Tmr Marvel
T M R INFRATECH · Medchal-Malkajgiri · RERA P02200001261
TMR MARVEL is a residential gated-community villa project in Bollaram, Alwal mandal, Medchal-Malkajgiri district. The registered promoter developing it is T M R Infratech. The project has a total land area of 25,487.59 sq. m and comprises 80 villas, with Ground + 1st Floor development; the RERA unit schedule records 80 3BHK units, each with a saleable area of 229.74 sq. m. Its TG-RERA registration number is P02200001261, and the proposed completion date is 17-03-2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 6 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | TMR MARVEL RERA record |
| Project type | Residential gated-community villa project; the RERA unit schedule records 80 3BHK units. RERA filing RERA unit table |
| Phase / registered portion | Phase not separately identified in the supplied records. RERA record |
| TG-RERA registration | P02200001261, granted under section 5; registration certificate records 05/10/2019 to 17/03/2025. Approvals record |
| Registration status in supplied record | The certificate says the registration was not extended; its recorded validity ended 17/03/2025. This is registration validity, not an occupancy certificate or evidence of completion. |
| Registered promoter | T M R Infratech (also styled TMR INFRATECH / M/s. TMR Infratech in filed documents). RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / address description | BOLLARAM, SECUNDERABAD; the GHMC permit describes Burtonguda, Bollaram. RERA record RERA filing |
| Revenue village | Bollaram in the RERA project identity; the GHMC permit and title materials describe Macha Bollaram / Macha Bolarum. The precise revenue-village identity should be checked against the underlying revenue records. RERA record Land records |
| Mandal / district / PIN | Alwal; Medchal-Malkajgiri; 500010. RERA record |
| Project survey numbers | 172, 173 and 175; title documents also refer to subdivisions including 173/e8, 173/26, 173/AA, 173/98, 173/8, 173/88, 173/18, 173/u, 175/u, and other plot-specific subdivisions. Land records Title record |
| Registered total / affected / net area | RERA land record: total 25,487.59 sq. m, affected 2,645 sq. m, net 22,842.59 sq. m. RERA filing Land records |
| GHMC permit site area | 22,842:59 sq. m as transcribed in the permit extraction. |
| Boundaries recorded in RERA | North: vendors’ land; south: neighbours’ land; east: neighbours’ land; west: defence land. RERA filing |
| Cadastral location reference | Parcel-centroid coordinate 17.41528, 78.35459; this is a geocoded parcel reference, not a surveyed boundary. Location record |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building permit | 53539/HO/NZ/Cir-16/2016, dated 18 03 2019; file no. 109429/28/12/2016/HO. Approvals record |
| Sanctioned development described | “Layout with Housing (Gated Community)” and an amenities block, each recorded as Ground + 1st Floor. The permit extraction identifies 80 villas. |
| Approved built-up area | RERA project record: 19,099.0 sq. m. RERA filing |
| Mortgage area | RERA project record: 2,010.22 sq. m; the GHMC permit identifies plots 1A, 2A, 3A, 4A, 24A, 25A, 26A, 27A and 28A as mortgaged built-up area. RERA filing |
| Floors and parking levels | Permit extraction states Ground + 1st Floor. Basement, podium, stilt, parking-level arrangement and parking counts are not disclosed in the supplied material. |
| Unit count | GHMC permit: 80 villas; RERA filing: 80 units, all recorded as 3BHK. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration and saleable area | 3BHK; 229.74 sq. m saleable area per unit. RERA unit table |
| Booked / available | RERA portal-derived schedule shows 0 booked and 80 available; the record has no as-of date, so these counts are indicative. RERA unit table |
| Completion deadline | GHMC permit says construction to be completed before 17.03.2025; the Form B declaration also states 17-03-2025. |
| Construction stage | TG-RERA amenity schedule records item-level declared progress ranging from 0% to 80%; this is promoter-reported filing data, not an independent site inspection. RERA amenities |
| Occupancy / completion certificate | No completed or occupancy-certified status is established in the supplied documents. The GHMC permit requires completion notice and an occupancy certificate; its extracted status records completion as not certified. |
2. The project story
TMR MARVEL is filed with TG-RERA as a residential project at Bollaram, Secunderabad, and the GHMC permit describes a gated-community layout with housing on Survey Nos. 172, 173 and 175. The permit identifies a Ground + 1st Floor residential development of 80 villas, together with a Ground + 1st Floor amenities block. The RERA unit schedule lists 80 3BHK units. RERA record Land records RERA unit table
The declared site extent is 25,487.59 sq. m in total, with 2,645 sq. m recorded as affected and a net area of 22,842.59 sq. m. The GHMC permit describes a site area of 22,842:59 sq. m. RERA filing
The project’s filed completion deadline was 17 March 2025. The available RERA amenity schedule gives progress percentages for selected infrastructure and services, but does not establish overall construction completion. No occupancy certificate is evidenced in the material reviewed; the permit states that an occupancy certificate is required before occupation. RERA amenities
3. Master plan, architecture & building design
The GHMC permit describes a gated-community housing layout and a separate amenities block, each Ground + 1st Floor, on Survey Nos. 172, 173 and 175. It identifies 80 villas and records an approved built-up area of 19,099.0 sq. m in the RERA project fields. The supplied material does not provide measurable drawings from which to describe villa footprints, individual floor layouts, building spacing, internal circulation or the amenities-block room arrangement. RERA filing Floor plans
The RERA land record gives total area as 25,487.59 sq. m, affected area as 2,645 sq. m and net area as 22,842.59 sq. m. The GHMC permit also records a site area of 22,842:59 sq. m and identifies a road-affected portion for surrender to GHMC. These are land-area entries, not a statement of carpet or saleable area. RERA filing
The permit records Ground + 1st Floor for the residential layout and amenities block. Basement, stilt or podium levels, tower height, homes per floor, lift and stair arrangements, and the distribution of residential, communal and open-space areas are not specified in the extracted records.
4. Homes, configurations & floor plans
The RERA unit schedule records 80 3BHK units, each with a filed saleable area of 229.74 sq. m. It records 0 booked and 80 available, but provides no as-of date; counts should therefore be treated as indicative. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 80 | 0 | 80 | 229.74 sq. m per unit | Not measured from the supplied drawings | Not supplied |
Four floor-plan drawings are recorded, but none has been measured; all four are listed as scans pending. No drawing-based carpet-area or room-dimension measurement is therefore available. RERA saleable area and carpet area are distinct measures: the supplied floor-plan note explains that saleable area includes the home’s share of common areas and is larger than carpet area. Floor plans
5. Parking & vehicle circulation
The supplied records do not establish the number or type of parking spaces, parking levels, visitor or accessible parking, driveway and ramp arrangements, pedestrian separation, or any EV-charging provision. The GHMC permit states that no parking or construction is permitted in setback areas and identifies nine plot numbers within the mortgaged built-up area; that mortgage entry is not evidence of parking allocation or exclusive parking rights. RERA filing
The sanctioned parking count, any unit-specific parking allocation and the arrangements for vehicle circulation should be confirmed from the stamped approved plans and sale documents.
6. Amenities, recreation & open spaces
The RERA amenity schedule marks the following facilities as available in the project schedule and records declared progress percentages. These percentages are filing entries, not independent verification of completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Community buildings | Community buildings; size not supplied. | RERA amenity schedule | 0% declared; completion not independently verified. |
| Green Strip / TOT LOT / Park | Listed as a green strip, tot lot or park; size not supplied. | RERA amenity schedule; GHMC permit | 0% declared. Permit requires the tot-lot to be fenced and maintained as greenery before occupancy certificate. |
| Aggregate recreational open space | Listed; area not supplied. | RERA amenity schedule | 0% declared. |
| Internal roads & footpaths | Listed; dimensions not supplied. | RERA amenity schedule | 20% declared. |
| Street lighting | Listed; quantities not supplied. | RERA amenity schedule | 10% declared. |
The GHMC permit also identifies an amenities block and requires a garbage house within the premises. The supplied records do not provide a facility inventory or measured areas for indoor recreation, sports or convenience spaces.
7. Utilities, building services & safety
The RERA amenity schedule lists water supply, sewerage, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, rainwater harvesting, energy management, fire protection, and electrical meter/substation/receiving-station facilities. The recorded progress figures are filing declarations; they do not independently establish operational service or statutory compliance. RERA amenities
| Service | Evidence in the supplied record |
|---|---|
| Water | “Water Supply” is listed at 0% declared progress. The GHMC permit specifies a separate underground static water-storage tank of 25,000 litres and a separate terrace tank of 25,000 litres for residential buildings. Water source and treatment capacity are not disclosed. RERA amenities |
| Sewerage / drainage | Sewerage is listed at 10%; storm-water drains at 5%; treatment and disposal of sewage and sullage water at 80%. No STP capacity, reuse arrangement or drainage design details are supplied. RERA amenities |
| Rainwater harvesting | Listed at 20% declared progress. The permit requires rainwater-harvesting structures and records 10 percolation pits, with 2 pits per villa. RERA amenities |
| Electrical | Electrical meter room, substation and receiving station are listed at 10%. The permit requires transformer space. Backup power and electrical capacity are not stated. RERA amenities |
| Fire and life safety | Fire protection and fire-safety requirements are listed at 0% declared progress. Specific systems, escape arrangements and clearances are not described in the supplied material. RERA amenities |
| Waste and security | Solid-waste management and disposal is listed at 20%; the permit requires a garbage house. Security systems, CCTV and access-control details are not supplied. RERA amenities |
| Accessibility | Accessible routes, ramps and facilities are not described in the supplied records. |
8. Location, access & connectivity
The registered project identity places TMR MARVEL in BOLLARAM, SECUNDERABAD, Alwal mandal, Medchal-Malkajgiri district, PIN 500010. The GHMC permit describes the site as Burtonguda, Bollaram, and the title material uses Macha Bolarum / Macha Bollaram. The project land is identified as Survey Nos. 172, 173 and 175. RERA record RERA filing Title record
The location record gives the Financial District (Nanakramguda) as 1.2 km away. It provides no measured approach-road distances, public-transport details or additional landmark distances. Location record
9. Developer & development status
The registered promoter is T M R Infratech, identified in the RERA project record as a partnership. The project Form B declaration was made by Samala Sreeram Reddy, described as managing partner and authorised representative of M/s. TMR Infratech; the GHMC permit identifies TMR INFRATECH as developer/builder. RERA record RERA filing
The promoter’s Form B declaration, dated 19 July 2019, states a completion date of 17 March 2025 and includes declarations about project title, encumbrances, project funds, audits and pending approvals. These are promoter declarations in the filed document. The supplied records show no registration extension and do not establish that the project obtained an occupancy or completion certificate.
The RERA amenity schedule records declared progress for individual infrastructure items; it does not provide a verified overall construction percentage or a tower-by-tower or villa-by-villa completion status. RERA amenities
10. Approvals, official records & documents
| Identifier / date | P02200001261; issued 05/10/2019; valid to 17/03/2025 |
|---|---|
| What the supplied record establishes | Form C records registration of TMR MARVEL under section 5 and states the registration validity period and conditions. No extension is recorded in the supplied certificate extraction. |
| Identifier / date | 53539/HO/NZ/Cir-16/2016; 18 03 2019; file no. 109429/28/12/2016/HO |
|---|---|
| What the supplied record establishes | Permit extraction describes a gated-community housing layout and amenities block on Survey Nos. 172, 173 and 175, with 80 villas, and records conditions including completion notice, occupancy certification, rainwater harvesting and transformer space. |
| Identifier / date | Dated 19 July 2019 |
|---|---|
| What the supplied record establishes | Promoter’s affidavit-cum-declaration for TMR MARVEL, including the declared completion date of 17-03-2025 and statements concerning land, funds, audits and approvals. |
| Identifier / date | Title-report records include docs 64032, 64033, 64034, 64044, 64050, 66096, 66097 and 68368 |
|---|---|
| What the supplied record establishes | These include gift-settlement material, powers of attorney, a title-search report, partnership reconstitution material and revenue-record extracts. Document index Title record |
| Identifier / date | Four drawings listed; none measured; scans pending |
|---|---|
| What the supplied record establishes | Drawing-based carpet-area and room-dimension measurements are not available in the supplied extraction. Floor plans |
The supplied record does not establish an occupancy or completion certificate. The GHMC permit states that an occupancy certificate is compulsory before occupation.
1. Project at a glance
Project identity
Registered project name: TMR MARVEL
Project type: Residential gated-community villa project; the RERA unit schedule records 80 3BHK units.
Phase / registered portion: Phase not separately identified in the supplied records.
TG-RERA registration: P02200001261, granted under section 5; registration certificate records 05/10/2019 to 17/03/2025.
Registration status in supplied record: The certificate says the registration was not extended; its recorded validity ended 17/03/2025. This is registration validity, not an occupancy certificate or evidence of completion.
Registered promoter: T M R Infratech (also styled TMR INFRATECH / M/s. TMR Infratech in filed documents).
Land and geographic identity
Locality / address description: BOLLARAM, SECUNDERABAD; the GHMC permit describes Burtonguda, Bollaram.
Revenue village: Bollaram in the RERA project identity; the GHMC permit and title materials describe Macha Bollaram / Macha Bolarum. The precise revenue-village identity should be checked against the underlying revenue records.
Mandal / district / PIN: Alwal; Medchal-Malkajgiri; 500010.
Project survey numbers: 172, 173 and 175; title documents also refer to subdivisions including 173/e8, 173/26, 173/AA, 173/98, 173/8, 173/88, 173/18, 173/u, 175/u, and other plot-specific subdivisions.
Registered total / affected / net area: RERA land record: total 25,487.59 sq. m, affected 2,645 sq. m, net 22,842.59 sq. m.
GHMC permit site area: 22,842:59 sq. m as transcribed in the permit extraction.
Boundaries recorded in RERA: North: vendors’ land; south: neighbours’ land; east: neighbours’ land; west: defence land.
Cadastral location reference: Parcel-centroid coordinate 17.41528, 78.35459; this is a geocoded parcel reference, not a surveyed boundary.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building permit: 53539/HO/NZ/Cir-16/2016, dated 18 03 2019; file no. 109429/28/12/2016/HO.
Sanctioned development described: “Layout with Housing (Gated Community)” and an amenities block, each recorded as Ground + 1st Floor. The permit extraction identifies 80 villas.
Approved built-up area: RERA project record: 19,099.0 sq. m.
Mortgage area: RERA project record: 2,010.22 sq. m; the GHMC permit identifies plots 1A, 2A, 3A, 4A, 24A, 25A, 26A, 27A and 28A as mortgaged built-up area.
Floors and parking levels: Permit extraction states Ground + 1st Floor. Basement, podium, stilt, parking-level arrangement and parking counts are not disclosed in the supplied material.
Unit count: GHMC permit: 80 villas; RERA filing: 80 units, all recorded as 3BHK.
Offering and status
RERA-filed configuration and saleable area: 3BHK; 229.74 sq. m saleable area per unit.
Booked / available: RERA portal-derived schedule shows 0 booked and 80 available; the record has no as-of date, so these counts are indicative.
Completion deadline: GHMC permit says construction to be completed before 17.03.2025; the Form B declaration also states 17-03-2025.
Construction stage: TG-RERA amenity schedule records item-level declared progress ranging from 0% to 80%; this is promoter-reported filing data, not an independent site inspection.
Occupancy / completion certificate: No completed or occupancy-certified status is established in the supplied documents. The GHMC permit requires completion notice and an occupancy certificate; its extracted status records completion as not certified.
2. The project story
TMR MARVEL is filed with TG-RERA as a residential project at Bollaram, Secunderabad, and the GHMC permit describes a gated-community layout with housing on Survey Nos. 172, 173 and 175. The permit identifies a Ground + 1st Floor residential development of 80 villas, together with a Ground + 1st Floor amenities block. The RERA unit schedule lists 80 3BHK units.
The declared site extent is 25,487.59 sq. m in total, with 2,645 sq. m recorded as affected and a net area of 22,842.59 sq. m. The GHMC permit describes a site area of 22,842:59 sq. m.
The project’s filed completion deadline was 17 March 2025. The available RERA amenity schedule gives progress percentages for selected infrastructure and services, but does not establish overall construction completion. No occupancy certificate is evidenced in the material reviewed; the permit states that an occupancy certificate is required before occupation.
3. Master plan, architecture & building design
The GHMC permit describes a gated-community housing layout and a separate amenities block, each Ground + 1st Floor, on Survey Nos. 172, 173 and 175. It identifies 80 villas and records an approved built-up area of 19,099.0 sq. m in the RERA project fields. The supplied material does not provide measurable drawings from which to describe villa footprints, individual floor layouts, building spacing, internal circulation or the amenities-block room arrangement.
The RERA land record gives total area as 25,487.59 sq. m, affected area as 2,645 sq. m and net area as 22,842.59 sq. m. The GHMC permit also records a site area of 22,842:59 sq. m and identifies a road-affected portion for surrender to GHMC. These are land-area entries, not a statement of carpet or saleable area.
The permit records Ground + 1st Floor for the residential layout and amenities block. Basement, stilt or podium levels, tower height, homes per floor, lift and stair arrangements, and the distribution of residential, communal and open-space areas are not specified in the extracted records.
4. Homes, configurations & floor plans
The RERA unit schedule records 80 3BHK units, each with a filed saleable area of 229.74 sq. m. It records 0 booked and 80 available, but provides no as-of date; counts should therefore be treated as indicative.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 80 | 0 | 80 | 229.74 sq. m per unit | Not measured from the supplied drawings | Not supplied |
Four floor-plan drawings are recorded, but none has been measured; all four are listed as scans pending. No drawing-based carpet-area or room-dimension measurement is therefore available. RERA saleable area and carpet area are distinct measures: the supplied floor-plan note explains that saleable area includes the home’s share of common areas and is larger than carpet area.
5. Parking & vehicle circulation
The supplied records do not establish the number or type of parking spaces, parking levels, visitor or accessible parking, driveway and ramp arrangements, pedestrian separation, or any EV-charging provision. The GHMC permit states that no parking or construction is permitted in setback areas and identifies nine plot numbers within the mortgaged built-up area; that mortgage entry is not evidence of parking allocation or exclusive parking rights.
The sanctioned parking count, any unit-specific parking allocation and the arrangements for vehicle circulation should be confirmed from the stamped approved plans and sale documents.
6. Amenities, recreation & open spaces
The RERA amenity schedule marks the following facilities as available in the project schedule and records declared progress percentages. These percentages are filing entries, not independent verification of completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Community buildings | Community buildings; size not supplied. | RERA amenity schedule | 0% declared; completion not independently verified. |
| Green Strip / TOT LOT / Park | Listed as a green strip, tot lot or park; size not supplied. | RERA amenity schedule; GHMC permit | 0% declared. Permit requires the tot-lot to be fenced and maintained as greenery before occupancy certificate. |
| Aggregate recreational open space | Listed; area not supplied. | RERA amenity schedule | 0% declared. |
| Internal roads & footpaths | Listed; dimensions not supplied. | RERA amenity schedule | 20% declared. |
| Street lighting | Listed; quantities not supplied. | RERA amenity schedule | 10% declared. |
The GHMC permit also identifies an amenities block and requires a garbage house within the premises. The supplied records do not provide a facility inventory or measured areas for indoor recreation, sports or convenience spaces.
7. Utilities, building services & safety
The RERA amenity schedule lists water supply, sewerage, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, rainwater harvesting, energy management, fire protection, and electrical meter/substation/receiving-station facilities. The recorded progress figures are filing declarations; they do not independently establish operational service or statutory compliance.
Water: “Water Supply” is listed at 0% declared progress. The GHMC permit specifies a separate underground static water-storage tank of 25,000 litres and a separate terrace tank of 25,000 litres for residential buildings. Water source and treatment capacity are not disclosed.
Sewerage / drainage: Sewerage is listed at 10%; storm-water drains at 5%; treatment and disposal of sewage and sullage water at 80%. No STP capacity, reuse arrangement or drainage design details are supplied.
Rainwater harvesting: Listed at 20% declared progress. The permit requires rainwater-harvesting structures and records 10 percolation pits, with 2 pits per villa.
Electrical: Electrical meter room, substation and receiving station are listed at 10%. The permit requires transformer space. Backup power and electrical capacity are not stated.
Fire and life safety: Fire protection and fire-safety requirements are listed at 0% declared progress. Specific systems, escape arrangements and clearances are not described in the supplied material.
Waste and security: Solid-waste management and disposal is listed at 20%; the permit requires a garbage house. Security systems, CCTV and access-control details are not supplied.
Accessibility: Accessible routes, ramps and facilities are not described in the supplied records.
8. Location, access & connectivity
The registered project identity places TMR MARVEL in BOLLARAM, SECUNDERABAD, Alwal mandal, Medchal-Malkajgiri district, PIN 500010. The GHMC permit describes the site as Burtonguda, Bollaram, and the title material uses Macha Bolarum / Macha Bollaram. The project land is identified as Survey Nos. 172, 173 and 175.
The location record gives the Financial District (Nanakramguda) as 1.2 km away. It provides no measured approach-road distances, public-transport details or additional landmark distances.
9. Developer & development status
The registered promoter is T M R Infratech, identified in the RERA project record as a partnership. The project Form B declaration was made by Samala Sreeram Reddy, described as managing partner and authorised representative of M/s. TMR Infratech; the GHMC permit identifies TMR INFRATECH as developer/builder.
The promoter’s Form B declaration, dated 19 July 2019, states a completion date of 17 March 2025 and includes declarations about project title, encumbrances, project funds, audits and pending approvals. These are promoter declarations in the filed document. The supplied records show no registration extension and do not establish that the project obtained an occupancy or completion certificate.
The RERA amenity schedule records declared progress for individual infrastructure items; it does not provide a verified overall construction percentage or a tower-by-tower or villa-by-villa completion status.
10. Approvals, official records & documents
| Identifier / date | P02200001261; issued 05/10/2019; valid to 17/03/2025 |
|---|---|
| What the supplied record establishes | Form C records registration of TMR MARVEL under section 5 and states the registration validity period and conditions. No extension is recorded in the supplied certificate extraction. |
| Identifier / date | 53539/HO/NZ/Cir-16/2016; 18 03 2019; file no. 109429/28/12/2016/HO |
|---|---|
| What the supplied record establishes | Permit extraction describes a gated-community housing layout and amenities block on Survey Nos. 172, 173 and 175, with 80 villas, and records conditions including completion notice, occupancy certification, rainwater harvesting and transformer space. |
| Identifier / date | Dated 19 July 2019 |
|---|---|
| What the supplied record establishes | Promoter’s affidavit-cum-declaration for TMR MARVEL, including the declared completion date of 17-03-2025 and statements concerning land, funds, audits and approvals. |
| Identifier / date | Title-report records include docs 64032, 64033, 64034, 64044, 64050, 66096, 66097 and 68368 |
|---|---|
| What the supplied record establishes | These include gift-settlement material, powers of attorney, a title-search report, partnership reconstitution material and revenue-record extracts. |
| Identifier / date | Four drawings listed; none measured; scans pending |
|---|---|
| What the supplied record establishes | Drawing-based carpet-area and room-dimension measurements are not available in the supplied extraction. |
The supplied record does not establish an occupancy or completion certificate. The GHMC permit states that an occupancy certificate is compulsory before occupation.
Frequently asked questions
Is TMR MARVEL registered with Telangana RERA?
Yes. TMR MARVEL is registered with the Telangana Real Estate Regulatory Authority as P02200001261; the registration status is New Project.
Who is the developer of TMR MARVEL?
The promoter named in the RERA registration is T M R INFRATECH.
Where is TMR MARVEL located?
TMR MARVEL is in BOLLARAM, SECUNDERABAD, Alwal, Medchal-Malkajgiri, Telangana (500010).
When will TMR MARVEL be completed?
The promoter's proposed date of completion filed with RERA is 17/03/2025. This is the promoter's declaration, not a guarantee.