pool, kids’ play area, walking and cycling tracks, gated entrance, security and compound wall
Evidence sourceVendor Promoter website
Declared progress / verified statusPromoter-marketed claims; no supplied approval or completion evidence establishes delivery.

7. Utilities, building services & safety

HMDA’s draft permit specifies protected water supply, an overhead tank and sumps, internal water-supply pipelines, underground storm-water drainage, underground drainage lines, independent sewerage disposal, rainwater-harvesting pits, electrical supply lines, a transformer, street lighting, solid-waste disposal and a bio-compost unit. It also calls for source segregation of garbage. These are approval-condition descriptions; the supplied evidence does not independently verify installation, operation, capacities, or current service levels.

The final-layout record lists water supply, sewerage and drainage disposal, street lighting, rainwater-harvesting structure and civic amenities. The supplied records do not specify water source or storage capacity, treatment capacity, electrical backup, EV charging, fire systems, security-system specifications, accessibility provisions, or utility capacities. RERA amenities

8. Location, access & connectivity

The registered project location is Harshaguda, Maheshwaram Mandal, Ranga Reddy District, Telangana 501359. The project boundary information records a 33 FT WIDE ROAD to the east. A supplied location record gives the nearest sampled Outer Ring Road interchange as approximately 4.9 km away. RERA record RERA filing Location record

The project data does not provide verified public-transport details, measured distances to other landmarks, or travel times. The vendor record includes travel-time claims, but these are not treated as verified connectivity measurements. Location record Promoter website

9. Developer & development status

The registered legal promoter is VASUDAIKA VENTURES LLP, an LLP. The supplied corporate identifier is GSTIN 36AATFV4950F1ZO. The registered-office address is not fully established by the supplied record: the project promoter information gives PLOT NO 163/2, PATRIKA NAGAR, while the RERA certificate’s promoter-office field is incomplete. RERA record Corporate record RERA filing

J. Venkat Ram is identified as the promoter’s authorized signatory in the Form B declaration, dated 02/11/2022; that declaration undertakes completion by 20 APRIL 2025. The architect’s Form–1A records completion on 14/6/2023 and certifies the project complete in all aspects. No independent site-progress inspection or plot-wise sold/unsold schedule is supplied.

10. Approvals, official records & documents

TG-RERA registration certificate, Form C
Identifier / dateP02400005800, issued 15/03/2023; valid through 20/04/2025 as stated in the certificate
What it establishesRegistration of VASUDAIKA WHISTLING WOODS and the certificate’s validity and conditions.
HMDA Draft Layout Permit
Identifier / date003719/LO/HMDA/0452/SMD/2021, 20.04.2022
What it establishesDraft open-plots layout approval for 45 plots on survey numbers 665/P and 679/P.
HMDA Final Layout with open plots
Identifier / date003719/LO/HMDA/0452/SMD/2021, 14.06.2023
What it establishesFinal layout record for survey numbers 665/P and 679/P; records handover of identified roads, open-space/park, utilities and social-infrastructure land by Gift Deed 12003/2022, and refers to Relinquishment Deed 8115/2023 for mortgaged plots.
Architect’s Form–1A completion certificate
Identifier / dateOccupancy certificate number 003719/LO/HMDA/0452/SMD/2021, dated 14/6/2023
What it establishesArchitect’s certification that the registered project was completed in all aspects.
Promoter Form B declaration
Identifier / dateDated 02/11/2022
What it establishesPromoter declaration concerning title documentation, encumbrances, separate-account obligations and the 20 APRIL 2025 completion undertaking.

Frequently asked questions

Is VASUDAIKA WHISTLING WOODS registered with Telangana RERA?

Yes. VASUDAIKA WHISTLING WOODS is registered with the Telangana Real Estate Regulatory Authority as P02400005800; the registration status is New Project.

Who is the developer of VASUDAIKA WHISTLING WOODS?

The promoter named in the RERA registration is VASUDAIKA VENTURES LLP.

Where is VASUDAIKA WHISTLING WOODS located?

VASUDAIKA WHISTLING WOODS is in HARSHAGUDA, Maheshwaram, Rangareddy, Telangana (501359).

When will VASUDAIKA WHISTLING WOODS be completed?

The promoter's proposed date of completion filed with RERA is 20/04/2025. This is the promoter's declaration, not a guarantee.