The Pride By Palladium
M/s.PALLADIUM REAL ESTATE DEVELOPERS LLP · Hyderabad · RERA P02500006660
THE PRIDE BY PALLADIUM is a commercial project in Parklane, Secunderabad mandal, Hyderabad district, developed by M/s.PALLADIUM REAL ESTATE DEVELOPERS LLP. The site area is 2602.84 sq. m, and the project comprises one building with 3 Cellar + 1 Ground + 7 upper floors and 8 commercial units, with a recorded saleable area of 1156.0 sq. m. Its TG-RERA registration number is P02500006660, and the project header gives a proposed completion date of 03/09/2029.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | THE PRIDE BY PALLADIUM RERA record |
| Project type | Commercial project, as classified in the project record RERA record RERA filing |
| Phase / registered portion | New Project; the supplied registration record does not identify a separate phase RERA record |
| TG-RERA registration | P02500006660; registered from 02/08/2023 to 03/05/2029. The certificate describes a five-year registration period; this is registration validity, not the project completion deadline. |
| Registered promoter | M/s.PALLADIUM REAL ESTATE DEVELOPERS LLP RERA record Corporate record |
| RERA status | Registration certificate on file; the available record gives the validity dates above. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Parklane is the recorded locality and village. The building-permit extraction separately identifies its village field as Secunderabad; the supplied record does not confirm a distinct revenue-village name. RERA record RERA filing |
| Mandal / district / PIN | Secunderabad / Hyderabad / 500003 RERA record |
| Survey numbers and subdivisions | 1-2-34 TO 39, 1-2-42, 42/A AND 42/B RERA filing |
| Site area | Total area 2602.84 sq. m; area affected by road widening 195.89 sq. m; net area 2406.95 sq. m. The permit records the same figures as plot area, road-affected area and net plot area. RERA filing |
| Boundaries recorded in RERA filing | East: OTHERS LAND; West: 18 MT WIDE EXISTING ROAD; North: OTHERS LAND; South: OTHERS LAND. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal approval | Building Permit Order 5735/GHMC/SEC/2023-BP, approved 03 May 2023; File No. 013580/GHMC/6653/SEC1/2022-BP Approvals record |
| Approved built-up area | 14082.90 sq. m in the project filing RERA filing. The permit extraction separately provides area components; the supplied evidence does not label these as a substitute for the filed approved built-up area. |
| Building count | One building/unit in the project record; one commercial building is identified in the permit extraction. RERA filing |
| Sanctioned floors | 3 Cellar + 1 Ground + 7 upper floors |
| Sanctioned height | 23.99; the supplied extraction does not state a measurement unit. |
| Parking | Permit extraction records Total Parking Area 4989.15; the unit count of parking spaces and individual allocations are not established in the supplied material. |
| Units | The sanctioned-plan record states one building unit, while the RERA unit record lists 8 commercial units. The unit count below is the RERA-filed offering. RERA filing RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed unit type and area | Commercial; saleable area 1156.0 sq. m as recorded for the configuration RERA unit table RERA unit details |
| Booked / available | 8 booked / 0 available, as last read from the TG-RERA portal; the portal record has no as-of date, so these counts are indicative. RERA unit table |
| Completion deadline | The promoter’s Form B undertaking states completion by 03 May 2029. The project header gives proposed completion as 03/09/2029; the supplied record does not explain this difference. RERA record |
| Construction stage | The RERA amenity record reports internal roads and footpaths at 30% and other listed facilities at 0%. These are filed progress figures, not independent site verification. RERA amenities |
| Occupancy / completion certificate | No occupancy or completion certificate is identified in the supplied project documents. GHMC’s permit conditions require an occupancy certificate before occupation. |
2. The project story
THE PRIDE BY PALLADIUM is registered with TG-RERA as a commercial project at Parklane, Secunderabad, on land identified by survey numbers 1-2-34 TO 39, 1-2-42, 42/A and 42/B. The registered site area is 2602.84 sq. m, with 195.89 sq. m recorded as road-affected and a net plot area of 2406.95 sq. m. RERA record RERA filing
GHMC’s permit approves one commercial building with 3 Cellar + 1 Ground + 7 upper floors. The RERA filing lists eight commercial units, all recorded as booked; that portal count lacks an as-of date and is therefore indicative. RERA unit table
The promoter’s Form B declares a completion date of 03 May 2029. The project header separately records a proposed completion date of 03/09/2029; the available evidence does not reconcile the two dates. The supplied records do not establish that construction is complete or that an occupancy certificate has been issued. RERA record
3. Master plan, architecture & building design
GHMC’s permit records a single commercial building, with a sanctioned configuration of 3 Cellar + 1 Ground + 7 upper floors and a stated building height of 23.99 (unit not specified in the extraction). The permit records plot area of 2602.84 sq. m, road-affected area of 195.89 sq. m and net plot area of 2406.95 sq. m.
The permit extraction identifies commercial area components of 870.69 and 8,377.34, a tot lot of 242.84, and total parking area of 4989.15; units are not shown for these component figures in the extraction. These should not be treated as the RERA-filed approved built-up-area figure of 14082.90 sq. m. RERA filing
The supplied drawing record contains two sheets, neither measured as a floor plan; it reports no flats on those sheets. Accordingly, details such as building footprint, floor-by-floor unit arrangement, circulation, lifts, stairs and internal space dimensions cannot be established from the supplied drawing-derived data. Floor plans
4. Homes, configurations & floor plans
This is registered as a commercial project; the RERA-filed unit record lists commercial units, not residential apartment configurations.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Commercial | 8 | 8 | 0 | 1156.0 sq. m | Not measured in supplied drawings | Not supplied |
RERA unit table RERA unit details Floor plans
The saleable area is the RERA-filed figure. The supplied floor-plan record says the two available drawings were not measured; it provides no software-measured carpet area. Carpet area and saleable area are different measures, and no drawing-based room dimensions or unit plans are available here. The booked and available counts are indicative because the portal record has no as-of date. RERA unit details Floor plans RERA unit table
5. Parking & vehicle circulation
GHMC’s permit records a total parking area of 4989.15 and states that cellar and stilt areas approved for parking must be used exclusively for vehicle parking and not converted or misused. The permit’s floor configuration includes three cellar levels; the supplied extraction does not provide parking-space counts, vehicle categories, visitor or accessible-space allocations, ramps, entry/exit arrangements, EV charging provision or unit-specific parking allocations. A parking area in the permit does not establish an exclusive parking right for a particular unit.
6. Amenities, recreation & open spaces
The following progress figures are in the RERA amenity record. They are filing-reported percentages, not independent confirmation of completion. The permit also imposes conditions concerning certain site features. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | No size supplied | RERA amenity record | 30% reported; not independently verified |
| Water supply | No source or capacity supplied | RERA amenity record | 0% reported; not independently verified |
| Sewerage, treatment and disposal | RERA record lists sewerage (chambers, lines, septic tank, STP) and treatment/disposal of sewage and sullage water; no capacity supplied | RERA amenity record | 0% reported; not independently verified |
| Storm-water drains | No dimensions supplied | RERA amenity record | 0% reported; not independently verified |
| Green strip / tot lot / park | Permit identifies a tot lot of 242.84 (unit not stated in the extraction); permit requires it to be fenced and maintained as greenery | RERA amenity record; GHMC permit | 0% reported in RERA record; completion not verified |
| Street lighting | No details supplied | RERA amenity record | 0% reported; not independently verified |
| Community buildings | No description or size supplied | RERA amenity record | 0% reported; not independently verified |
| Solid-waste management and disposal | No system details supplied; permit requires a garbage house within the premises | RERA amenity record; GHMC permit | 0% reported; not independently verified |
| Water conservation / rainwater harvesting | Permit specifies 14 rainwater-harvesting pits and a percolation-pit structure | RERA amenity record; GHMC permit | 0% reported in RERA record; completion not verified |
| Fire protection and fire safety | Permit refers to fire-safety requirements and requires an occupancy Fire NOC before an occupancy certificate | RERA amenity record; GHMC permit | 0% reported in RERA record; completion not verified |
| Electrical meter room / sub-station / receiving station | No capacity or equipment details supplied; permit requires transformer space | RERA amenity record; GHMC permit | 0% reported; not independently verified |
| Recreational open space | Area not stated in the RERA amenity record | RERA amenity record | 0% reported; not independently verified |
7. Utilities, building services & safety
The RERA amenity record lists water supply, sewerage and sewage treatment/disposal, storm-water drains, rainwater harvesting, solid-waste management, electrical infrastructure, and fire-protection requirements. It does not provide water sources or storage/treatment capacities, sewerage or STP capacity, backup-power capacity, or detailed waste-management arrangements. The listed progress for these facilities is 0% in the RERA record. RERA amenities
GHMC’s permit specifies 14 rainwater-harvesting pits, space for a transformer, and a garbage house within the premises. It requires fire-safety provisions and an occupancy Fire NOC before issuance of the occupancy certificate. The permit also states that services such as sanitation, plumbing, fire safety, lifts and electrical installations are to be executed under qualified technical supervision. These permit provisions describe requirements; they do not establish that the facilities are complete or that statutory clearances have been obtained.
The supplied project evidence does not specify lift or service-lift count or capacity, emergency power, CCTV or access-control arrangements, accessible circulation, or fire-system equipment details. RERA amenities
8. Location, access & connectivity
The registered project location is Parklane, Secunderabad, Hyderabad, Telangana, PIN 500003. The project record gives the site’s west boundary as an 18 MT WIDE EXISTING ROAD. The building-permit extraction also refers to a 15 Mts road and a proposed 24 Mts Master Plan Road associated with the road-affected portion; further approval conditions are addressed in the Approvals section. RERA record RERA filing
The supplied location data identifies Financial District (Nanakramguda) at 1.2 km from a cadastral parcel-centroid location; it does not provide a route or travel time. The RERA record does not supply public-transport details or a project-specific access assessment. Location record
9. Developer & development status
The registered promoter is M/s.PALLADIUM REAL ESTATE DEVELOPERS LLP, an LLP. Its GSTIN is 36AAVFP4761C1ZX. The project record lists the promoter’s address as T19 Towers, Mahatma Gandhi Road, Sardar Patel Road, Secunderabad, Parklane, Secunderabad, Hyderabad, 500003. No official website or project contact details are supplied here. Corporate record Parties record
The promoter’s Form B affidavit, signed by authorized signatory Arun Rama and dated 06/06/2023, declares that the project would be completed by 03 May 2029. The project header records a proposed completion date of 03/09/2029. The supplied materials do not explain the differing recorded dates. RERA record The RERA registration remains recorded through 03/05/2029, which is a separate registration-validity date.
The RERA amenity record reports internal roads and footpaths at 30%, with the other listed facilities at 0%; these are declared progress figures, not independent site verification. No occupancy or completion certificate is included in the supplied documents. RERA amenities
10. Approvals, official records & documents
| Supplied evidence | Form C certificate, P02500006660, issued 02/08/2023; validity stated to 03/05/2029 |
|---|---|
| Scope / note | THE PRIDE BY PALLADIUM; registered project |
| Supplied evidence | Permit No. 5735/GHMC/SEC/2023-BP, approved 03 May 2023; File No. 013580/GHMC/6653/SEC1/2022-BP |
|---|---|
| Scope / note | Commercial building permit; permit conditions include completion notice and occupancy certificate requirements |
| Supplied evidence | Form B affidavit by Arun Rama, authorized signatory, dated 06/06/2023 |
|---|---|
| Scope / note | Promoter declarations and completion undertaking |
| Supplied evidence | Not present in the supplied project documents Document index |
|---|---|
| Scope / note | Certificate status is not established by this evidence set |
| Supplied evidence | A layout-plan document entry is listed, but the supplied record does not include an extracted approval Document index |
|---|---|
| Scope / note | No additional layout-approval details established here |
1. Project at a glance
Project identity
Registered name: THE PRIDE BY PALLADIUM
Project type: Commercial project, as classified in the project record
Phase / registered portion: New Project; the supplied registration record does not identify a separate phase
TG-RERA registration: P02500006660; registered from 02/08/2023 to 03/05/2029. The certificate describes a five-year registration period; this is registration validity, not the project completion deadline.
Registered promoter: M/s.PALLADIUM REAL ESTATE DEVELOPERS LLP
RERA status: Registration certificate on file; the available record gives the validity dates above.
Land and geographic identity
Locality / revenue village: Parklane is the recorded locality and village. The building-permit extraction separately identifies its village field as Secunderabad; the supplied record does not confirm a distinct revenue-village name.
Mandal / district / PIN: Secunderabad / Hyderabad / 500003
Survey numbers and subdivisions: 1-2-34 TO 39, 1-2-42, 42/A AND 42/B
Site area: Total area 2602.84 sq. m; area affected by road widening 195.89 sq. m; net area 2406.95 sq. m. The permit records the same figures as plot area, road-affected area and net plot area.
Boundaries recorded in RERA filing: East: OTHERS LAND; West: 18 MT WIDE EXISTING ROAD; North: OTHERS LAND; South: OTHERS LAND.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal approval: Building Permit Order 5735/GHMC/SEC/2023-BP, approved 03 May 2023; File No. 013580/GHMC/6653/SEC1/2022-BP
Approved built-up area: 14082.90 sq. m in the project filing. The permit extraction separately provides area components; the supplied evidence does not label these as a substitute for the filed approved built-up area.
Building count: One building/unit in the project record; one commercial building is identified in the permit extraction.
Sanctioned floors: 3 Cellar + 1 Ground + 7 upper floors
Sanctioned height: 23.99; the supplied extraction does not state a measurement unit.
Parking: Permit extraction records Total Parking Area 4989.15; the unit count of parking spaces and individual allocations are not established in the supplied material.
Units: The sanctioned-plan record states one building unit, while the RERA unit record lists 8 commercial units. The unit count below is the RERA-filed offering.
Offering and status
RERA-filed unit type and area: Commercial; saleable area 1156.0 sq. m as recorded for the configuration
Booked / available: 8 booked / 0 available, as last read from the TG-RERA portal; the portal record has no as-of date, so these counts are indicative.
Completion deadline: The promoter’s Form B undertaking states completion by 03 May 2029. The project header gives proposed completion as 03/09/2029; the supplied record does not explain this difference.
Construction stage: The RERA amenity record reports internal roads and footpaths at 30% and other listed facilities at 0%. These are filed progress figures, not independent site verification.
Occupancy / completion certificate: No occupancy or completion certificate is identified in the supplied project documents. GHMC’s permit conditions require an occupancy certificate before occupation.
2. The project story
THE PRIDE BY PALLADIUM is registered with TG-RERA as a commercial project at Parklane, Secunderabad, on land identified by survey numbers 1-2-34 TO 39, 1-2-42, 42/A and 42/B. The registered site area is 2602.84 sq. m, with 195.89 sq. m recorded as road-affected and a net plot area of 2406.95 sq. m.
GHMC’s permit approves one commercial building with 3 Cellar + 1 Ground + 7 upper floors. The RERA filing lists eight commercial units, all recorded as booked; that portal count lacks an as-of date and is therefore indicative.
The promoter’s Form B declares a completion date of 03 May 2029. The project header separately records a proposed completion date of 03/09/2029; the available evidence does not reconcile the two dates. The supplied records do not establish that construction is complete or that an occupancy certificate has been issued.
3. Master plan, architecture & building design
GHMC’s permit records a single commercial building, with a sanctioned configuration of 3 Cellar + 1 Ground + 7 upper floors and a stated building height of 23.99 (unit not specified in the extraction). The permit records plot area of 2602.84 sq. m, road-affected area of 195.89 sq. m and net plot area of 2406.95 sq. m.
The permit extraction identifies commercial area components of 870.69 and 8,377.34, a tot lot of 242.84, and total parking area of 4989.15; units are not shown for these component figures in the extraction. These should not be treated as the RERA-filed approved built-up-area figure of 14082.90 sq. m.
The supplied drawing record contains two sheets, neither measured as a floor plan; it reports no flats on those sheets. Accordingly, details such as building footprint, floor-by-floor unit arrangement, circulation, lifts, stairs and internal space dimensions cannot be established from the supplied drawing-derived data.
4. Homes, configurations & floor plans
This is registered as a commercial project; the RERA-filed unit record lists commercial units, not residential apartment configurations.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Commercial | 8 | 8 | 0 | 1156.0 sq. m | Not measured in supplied drawings | Not supplied |
The saleable area is the RERA-filed figure. The supplied floor-plan record says the two available drawings were not measured; it provides no software-measured carpet area. Carpet area and saleable area are different measures, and no drawing-based room dimensions or unit plans are available here. The booked and available counts are indicative because the portal record has no as-of date.
5. Parking & vehicle circulation
GHMC’s permit records a total parking area of 4989.15 and states that cellar and stilt areas approved for parking must be used exclusively for vehicle parking and not converted or misused. The permit’s floor configuration includes three cellar levels; the supplied extraction does not provide parking-space counts, vehicle categories, visitor or accessible-space allocations, ramps, entry/exit arrangements, EV charging provision or unit-specific parking allocations. A parking area in the permit does not establish an exclusive parking right for a particular unit.
6. Amenities, recreation & open spaces
The following progress figures are in the RERA amenity record. They are filing-reported percentages, not independent confirmation of completion. The permit also imposes conditions concerning certain site features.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | No size supplied | RERA amenity record | 30% reported; not independently verified |
| Water supply | No source or capacity supplied | RERA amenity record | 0% reported; not independently verified |
| Sewerage, treatment and disposal | RERA record lists sewerage (chambers, lines, septic tank, STP) and treatment/disposal of sewage and sullage water; no capacity supplied | RERA amenity record | 0% reported; not independently verified |
| Storm-water drains | No dimensions supplied | RERA amenity record | 0% reported; not independently verified |
| Green strip / tot lot / park | Permit identifies a tot lot of 242.84 (unit not stated in the extraction); permit requires it to be fenced and maintained as greenery | RERA amenity record; GHMC permit | 0% reported in RERA record; completion not verified |
| Street lighting | No details supplied | RERA amenity record | 0% reported; not independently verified |
| Community buildings | No description or size supplied | RERA amenity record | 0% reported; not independently verified |
| Solid-waste management and disposal | No system details supplied; permit requires a garbage house within the premises | RERA amenity record; GHMC permit | 0% reported; not independently verified |
| Water conservation / rainwater harvesting | Permit specifies 14 rainwater-harvesting pits and a percolation-pit structure | RERA amenity record; GHMC permit | 0% reported in RERA record; completion not verified |
| Fire protection and fire safety | Permit refers to fire-safety requirements and requires an occupancy Fire NOC before an occupancy certificate | RERA amenity record; GHMC permit | 0% reported in RERA record; completion not verified |
| Electrical meter room / sub-station / receiving station | No capacity or equipment details supplied; permit requires transformer space | RERA amenity record; GHMC permit | 0% reported; not independently verified |
| Recreational open space | Area not stated in the RERA amenity record | RERA amenity record | 0% reported; not independently verified |
7. Utilities, building services & safety
The RERA amenity record lists water supply, sewerage and sewage treatment/disposal, storm-water drains, rainwater harvesting, solid-waste management, electrical infrastructure, and fire-protection requirements. It does not provide water sources or storage/treatment capacities, sewerage or STP capacity, backup-power capacity, or detailed waste-management arrangements. The listed progress for these facilities is 0% in the RERA record.
GHMC’s permit specifies 14 rainwater-harvesting pits, space for a transformer, and a garbage house within the premises. It requires fire-safety provisions and an occupancy Fire NOC before issuance of the occupancy certificate. The permit also states that services such as sanitation, plumbing, fire safety, lifts and electrical installations are to be executed under qualified technical supervision. These permit provisions describe requirements; they do not establish that the facilities are complete or that statutory clearances have been obtained.
The supplied project evidence does not specify lift or service-lift count or capacity, emergency power, CCTV or access-control arrangements, accessible circulation, or fire-system equipment details.
8. Location, access & connectivity
The registered project location is Parklane, Secunderabad, Hyderabad, Telangana, PIN 500003. The project record gives the site’s west boundary as an 18 MT WIDE EXISTING ROAD. The building-permit extraction also refers to a 15 Mts road and a proposed 24 Mts Master Plan Road associated with the road-affected portion; further approval conditions are addressed in the Approvals section.
The supplied location data identifies Financial District (Nanakramguda) at 1.2 km from a cadastral parcel-centroid location; it does not provide a route or travel time. The RERA record does not supply public-transport details or a project-specific access assessment.
9. Developer & development status
The registered promoter is M/s.PALLADIUM REAL ESTATE DEVELOPERS LLP, an LLP. Its GSTIN is 36AAVFP4761C1ZX. The project record lists the promoter’s address as T19 Towers, Mahatma Gandhi Road, Sardar Patel Road, Secunderabad, Parklane, Secunderabad, Hyderabad, 500003. No official website or project contact details are supplied here.
The promoter’s Form B affidavit, signed by authorized signatory Arun Rama and dated 06/06/2023, declares that the project would be completed by 03 May 2029. The project header records a proposed completion date of 03/09/2029. The supplied materials do not explain the differing recorded dates. The RERA registration remains recorded through 03/05/2029, which is a separate registration-validity date.
The RERA amenity record reports internal roads and footpaths at 30%, with the other listed facilities at 0%; these are declared progress figures, not independent site verification. No occupancy or completion certificate is included in the supplied documents.
10. Approvals, official records & documents
| Supplied evidence | Form C certificate, P02500006660, issued 02/08/2023; validity stated to 03/05/2029 |
|---|---|
| Scope / note | THE PRIDE BY PALLADIUM; registered project |
| Supplied evidence | Permit No. 5735/GHMC/SEC/2023-BP, approved 03 May 2023; File No. 013580/GHMC/6653/SEC1/2022-BP |
|---|---|
| Scope / note | Commercial building permit; permit conditions include completion notice and occupancy certificate requirements |
| Supplied evidence | Form B affidavit by Arun Rama, authorized signatory, dated 06/06/2023 |
|---|---|
| Scope / note | Promoter declarations and completion undertaking |
| Supplied evidence | Not present in the supplied project documents |
|---|---|
| Scope / note | Certificate status is not established by this evidence set |
| Supplied evidence | A layout-plan document entry is listed, but the supplied record does not include an extracted approval |
|---|---|
| Scope / note | No additional layout-approval details established here |
Frequently asked questions
Is THE PRIDE BY PALLADIUM registered with Telangana RERA?
Yes. THE PRIDE BY PALLADIUM is registered with the Telangana Real Estate Regulatory Authority as P02500006660; the registration status is New Project.
Who is the developer of THE PRIDE BY PALLADIUM?
The promoter named in the RERA registration is M/s.PALLADIUM REAL ESTATE DEVELOPERS LLP.
Where is THE PRIDE BY PALLADIUM located?
THE PRIDE BY PALLADIUM is in Parklane, Secunderabad, Hyderabad, Telangana (500003).
When will THE PRIDE BY PALLADIUM be completed?
The promoter's proposed date of completion filed with RERA is 03/09/2029. This is the promoter's declaration, not a guarantee.