Lakshmi Sikhara Pride
SIKHARA PROJECTS AND ESTATES LLP · Hyderabad · RERA P02500002106
LAKSHMI SIKHARA PRIDE is a residential apartment project in Jubilee Hills, Shaikpet Mandal, Hyderabad District, developed by registered promoter SIKHARA PROJECTS AND ESTATES LLP. The site area is 1623.76 sq.m, and the project comprises one residential building with 2 Cellar + Ground + 4 upper floors and 20 apartments. The RERA unit schedule lists 16 3BHK apartments and 4 apartments recorded as “BHK (unspecified),” each with a saleable area of 193.97 sq.m. Its TG-RERA registration number is P02500002106, and the recorded completion date is 16/08/2025.
📘 Project brochure from the promoter’s website ↗More from Sikhara Projects And Estates LLP · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | LAKSHMI SIKHARA PRIDE RERA record |
| Project type / phase | Residential apartment project; the registration record identifies a “New Project.” A separate phase name or phase number is not disclosed. RERA record RERA filing |
| TG-RERA registration | P02500002106 RERA record |
| Registration validity | Certificate states 24/08/2020–16/08/2025 and four years, subject to extension by the Authority. No extension is recorded in the supplied certificate. Registration validity is distinct from the completion deadline and occupancy-certificate status. |
| Registered promoter | SIKHARA PROJECTS AND ESTATES LLP RERA record Corporate record |
| RERA status in supplied record | Registration certificate issued; the recorded validity ended 16/08/2025. Current validity/status is not established by the supplied record. Approvals record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Jubilee Hills; the RERA filing also identifies the site as Jubilee Hills. RERA record RERA filing |
| Revenue village | Shaikpet Village in the title documents; the RERA/building-permit records also use Jubilee Hills or JUBILEE HILLS -19. These supplied village/location labels are retained as recorded. |
| Mandal / district / PIN | Shaikpet / Hyderabad / 500096 RERA record RERA filing |
| Survey number | Survey No. 403 (also written Sy.No.403); no project subdivision is stated in the RERA identity record. RERA record Land records |
| Plot identifiers | 69-A, 70-A RERA filing |
| Site extent | Total 1623.76 sq.m; road-affected area 215.65 sq.m; net area 1408.11 sq.m. The building permit records the road-affected portion as to be surrendered to GHMC free of cost. RERA filing |
| Title-document extent | Development Agreement-cum-Irrevocable GPA records 1942 sq. yards in Survey No. 403, Shaikpet Village. |
| Boundaries (RERA filing) | North: road width 15; west: road width 12; east and south: existing building. Units for the boundary road widths are not specified in this RERA field. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building-permit approval | 1/C18/12488/2019, dated 16 August 2019; permit file no. 1/C18/22777/2018. Approvals record |
| Building configuration in permit | One residential building, Building A-1 (BLG): 2 Cellar + Ground + 4 upper floors. |
| Height and areas in permit | Height 14.95 m; residential ground-floor area 775.86 m²; residential upper-floors area 3,103.44 m²; cellar parking area 1,439.61 m². The permit separately records a first-floor area of 418.18 m². |
| Approved built-up area | 3,879.30 sq.m in the RERA project information. RERA filing |
| Parking levels | Permit identifies cellar parking; the two cellar levels are the sanctioned configuration. Parking count is not established in the supplied permit extraction. |
| Unit count | RERA project information records 1 total building unit and 1 proposed building unit; the RERA unit schedule records 20 apartments in total. RERA filing RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configurations | 3BHK: 16 units; BHK (unspecified): 4 units. RERA unit table |
| RERA-filed saleable area | 193.97 sq.m for each listed configuration. RERA unit table |
| Booking / availability | Portal-derived counts: 1 booked, 15 available among the 3BHK units; 0 booked, 4 available among the unspecified BHK units. The portal data has no stated as-of date, so counts are indicative. RERA unit table |
| RERA completion date | 16/08/2025 in the registration certificate and RERA project record. RERA record |
| Promoter Form B completion undertaking | 31-03-2021; this is a promoter declaration in the registration file. |
| Construction stage | No independently verified site-progress information is supplied. The RERA amenity schedule records 0% for the listed progress items. RERA amenities |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project documents. The GHMC permit requires a completion notice and occupancy certificate before occupation. |
2. The project story
- LAKSHMI SIKHARA PRIDE is registered as a residential apartment project on Survey No. 403, at plots 69-A and 70-A, in the supplied Jubilee Hills/Shaikpet location records. The filed land schedule gives a total site area of 1623.76 sq.m, including 215.65 sq.m identified as road-affected, and a net area of 1408.11 sq.m. GHMC’s building-permit order describes one residential building, A-1, with two cellar levels, a ground floor and four upper floors. RERA record RERA filing
- The RERA unit schedule records 20 apartments: 16 listed as 3BHK and four recorded only as “BHK.” Portal booking figures show one booked unit, but have no as-of date. These counts describe the supplied RERA record, not independently checked current sales or construction progress. RERA unit table
- The registration certificate’s completion date is 16/08/2025, while the promoter’s Form B contains a completion undertaking of 31-03-2021. No revised completion approval, current construction-status report, or occupancy/completion certificate is supplied. The permit states that an occupancy certificate is required before occupation.
3. Master plan, architecture & building design
- The filed site schedule and GHMC building-permit order describe a single-building residential development on a site of 1623.76 sq.m, with net area 1408.11 sq.m and a road-affected portion of 215.65 sq.m. The permit identifies Building A-1 (BLG), with a height of 14.95 m and configuration of 2 Cellar + Ground + 4 upper floors. RERA filing
- The permit records residential ground-floor area of 775.86 m², residential upper-floors area of 3,103.44 m², and cellar parking area of 1,439.61 m². Separately, the RERA filing states approved built-up area of 3,879.30 sq.m. The RERA filing does not provide a breakdown here of FSI-counted area, gross built-up area, carpet area or common-area area. RERA filing
- GHMC’s order lists a tot-lot of 87.77 m², requires space for a transformer, and says the road-affected portion is to be surrendered to GHMC free of cost. It also specifies that the cellar and stilt areas approved for parking are to be used exclusively for vehicle parking, and that the sanctioned unit count is not to be increased without prior GHMC approval.
- The available extraction does not establish the number of flats per floor, lift or stair arrangement, building footprint, detailed internal circulation, or landscaping/open-space design beyond the stated tot-lot and RERA amenity entries. The supplied floor-plan record is a drawing-based software measurement, not a RERA area disclosure. RERA amenities
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 16 | 1 | 15 | 193.97 sq.m | Median 138.5 sq.m; measured range 136.0–152.6 sq.m | 29% |
| BHK (unspecified) | 4 | 0 | 4 | 193.97 sq.m | Not supplied | Not supplied |
RERA configuration, unit counts, booking/availability and saleable areas are from the TG-RERA unit record; booking figures are indicative because the portal record has no as-of date. The 3BHK carpet-area figures are software measurements from approved floor-plan drawing geometry, not RERA-filed carpet areas. The measurement set covers 11 flat designs; the source notes that the drawing measurements need review. RERA unit table RERA unit details
The supplied measured ground-floor flat plan (flat 02) shows living/dining, kitchen, three bedrooms, dress areas, toilets and a utility area. The utility is identified as excluded from the measured carpet area. For example, the plan labels living/dining at 4.57 × 7.66 m, kitchen at 3.89 × 4.27 m and utility at 1.52 × 3.89 m. These are drawing-based measurements and should be checked against the plan. RERA unit details
Carpet area, saleable area and the measured loading are distinct area concepts in the supplied records. The RERA figure is saleable area; the drawing-based carpet measurement is not a substitute for that filing figure, and the supplied record does not provide a separately filed balcony area or a unit-by-unit common-area allocation. RERA unit table RERA unit details
5. Parking & vehicle circulation
- The GHMC permit records cellar parking area of 1,439.61 m² and the building has two cellar levels in its sanctioned configuration. It requires the cellar and stilt areas approved for parking to be used exclusively for vehicle parking, without partition walls or rolling shutters.
- A parking-space count, visitor or accessible-bay count, parking allocation by apartment, and vehicle entry/ramp arrangement are not established by the supplied permit extraction. A brochure claims two-level parking and two car parks per apartment, but those are promoter-marketed statements rather than a verified unit allocation or a count confirmed by the supplied sanction. Promoter website
6. Amenities, recreation & open spaces
| Description / size | 87.77 m²; permit also says it is to be fenced and maintained as greenery before issue of occupancy certificate |
|---|---|
| Evidence source | GHMC building-permit order |
| Declared progress / verified status | Sanctioned/required; completion not verified. |
| Description / size | Listed as available “YES” in the RERA amenity schedule |
|---|---|
| Evidence source | RERA amenity schedule |
| Declared progress / verified status | Progress recorded as 0%; physical delivery not independently verified. RERA amenities |
| Description / size | Listed as available “YES” |
|---|---|
| Evidence source | RERA amenity schedule |
| Declared progress / verified status | Progress recorded as 0%; operational status not independently verified. RERA amenities |
| Description / size | Listed as available “YES” |
|---|---|
| Evidence source | RERA amenity schedule |
| Declared progress / verified status | Progress recorded as 0%; completion not independently verified. RERA amenities |
| Description / size | Listed as available “YES” |
|---|---|
| Evidence source | RERA amenity schedule |
| Declared progress / verified status | Progress recorded as 0%; installation/operation not independently verified. RERA amenities |
| Description / size | Named in the RERA amenity schedule; no dimensions or facility-specific descriptions are supplied |
|---|---|
| Evidence source | RERA amenity schedule |
| Declared progress / verified status | Each listed at 0% in the supplied schedule; no independent completion verification. RERA amenities |
The RERA amenity schedule contains 14 entries. No clubhouse or indoor/sports facility is established as a RERA-declared or completed project facility in the supplied amenity schedule. RERA amenities
7. Utilities, building services & safety
The RERA amenity schedule names water supply, sewerage, storm-water drains, rainwater harvesting, solid-waste management, energy management, fire protection and safety requirements, and electrical meter-room/substation/receiving-station infrastructure. It marks water supply, storm-water drains and water conservation/rainwater harvesting as “YES,” while the listed progress percentages are 0%; the supplied information does not establish operational completion, capacity, water source, treatment method, STP design or reuse arrangements. RERA amenities
GHMC’s permit requires space for a transformer and states that a completion notice and occupancy certificate are required before occupation. The supplied permit extraction does not give lift counts or capacities, fire-system specifications, emergency access details, backup-power arrangements, security systems, waste segregation facilities or accessibility provisions. RERA amenities
8. Location, access & connectivity
- The project’s RERA identity places it in Jubilee Hills, Shaikpet Mandal, Hyderabad District, PIN 500096, on Survey No. 403, at plots 69-A and 70-A. The title documents describe the revenue village as Shaikpet Village; the building-permit record uses “JUBILEE HILLS -19.” RERA record RERA filing
- The supplied location record identifies Financial District (Nanakramguda) at 1.2 km from the recorded cadastral parcel centroid. No approach-road route, measured distance to public transport, or independently verified travel time is supplied. Location record
- The developer’s brochure lists nearby landmarks and estimated travel-time bands, but these are promoter-marketed claims, not verified route measurements. Promoter website
9. Developer & development status
The registered legal promoter is SIKHARA PROJECTS AND ESTATES LLP, an LLP, with GSTIN 36ADJFS1966M1ZE. The supplied promoter address is Landmark, Road No. 12, Jubilee Hills, Shaikpet, Hyderabad, Telangana, 500096; the registration certificate separately records the promoter office PIN as 500034. The supplied records identify Boppidi Vinod Reddy as an authorized signatory and LLP partner. Corporate record Parties record
The Form B affidavit, dated 08 June 2020, is a promoter declaration by Boppidi Vinod Reddy on behalf of the LLP. It declares a title basis and undertakes completion by 31-03-2021, alongside separate-account, audit and pending-approval commitments.
No independently verified construction progress, current completion schedule, or occupancy/completion certificate is supplied. The RERA registration record gives a completion date of 16/08/2025, and the registration certificate states validity through the same date; these are separate registration and completion records, and the supplied evidence does not establish a subsequent extension or current certificate status. RERA record
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for LAKSHMI SIKHARA PRIDE, registration P02500002106, issued 24/08/2020, stated valid through 16/08/2025. |
| GHMC building permit | Building Permit Order dated 16 August 2019, approval no. 1/C18/12488/2019, file no. 1/C18/22777/2018; Building A-1 (BLG), Survey No. 403. |
| Approved drawing / plan record | Drawing stamp records approval number 1/C18/12488/2019, dated 03-09-2019; the extracted stamp text is noted as needing review. |
| Title and development-rights documents | Advocate’s title report dated 30 May 2020 and registered Development Agreement-cum-Irrevocable GPA 1081/2020, dated 13 February 2020, are included in the registration file. |
| Promoter declaration | Form B affidavit-cum-declaration dated 08 June 2020. |
| Occupancy/completion certificate | Not present in the supplied project document set. The GHMC permit states that an occupancy certificate is compulsory before occupation. |
The supplied evidence includes the TG-RERA certificate, GHMC building-permit order, drawing record, title-related documents and Form B declaration. It does not include an occupancy/completion certificate or a current construction-progress verification. Document index
1. Project at a glance
Project identity
Registered project name: LAKSHMI SIKHARA PRIDE
Project type / phase: Residential apartment project; the registration record identifies a “New Project.” A separate phase name or phase number is not disclosed.
TG-RERA registration: P02500002106
Registration validity: Certificate states 24/08/2020–16/08/2025 and four years, subject to extension by the Authority. No extension is recorded in the supplied certificate. Registration validity is distinct from the completion deadline and occupancy-certificate status.
Registered promoter: SIKHARA PROJECTS AND ESTATES LLP
RERA status in supplied record: Registration certificate issued; the recorded validity ended 16/08/2025. Current validity/status is not established by the supplied record.
Land and geographic identity
Locality: Jubilee Hills; the RERA filing also identifies the site as Jubilee Hills.
Revenue village: Shaikpet Village in the title documents; the RERA/building-permit records also use Jubilee Hills or JUBILEE HILLS -19. These supplied village/location labels are retained as recorded.
Mandal / district / PIN: Shaikpet / Hyderabad / 500096
Survey number: Survey No. 403 (also written Sy.No.403); no project subdivision is stated in the RERA identity record.
Plot identifiers: 69-A, 70-A
Site extent: Total 1623.76 sq.m; road-affected area 215.65 sq.m; net area 1408.11 sq.m. The building permit records the road-affected portion as to be surrendered to GHMC free of cost.
Title-document extent: Development Agreement-cum-Irrevocable GPA records 1942 sq. yards in Survey No. 403, Shaikpet Village.
Boundaries (RERA filing): North: road width 15; west: road width 12; east and south: existing building. Units for the boundary road widths are not specified in this RERA field.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building-permit approval: 1/C18/12488/2019, dated 16 August 2019; permit file no. 1/C18/22777/2018.
Building configuration in permit: One residential building, Building A-1 (BLG): 2 Cellar + Ground + 4 upper floors.
Height and areas in permit: Height 14.95 m; residential ground-floor area 775.86 m²; residential upper-floors area 3,103.44 m²; cellar parking area 1,439.61 m². The permit separately records a first-floor area of 418.18 m².
Approved built-up area: 3,879.30 sq.m in the RERA project information.
Parking levels: Permit identifies cellar parking; the two cellar levels are the sanctioned configuration. Parking count is not established in the supplied permit extraction.
Unit count: RERA project information records 1 total building unit and 1 proposed building unit; the RERA unit schedule records 20 apartments in total.
Offering and status
RERA-filed configurations: 3BHK: 16 units; BHK (unspecified): 4 units.
RERA-filed saleable area: 193.97 sq.m for each listed configuration.
Booking / availability: Portal-derived counts: 1 booked, 15 available among the 3BHK units; 0 booked, 4 available among the unspecified BHK units. The portal data has no stated as-of date, so counts are indicative.
RERA completion date: 16/08/2025 in the registration certificate and RERA project record.
Promoter Form B completion undertaking: 31-03-2021; this is a promoter declaration in the registration file.
Construction stage: No independently verified site-progress information is supplied. The RERA amenity schedule records 0% for the listed progress items.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project documents. The GHMC permit requires a completion notice and occupancy certificate before occupation.
2. The project story
- LAKSHMI SIKHARA PRIDE is registered as a residential apartment project on Survey No. 403, at plots 69-A and 70-A, in the supplied Jubilee Hills/Shaikpet location records. The filed land schedule gives a total site area of 1623.76 sq.m, including 215.65 sq.m identified as road-affected, and a net area of 1408.11 sq.m. GHMC’s building-permit order describes one residential building, A-1, with two cellar levels, a ground floor and four upper floors.
- The RERA unit schedule records 20 apartments: 16 listed as 3BHK and four recorded only as “BHK.” Portal booking figures show one booked unit, but have no as-of date. These counts describe the supplied RERA record, not independently checked current sales or construction progress.
- The registration certificate’s completion date is 16/08/2025, while the promoter’s Form B contains a completion undertaking of 31-03-2021. No revised completion approval, current construction-status report, or occupancy/completion certificate is supplied. The permit states that an occupancy certificate is required before occupation.
3. Master plan, architecture & building design
- The filed site schedule and GHMC building-permit order describe a single-building residential development on a site of 1623.76 sq.m, with net area 1408.11 sq.m and a road-affected portion of 215.65 sq.m. The permit identifies Building A-1 (BLG), with a height of 14.95 m and configuration of 2 Cellar + Ground + 4 upper floors.
- The permit records residential ground-floor area of 775.86 m², residential upper-floors area of 3,103.44 m², and cellar parking area of 1,439.61 m². Separately, the RERA filing states approved built-up area of 3,879.30 sq.m. The RERA filing does not provide a breakdown here of FSI-counted area, gross built-up area, carpet area or common-area area.
- GHMC’s order lists a tot-lot of 87.77 m², requires space for a transformer, and says the road-affected portion is to be surrendered to GHMC free of cost. It also specifies that the cellar and stilt areas approved for parking are to be used exclusively for vehicle parking, and that the sanctioned unit count is not to be increased without prior GHMC approval.
- The available extraction does not establish the number of flats per floor, lift or stair arrangement, building footprint, detailed internal circulation, or landscaping/open-space design beyond the stated tot-lot and RERA amenity entries. The supplied floor-plan record is a drawing-based software measurement, not a RERA area disclosure.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 16 | 1 | 15 | 193.97 sq.m | Median 138.5 sq.m; measured range 136.0–152.6 sq.m | 29% |
| BHK (unspecified) | 4 | 0 | 4 | 193.97 sq.m | Not supplied | Not supplied |
RERA configuration, unit counts, booking/availability and saleable areas are from the TG-RERA unit record; booking figures are indicative because the portal record has no as-of date. The 3BHK carpet-area figures are software measurements from approved floor-plan drawing geometry, not RERA-filed carpet areas. The measurement set covers 11 flat designs; the source notes that the drawing measurements need review.
The supplied measured ground-floor flat plan (flat 02) shows living/dining, kitchen, three bedrooms, dress areas, toilets and a utility area. The utility is identified as excluded from the measured carpet area. For example, the plan labels living/dining at 4.57 × 7.66 m, kitchen at 3.89 × 4.27 m and utility at 1.52 × 3.89 m. These are drawing-based measurements and should be checked against the plan.
Carpet area, saleable area and the measured loading are distinct area concepts in the supplied records. The RERA figure is saleable area; the drawing-based carpet measurement is not a substitute for that filing figure, and the supplied record does not provide a separately filed balcony area or a unit-by-unit common-area allocation.
5. Parking & vehicle circulation
- The GHMC permit records cellar parking area of 1,439.61 m² and the building has two cellar levels in its sanctioned configuration. It requires the cellar and stilt areas approved for parking to be used exclusively for vehicle parking, without partition walls or rolling shutters.
- A parking-space count, visitor or accessible-bay count, parking allocation by apartment, and vehicle entry/ramp arrangement are not established by the supplied permit extraction. A brochure claims two-level parking and two car parks per apartment, but those are promoter-marketed statements rather than a verified unit allocation or a count confirmed by the supplied sanction.
6. Amenities, recreation & open spaces
| Description / size | 87.77 m²; permit also says it is to be fenced and maintained as greenery before issue of occupancy certificate |
|---|---|
| Evidence source | GHMC building-permit order |
| Declared progress / verified status | Sanctioned/required; completion not verified. |
| Description / size | Listed as available “YES” in the RERA amenity schedule |
|---|---|
| Evidence source | RERA amenity schedule |
| Declared progress / verified status | Progress recorded as 0%; physical delivery not independently verified. |
| Description / size | Listed as available “YES” |
|---|---|
| Evidence source | RERA amenity schedule |
| Declared progress / verified status | Progress recorded as 0%; operational status not independently verified. |
| Description / size | Listed as available “YES” |
|---|---|
| Evidence source | RERA amenity schedule |
| Declared progress / verified status | Progress recorded as 0%; completion not independently verified. |
| Description / size | Listed as available “YES” |
|---|---|
| Evidence source | RERA amenity schedule |
| Declared progress / verified status | Progress recorded as 0%; installation/operation not independently verified. |
| Description / size | Named in the RERA amenity schedule; no dimensions or facility-specific descriptions are supplied |
|---|---|
| Evidence source | RERA amenity schedule |
| Declared progress / verified status | Each listed at 0% in the supplied schedule; no independent completion verification. |
The RERA amenity schedule contains 14 entries. No clubhouse or indoor/sports facility is established as a RERA-declared or completed project facility in the supplied amenity schedule.
7. Utilities, building services & safety
The RERA amenity schedule names water supply, sewerage, storm-water drains, rainwater harvesting, solid-waste management, energy management, fire protection and safety requirements, and electrical meter-room/substation/receiving-station infrastructure. It marks water supply, storm-water drains and water conservation/rainwater harvesting as “YES,” while the listed progress percentages are 0%; the supplied information does not establish operational completion, capacity, water source, treatment method, STP design or reuse arrangements.
GHMC’s permit requires space for a transformer and states that a completion notice and occupancy certificate are required before occupation. The supplied permit extraction does not give lift counts or capacities, fire-system specifications, emergency access details, backup-power arrangements, security systems, waste segregation facilities or accessibility provisions.
8. Location, access & connectivity
- The project’s RERA identity places it in Jubilee Hills, Shaikpet Mandal, Hyderabad District, PIN 500096, on Survey No. 403, at plots 69-A and 70-A. The title documents describe the revenue village as Shaikpet Village; the building-permit record uses “JUBILEE HILLS -19.”
- The supplied location record identifies Financial District (Nanakramguda) at 1.2 km from the recorded cadastral parcel centroid. No approach-road route, measured distance to public transport, or independently verified travel time is supplied.
- The developer’s brochure lists nearby landmarks and estimated travel-time bands, but these are promoter-marketed claims, not verified route measurements.
9. Developer & development status
The registered legal promoter is SIKHARA PROJECTS AND ESTATES LLP, an LLP, with GSTIN 36ADJFS1966M1ZE. The supplied promoter address is Landmark, Road No. 12, Jubilee Hills, Shaikpet, Hyderabad, Telangana, 500096; the registration certificate separately records the promoter office PIN as 500034. The supplied records identify Boppidi Vinod Reddy as an authorized signatory and LLP partner.
The Form B affidavit, dated 08 June 2020, is a promoter declaration by Boppidi Vinod Reddy on behalf of the LLP. It declares a title basis and undertakes completion by 31-03-2021, alongside separate-account, audit and pending-approval commitments.
No independently verified construction progress, current completion schedule, or occupancy/completion certificate is supplied. The RERA registration record gives a completion date of 16/08/2025, and the registration certificate states validity through the same date; these are separate registration and completion records, and the supplied evidence does not establish a subsequent extension or current certificate status.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for LAKSHMI SIKHARA PRIDE, registration P02500002106, issued 24/08/2020, stated valid through 16/08/2025.
GHMC building permit: Building Permit Order dated 16 August 2019, approval no. 1/C18/12488/2019, file no. 1/C18/22777/2018; Building A-1 (BLG), Survey No. 403.
Approved drawing / plan record: Drawing stamp records approval number 1/C18/12488/2019, dated 03-09-2019; the extracted stamp text is noted as needing review.
Title and development-rights documents: Advocate’s title report dated 30 May 2020 and registered Development Agreement-cum-Irrevocable GPA 1081/2020, dated 13 February 2020, are included in the registration file.
Promoter declaration: Form B affidavit-cum-declaration dated 08 June 2020.
Occupancy/completion certificate: Not present in the supplied project document set. The GHMC permit states that an occupancy certificate is compulsory before occupation.
The supplied evidence includes the TG-RERA certificate, GHMC building-permit order, drawing record, title-related documents and Form B declaration. It does not include an occupancy/completion certificate or a current construction-progress verification.
Frequently asked questions
Is LAKSHMI SIKHARA PRIDE registered with Telangana RERA?
Yes. LAKSHMI SIKHARA PRIDE is registered with the Telangana Real Estate Regulatory Authority as P02500002106; the registration status is New Project.
Who is the developer of LAKSHMI SIKHARA PRIDE?
The promoter named in the RERA registration is SIKHARA PROJECTS AND ESTATES LLP.
Where is LAKSHMI SIKHARA PRIDE located?
LAKSHMI SIKHARA PRIDE is in JUBILEE HILLS, Shaikpet, Hyderabad, Telangana (500096).
When will LAKSHMI SIKHARA PRIDE be completed?
The promoter's proposed date of completion filed with RERA is 16/08/2025. This is the promoter's declaration, not a guarantee.