The Niche
VAMSIRAM HOMES · Hyderabad · RERA P02500006592
THE NICHE is a residential apartment project in Jubilee Hills - 19, Shaikpet Mandal, Hyderabad District. The registered promoter developing it is VAMSIRAM HOMES. The project covers 8,096.27 sq. m and comprises one residential building with 3 Stilt + 10 upper floors and 96 4BHK apartments. It is registered with TG-RERA under P02500006592, granted 7 July 2023, with stated validity through 28 December 2028; the GHMC permit states construction was to be completed before 28 December 2028.
More from Vamsiram Homes · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | THE NICHE RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Registered project; phase-wise scope is not specified in the available record RERA record |
| TG-RERA registration | P02500006592; granted 7 July 2023; stated validity through 28 December 2028. Registration validity is separate from the construction completion deadline and from occupancy certification. RERA record |
| Registered promoter | VAMSIRAM HOMES RERA record RERA filing |
| RERA status | New Project RERA record |
Land and geographic identity
| Item | Record |
|---|---|
| Locality | Jubilee Hills - 19 RERA record RERA filing |
| Revenue village | Jubilee Hills in the project identity record; the building permit identifies Shaikpet Village. RERA record |
| Mandal / district / PIN | Shaikpet Mandal; Hyderabad District; 500033 RERA record |
| Survey numbers and subdivisions | 330/1, 331/1, 331/2 RERA record Land records |
| Site extent | 8,096.27 sq. m; the permit records both plot area and net plot area as 8,096.27 sq. m, and road-affected and nala-affected area as 0.0 sq. m. Land records |
| Boundaries in RERA record | East: property of C Sowmya and N Hima Bindu; west: 60 Feet Existing Road; north: property of N Sharada and P Padmaja; south: property of G Ammaji and N Sharada. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | Building Permit Order 4807/GHMC/KHB/2022-BP, dated 28 December 2022; file no. 013194/GHMC/6464/KHB1/2022-BP. Approvals record |
| Approved layout / subdivision reference | 007414/GHMC/3674/KHB1/2022-BP Approvals record |
| Approved built-up area | 31,940.17 sq. m, recorded in the project fields as approved built-up area. The permit extraction separately lists 31,940.17 for residential upper floors and 10,671.5 for stilt; these are permit schedule entries and are not presented here as interchangeable area measures. RERA filing |
| Building and floors | One residential building; permit configuration: 3 Stilt + 10 upper floors. Permit-stated building height: 29.90 m. RERA filing |
| Parking | Permit records total parking area of 11,175.33; it says the approved cellar and stilt areas are for parking. The available extract does not state a parking-space count. |
| Unit counts | GHMC permit conditions say sanctioned unit numbers must not be increased without prior approval, but a sanctioned unit count is not stated in the available permit extract. The RERA filing records 96 4BHK homes. RERA unit table |
Offering and status
| Item | Record |
|---|---|
| RERA-filed homes | 96 4BHK apartments; filed saleable area 351.97 sq. m per unit. RERA unit table |
| Booked / available | 10 booked and 86 available, as last read from the TG-RERA portal; the record has no as-of date, so counts are indicative. RERA unit table |
| Other RERA unit-table entries | Four entries named “107 Amenities” through “110 Amenities” are recorded as not-for-sale/common-area rows, not homes available for purchase. RERA unit table |
| Construction stage | No independently verified site-progress information is supplied. The RERA amenity table reports water supply at 10% and lists several other infrastructure items at 0%; those are filed progress entries, not independent site verification. RERA amenities |
| Completion deadline | GHMC permit states construction was to commence before 28 June 2023 and be completed before 28 December 2028. The promoter’s Form B contains a truncated completion undertaking (“28-”), so it does not provide a usable complete date in the extracted text. |
| Occupancy / completion certificate | The building-permit record says the completion notice and occupancy certificate are to be obtained after construction and that an occupancy certificate is compulsory before occupation. The extracted record does not establish that a completion or occupancy certificate has been issued. |
The project story
- THE NICHE is registered as a residential apartment project on land identified as Survey Nos. 330/1, 331/1 and 331/2, in the Jubilee Hills - 19 locality, Shaikpet Mandal, Hyderabad District. The recorded site extent is 8,096.27 sq. m. The GHMC building permit describes one residential building with three stilt levels and ten upper floors. RERA record Land records
- The RERA filing lists 96 4BHK apartments. It also contains four rows labelled as amenities, which are not counted as sale homes. The booking snapshot shows 10 booked and 86 available, but has no recorded as-of date. These are RERA-portal figures, not a current availability confirmation. RERA unit table
- The supplied record does not provide independently verified construction progress or establish that an occupancy or completion certificate has been issued. The GHMC permit sets out construction and occupancy-certificate conditions; the filed amenity progress figures are reported entries rather than independent verification of work on site. RERA amenities
Master plan, architecture & building design
- The GHMC permit covers a residential building on a plot area of 8,096.27 sq. m, with net plot area also recorded as 8,096.27 sq. m. It specifies 3 Stilt + 10 upper floors, a height of 29.90 m and four setbacks: front 12.8, rear 10, side I 11 and side II 8.38 (as recorded in the permit extract). The permit lists residential upper-floor area as 31,940.17 and stilt area as 10,671.5; the project filing separately records approved built-up area of 31,940.17 sq. m. The available material does not provide a full area schedule clarifying the relationship among these entries. RERA filing
- The permit specifies a tot lot of 811.65, one rainwater-harvesting pit and total parking area of 11,175.33. It also requires space for a transformer and a garbage house. The extracted material does not establish a basement/cellar floor count, homes per floor, lift or stair arrangement, building footprint, internal circulation plan or detailed open-space distribution.
Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 4BHK | 96 | 10 | 86 | 351.97 sq. m | Software-measured: median 213.6 sq. m; range 208.7–306.0 sq. m across 18 measured designs | 39% |
- The 4BHK count, bookings, availability and saleable area are from the TG-RERA filing; booking counts have no as-of date in the supplied data. The carpet-area figures and loading are software measurements from the approved floor-plan drawings, not RERA disclosures; the measured range includes one design flagged for review. RERA unit table RERA unit details Floor plans
- Carpet area measures the home’s internal floor area under the supplied drawing-measurement method. Saleable area is a separate RERA-filed figure and includes the home’s share of common areas; it should not be treated as carpet area. Room-level drawing measurements are available for a sampled first-floor 4BHK plan, but the material does not establish that this is a standard arrangement for every unit. RERA unit details Floor plans
Parking & vehicle circulation
- The GHMC permit records 11,175.33 as total parking area and states that cellar and stilt areas approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. It does not provide a number of parking spaces, allocation by apartment, visitor or accessible parking details, or a confirmed cellar-level configuration in the supplied extract.
- The RERA record identifies a mortgage area of 3,238.71 sq. m; the permit extract also records a mortgage of the first and second floor area of 3,277.57. These are document-recorded land/building matters, not evidence of an individual buyer’s parking allocation. RERA filing
Amenities, recreation & open spaces
| Description / size | Permit schedule: 811.65; GHMC condition requires it to be fenced and maintained as greenery before issue of the occupancy certificate. |
|---|---|
| Evidence source | GHMC building permit |
| Declared progress / verified status | Permit requirement; completion not established. |
| Description / size | Listed as available: YES; progress recorded as 0%. RERA amenities |
|---|---|
| Evidence source | RERA-filed amenity table |
| Declared progress / verified status | Declared progress entry; not independently verified. |
| Description / size | Listed; progress recorded as 0%. RERA amenities |
|---|---|
| Evidence source | RERA-filed amenity table |
| Declared progress / verified status | Declared progress entry; no facility description or size supplied. |
| Description / size | Listed; progress recorded as 0%. RERA amenities |
|---|---|
| Evidence source | RERA-filed amenity table |
| Declared progress / verified status | Declared progress entry; area not stated in this table. |
- Promoter-marketed amenities—including a clubhouse, pool, sports and indoor-recreation facilities—are not used here as confirmed or sanctioned facilities. The supplied RERA amenity table and permit extract do not establish their approved scope, dimensions or delivery status. Promoter website RERA amenities
Utilities, building services & safety
| Service | Evidence in the project record |
|---|---|
| Water | RERA amenity table lists water supply as available: YES, with progress at 10%; source, storage and treatment capacity are not specified there. RERA amenities |
| Sewerage and drainage | Sewerage and storm-water drains are listed as available: YES, each with progress at 0%. Treatment and disposal of sewage and sullage water is also listed as available: YES, at 0%; the record does not specify plant capacity or reuse arrangements. RERA amenities |
| Rainwater harvesting | GHMC permit specifies one rainwater-harvesting pit and requires a rainwater-harvesting structure (percolation pit). |
| Electrical | Permit requires space for a transformer. The RERA table lists an electrical meter room/sub-station/receiving station as available: YES, with progress at 0%. Supply capacity and backup arrangements are not established by these records. RERA amenities |
| Waste | Permit requires a garbage house within the premises. Solid-waste management and disposal is listed in the RERA table as available: YES, with progress at 0%. RERA amenities |
| Fire and life safety | RERA table lists fire protection and fire-safety requirements with progress at 0%. The GHMC permit requires an Occupancy Fire NOC from the Director (EV&DM) before issue of the occupancy certificate. The supplied record does not establish that the NOC has been issued. RERA amenities |
| Accessibility, lifts and security | Specific accessibility provisions, lift numbers/capacities and security systems are not established in the supplied RERA and permit extracts. Document index RERA amenities |
These entries describe permit conditions and RERA-filed amenity status; they do not independently verify completed services or statutory compliance.
Location, access & connectivity
- The official project identity places THE NICHE in Jubilee Hills - 19, Jubilee Hills revenue-village identity, Shaikpet Mandal, Hyderabad District, PIN 500033; the GHMC building permit identifies the site as Jubilee Hills - 19, Shaikpet. The permit records a west boundary of 60 Feet Existing Road and refers to an 18 mt road-width condition for the site. RERA record RERA filing
- The supplied location record gives a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and lists Financial District (Nanakramguda) at 1.2 km. The distance is a record-supplied connectivity figure; no measurement method is stated. No public-transport details or other independently measured access distances are supplied. Location record
Developer & development status
- The registered promoter is VAMSIRAM HOMES, recorded as a partnership. Its GSTIN is 36AAMFV7544C1ZX. The project record gives the promoter’s address as Jyothi Estate, Srinagar Colony, Shaikpet, Jubilee Hills - 19, Hyderabad, 500033. RERA filing RERA filing Parties record
- The building permit names Smt. N. Sharada and M/s Vamsiram Homes in connection with the development-agreement-cum-GPA arrangement and identifies Vamsiram Homes as developer. The RERA Form B, signed by an authorized signatory for Vamsiram Homes, declares the landowner’s title and identifies Development Agreement-cum-GPA Nos. 214/2020 and 6446/2021. These are promoter-filed declarations and permit-record descriptions.
- The RERA registration certificate states validity from 7 July 2023 through 28 December 2028. The GHMC permit states completion before 28 December 2028. The supplied material does not establish current on-site progress or issue of an occupancy certificate.
Approvals, official records & documents
| Identifier / date | P02500006592; issued 7 July 2023; stated validity through 28 December 2028 |
|---|---|
| Scope and source | FORM C for THE NICHE, identifying Survey Nos. 330/1, 331/1 and 331/2. |
| Identifier / date | 4807/GHMC/KHB/2022-BP; 28 December 2022 |
|---|---|
| Scope and source | Residential building permit for 3 Stilt + 10 upper floors on 8,096.27 sq. m; includes conditions on construction, parking, rainwater harvesting, garbage house and occupancy certification. |
| Identifier / date | 013194/GHMC/6464/KHB1/2022-BP; 28 December 2022 |
|---|---|
| Scope and source | File number recorded with the permit. |
| Identifier / date | 007414/GHMC/3674/KHB1/2022-BP |
|---|---|
| Scope and source | Reference listed in the permit; an approved layout drawing is not extracted in the supplied material. |
| Identifier / date | Dated 2 March 2022 |
|---|---|
| Scope and source | Promoter declaration concerning title, development agreements, project undertakings and encumbrances. Its extracted completion date is truncated. |
| Identifier / date | Not established in supplied records |
|---|---|
| Scope and source | The permit requires completion notice and an occupancy certificate before occupation; the extracted permit record indicates completion certification is not recorded as complete. |
The building permit also cites GHMC/HMC statutory provisions and requires a Fire NOC before issue of an occupancy certificate. The supplied documents do not establish the later issue of that NOC or an occupancy certificate.
Project at a glance
Project identity
Registered project name: THE NICHE
Project type: Residential apartment project
Phase / registered portion: Registered project; phase-wise scope is not specified in the available record
TG-RERA registration: P02500006592; granted 7 July 2023; stated validity through 28 December 2028. Registration validity is separate from the construction completion deadline and from occupancy certification.
Registered promoter: VAMSIRAM HOMES
RERA status: New Project
Land and geographic identity
Locality: Jubilee Hills - 19
Revenue village: Jubilee Hills in the project identity record; the building permit identifies Shaikpet Village.
Mandal / district / PIN: Shaikpet Mandal; Hyderabad District; 500033
Survey numbers and subdivisions: 330/1, 331/1, 331/2
Site extent: 8,096.27 sq. m; the permit records both plot area and net plot area as 8,096.27 sq. m, and road-affected and nala-affected area as 0.0 sq. m.
Boundaries in RERA record: East: property of C Sowmya and N Hima Bindu; west: 60 Feet Existing Road; north: property of N Sharada and P Padmaja; south: property of G Ammaji and N Sharada.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Building Permit Order 4807/GHMC/KHB/2022-BP, dated 28 December 2022; file no. 013194/GHMC/6464/KHB1/2022-BP.
Approved layout / subdivision reference: 007414/GHMC/3674/KHB1/2022-BP
Approved built-up area: 31,940.17 sq. m, recorded in the project fields as approved built-up area. The permit extraction separately lists 31,940.17 for residential upper floors and 10,671.5 for stilt; these are permit schedule entries and are not presented here as interchangeable area measures.
Building and floors: One residential building; permit configuration: 3 Stilt + 10 upper floors. Permit-stated building height: 29.90 m.
Parking: Permit records total parking area of 11,175.33; it says the approved cellar and stilt areas are for parking. The available extract does not state a parking-space count.
Unit counts: GHMC permit conditions say sanctioned unit numbers must not be increased without prior approval, but a sanctioned unit count is not stated in the available permit extract. The RERA filing records 96 4BHK homes.
Offering and status
RERA-filed homes: 96 4BHK apartments; filed saleable area 351.97 sq. m per unit.
Booked / available: 10 booked and 86 available, as last read from the TG-RERA portal; the record has no as-of date, so counts are indicative.
Other RERA unit-table entries: Four entries named “107 Amenities” through “110 Amenities” are recorded as not-for-sale/common-area rows, not homes available for purchase.
Construction stage: No independently verified site-progress information is supplied. The RERA amenity table reports water supply at 10% and lists several other infrastructure items at 0%; those are filed progress entries, not independent site verification.
Completion deadline: GHMC permit states construction was to commence before 28 June 2023 and be completed before 28 December 2028. The promoter’s Form B contains a truncated completion undertaking (“28-”), so it does not provide a usable complete date in the extracted text.
Occupancy / completion certificate: The building-permit record says the completion notice and occupancy certificate are to be obtained after construction and that an occupancy certificate is compulsory before occupation. The extracted record does not establish that a completion or occupancy certificate has been issued.
The project story
- THE NICHE is registered as a residential apartment project on land identified as Survey Nos. 330/1, 331/1 and 331/2, in the Jubilee Hills - 19 locality, Shaikpet Mandal, Hyderabad District. The recorded site extent is 8,096.27 sq. m. The GHMC building permit describes one residential building with three stilt levels and ten upper floors.
- The RERA filing lists 96 4BHK apartments. It also contains four rows labelled as amenities, which are not counted as sale homes. The booking snapshot shows 10 booked and 86 available, but has no recorded as-of date. These are RERA-portal figures, not a current availability confirmation.
- The supplied record does not provide independently verified construction progress or establish that an occupancy or completion certificate has been issued. The GHMC permit sets out construction and occupancy-certificate conditions; the filed amenity progress figures are reported entries rather than independent verification of work on site.
Master plan, architecture & building design
- The GHMC permit covers a residential building on a plot area of 8,096.27 sq. m, with net plot area also recorded as 8,096.27 sq. m. It specifies 3 Stilt + 10 upper floors, a height of 29.90 m and four setbacks: front 12.8, rear 10, side I 11 and side II 8.38 (as recorded in the permit extract). The permit lists residential upper-floor area as 31,940.17 and stilt area as 10,671.5; the project filing separately records approved built-up area of 31,940.17 sq. m. The available material does not provide a full area schedule clarifying the relationship among these entries.
- The permit specifies a tot lot of 811.65, one rainwater-harvesting pit and total parking area of 11,175.33. It also requires space for a transformer and a garbage house. The extracted material does not establish a basement/cellar floor count, homes per floor, lift or stair arrangement, building footprint, internal circulation plan or detailed open-space distribution.
Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 4BHK | 96 | 10 | 86 | 351.97 sq. m | Software-measured: median 213.6 sq. m; range 208.7–306.0 sq. m across 18 measured designs | 39% |
- The 4BHK count, bookings, availability and saleable area are from the TG-RERA filing; booking counts have no as-of date in the supplied data. The carpet-area figures and loading are software measurements from the approved floor-plan drawings, not RERA disclosures; the measured range includes one design flagged for review.
- Carpet area measures the home’s internal floor area under the supplied drawing-measurement method. Saleable area is a separate RERA-filed figure and includes the home’s share of common areas; it should not be treated as carpet area. Room-level drawing measurements are available for a sampled first-floor 4BHK plan, but the material does not establish that this is a standard arrangement for every unit.
Parking & vehicle circulation
- The GHMC permit records 11,175.33 as total parking area and states that cellar and stilt areas approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. It does not provide a number of parking spaces, allocation by apartment, visitor or accessible parking details, or a confirmed cellar-level configuration in the supplied extract.
- The RERA record identifies a mortgage area of 3,238.71 sq. m; the permit extract also records a mortgage of the first and second floor area of 3,277.57. These are document-recorded land/building matters, not evidence of an individual buyer’s parking allocation.
Amenities, recreation & open spaces
| Description / size | Permit schedule: 811.65; GHMC condition requires it to be fenced and maintained as greenery before issue of the occupancy certificate. |
|---|---|
| Evidence source | GHMC building permit |
| Declared progress / verified status | Permit requirement; completion not established. |
| Description / size | Listed as available: YES; progress recorded as 0%. |
|---|---|
| Evidence source | RERA-filed amenity table |
| Declared progress / verified status | Declared progress entry; not independently verified. |
| Description / size | Listed; progress recorded as 0%. |
|---|---|
| Evidence source | RERA-filed amenity table |
| Declared progress / verified status | Declared progress entry; no facility description or size supplied. |
| Description / size | Listed; progress recorded as 0%. |
|---|---|
| Evidence source | RERA-filed amenity table |
| Declared progress / verified status | Declared progress entry; area not stated in this table. |
- Promoter-marketed amenities—including a clubhouse, pool, sports and indoor-recreation facilities—are not used here as confirmed or sanctioned facilities. The supplied RERA amenity table and permit extract do not establish their approved scope, dimensions or delivery status.
Utilities, building services & safety
Water: RERA amenity table lists water supply as available: YES, with progress at 10%; source, storage and treatment capacity are not specified there.
Sewerage and drainage: Sewerage and storm-water drains are listed as available: YES, each with progress at 0%. Treatment and disposal of sewage and sullage water is also listed as available: YES, at 0%; the record does not specify plant capacity or reuse arrangements.
Rainwater harvesting: GHMC permit specifies one rainwater-harvesting pit and requires a rainwater-harvesting structure (percolation pit).
Electrical: Permit requires space for a transformer. The RERA table lists an electrical meter room/sub-station/receiving station as available: YES, with progress at 0%. Supply capacity and backup arrangements are not established by these records.
Waste: Permit requires a garbage house within the premises. Solid-waste management and disposal is listed in the RERA table as available: YES, with progress at 0%.
Fire and life safety: RERA table lists fire protection and fire-safety requirements with progress at 0%. The GHMC permit requires an Occupancy Fire NOC from the Director (EV&DM) before issue of the occupancy certificate. The supplied record does not establish that the NOC has been issued.
Accessibility, lifts and security: Specific accessibility provisions, lift numbers/capacities and security systems are not established in the supplied RERA and permit extracts.
These entries describe permit conditions and RERA-filed amenity status; they do not independently verify completed services or statutory compliance.
Location, access & connectivity
- The official project identity places THE NICHE in Jubilee Hills - 19, Jubilee Hills revenue-village identity, Shaikpet Mandal, Hyderabad District, PIN 500033; the GHMC building permit identifies the site as Jubilee Hills - 19, Shaikpet. The permit records a west boundary of 60 Feet Existing Road and refers to an 18 mt road-width condition for the site.
- The supplied location record gives a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and lists Financial District (Nanakramguda) at 1.2 km. The distance is a record-supplied connectivity figure; no measurement method is stated. No public-transport details or other independently measured access distances are supplied.
Developer & development status
- The registered promoter is VAMSIRAM HOMES, recorded as a partnership. Its GSTIN is 36AAMFV7544C1ZX. The project record gives the promoter’s address as Jyothi Estate, Srinagar Colony, Shaikpet, Jubilee Hills - 19, Hyderabad, 500033.
- The building permit names Smt. N. Sharada and M/s Vamsiram Homes in connection with the development-agreement-cum-GPA arrangement and identifies Vamsiram Homes as developer. The RERA Form B, signed by an authorized signatory for Vamsiram Homes, declares the landowner’s title and identifies Development Agreement-cum-GPA Nos. 214/2020 and 6446/2021. These are promoter-filed declarations and permit-record descriptions.
- The RERA registration certificate states validity from 7 July 2023 through 28 December 2028. The GHMC permit states completion before 28 December 2028. The supplied material does not establish current on-site progress or issue of an occupancy certificate.
Approvals, official records & documents
| Identifier / date | P02500006592; issued 7 July 2023; stated validity through 28 December 2028 |
|---|---|
| Scope and source | FORM C for THE NICHE, identifying Survey Nos. 330/1, 331/1 and 331/2. |
| Identifier / date | 4807/GHMC/KHB/2022-BP; 28 December 2022 |
|---|---|
| Scope and source | Residential building permit for 3 Stilt + 10 upper floors on 8,096.27 sq. m; includes conditions on construction, parking, rainwater harvesting, garbage house and occupancy certification. |
| Identifier / date | 013194/GHMC/6464/KHB1/2022-BP; 28 December 2022 |
|---|---|
| Scope and source | File number recorded with the permit. |
| Identifier / date | 007414/GHMC/3674/KHB1/2022-BP |
|---|---|
| Scope and source | Reference listed in the permit; an approved layout drawing is not extracted in the supplied material. |
| Identifier / date | Dated 2 March 2022 |
|---|---|
| Scope and source | Promoter declaration concerning title, development agreements, project undertakings and encumbrances. Its extracted completion date is truncated. |
| Identifier / date | Not established in supplied records |
|---|---|
| Scope and source | The permit requires completion notice and an occupancy certificate before occupation; the extracted permit record indicates completion certification is not recorded as complete. |
The building permit also cites GHMC/HMC statutory provisions and requires a Fire NOC before issue of an occupancy certificate. The supplied documents do not establish the later issue of that NOC or an occupancy certificate.
Frequently asked questions
Is THE NICHE registered with Telangana RERA?
Yes. THE NICHE is registered with the Telangana Real Estate Regulatory Authority as P02500006592; the registration status is New Project.
Who is the developer of THE NICHE?
The promoter named in the RERA registration is VAMSIRAM HOMES.
Where is THE NICHE located?
THE NICHE is in Jubilee Hills - 19, Shaikpet, Hyderabad, Telangana (500033).
When will THE NICHE be completed?
The promoter's proposed date of completion filed with RERA is 28/04/2029. This is the promoter's declaration, not a guarantee.
More projects in Jubilee Hills