Marvel Advaya
Marvel Infra · Hyderabad · RERA P02500008225
Marvel Advaya is a residential apartment project in Jubilee Hills, Shaikpet Mandal, Hyderabad District. The registered promoter developing it is Marvel Infra, a Partnership. The project has a registered site extent of 869 sq. m. and one residential building with 1 cellar, 1 ground and 4 upper floors, comprising five 4BHK homes with a saleable area of 406.0 sq. m. The TG-RERA registration number is P02500008225, and the proposed completion date is 30/11/2026.
More from Marvel Infra · 4 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | Marvel Advaya |
| Project type / phase | Residential apartment project; registered portion is not separately named as a phase. The record lists survey numbers 1P, 2P and 3P. RERA record |
| TG-RERA registration | P02500008225 |
| Registration validity | 10/05/2024 to 23/05/2026, unless extended by the Authority. This is the registration-validity period, not the completion deadline. |
| Registered promoter | Marvel Infra; entity type: Partnership. RERA record RERA filing |
| RERA status | The project evidence identifies it as a New Project. The certificate establishes registration; current validity or any extension after 23/05/2026 is not verified in the supplied record. RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / plot | Jubilee Hills; Plot No. 69 RERA record |
| Revenue village | Shaikpet Village (also rendered “Shakpet” in the drawing extraction); “Jubilee Hills” appears as locality/village in the RERA header. The exact revenue-village identity should be confirmed against the underlying land records. RERA record |
| Mandal / district / PIN | Shaikpet Mandal; Hyderabad District; 500033 RERA record |
| Survey numbers and subdivisions | T.S. No. 2 (P), T.S. No. 3 (P), and T.S. No. 1 (P); RERA records them as 1P, 2P, 3P. |
| Registered site extent | 869 sq. m. |
| Total / net plot area | 869.00 sq. m.; the layout extraction separately records net plot area as 869.00 sq. m. |
| Boundaries | North: 12 m wide road; South: Plot No. 49; East: Plot No. 68; West: Plot No. 70. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) |
| Principal building permit | Permit No. 1409/GHMC/KHB/2023-BP, dated 23 May 2023 |
| Related plan/application reference | TS/021859/2023, dated 24-03-2023 in the drawing extraction |
| Approved built-up area | The drawing extraction states 2,030.00 sq. m. total proposed built-up area excluding parking and 2,715.20 sq. m. including parking. |
| Building count / floors | One residential building: 1 cellar + 1 ground + 4 upper floors. The permit extraction states a building height of 14.98 m. |
| Parking provision in plan | 14 proposed car parks; total parking area stated as 685.20 sq. m. |
| Unit count | Five 4BHK units in the TG-RERA filing; the drawing extraction also states five sanctioned units. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| Configuration and filed saleable area | 4BHK; 406.0 sq. m. saleable area as recorded in the RERA unit data RERA unit table |
| Booked / available | 0 booked and 5 available, as last read from the TG-RERA portal; the supplied record has no as-of date, so counts are indicative. RERA unit table |
| Construction stage | The project is identified as a New Project; no independently verified site-progress assessment is supplied. RERA record |
| Completion dates | The header gives proposed completion as 30/11/2026. The promoter’s Form B declares completion before 23rd May, 2026. These are declarations in their respective records; no revised completion order is supplied. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The GHMC permit states that an occupancy certificate is required before occupation. |
2. The project story
Marvel Advaya is a five-home residential apartment development on Plot No. 69, within HUDA Enclave, Jubilee Hills, in the Shaikpet area of Hyderabad. The registered land identity includes T.S. Nos. 2 (P), 3 (P) and 1 (P), with a stated site extent of 869 sq. m.
The sanctioned scheme is one building with a cellar, ground floor and four upper floors. The RERA unit record lists five 4BHK homes, all shown as available and none booked in the portal data supplied; that count has no stated retrieval date. RERA unit table
The supplied evidence does not establish construction progress through an independent site inspection or dated progress certificate. The header’s proposed completion date is 30/11/2026, while the promoter’s Form B contains a completion undertaking before 23rd May, 2026; these are declarations, not proof of completion. No occupancy certificate is included. RERA record
3. Master plan, architecture & building design
The GHMC building-permit material describes a single residential building on an 869.00 sq. m. plot, arranged as 1 cellar + 1 ground + 4 upper floors, with a stated building height of 14.98 m.
The drawing extraction gives 2,030.00 sq. m. as total proposed built-up area excluding parking and 2,715.20 sq. m. including parking. It also records total net BUA as 2,030.00 sq. m., total parking area as 685.20 sq. m., and a proposed coverage area of 406.00 sq. m. No FSI-counted area is provided in the supplied data.
The plan extraction describes a tot-lot and periphery greenery. It records a proposed tot-lot area of 70.43 sq. m. in one set of plan parameters; the building-permit extraction separately lists “Tot Lot 77” without a unit in that field. No internal-road network or multi-building phase arrangement is described.
The approved-plan material also specifies that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking and not converted or partitioned for other uses. It requires one entry and one exit with minimum width 4.5 m and height clearance 5 m, and says no parking or construction is to be placed in setback areas.
4. Homes, configurations & floor plans
The TG-RERA unit data lists five 4BHK homes, with 406.0 sq. m. saleable area per unit; the portal shows 0 booked and 5 available, without an as-of date. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 4BHK | 5 | 0 | 5 | 406.0 sq. m. | Software-measured range: 237.1–270.0 sq. m.; median 247.0 sq. m. | 39% |
The carpet-area range and loading are software measurements from approved floor-plan drawing geometry, not RERA-filed disclosures; the measurement record says they need review. The supplied drawing analysis covers three measured flat designs. Saleable area and measured carpet area are different area measures; the supplied evidence does not give a separately verified area breakdown for balconies, utilities or common-area share. Floor plans RERA unit details
One measured drawing panel is labelled “TYPICAL - 2, 3& 4 FLOOR PLAN.” For the illustrated flat, the extracted rooms include four bedrooms, living/dining, kitchen, toilets and a servant room; room dimensions are software-extracted from the plan and should be checked against the drawing. The supplied room list does not provide a complete, independently verified room schedule for every home. RERA unit details
5. Parking & vehicle circulation
The plan extraction records 14 proposed car parks and 685.20 sq. m. total parking area; it also gives a parking area figure of 609.00 sq. m. and visitor’s car-parking figures of 60.90 and 101.43 sq. m. No separate count of visitor spaces, accessible spaces, two-wheeler spaces or EV-charging provision is supplied.
The permit describes one entry and one exit, each with a minimum width of 4.5 m and height clearance of 5 m. It requires the approved cellar/stilt parking area to remain for parking use. The record does not establish unit-by-unit parking allocation or exclusive ownership of any drawn bay.
6. Amenities, recreation & open spaces
The amenities record lists project facilities and services, with progress percentages shown as 0 where provided. These figures are declarations in the RERA record, not independent confirmation of delivery. The building-permit material also sets out plan conditions and utility provisions. RERA amenities
| Description / size | Plan extraction states proposed tot-lot area of 70.43 sq. m.; permit extraction separately lists “Tot Lot 77” without a unit in that field. |
|---|---|
| Declared progress / verified status | RERA amenity progress shown as 0%; not independently verified. RERA amenities |
| Description / size | Listed as an RERA project facility; no dimensions or layout detail supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; not independently verified. |
| Description / size | Listed; no building description or size supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; not independently verified. |
| Description / size | Listed; no aggregate area supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; not independently verified. |
| Description / size | Permit conditions require periphery greenery and tree plantation; permit extraction also refers to avenue planting. |
|---|---|
| Declared progress / verified status | Required by the permit; completion not verified. |
Vendor-listed amenities such as a swimming pool, gym, clubhouse and indoor games are not established by the supplied TG-RERA amenity or permit extracts as approved or delivered facilities, so they are not treated here as confirmed project provisions. Promoter website RERA amenities
7. Utilities, building services & safety
The TG-RERA amenity record marks water supply, sewerage and water conservation/rainwater harvesting as available, but shows 0% progress for those listed infrastructure items; this is not independent verification of operating services. RERA amenities
The approved-plan material requires a rainwater-harvesting structure and identifies six rainwater-harvesting pits in the building-permit extraction. It also specifies a separate underground static water storage tank of 25,000 litres and a separate residential terrace tank of 25,000 litres.
The permit material lists a garbage house, transformer space, generator as an alternate electricity source, emergency lighting in common corridors/passages and staircases, and fire-safety provisions including fire extinguishers, hose reel/down-comer and manual alarm. It specifies an automatic sprinkler system if the basement area exceeds 200 sq. m. No completed-system inspection or occupancy/fire clearance is supplied.
The supplied records do not state lift count or capacity, STP capacity, water-source allocation, electrical substation capacity, backup-generator capacity, CCTV installation status, accessible-unit/circulation details or operational security arrangements. The building permit states that an occupancy certificate is compulsory before occupation and that an occupancy fire NOC is to be obtained before issue of the occupancy certificate.
8. Location, access & connectivity
The registered project location is Plot No. 69, Jubilee Hills, Shaikpet, Hyderabad 500033, within the identified survey subdivisions T.S. Nos. 2 (P), 3 (P) and 1 (P). The plan extraction describes a 12.0 m wide road and also refers to an 18 m road frontage condition; the site boundary schedule in the RERA fields identifies a 12 m wide road on the north side. RERA record RERA filing
The supplied location data gives Financial District (Nanakramguda): 1.2 km from a cadastral parcel-centroid geocode. No public-transport details or additional measured access distances are supplied. Location record
9. Developer & development status
The registered promoter is Marvel Infra, recorded as a partnership. The supplied promoter information lists GSTIN 36ABJFM4512H1ZB and names Gunupati Surya Teja Reddy, Manthapuri Suresh and Pallala Krishna Reddy as partners; Pallala Krishna Reddy is also listed as authorised signatory. RERA filing Corporate record Parties record
The project record identifies G Mahipal Reddy and G Renuka Reddy as landowners associated with an area-share arrangement. The promoter’s Form B states that Marvel Infra entered into a Development Agreement-cum-General Power of Attorney with G Manipal Reddy and G Renuka Reddy for the stated 869.00 sq. m. site. Parties record
The TG-RERA header gives proposed completion as 30/11/2026; the promoter’s Form B declares completion before 23rd May, 2026. Neither declaration establishes construction progress or completion, and no occupancy certificate is supplied. RERA record
10. Approvals, official records & documents
| Identifier / date | P02500008225; valid from 10/05/2024 to 23/05/2026 unless extended |
|---|---|
| What the supplied document establishes | Registration of Marvel Advaya by Marvel Infra; identifies Plot No. 69 and survey numbers 1P, 2P and 3P. |
| Identifier / date | 1409/GHMC/KHB/2023-BP; 23 May 2023 |
|---|---|
| What the supplied document establishes | Sanctions a residential building of 1 cellar, 1 ground and 4 upper floors on an 869 sq. m. plot, subject to conditions. |
| Identifier / date | TS/021859/2023; drawing extraction dated 24-03-2023 |
|---|---|
| What the supplied document establishes | Plan extraction records the site, floor arrangement, proposed unit count, built-up area, parking and plan conditions. |
| Identifier / date | 7246/PFU/H/93 |
|---|---|
| What the supplied document establishes | Recorded as the approved layout/LRS proceeding reference in the building-permit extraction. |
| Identifier / date | 30 APR 2024 |
|---|---|
| What the supplied document establishes | Promoter declaration concerning the development arrangement, encumbrances, completion undertaking and RERA obligations. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied document establishes | No occupancy or completion certificate is included in the evidence reviewed. |
| Identifier / date | Unavailable in supplied evidence |
|---|---|
| What the supplied document establishes | The HMDA DPMS lookup is reported as not publicly reachable; no layout-portal confirmation is supplied. HMDA |
1. Project at a glance
Project identity
Registered project name: Marvel Advaya
Project type / phase: Residential apartment project; registered portion is not separately named as a phase. The record lists survey numbers 1P, 2P and 3P.
TG-RERA registration: P02500008225
Registration validity: 10/05/2024 to 23/05/2026, unless extended by the Authority. This is the registration-validity period, not the completion deadline.
Registered promoter: Marvel Infra; entity type: Partnership.
RERA status: The project evidence identifies it as a New Project. The certificate establishes registration; current validity or any extension after 23/05/2026 is not verified in the supplied record.
Land and geographic identity
Locality / plot: Jubilee Hills; Plot No. 69
Revenue village: Shaikpet Village (also rendered “Shakpet” in the drawing extraction); “Jubilee Hills” appears as locality/village in the RERA header. The exact revenue-village identity should be confirmed against the underlying land records.
Mandal / district / PIN: Shaikpet Mandal; Hyderabad District; 500033
Survey numbers and subdivisions: T.S. No. 2 (P), T.S. No. 3 (P), and T.S. No. 1 (P); RERA records them as 1P, 2P, 3P.
Registered site extent: 869 sq. m.
Total / net plot area: 869.00 sq. m.; the layout extraction separately records net plot area as 869.00 sq. m.
Boundaries: North: 12 m wide road; South: Plot No. 49; East: Plot No. 68; West: Plot No. 70.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building permit: Permit No. 1409/GHMC/KHB/2023-BP, dated 23 May 2023
Related plan/application reference: TS/021859/2023, dated 24-03-2023 in the drawing extraction
Approved built-up area: The drawing extraction states 2,030.00 sq. m. total proposed built-up area excluding parking and 2,715.20 sq. m. including parking.
Building count / floors: One residential building: 1 cellar + 1 ground + 4 upper floors. The permit extraction states a building height of 14.98 m.
Parking provision in plan: 14 proposed car parks; total parking area stated as 685.20 sq. m.
Unit count: Five 4BHK units in the TG-RERA filing; the drawing extraction also states five sanctioned units.
Offering and status
Configuration and filed saleable area: 4BHK; 406.0 sq. m. saleable area as recorded in the RERA unit data
Booked / available: 0 booked and 5 available, as last read from the TG-RERA portal; the supplied record has no as-of date, so counts are indicative.
Construction stage: The project is identified as a New Project; no independently verified site-progress assessment is supplied.
Completion dates: The header gives proposed completion as 30/11/2026. The promoter’s Form B declares completion before 23rd May, 2026. These are declarations in their respective records; no revised completion order is supplied.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The GHMC permit states that an occupancy certificate is required before occupation.
2. The project story
Marvel Advaya is a five-home residential apartment development on Plot No. 69, within HUDA Enclave, Jubilee Hills, in the Shaikpet area of Hyderabad. The registered land identity includes T.S. Nos. 2 (P), 3 (P) and 1 (P), with a stated site extent of 869 sq. m.
The sanctioned scheme is one building with a cellar, ground floor and four upper floors. The RERA unit record lists five 4BHK homes, all shown as available and none booked in the portal data supplied; that count has no stated retrieval date.
The supplied evidence does not establish construction progress through an independent site inspection or dated progress certificate. The header’s proposed completion date is 30/11/2026, while the promoter’s Form B contains a completion undertaking before 23rd May, 2026; these are declarations, not proof of completion. No occupancy certificate is included.
3. Master plan, architecture & building design
The GHMC building-permit material describes a single residential building on an 869.00 sq. m. plot, arranged as 1 cellar + 1 ground + 4 upper floors, with a stated building height of 14.98 m.
The drawing extraction gives 2,030.00 sq. m. as total proposed built-up area excluding parking and 2,715.20 sq. m. including parking. It also records total net BUA as 2,030.00 sq. m., total parking area as 685.20 sq. m., and a proposed coverage area of 406.00 sq. m. No FSI-counted area is provided in the supplied data.
The plan extraction describes a tot-lot and periphery greenery. It records a proposed tot-lot area of 70.43 sq. m. in one set of plan parameters; the building-permit extraction separately lists “Tot Lot 77” without a unit in that field. No internal-road network or multi-building phase arrangement is described.
The approved-plan material also specifies that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking and not converted or partitioned for other uses. It requires one entry and one exit with minimum width 4.5 m and height clearance 5 m, and says no parking or construction is to be placed in setback areas.
4. Homes, configurations & floor plans
The TG-RERA unit data lists five 4BHK homes, with 406.0 sq. m. saleable area per unit; the portal shows 0 booked and 5 available, without an as-of date.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 4BHK | 5 | 0 | 5 | 406.0 sq. m. | Software-measured range: 237.1–270.0 sq. m.; median 247.0 sq. m. | 39% |
The carpet-area range and loading are software measurements from approved floor-plan drawing geometry, not RERA-filed disclosures; the measurement record says they need review. The supplied drawing analysis covers three measured flat designs. Saleable area and measured carpet area are different area measures; the supplied evidence does not give a separately verified area breakdown for balconies, utilities or common-area share.
One measured drawing panel is labelled “TYPICAL - 2, 3& 4 FLOOR PLAN.” For the illustrated flat, the extracted rooms include four bedrooms, living/dining, kitchen, toilets and a servant room; room dimensions are software-extracted from the plan and should be checked against the drawing. The supplied room list does not provide a complete, independently verified room schedule for every home.
5. Parking & vehicle circulation
The plan extraction records 14 proposed car parks and 685.20 sq. m. total parking area; it also gives a parking area figure of 609.00 sq. m. and visitor’s car-parking figures of 60.90 and 101.43 sq. m. No separate count of visitor spaces, accessible spaces, two-wheeler spaces or EV-charging provision is supplied.
The permit describes one entry and one exit, each with a minimum width of 4.5 m and height clearance of 5 m. It requires the approved cellar/stilt parking area to remain for parking use. The record does not establish unit-by-unit parking allocation or exclusive ownership of any drawn bay.
6. Amenities, recreation & open spaces
The amenities record lists project facilities and services, with progress percentages shown as 0 where provided. These figures are declarations in the RERA record, not independent confirmation of delivery. The building-permit material also sets out plan conditions and utility provisions.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | Plan extraction states proposed tot-lot area of 70.43 sq. m.; permit extraction separately lists “Tot Lot 77” without a unit in that field. | RERA amenity progress shown as 0%; not independently verified. | |
| Internal roads & footpaths | Listed as an RERA project facility; no dimensions or layout detail supplied. | 0%; not independently verified. | |
| Community buildings | Listed; no building description or size supplied. | 0%; not independently verified. | |
| Aggregate recreational open space | Listed; no aggregate area supplied. | 0%; not independently verified. | |
| Greenery / periphery planting | Permit conditions require periphery greenery and tree plantation; permit extraction also refers to avenue planting. | Required by the permit; completion not verified. |
Vendor-listed amenities such as a swimming pool, gym, clubhouse and indoor games are not established by the supplied TG-RERA amenity or permit extracts as approved or delivered facilities, so they are not treated here as confirmed project provisions.
7. Utilities, building services & safety
The TG-RERA amenity record marks water supply, sewerage and water conservation/rainwater harvesting as available, but shows 0% progress for those listed infrastructure items; this is not independent verification of operating services.
The approved-plan material requires a rainwater-harvesting structure and identifies six rainwater-harvesting pits in the building-permit extraction. It also specifies a separate underground static water storage tank of 25,000 litres and a separate residential terrace tank of 25,000 litres.
The permit material lists a garbage house, transformer space, generator as an alternate electricity source, emergency lighting in common corridors/passages and staircases, and fire-safety provisions including fire extinguishers, hose reel/down-comer and manual alarm. It specifies an automatic sprinkler system if the basement area exceeds 200 sq. m. No completed-system inspection or occupancy/fire clearance is supplied.
The supplied records do not state lift count or capacity, STP capacity, water-source allocation, electrical substation capacity, backup-generator capacity, CCTV installation status, accessible-unit/circulation details or operational security arrangements. The building permit states that an occupancy certificate is compulsory before occupation and that an occupancy fire NOC is to be obtained before issue of the occupancy certificate.
8. Location, access & connectivity
The registered project location is Plot No. 69, Jubilee Hills, Shaikpet, Hyderabad 500033, within the identified survey subdivisions T.S. Nos. 2 (P), 3 (P) and 1 (P). The plan extraction describes a 12.0 m wide road and also refers to an 18 m road frontage condition; the site boundary schedule in the RERA fields identifies a 12 m wide road on the north side.
The supplied location data gives Financial District (Nanakramguda): 1.2 km from a cadastral parcel-centroid geocode. No public-transport details or additional measured access distances are supplied.
9. Developer & development status
The registered promoter is Marvel Infra, recorded as a partnership. The supplied promoter information lists GSTIN 36ABJFM4512H1ZB and names Gunupati Surya Teja Reddy, Manthapuri Suresh and Pallala Krishna Reddy as partners; Pallala Krishna Reddy is also listed as authorised signatory.
The project record identifies G Mahipal Reddy and G Renuka Reddy as landowners associated with an area-share arrangement. The promoter’s Form B states that Marvel Infra entered into a Development Agreement-cum-General Power of Attorney with G Manipal Reddy and G Renuka Reddy for the stated 869.00 sq. m. site.
The TG-RERA header gives proposed completion as 30/11/2026; the promoter’s Form B declares completion before 23rd May, 2026. Neither declaration establishes construction progress or completion, and no occupancy certificate is supplied.
10. Approvals, official records & documents
| Identifier / date | P02500008225; valid from 10/05/2024 to 23/05/2026 unless extended |
|---|---|
| What the supplied document establishes | Registration of Marvel Advaya by Marvel Infra; identifies Plot No. 69 and survey numbers 1P, 2P and 3P. |
| Identifier / date | 1409/GHMC/KHB/2023-BP; 23 May 2023 |
|---|---|
| What the supplied document establishes | Sanctions a residential building of 1 cellar, 1 ground and 4 upper floors on an 869 sq. m. plot, subject to conditions. |
| Identifier / date | TS/021859/2023; drawing extraction dated 24-03-2023 |
|---|---|
| What the supplied document establishes | Plan extraction records the site, floor arrangement, proposed unit count, built-up area, parking and plan conditions. |
| Identifier / date | 7246/PFU/H/93 |
|---|---|
| What the supplied document establishes | Recorded as the approved layout/LRS proceeding reference in the building-permit extraction. |
| Identifier / date | 30 APR 2024 |
|---|---|
| What the supplied document establishes | Promoter declaration concerning the development arrangement, encumbrances, completion undertaking and RERA obligations. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied document establishes | No occupancy or completion certificate is included in the evidence reviewed. |
| Identifier / date | Unavailable in supplied evidence |
|---|---|
| What the supplied document establishes | The HMDA DPMS lookup is reported as not publicly reachable; no layout-portal confirmation is supplied. |
Frequently asked questions
Is Marvel Advaya registered with Telangana RERA?
Yes. Marvel Advaya is registered with the Telangana Real Estate Regulatory Authority as P02500008225; the registration status is New Project.
Who is the developer of Marvel Advaya?
The promoter named in the RERA registration is Marvel Infra.
Where is Marvel Advaya located?
Marvel Advaya is in Jubilee Hills, Shaikpet, Hyderabad, Telangana (500033).
When will Marvel Advaya be completed?
The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.
More projects in Jubilee Hills