Vasavi Sri Sri Signature
VASAVI NIRMAAN PRIVATE LIMITED · Medchal-Malkajgiri · RERA P02200000209
VASAVI SRI SRI SIGNATURE is a Mixed Development (Residential & Commercial) in KPHB, Kphb revenue village, Medchal-Malkajgiri district; the mandal is not disclosed. It is being developed by registered promoter VASAVI NIRMAAN PRIVATE LIMITED on 11,047.91 sq. m of land, with 2 building units and a sanctioned configuration that includes residential flats on the 3rd to 10th floors, commercial use on the 2nd floor, and residential amenities at Ground + 2 floors. The TG-RERA registration number is P02200000209, and the RERA unit record lists 164 3BHK units and 3 commercial units. Its proposed completion date is 13/11/2023.
More from Vasavi Nirmaan Pvt Ltd · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | VASAVI SRI SRI SIGNATURE RERA record |
| Project type | Mixed Development (Residential & Commercial), as recorded by TG-RERA RERA record RERA filing |
| Phase / registered portion | Phase details are not disclosed in the supplied record. The registration certificate identifies the project; it does not specify a separately described phase. |
| TG-RERA registration number | P02200000209 RERA record |
| Registration validity | Certificate states commencement on 21/01/2019 and expiry on 13/11/2023; it records no extension. This is the registration period, separate from the completion date and occupancy-certificate status. |
| Registered promoter | VASAVI NIRMAAN PRIVATE LIMITED, company RERA record Corporate record |
| RERA status | Recorded as On-Going Project. RERA filing |
Land and geographic identity
| Item | Record |
|---|---|
| Locality | KPHB RERA filing |
| Revenue village | Kphb, as recorded; mandal is not disclosed. The supplied title materials also refer to Kukatpally/Kakatpally, but the RERA land record identifies Kphb. RERA record Land records |
| District | Medchal-Malkajgiri RERA record Land records |
| PIN | 500072 RERA record RERA filing |
| Survey number(s) | Survey No. 1009; no subdivision is stated in the RERA land record or registration certificate. Land records |
| Registered site extent | 11,047.91 sq. m in the GHMC building-permit extraction; RERA land record gives total and net area as 11,047.91 sq. m. Land records |
| Road-widening / FTL / nala affected area | 0 sq. m in the RERA land record. Land records |
| Boundaries | North: 100 FEET ROAD; South: KPHB COLONY PHASE VRAIN TREE PARK; East: 50 FEET ROAD; West: SPINAL ROAD. Land records |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building-permit approval | 53388/HO/WZ/Cir-14/2016, dated 14.11.2017; associated file number 117822 / 25 / 02 / 2017 / HO. Approvals record |
| Approved built-up area | 46,795.19 sq. m, as recorded in the RERA fields and GHMC permit extraction. The permit’s extracted area schedule separately lists residential amenities, residential floors and commercial area. RERA filing |
| Buildings / blocks | 2 building units in the RERA land record; the supplied permit extract describes residential, commercial and amenity uses but does not identify the two buildings’ complete floor-by-floor arrangement. Land records |
| Sanctioned floor configuration | The permit extraction identifies residential flats on the 3rd to 10th floors, commercial use on the 2nd floor, and residential amenities at Ground + 2 floors. It does not supply a complete floor schedule for both buildings. |
| Parking levels | Permit extraction records 2 parking floors and 3 basements; the permit conditions state cellar and stilt areas approved for parking are to be used exclusively for vehicle parking. |
| Units | GHMC permit extraction states 164 units. TG-RERA unit record lists 164 3BHK units and 3 commercial units, total 167. RERA unit table |
Offering and status
| Item | Record |
|---|---|
| Residential configuration | 3BHK; RERA-filed saleable area 197.66 sq. m per unit. RERA unit table |
| Commercial offering | 3 COMMERCIAL units; the RERA unit record states saleable area 4909.0 sq. m, without clarifying in the supplied material whether this is per unit or an aggregate figure. RERA unit table RERA unit details |
| Booked / available | RERA portal data: 3BHK 86 booked / 78 available; commercial 0 booked / 3 available. The portal extract has no as-of date, so these counts are indicative. RERA unit table RERA unit details |
| Declared construction progress | RERA header records 80% completeness; the supplied extract does not specify the date, measurement method, or tower-by-tower scope. This is a recorded declaration, not an independent site inspection. RERA record |
| Completion dates | Original and revised proposed completion dates are both 13/11/2023. RERA record RERA filing |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project records. The GHMC permit extraction records completion certification as false; tower/block-specific OC status is not supplied. Document index |
2. The project story
VASAVI SRI SRI SIGNATURE is registered with TG-RERA as a mixed residential and commercial development on Survey No. 1009, with the RERA land record giving a site area of 11,047.91 sq. m in KPHB, Medchal-Malkajgiri. The record describes two building units. The GHMC permit extraction identifies residential flats, commercial use and residential amenity floors; the RERA unit schedule records 164 3BHK homes and three commercial units. RERA record Land records RERA unit table
The project’s RERA record reports 80% completeness and a proposed completion date of 13/11/2023. Those are record declarations; no independent construction inspection or tower-specific progress evidence is supplied here. The registration certificate ran from 21/01/2019 to 13/11/2023 and shows no extension in the supplied certificate. No occupancy or completion certificate is supplied, so the record provided does not establish that either building or any phase has received one. RERA record
3. Master plan, architecture & building design
The site area recorded in the land record is 11,047.91 sq. m net and total; the GHMC permit extraction gives the same site area. The RERA field records approved built-up area of 46,795.19 sq. m. These are different measures: the supplied material does not provide a verified FSI-counted area, carpet area for the whole project, or a complete area reconciliation. Land records RERA filing
The permit extraction describes two building units in the RERA land record and identifies these uses and levels: residential flats on the 3rd–10th floors, commercial use on the 2nd floor, and residential amenities at Ground + 2 floors. It records three basements and two parking floors. The full sanctioned drawings, detailed floor schedules for both buildings, footprints, flats per floor, lift and stair counts, entrances, circulation plans, and phase organization are not available in the supplied extracts. Land records
The permit’s extracted area schedule includes Residential (Amenities) 14,725.93, 3°to-10° foor: 22,300.00, and Commercial Area 32,069.26; the permit also records 46,795.19 as a separate total-area figure. The supplied extraction does not state units consistently for each line or explain how these entries relate to the total, so they are reproduced as recorded rather than treated as a reconciled area schedule.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 164 | 86 | 78 | 197.66 sq. m | Not measured from supplied drawings | Not supplied |
| Commercial units | 3 | 0 | 3 | 4909.0 sq. m as recorded; per-unit versus aggregate basis not specified | Not applicable / not supplied | Not supplied |
RERA saleable areas and unit counts are from the TG-RERA unit record. The portal extract gives no booking-count as-of date, so counts should be treated as indicative. RERA unit table RERA unit details
Thirteen floor-plan drawings are listed, but 0 are recorded as measured and 13 as scans pending. Consequently, no software-measured carpet area, room dimensions, orientation, balcony or utility measurements, or typical-floor unit arrangement can be reported from the supplied drawing data. Carpet area is not interchangeable with RERA saleable area; no drawing-derived measurement is available here to quantify the difference. Floor plans
5. Parking & vehicle circulation
The GHMC permit extraction records 3 basements and 2 parking floors. Its conditions state that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking and not partitioned, converted or misused. The permit’s extracted parameters do not provide parking-space counts, two-wheeler or visitor-space allocations, accessible bays, mechanical parking details, ramp or driveway arrangements, EV charging, or unit-specific parking allocations. A drawn or sanctioned parking provision does not by itself establish exclusive ownership or allocation to a particular unit.
6. Amenities, recreation & open spaces
| Description / size | 1,117.50 sq. m in the permit extraction |
|---|---|
| Evidence source | GHMC permit extraction |
| Declared progress / verified status | Permit condition requires it to be fenced and maintained as greenery before occupancy certificate; completion is not independently verified. |
| Description / size | Listed as available, 100% |
|---|---|
| Evidence source | TG-RERA amenities record RERA amenities |
| Declared progress / verified status | Portal-declared; no independent verification supplied. |
| Description / size | No area or facility detail supplied; progress 0% |
|---|---|
| Evidence source | TG-RERA amenities record RERA amenities |
| Declared progress / verified status | Not shown as provided in the extract. |
| Description / size | Mentioned in vendor material only; no sizes or project-filed specifications supplied |
|---|---|
| Evidence source | Vendor Promoter website |
| Declared progress / verified status | Promoter-marketed/vendor claims; not established here as sanctioned or delivered. |
The GHMC permit extraction also specifies that 10% organized open space is to be handed over to GHMC free of cost through a registered gift deed before obtaining an occupancy certificate. The supplied record does not establish completion or registration of that gift deed.
7. Utilities, building services & safety
The permit conditions require provision of a water-recycling plant before occupancy certification, rainwater-harvesting structures, storm-water disposal, sewerage, garbage disposal, a transformer space, and service utilities. The permit also requires a garbage house within the premises. These are approval conditions; the supplied evidence does not independently verify installation, operating status, capacity, or completion.
The TG-RERA amenities record marks water supply, sewerage, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, water conservation/rainwater harvesting, fire protection, and electrical meter room/sub-station/receiving station as YES / 100%. These are portal declarations, not independent commissioning or compliance checks. RERA amenities
The GHMC permit extraction refers to a revised provisional Fire Services NOC and requires compliance with its conditions, and states that sanitation, plumbing, fire-safety requirements, lifts and electrical installations are to be executed under qualified technical personnel. No lift count or capacity, water-storage or treatment capacity, STP capacity, power-backup details, CCTV specifications, access-control details, or accessibility design is supplied.
8. Location, access & connectivity
The registered project identity places the development in KPHB, Kphb revenue village as recorded, Medchal-Malkajgiri district, PIN 500072. The GHMC permit describes the location as Rajiv Gandhi Circle, JNTU Hi-Tech City Road, Kukatpally, Hyderabad. The RERA land record identifies the site boundaries as 100 FEET ROAD to the north, 50 FEET ROAD to the east, SPINAL ROAD to the west and KPHB COLONY PHASE VRAIN TREE PARK to the south. RERA record Land records
The supplied location data lists the nearest sampled Outer Ring Road interchange at approximately 71.0 km. No other measured distance or public-transport detail is supplied. Location record
9. Developer & development status
The registered promoter is VASAVI NIRMAAN PRIVATE LIMITED, a company. The supplied records identify YERRAM VIJAY KUMAR as authorized signatory and list him as a director in the Form B declaration. The RERA project record also lists Telangana Housing Board, M/s Parsvnath Developers Limited and Vasavi PDL Ventures Private Limited as landowners/promoter-side parties. The supplied promoter address is SAGAR SOCIETY, ROAD NO 2, JNTU MAIN ROAD, KPHB, Medchal-Malkajgiri, PIN 500072. No official promoter contact details or project-specific official website are supplied in the RERA identity record. Corporate record Parties record
The Form B declaration by Y. Vijay Kumar states that the co-promoters (THB and M/s Parsvnath Developers Ltd) have legal title to the land, declares the land free from encumbrances, and undertakes completion before 13.11.2023. These are promoter-filed declarations, not independent title findings.
RERA records 80% completeness and the same original and revised proposed completion date, 13/11/2023; the project-specific construction status is not independently verified in the supplied material. No tower-wise completion or occupancy-certificate status is provided. RERA record RERA filing
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Certificate P02200000209, Form C, issued 21/01/2019; stated validity through 13/11/2023. |
| GHMC building permit | Building Permit Order 53388/HO/WZ/Cir-14/2016, dated 14.11.2017, associated file 117822 / 25 / 02 / 2017 / HO. |
| Survey and site extent in permit | Sy.No.1009; site area 11,047.91 as recorded in the permit extraction. |
| Form B declaration | Promoter affidavit-cum-declaration by Y. Vijay Kumar, dated November 2018 in the extraction; includes completion undertaking and project-fund, audit and approval declarations. |
| Occupancy / completion certificate | None supplied; permit extraction records completion certification as false. |
| Other approval references recorded in the permit | Osmania University IDIC letter IDIC/2017/GHMC/206 dated 17.06.2017; revised provisional Fire Services NOC Rc.No.4340 /MSB/CR/RR/2007 dated 22.02.2017; Airport Authority of India NOC HYDE/SOUTH/B/101316/177106; SEIAA order SEIAA/TS/OL/RRD-50/2016-2307 dated 28.11.2016. These are references listed in the permit extraction; underlying certificates are not separately supplied here. |
| Drawing evidence | Thirteen floor-plan drawings are recorded, all scans pending measurement; no measured floor-plan geometry is available in this extract. Floor plans |
The supplied material does not include a complete set of sanctioned drawings, an approved-layout record, or an occupancy/completion certificate. The project’s detailed sanction conditions and approval-document review are outside this overview. Document index
1. Project at a glance
Project identity
Registered project name: VASAVI SRI SRI SIGNATURE
Project type: Mixed Development (Residential & Commercial), as recorded by TG-RERA
Phase / registered portion: Phase details are not disclosed in the supplied record. The registration certificate identifies the project; it does not specify a separately described phase.
TG-RERA registration number: P02200000209
Registration validity: Certificate states commencement on 21/01/2019 and expiry on 13/11/2023; it records no extension. This is the registration period, separate from the completion date and occupancy-certificate status.
Registered promoter: VASAVI NIRMAAN PRIVATE LIMITED, company
RERA status: Recorded as On-Going Project.
Land and geographic identity
Locality: KPHB
Revenue village: Kphb, as recorded; mandal is not disclosed. The supplied title materials also refer to Kukatpally/Kakatpally, but the RERA land record identifies Kphb.
District: Medchal-Malkajgiri
PIN: 500072
Survey number(s): Survey No. 1009; no subdivision is stated in the RERA land record or registration certificate.
Registered site extent: 11,047.91 sq. m in the GHMC building-permit extraction; RERA land record gives total and net area as 11,047.91 sq. m.
Road-widening / FTL / nala affected area: 0 sq. m in the RERA land record.
Boundaries: North: 100 FEET ROAD; South: KPHB COLONY PHASE VRAIN TREE PARK; East: 50 FEET ROAD; West: SPINAL ROAD.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building-permit approval: 53388/HO/WZ/Cir-14/2016, dated 14.11.2017; associated file number 117822 / 25 / 02 / 2017 / HO.
Approved built-up area: 46,795.19 sq. m, as recorded in the RERA fields and GHMC permit extraction. The permit’s extracted area schedule separately lists residential amenities, residential floors and commercial area.
Buildings / blocks: 2 building units in the RERA land record; the supplied permit extract describes residential, commercial and amenity uses but does not identify the two buildings’ complete floor-by-floor arrangement.
Sanctioned floor configuration: The permit extraction identifies residential flats on the 3rd to 10th floors, commercial use on the 2nd floor, and residential amenities at Ground + 2 floors. It does not supply a complete floor schedule for both buildings.
Parking levels: Permit extraction records 2 parking floors and 3 basements; the permit conditions state cellar and stilt areas approved for parking are to be used exclusively for vehicle parking.
Units: GHMC permit extraction states 164 units. TG-RERA unit record lists 164 3BHK units and 3 commercial units, total 167.
Offering and status
Residential configuration: 3BHK; RERA-filed saleable area 197.66 sq. m per unit.
Commercial offering: 3 COMMERCIAL units; the RERA unit record states saleable area 4909.0 sq. m, without clarifying in the supplied material whether this is per unit or an aggregate figure.
Booked / available: RERA portal data: 3BHK 86 booked / 78 available; commercial 0 booked / 3 available. The portal extract has no as-of date, so these counts are indicative.
Declared construction progress: RERA header records 80% completeness; the supplied extract does not specify the date, measurement method, or tower-by-tower scope. This is a recorded declaration, not an independent site inspection.
Completion dates: Original and revised proposed completion dates are both 13/11/2023.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project records. The GHMC permit extraction records completion certification as false; tower/block-specific OC status is not supplied.
2. The project story
VASAVI SRI SRI SIGNATURE is registered with TG-RERA as a mixed residential and commercial development on Survey No. 1009, with the RERA land record giving a site area of 11,047.91 sq. m in KPHB, Medchal-Malkajgiri. The record describes two building units. The GHMC permit extraction identifies residential flats, commercial use and residential amenity floors; the RERA unit schedule records 164 3BHK homes and three commercial units.
The project’s RERA record reports 80% completeness and a proposed completion date of 13/11/2023. Those are record declarations; no independent construction inspection or tower-specific progress evidence is supplied here. The registration certificate ran from 21/01/2019 to 13/11/2023 and shows no extension in the supplied certificate. No occupancy or completion certificate is supplied, so the record provided does not establish that either building or any phase has received one.
3. Master plan, architecture & building design
The site area recorded in the land record is 11,047.91 sq. m net and total; the GHMC permit extraction gives the same site area. The RERA field records approved built-up area of 46,795.19 sq. m. These are different measures: the supplied material does not provide a verified FSI-counted area, carpet area for the whole project, or a complete area reconciliation.
The permit extraction describes two building units in the RERA land record and identifies these uses and levels: residential flats on the 3rd–10th floors, commercial use on the 2nd floor, and residential amenities at Ground + 2 floors. It records three basements and two parking floors. The full sanctioned drawings, detailed floor schedules for both buildings, footprints, flats per floor, lift and stair counts, entrances, circulation plans, and phase organization are not available in the supplied extracts.
The permit’s extracted area schedule includes Residential (Amenities) 14,725.93, 3°to-10° foor: 22,300.00, and Commercial Area 32,069.26; the permit also records 46,795.19 as a separate total-area figure. The supplied extraction does not state units consistently for each line or explain how these entries relate to the total, so they are reproduced as recorded rather than treated as a reconciled area schedule.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 164 | 86 | 78 | 197.66 sq. m | Not measured from supplied drawings | Not supplied |
| Commercial units | 3 | 0 | 3 | 4909.0 sq. m as recorded; per-unit versus aggregate basis not specified | Not applicable / not supplied | Not supplied |
RERA saleable areas and unit counts are from the TG-RERA unit record. The portal extract gives no booking-count as-of date, so counts should be treated as indicative.
Thirteen floor-plan drawings are listed, but 0 are recorded as measured and 13 as scans pending. Consequently, no software-measured carpet area, room dimensions, orientation, balcony or utility measurements, or typical-floor unit arrangement can be reported from the supplied drawing data. Carpet area is not interchangeable with RERA saleable area; no drawing-derived measurement is available here to quantify the difference.
5. Parking & vehicle circulation
The GHMC permit extraction records 3 basements and 2 parking floors. Its conditions state that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking and not partitioned, converted or misused. The permit’s extracted parameters do not provide parking-space counts, two-wheeler or visitor-space allocations, accessible bays, mechanical parking details, ramp or driveway arrangements, EV charging, or unit-specific parking allocations. A drawn or sanctioned parking provision does not by itself establish exclusive ownership or allocation to a particular unit.
6. Amenities, recreation & open spaces
| Description / size | 1,117.50 sq. m in the permit extraction |
|---|---|
| Evidence source | GHMC permit extraction |
| Declared progress / verified status | Permit condition requires it to be fenced and maintained as greenery before occupancy certificate; completion is not independently verified. |
| Description / size | Listed as available, 100% |
|---|---|
| Evidence source | TG-RERA amenities record |
| Declared progress / verified status | Portal-declared; no independent verification supplied. |
| Description / size | No area or facility detail supplied; progress 0% |
|---|---|
| Evidence source | TG-RERA amenities record |
| Declared progress / verified status | Not shown as provided in the extract. |
| Description / size | Mentioned in vendor material only; no sizes or project-filed specifications supplied |
|---|---|
| Evidence source | Vendor |
| Declared progress / verified status | Promoter-marketed/vendor claims; not established here as sanctioned or delivered. |
The GHMC permit extraction also specifies that 10% organized open space is to be handed over to GHMC free of cost through a registered gift deed before obtaining an occupancy certificate. The supplied record does not establish completion or registration of that gift deed.
7. Utilities, building services & safety
The permit conditions require provision of a water-recycling plant before occupancy certification, rainwater-harvesting structures, storm-water disposal, sewerage, garbage disposal, a transformer space, and service utilities. The permit also requires a garbage house within the premises. These are approval conditions; the supplied evidence does not independently verify installation, operating status, capacity, or completion.
The TG-RERA amenities record marks water supply, sewerage, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, water conservation/rainwater harvesting, fire protection, and electrical meter room/sub-station/receiving station as YES / 100%. These are portal declarations, not independent commissioning or compliance checks.
The GHMC permit extraction refers to a revised provisional Fire Services NOC and requires compliance with its conditions, and states that sanitation, plumbing, fire-safety requirements, lifts and electrical installations are to be executed under qualified technical personnel. No lift count or capacity, water-storage or treatment capacity, STP capacity, power-backup details, CCTV specifications, access-control details, or accessibility design is supplied.
8. Location, access & connectivity
The registered project identity places the development in KPHB, Kphb revenue village as recorded, Medchal-Malkajgiri district, PIN 500072. The GHMC permit describes the location as Rajiv Gandhi Circle, JNTU Hi-Tech City Road, Kukatpally, Hyderabad. The RERA land record identifies the site boundaries as 100 FEET ROAD to the north, 50 FEET ROAD to the east, SPINAL ROAD to the west and KPHB COLONY PHASE VRAIN TREE PARK to the south.
The supplied location data lists the nearest sampled Outer Ring Road interchange at approximately 71.0 km. No other measured distance or public-transport detail is supplied.
9. Developer & development status
The registered promoter is VASAVI NIRMAAN PRIVATE LIMITED, a company. The supplied records identify YERRAM VIJAY KUMAR as authorized signatory and list him as a director in the Form B declaration. The RERA project record also lists Telangana Housing Board, M/s Parsvnath Developers Limited and Vasavi PDL Ventures Private Limited as landowners/promoter-side parties. The supplied promoter address is SAGAR SOCIETY, ROAD NO 2, JNTU MAIN ROAD, KPHB, Medchal-Malkajgiri, PIN 500072. No official promoter contact details or project-specific official website are supplied in the RERA identity record.
The Form B declaration by Y. Vijay Kumar states that the co-promoters (THB and M/s Parsvnath Developers Ltd) have legal title to the land, declares the land free from encumbrances, and undertakes completion before 13.11.2023. These are promoter-filed declarations, not independent title findings.
RERA records 80% completeness and the same original and revised proposed completion date, 13/11/2023; the project-specific construction status is not independently verified in the supplied material. No tower-wise completion or occupancy-certificate status is provided.
10. Approvals, official records & documents
TG-RERA registration: Certificate P02200000209, Form C, issued 21/01/2019; stated validity through 13/11/2023.
GHMC building permit: Building Permit Order 53388/HO/WZ/Cir-14/2016, dated 14.11.2017, associated file 117822 / 25 / 02 / 2017 / HO.
Survey and site extent in permit: Sy.No.1009; site area 11,047.91 as recorded in the permit extraction.
Form B declaration: Promoter affidavit-cum-declaration by Y. Vijay Kumar, dated November 2018 in the extraction; includes completion undertaking and project-fund, audit and approval declarations.
Occupancy / completion certificate: None supplied; permit extraction records completion certification as false.
Other approval references recorded in the permit: Osmania University IDIC letter IDIC/2017/GHMC/206 dated 17.06.2017; revised provisional Fire Services NOC Rc.No.4340 /MSB/CR/RR/2007 dated 22.02.2017; Airport Authority of India NOC HYDE/SOUTH/B/101316/177106; SEIAA order SEIAA/TS/OL/RRD-50/2016-2307 dated 28.11.2016. These are references listed in the permit extraction; underlying certificates are not separately supplied here.
Drawing evidence: Thirteen floor-plan drawings are recorded, all scans pending measurement; no measured floor-plan geometry is available in this extract.
The supplied material does not include a complete set of sanctioned drawings, an approved-layout record, or an occupancy/completion certificate. The project’s detailed sanction conditions and approval-document review are outside this overview.
Frequently asked questions
Is VASAVI SRI SRI SIGNATURE registered with Telangana RERA?
Yes. VASAVI SRI SRI SIGNATURE is registered with the Telangana Real Estate Regulatory Authority as P02200000209; the registration status is On-Going Project.
Who is the developer of VASAVI SRI SRI SIGNATURE?
The promoter named in the RERA registration is VASAVI NIRMAAN PRIVATE LIMITED.
Where is VASAVI SRI SRI SIGNATURE located?
VASAVI SRI SRI SIGNATURE is in KPHB, Medchal-Malkajgiri, Telangana (500072).
When will VASAVI SRI SRI SIGNATURE be completed?
The promoter's proposed date of completion filed with RERA is 13/11/2023. This is the promoter's declaration, not a guarantee.