Ananda Pride Residency
SREEBALAJI INFRA · Hyderabad · RERA P02500007098
ANANDA PRIDE RESIDENCY is a residential apartment project in New Bhoiguda, Secunderabad mandal, Hyderabad district, developed by the registered promoter SREEBALAJI INFRA. It comprises one residential building with 1 Cellar + 1 Stilt + 5 upper floors and 10 3BHK apartments, each with a RERA-filed saleable area of 133.31 sq. m, on a site of 1005.03 sq. m. Its TG-RERA registration is P02500007098, and its proposed completion date is 25/11/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | ANANDA PRIDE RESIDENCY RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | A single residential building is identified in the supplied permit; a separate phase name or phase identifier is not disclosed. |
| TG-RERA registration | P02500007098 |
| Registration validity | 17/10/2023 to 25/11/2025; the certificate says validity is subject to extension by the Authority. Registration validity is distinct from the completion date. |
| Registered promoter | SREEBALAJI INFRA RERA record |
| RERA status in supplied record | New Project; no extension is recorded in the supplied certificate. Its stated validity ended on 25/11/2025. The supplied material does not establish a current registration status beyond that date. RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / site address | Plot No. 9/B, H No. 6-2-121/2, New Bhoiguda, Secunderabad; the permit identifies the site as New Bhoiguda 18. RERA filing |
| Revenue village | New Bhoiguda in the project identity and land record. The permit and registration certificate also state Secunderabad / New Bhoiguda, but a consistent revenue-village designation is not established across the supplied records. RERA record Land records |
| Mandal | Secunderabad in the project identity and permit; the registration certificate instead lists Uppal in the promoter-office details. The project-location mandal is therefore recorded here as Secunderabad, as stated in the project identity and permit. RERA record |
| District | Hyderabad in the project identity and permit. RERA record |
| PIN | 500003 in the project identity and registration certificate. RERA record |
| Survey number(s) / subdivision(s) | 00 (as recorded in the RERA project record and registration certificate); no further survey subdivision is disclosed. RERA filing |
| Plot / house identifier | PLOT NO 9/B, H NO 6-2-121/2 RERA filing |
| Site area | Total area 1005.03 sq. m; road-affected area 66.63 sq. m; net plot area 938.41 sq. m in the GHMC permit. The RERA land record gives net area 938.40 sq. m. RERA filing |
| Boundaries | East: ROAD WIDTH - 9; West: PLOT NO 4; North: PLOT NO 9 A; South: PLOT NO 10. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | Building Permit Order 2601/GHMC/SEC/2022-BP, dated 26 November, 2022; file no. 005193/GHMC/2818/SEC1/2021-BP. Approvals record |
| Approved building | One residential building, identified as Building Name A |
| Sanctioned floor configuration | 1 Cellar + 1 Stilt + 5 upper floors |
| Building height | 14.88; the supplied permit extraction does not state a unit beside this figure. |
| Approved built-up area | The project record lists 2331.24 sq. m; the permit separately itemizes residential upper-floor area 1,478.15 sq. m, cellar area 392.48 sq. m, and stilt area 190.98 sq. m. RERA filing |
| Units | 10 apartment units in the RERA unit record; the permit extraction does not state an approved unit count. The permit requires that sanctioned units not be increased without prior GHMC approval. RERA unit table |
| Parking level(s) | Cellar and stilt are approved for parking. The permit lists total parking area 835.08; a unit for this figure is not shown in the supplied extraction. |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | 3BHK, 10 units RERA unit table |
| RERA-filed saleable area | 133.31 sq. m per unit RERA unit table |
| Booked / available | 0 booked; 10 available, as last read from the TG-RERA portal. No as-of date is supplied, so these counts are indicative rather than a live availability confirmation. RERA unit table |
| Promoter-declared completion date | 25/11/2025 in the Form B declaration |
| Sanctioned completion deadline | GHMC permit states construction to be completed before 26 November, 2025. |
| Construction stage | The RERA amenity/infrastructure record reports sewerage at 20% and gives 0% for several other listed works; it does not provide an overall project construction percentage. These are filed progress figures, not independent site verification. RERA amenities |
| Occupancy / completion certificate | No occupancy certificate or completion certificate is identified in the supplied project record. The GHMC permit requires an occupancy certificate before occupation. |
2. The project story
ANANDA PRIDE RESIDENCY is a residential apartment development registered with TG-RERA as P02500007098. The project record locates it at Plot No. 9/B, H No. 6-2-121/2, New Bhoiguda, Secunderabad, and identifies survey number 00. The registered land record states a total site area of 1005.03 sq. m, with 66.63 sq. m affected by road widening and a net area of 938.40 sq. m; the GHMC permit records the net plot area as 938.41 sq. m. RERA record RERA filing Land records
The GHMC permit sanctions one residential building with one cellar, one stilt level and five upper floors. The RERA unit record lists ten 3BHK apartments. The supplied records do not set out tower-by-tower or phase-wise construction progress; the only reported progress figures are among individual RERA-filed infrastructure items, including sewerage at 20%. No overall completion percentage is provided, and the supplied evidence does not independently verify on-site progress. RERA unit table RERA amenities
The promoter’s Form B declaration gives 25/11/2025 as the completion date, while the GHMC permit specifies completion before 26 November, 2025. Those dates are completion commitments, not proof of completion or occupancy approval. No occupancy or completion certificate is identified in the supplied records; the GHMC permit states that an occupancy certificate is required before occupation.
3. Master plan, architecture & building design
The GHMC Building Permit Order identifies a single residential building, Building Name A, on the project site. It sanctions 1 Cellar + 1 Stilt + 5 upper floors, with a stated building height of 14.88 (unit not given in the extraction). The permit lists front setback 22.39, rear setback 2.5, and side setbacks 4 and 4; units for these setback figures are not shown in the supplied extraction.
The permit states plot area 1005.03 sq. m, road-affected area 66.63 sq. m, and net plot area 938.41 sq. m. The RERA project record lists approved built-up area 2331.24 sq. m. Separately, the permit’s extracted area schedule lists residential upper floors 1,478.15 sq. m, cellar 392.48 sq. m, and stilt 190.98 sq. m. These are separate recorded area figures; the supplied material does not identify them as carpet area or FSI-counted area. RERA filing
The permit extraction does not provide a floor-by-floor apartment arrangement, flats per floor, lift or stair details, building footprint, or an approved layout drawing. It identifies a tot-lot of 48.09 (unit not stated), rainwater-harvesting pits 1, transformer space and a garbage house. The RERA layout-plan document is listed as not extracted, so further layout or circulation detail cannot be confirmed from the supplied records. Document index
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 133.31 sq. m | Software-measured: median 119.1 sq. m; range 116.2–121.8 sq. m | Not supplied |
The RERA record lists ten 3BHK units and saleable area of 133.31 sq. m per unit. Booked and available counts are indicative: the portal capture has no as-of date. RERA unit table RERA unit details
The floor-plan measurements are software-derived from the supplied approved floor-plan drawing, not RERA-filed carpet-area disclosures. The software measured four flat designs; the reported median is 119.1 sq. m (1282 sq. ft), with a range of 116.2–121.8 sq. m (1251–1312 sq. ft). These measurements require review against the drawing. The filed saleable area and drawing-measured carpet area are different area categories; the supplied evidence does not provide a loading figure. Floor plans RERA unit details
The extracted typical-plan panel identifies a flat marked 02 and shows a drawing room, guest room, bedroom, master bedroom, living/dining area, kitchen, puja/store, toilets and two balconies. The supplied extraction includes dimensions for these spaces, but they are drawing-derived measurements rather than RERA disclosures. RERA unit details
5. Parking & vehicle circulation
The GHMC permit approves the cellar and stilt for vehicle parking and lists total parking area 835.08; the unit is not stated in the supplied extraction. It requires those approved cellar and stilt areas to be used exclusively for parking, without partition walls or rolling shutters, and not to be converted or misused for another purpose.
A parking-space count, resident/visitor/accessibility allocation, parking-bay dimensions, ramp or driveway arrangement, EV charging provision, and unit-specific parking allotments are not established in the supplied records. A parking area figure alone does not establish the number of spaces or exclusive allocation to a particular apartment. RERA unit table
6. Amenities, recreation & open spaces
| Description / size | 48.09; unit not stated in the permit extraction. The permit also requires the tot-lot to be fenced and maintained as greenery. |
|---|---|
| Evidence source | GHMC permit |
| Declared progress / verified status | Sanctioned / permit condition; no completion verification supplied. |
| Description / size | 1 rainwater-harvesting pit; permit requires a rainwater-harvesting structure (percolation pit). |
|---|---|
| Evidence source | GHMC permit |
| Declared progress / verified status | Sanctioned / permit condition; no completion verification supplied. |
| Description / size | Peripheral greenery and tree planting are identified in the permit conditions and RERA infrastructure list. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA-filed availability marked “YES”; listed progress is 0%. No independent completion verification supplied. |
| Description / size | RERA infrastructure list marks water supply “YES”. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Filed availability; listed progress is 0%. No independent completion verification supplied. |
| Description / size | RERA infrastructure record lists sewerage (chamber, lines, septic tank, STP) as “YES”. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Listed progress is 20%; not independently verified. |
| Description / size | Permit identifies space for a transformer. |
|---|---|
| Declared progress / verified status | Permit-listed provision; completion not established. |
| Description / size | Permit requires a garbage house within the premises. |
|---|---|
| Declared progress / verified status | Permit condition; completion not established. |
The supplied evidence does not establish a project-specific clubhouse, gym, swimming pool, children’s play facility beyond the permit-listed tot-lot, or other indoor or sports/recreation facilities as sanctioned or delivered amenities. RERA amenities
7. Utilities, building services & safety
The RERA infrastructure record marks water supply, sewerage, rainwater harvesting and an electrical meter room/sub-station/receiving station as available; it reports sewerage progress at 20% and 0% for water supply, rainwater harvesting and the electrical facility. These are filed progress entries, not independent verification of completed services. RERA amenities
The GHMC permit requires a rainwater-harvesting percolation pit, transformer space, a garbage house and tree planting. It also states that sanitation, plumbing, fire-safety requirements, lifts and electrical installations are to be executed under qualified technical supervision. The permit’s conditions require necessary fire-fighting installations and an occupancy Fire NOC from the Director (EV&DM) before issue of an occupancy certificate. The supplied records do not establish that these works, clearances or certificates have been completed.
The supplied project-specific material does not state water-source or storage capacity, sewage-treatment capacity or reuse arrangements, storm-water design details, electrical or generator capacity, lift count or capacity, CCTV/security arrangements, waste-segregation arrangements, or accessible circulation provisions. RERA amenities
8. Location, access & connectivity
The registered project location is Plot No. 9/B, H No. 6-2-121/2, New Bhoiguda, Secunderabad, Hyderabad, Telangana, PIN 500003. The project identity lists revenue village New Bhoiguda, mandal Secunderabad and district Hyderabad; survey number 00 is the survey identifier recorded in the RERA data. RERA record RERA filing
The supplied location data gives a measured distance of 13.1 km to HITEC City. No approach-road description, public-transport distance, or further landmark distance is provided in the project location record. Location record
9. Developer & development status
The registered promoter is SREEBALAJI INFRA, identified in the project record as a partnership. The listed partners are MITTAKANTI SRAVYA REDDY and authorized signatory MENDU OMPRAKASH REDDY. The promoter’s registered-office address is recorded as ANDALLU NIVAS, SNEHA NAGAR, NEW BHOIGUDA 18, SECUNDERABAD, Secunderabad, Hyderabad, 500003. GSTIN: 36AEUFS1386R1ZT. Parties record Corporate record
The RERA certificate separately lists a promoter-office address at Village Habsiguda, Mandal Uppal, District Medchal-Malkajgiri, PIN 500007. No official promoter website, telephone number or email address is supplied in the project evidence.
The promoter’s Form B declaration, dated 30 August 2023, states that the project was to be completed by 25/11/2025. The supplied material does not provide an overall construction-progress percentage, a phase-wise construction schedule, or an occupancy/completion certificate. RERA amenities
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C registration certificate for ANANDA PRIDE RESIDENCY, P02500007098, issued 17/10/2023; validity stated through 25/11/2025. |
| GHMC building permit | Building Permit Order 2601/GHMC/SEC/2022-BP, approved 26 November, 2022; file no. 005193/GHMC/2818/SEC1/2021-BP. It sanctions one residential building with 1 Cellar + 1 Stilt + 5 upper floors. |
| RERA Form B declaration | Promoter declaration by MENDU OMPRAKASH REDDY, dated 30 August 2023, including the declared completion date of 25/11/2025. |
| RERA layout-plan filing | A layout-plan document is listed, but its content was not extracted in the supplied record. Document index |
| Occupancy / completion certificate | No project-specific occupancy or completion certificate is identified in the supplied evidence. The GHMC permit states that an occupancy certificate is compulsory before occupation. |
| Other project-filed records | The project file lists encumbrance statements 145857665 and 144680991, and title-report documents including a title search report and title-chain instruments. Document index |
1. Project at a glance
Project identity
Registered name: ANANDA PRIDE RESIDENCY
Project type: Residential apartment project
Phase / registered portion: A single residential building is identified in the supplied permit; a separate phase name or phase identifier is not disclosed.
TG-RERA registration: P02500007098
Registration validity: 17/10/2023 to 25/11/2025; the certificate says validity is subject to extension by the Authority. Registration validity is distinct from the completion date.
Registered promoter: SREEBALAJI INFRA
RERA status in supplied record: New Project; no extension is recorded in the supplied certificate. Its stated validity ended on 25/11/2025. The supplied material does not establish a current registration status beyond that date.
Land and geographic identity
Locality / site address: Plot No. 9/B, H No. 6-2-121/2, New Bhoiguda, Secunderabad; the permit identifies the site as New Bhoiguda 18.
Revenue village: New Bhoiguda in the project identity and land record. The permit and registration certificate also state Secunderabad / New Bhoiguda, but a consistent revenue-village designation is not established across the supplied records.
Mandal: Secunderabad in the project identity and permit; the registration certificate instead lists Uppal in the promoter-office details. The project-location mandal is therefore recorded here as Secunderabad, as stated in the project identity and permit.
District: Hyderabad in the project identity and permit.
PIN: 500003 in the project identity and registration certificate.
Survey number(s) / subdivision(s): 00 (as recorded in the RERA project record and registration certificate); no further survey subdivision is disclosed.
Plot / house identifier: PLOT NO 9/B, H NO 6-2-121/2
Site area: Total area 1005.03 sq. m; road-affected area 66.63 sq. m; net plot area 938.41 sq. m in the GHMC permit. The RERA land record gives net area 938.40 sq. m.
Boundaries: East: ROAD WIDTH - 9; West: PLOT NO 4; North: PLOT NO 9 A; South: PLOT NO 10.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Building Permit Order 2601/GHMC/SEC/2022-BP, dated 26 November, 2022; file no. 005193/GHMC/2818/SEC1/2021-BP.
Approved building: One residential building, identified as Building Name A
Sanctioned floor configuration: 1 Cellar + 1 Stilt + 5 upper floors
Building height: 14.88; the supplied permit extraction does not state a unit beside this figure.
Approved built-up area: The project record lists 2331.24 sq. m; the permit separately itemizes residential upper-floor area 1,478.15 sq. m, cellar area 392.48 sq. m, and stilt area 190.98 sq. m.
Units: 10 apartment units in the RERA unit record; the permit extraction does not state an approved unit count. The permit requires that sanctioned units not be increased without prior GHMC approval.
Parking level(s): Cellar and stilt are approved for parking. The permit lists total parking area 835.08; a unit for this figure is not shown in the supplied extraction.
Offering and status
RERA-filed configuration: 3BHK, 10 units
RERA-filed saleable area: 133.31 sq. m per unit
Booked / available: 0 booked; 10 available, as last read from the TG-RERA portal. No as-of date is supplied, so these counts are indicative rather than a live availability confirmation.
Promoter-declared completion date: 25/11/2025 in the Form B declaration
Sanctioned completion deadline: GHMC permit states construction to be completed before 26 November, 2025.
Construction stage: The RERA amenity/infrastructure record reports sewerage at 20% and gives 0% for several other listed works; it does not provide an overall project construction percentage. These are filed progress figures, not independent site verification.
Occupancy / completion certificate: No occupancy certificate or completion certificate is identified in the supplied project record. The GHMC permit requires an occupancy certificate before occupation.
2. The project story
ANANDA PRIDE RESIDENCY is a residential apartment development registered with TG-RERA as P02500007098. The project record locates it at Plot No. 9/B, H No. 6-2-121/2, New Bhoiguda, Secunderabad, and identifies survey number 00. The registered land record states a total site area of 1005.03 sq. m, with 66.63 sq. m affected by road widening and a net area of 938.40 sq. m; the GHMC permit records the net plot area as 938.41 sq. m.
The GHMC permit sanctions one residential building with one cellar, one stilt level and five upper floors. The RERA unit record lists ten 3BHK apartments. The supplied records do not set out tower-by-tower or phase-wise construction progress; the only reported progress figures are among individual RERA-filed infrastructure items, including sewerage at 20%. No overall completion percentage is provided, and the supplied evidence does not independently verify on-site progress.
The promoter’s Form B declaration gives 25/11/2025 as the completion date, while the GHMC permit specifies completion before 26 November, 2025. Those dates are completion commitments, not proof of completion or occupancy approval. No occupancy or completion certificate is identified in the supplied records; the GHMC permit states that an occupancy certificate is required before occupation.
3. Master plan, architecture & building design
The GHMC Building Permit Order identifies a single residential building, Building Name A, on the project site. It sanctions 1 Cellar + 1 Stilt + 5 upper floors, with a stated building height of 14.88 (unit not given in the extraction). The permit lists front setback 22.39, rear setback 2.5, and side setbacks 4 and 4; units for these setback figures are not shown in the supplied extraction.
The permit states plot area 1005.03 sq. m, road-affected area 66.63 sq. m, and net plot area 938.41 sq. m. The RERA project record lists approved built-up area 2331.24 sq. m. Separately, the permit’s extracted area schedule lists residential upper floors 1,478.15 sq. m, cellar 392.48 sq. m, and stilt 190.98 sq. m. These are separate recorded area figures; the supplied material does not identify them as carpet area or FSI-counted area.
The permit extraction does not provide a floor-by-floor apartment arrangement, flats per floor, lift or stair details, building footprint, or an approved layout drawing. It identifies a tot-lot of 48.09 (unit not stated), rainwater-harvesting pits 1, transformer space and a garbage house. The RERA layout-plan document is listed as not extracted, so further layout or circulation detail cannot be confirmed from the supplied records.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 133.31 sq. m | Software-measured: median 119.1 sq. m; range 116.2–121.8 sq. m | Not supplied |
The RERA record lists ten 3BHK units and saleable area of 133.31 sq. m per unit. Booked and available counts are indicative: the portal capture has no as-of date.
The floor-plan measurements are software-derived from the supplied approved floor-plan drawing, not RERA-filed carpet-area disclosures. The software measured four flat designs; the reported median is 119.1 sq. m (1282 sq. ft), with a range of 116.2–121.8 sq. m (1251–1312 sq. ft). These measurements require review against the drawing. The filed saleable area and drawing-measured carpet area are different area categories; the supplied evidence does not provide a loading figure.
The extracted typical-plan panel identifies a flat marked 02 and shows a drawing room, guest room, bedroom, master bedroom, living/dining area, kitchen, puja/store, toilets and two balconies. The supplied extraction includes dimensions for these spaces, but they are drawing-derived measurements rather than RERA disclosures.
5. Parking & vehicle circulation
The GHMC permit approves the cellar and stilt for vehicle parking and lists total parking area 835.08; the unit is not stated in the supplied extraction. It requires those approved cellar and stilt areas to be used exclusively for parking, without partition walls or rolling shutters, and not to be converted or misused for another purpose.
A parking-space count, resident/visitor/accessibility allocation, parking-bay dimensions, ramp or driveway arrangement, EV charging provision, and unit-specific parking allotments are not established in the supplied records. A parking area figure alone does not establish the number of spaces or exclusive allocation to a particular apartment.
6. Amenities, recreation & open spaces
| Description / size | 48.09; unit not stated in the permit extraction. The permit also requires the tot-lot to be fenced and maintained as greenery. |
|---|---|
| Evidence source | GHMC permit |
| Declared progress / verified status | Sanctioned / permit condition; no completion verification supplied. |
| Description / size | 1 rainwater-harvesting pit; permit requires a rainwater-harvesting structure (percolation pit). |
|---|---|
| Evidence source | GHMC permit |
| Declared progress / verified status | Sanctioned / permit condition; no completion verification supplied. |
| Description / size | Peripheral greenery and tree planting are identified in the permit conditions and RERA infrastructure list. |
|---|---|
| Declared progress / verified status | RERA-filed availability marked “YES”; listed progress is 0%. No independent completion verification supplied. |
| Description / size | RERA infrastructure list marks water supply “YES”. |
|---|---|
| Declared progress / verified status | Filed availability; listed progress is 0%. No independent completion verification supplied. |
| Description / size | RERA infrastructure record lists sewerage (chamber, lines, septic tank, STP) as “YES”. |
|---|---|
| Declared progress / verified status | Listed progress is 20%; not independently verified. |
| Description / size | Permit identifies space for a transformer. |
|---|---|
| Declared progress / verified status | Permit-listed provision; completion not established. |
| Description / size | Permit requires a garbage house within the premises. |
|---|---|
| Declared progress / verified status | Permit condition; completion not established. |
The supplied evidence does not establish a project-specific clubhouse, gym, swimming pool, children’s play facility beyond the permit-listed tot-lot, or other indoor or sports/recreation facilities as sanctioned or delivered amenities.
7. Utilities, building services & safety
The RERA infrastructure record marks water supply, sewerage, rainwater harvesting and an electrical meter room/sub-station/receiving station as available; it reports sewerage progress at 20% and 0% for water supply, rainwater harvesting and the electrical facility. These are filed progress entries, not independent verification of completed services.
The GHMC permit requires a rainwater-harvesting percolation pit, transformer space, a garbage house and tree planting. It also states that sanitation, plumbing, fire-safety requirements, lifts and electrical installations are to be executed under qualified technical supervision. The permit’s conditions require necessary fire-fighting installations and an occupancy Fire NOC from the Director (EV&DM) before issue of an occupancy certificate. The supplied records do not establish that these works, clearances or certificates have been completed.
The supplied project-specific material does not state water-source or storage capacity, sewage-treatment capacity or reuse arrangements, storm-water design details, electrical or generator capacity, lift count or capacity, CCTV/security arrangements, waste-segregation arrangements, or accessible circulation provisions.
8. Location, access & connectivity
The registered project location is Plot No. 9/B, H No. 6-2-121/2, New Bhoiguda, Secunderabad, Hyderabad, Telangana, PIN 500003. The project identity lists revenue village New Bhoiguda, mandal Secunderabad and district Hyderabad; survey number 00 is the survey identifier recorded in the RERA data.
The supplied location data gives a measured distance of 13.1 km to HITEC City. No approach-road description, public-transport distance, or further landmark distance is provided in the project location record.
9. Developer & development status
The registered promoter is SREEBALAJI INFRA, identified in the project record as a partnership. The listed partners are MITTAKANTI SRAVYA REDDY and authorized signatory MENDU OMPRAKASH REDDY. The promoter’s registered-office address is recorded as ANDALLU NIVAS, SNEHA NAGAR, NEW BHOIGUDA 18, SECUNDERABAD, Secunderabad, Hyderabad, 500003. GSTIN: 36AEUFS1386R1ZT.
The RERA certificate separately lists a promoter-office address at Village Habsiguda, Mandal Uppal, District Medchal-Malkajgiri, PIN 500007. No official promoter website, telephone number or email address is supplied in the project evidence.
The promoter’s Form B declaration, dated 30 August 2023, states that the project was to be completed by 25/11/2025. The supplied material does not provide an overall construction-progress percentage, a phase-wise construction schedule, or an occupancy/completion certificate.
10. Approvals, official records & documents
TG-RERA registration: Form C registration certificate for ANANDA PRIDE RESIDENCY, P02500007098, issued 17/10/2023; validity stated through 25/11/2025.
GHMC building permit: Building Permit Order 2601/GHMC/SEC/2022-BP, approved 26 November, 2022; file no. 005193/GHMC/2818/SEC1/2021-BP. It sanctions one residential building with 1 Cellar + 1 Stilt + 5 upper floors.
RERA Form B declaration: Promoter declaration by MENDU OMPRAKASH REDDY, dated 30 August 2023, including the declared completion date of 25/11/2025.
RERA layout-plan filing: A layout-plan document is listed, but its content was not extracted in the supplied record.
Occupancy / completion certificate: No project-specific occupancy or completion certificate is identified in the supplied evidence. The GHMC permit states that an occupancy certificate is compulsory before occupation.
Other project-filed records: The project file lists encumbrance statements 145857665 and 144680991, and title-report documents including a title search report and title-chain instruments.
Frequently asked questions
Is ANANDA PRIDE RESIDENCY registered with Telangana RERA?
Yes. ANANDA PRIDE RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02500007098; the registration status is New Project.
Who is the developer of ANANDA PRIDE RESIDENCY?
The promoter named in the RERA registration is SREEBALAJI INFRA.
Where is ANANDA PRIDE RESIDENCY located?
ANANDA PRIDE RESIDENCY is in SECUNDERABAD, New Bhoiguda, Hyderabad, Telangana (500003).
When will ANANDA PRIDE RESIDENCY be completed?
The promoter's proposed date of completion filed with RERA is 25/11/2025. This is the promoter's declaration, not a guarantee.