Sign in

The Edge

RISINIA BUILDERS · Medchal-Malkajgiri · RERA P02200005562

THE EDGE is a residential apartment project in Gajularamaram, Qutballapur mandal, Medchal-Malkajgiri district, developed by the registered promoter RISINIA BUILDERS, a partnership. The project has a total site area of 11,471.50 sq. m. and comprises Tower A, Tower B and a club house; Tower A has 2 Cellar + 1 Stilt + 8 upper floors, Tower B has 1 Stilt + 8 upper floors, and the club house has 1 Ground + 5 upper floors. The RERA unit record lists 340 homes in 2BHK, 3BHK and 2.5BHK configurations. It is registered under TG-RERA number P02200005562, and the promoter’s Form B undertaking gives a completion date of 21 November 2028.

More from Risinia Builders · 5 projects →

01What we found

RegisteredTG-RERA - valid till 21 Nov 2028
35documents on file - each fact links to its page
31court cases on this project's land (survey 307, Gajularamaram)
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

ItemTG-RERA record
Registered project nameTHE EDGE RERA record
Project typeResidential apartment project RERA record
Phase / registered portionThe record identifies the registered project as THE EDGE; a separate phase name or phase number is not disclosed. The building permit names Tower A, Tower B and a club house. RERA record
TG-RERA registrationP02200005562
Registration validity21/11/2022–21/11/2028; certificate states a six-year registration period. This is registration validity, not the construction completion date.
Registered promoterRISINIA BUILDERS, a partnership Corporate record
RERA statusListed as “New Project”; registration certificate records grant under section 5. RERA record

Land and geographic identity

ItemRecord
Locality / revenue villageGajularamaram; the building-permit extraction also describes the locality as Gajularamaram Locality. RERA record
MandalQutballapur; the building-permit extraction spells it Qutubullapur. RERA record
DistrictMedchal-Malkajgiri; the building-permit extraction states MEDCHAL. RERA record
PIN500055 RERA record
Project survey numbers and subdivisions307/EE/EE/1 and 307/EE/EE/2 RERA record Land records
Total site area11,471.50 sq. m. in the project record and building-permit parameters RERA filing
Road-affected area278.14 sq. m. RERA filing
Nala-affected area10.0 sq. m., as stated in the building-permit extraction
Net site area11,193.36 sq. m. in the project record; the permit states 11,193.37 sq. m. RERA filing
Boundaries recordedEast: others’ land; West: others’ land; North: others’ land; South: road. RERA filing

Development identity

ItemRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building-permit approval4190/GHMC/KPL/2022-BP, approved 21 November 2022 Approvals record
File number009898/GHMC/4865/KPL1/2022-BP Approvals record
Approved built-up area84,457.33 sq. m. RERA filing
Sanctioned buildingsTower A: 2 Cellar + 1 Stilt + 8 upper floors; Tower B: 1 Stilt + 8 upper floors; club house: 1 Ground + 5 upper floors.
Building heightsPermit parameters list 23.4, 23.99 and 17.99; the extracted text does not map each height to a named building.
Parking areaPermit parameters state “Total Parking Area 19413.15”; no parking-space count or allocation is supplied.
RERA-filed building/unit figuresThree building units are recorded, including an amenity building; 346 total units appear in the RERA unit record, of which 340 are residential homes and six are club-house entries, not homes for sale. RERA filing RERA unit table

Offering and status

ItemRecord
RERA-filed configurations2BHK, 3BHK and 2.5BHK RERA unit table
RERA-filed saleable areas2BHK: 121.07 sq. m.; 3BHK: 168.47 sq. m.; 2.5BHK: 121.88 sq. m. RERA unit table
Booked / availablePortal-derived counts show 0 booked and 234 available 2BHKs; 0 booked and 99 available 3BHKs; 0 booked and 7 available 2.5BHKs. The portal record has no as-of date, so counts are indicative. RERA unit table
Completion datePromoter’s Form B undertaking: 21 November 2028; GHMC permit parameter: construction to be completed before 21 November 2028.
Project header completion date21/03/2029 RERA record
Occupancy / completion certificateNo completion certificate is recorded in the supplied permit extraction; the permit requires an occupancy certificate before occupation. No project or tower-specific OC is supplied.

The project story

  • THE EDGE is a residential apartment development in Gajularamaram village, Qutballapur mandal, Medchal-Malkajgiri district, on the RERA-identified land in Survey Nos. 307/EE/EE/1 and 307/EE/EE/2. The project record identifies a site of 11,471.50 sq. m., with 278.14 sq. m. affected by road widening and a net area recorded as 11,193.36 sq. m. RERA record RERA filing
  • GHMC’s building permit describes two residential towers and a separate club-house building. Tower A is sanctioned with two cellars, a stilt and eight upper floors; Tower B with a stilt and eight upper floors; and the club house with a ground floor and five upper floors. The RERA unit record lists 340 homes across three configurations. It separately includes six club-house entries, which are not homes offered for sale. RERA unit table
  • The supplied records establish the sanctioned building form and promoter’s declared completion undertaking, but do not establish current physical construction progress or independently verified completion. The permit states that an occupancy certificate is required before occupation, and the supplied material does not include one for the project or any individual tower.

Master plan, architecture & building design

  • The building permit identifies a residential development comprising Tower A, Tower B and a club house, and gives an approved built-up area of 84,457.33 sq. m. in the project record. The permit’s site parameters list a total plot area of 11,471.5 sq. m., road-affected area of 278.14 sq. m., nala-affected area of 10.0 sq. m. and net plot area of 11,193.37 sq. m. The RERA land record gives net area as 11,193.36 sq. m. RERA filing
BuildingSanctioned use and floorsPermit-stated height
Tower AResidential; 2 Cellar + 1 Stilt + 8 upper floors23.4, 23.99 and 17.99 are listed in the permit parameters, but not mapped to a building in the supplied extraction.
Tower BResidential; 1 Stilt + 8 upper floorsSee height limitation above.
Club houseAmenity; 1 Ground + 5 upper floorsSee height limitation above.
  • The permit parameters include a total parking area of 19413.15, without an accompanying unit or space count in the supplied extraction. The project record states a mortgage area of 5,199.68 sq. m.; the RERA unit table marks the residential configurations as mortgaged. RERA filing RERA unit table
  • No usable approved floor-plan drawings are available for measurement in the supplied drawing record: four drawings are listed, with none measured and none identified as layout sheets. Accordingly, details such as footprint, flats per floor, lifts, stairs, entrances, internal circulation and tower-by-tower arrangement beyond the permit’s building descriptions are not established here. Floor plans

Homes, configurations & floor plans

RERA records 340 homes across three configurations. The filed saleable areas below are RERA figures; the unit table shows no bookings as last read from the portal, but provides no as-of date. RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK2340234121.07 sq. m.Not suppliedNot supplied
3BHK99099168.47 sq. m.Not suppliedNot supplied
2.5BHK707121.88 sq. m.Not suppliedNot supplied

RERA unit table RERA unit details Floor plans

The supplied floor-plan record reports no measured drawings, so software-measured carpet areas and room dimensions cannot be stated. RERA-filed saleable area is distinct from carpet area; the supplied material does not provide a carpet-area measurement or loading figure for these homes. Floor plans

Parking & vehicle circulation

  • GHMC’s permit parameters state “Total Parking Area 19413.15.” The supplied extraction does not specify the unit for that figure or give a count of car, two-wheeler, visitor or accessible spaces; it also does not describe a parking allocation for individual apartments. The permit sanctions two cellar levels for Tower A and a stilt for each residential tower, but the supplied record does not identify which parking spaces are assigned to those levels.
  • The RERA record lists 5,199.68 sq. m. as mortgage area and marks the home configurations as mortgaged; it does not establish that any drawn or listed parking area is exclusively allocated to a particular buyer. RERA filing RERA unit table

Amenities, recreation & open spaces

  • The building permit identifies a club house, a tot-lot, a rainwater-harvesting structure, transformer space and a garbage house. It requires the tot-lot to be fenced and maintained as greenery before issue of an occupancy certificate. The RERA amenities record lists facilities as available in the filing, but reports 0% progress for each item; this is not evidence of completion. RERA amenities
Club house
Description / sizeSeparate amenity building; 1 Ground + 5 upper floors. No verified facility-area breakdown supplied.
Evidence sourceGHMC permit; RERA unit record RERA unit table
Declared progress / verified statusSanctioned building; completion not verified.
Tot-lot / green strip
Description / sizePermit requires it to be fenced and maintained as greenery before OC.
Evidence sourceGHMC permit
Declared progress / verified statusRequired by permit; completion not verified.
Internal roads and footpaths
Description / sizeListed in RERA amenities record.
Evidence sourceRERA amenities RERA amenities
Declared progress / verified statusListed as available; reported progress 0%.
Water supply
Description / sizeListed in RERA amenities record.
Evidence sourceRERA amenities RERA amenities
Declared progress / verified statusListed as available; reported progress 0%.
Sewerage / sewage treatment
Description / sizeSewerage and treatment/disposal of sewage and sullage are listed.
Evidence sourceRERA amenities RERA amenities
Declared progress / verified statusListed as available; reported progress 0%.
Storm-water drains
Description / sizeListed in RERA amenities record.
Evidence sourceRERA amenities RERA amenities
Declared progress / verified statusListed as available; reported progress 0%.
Street lighting
Description / sizeListed in RERA amenities record.
Evidence sourceRERA amenities RERA amenities
Declared progress / verified statusListed as available; reported progress 0%.
Community buildings
Description / sizeListed in RERA amenities record; the permit separately sanctions a club-house building.
Evidence sourceRERA amenities RERA amenities
Declared progress / verified statusListed as available; reported progress 0%; completion not verified.
Solid-waste management and disposal
Description / sizeListed in RERA amenities record; permit also requires a garbage house.
Evidence sourceRERA amenities RERA amenities
Declared progress / verified statusListed as available; reported progress 0%; completion not verified.
Water conservation / rainwater harvesting
Description / sizeListed in RERA amenities record; permit requires a rainwater-harvesting structure (percolation pit).
Evidence sourceRERA amenities RERA amenities
Declared progress / verified statusListed as available; reported progress 0%; completion not verified.
Fire protection and fire-safety requirements
Description / sizeListed in RERA amenities record; permit requires a Fire NOC before OC.
Evidence sourceRERA amenities RERA amenities
Declared progress / verified statusListed as available; reported progress 0%; Fire NOC not supplied.
Electrical meter room / sub-station / receiving station
Description / sizeListed in RERA amenities record; permit requires transformer space.
Evidence sourceRERA amenities RERA amenities
Declared progress / verified statusListed as available; reported progress 0%; completion not verified.
Recreational open space
Description / sizeAggregate area is listed in RERA amenities record; no area figure supplied.
Evidence sourceRERA amenities RERA amenities
Declared progress / verified statusListed as available; reported progress 0%.

Utilities, building services & safety

  • The RERA amenities record lists water supply; sewerage and sewage/sullage treatment and disposal; storm-water drains; rainwater harvesting; solid-waste management; energy management; fire protection; and electrical meter-room, sub-station or receiving-station provision. It gives no system capacities, source details, storage volumes, treatment specifications or completion evidence. All items with a stated progress figure show 0%. RERA amenities
  • GHMC’s permit specifically requires a rainwater-harvesting structure (percolation pit), transformer space and a garbage house. It also requires a Fire NOC from the Director (EV&DM) before issue of an occupancy certificate and states that an OC is compulsory before occupation. The supplied records do not include a Fire NOC or OC.
  • The supplied evidence does not establish lift numbers or capacities, backup-power arrangements, fire equipment details, escape-stair configuration, CCTV, access control or accessibility features. RERA amenities Floor plans

Location, access & connectivity

  • The registered project location is Gajularamaram, Qutballapur mandal, Medchal-Malkajgiri district, Telangana, PIN 500055; the project survey identifiers are 307/EE/EE/1 and 307/EE/EE/2. RERA record Land records
  • The supplied location data provides a cadastral parcel centroid of 17.522871484143366, 78.40461261202259 and lists HITEC City at 9.3 km. No approach-road, public-transport or other landmark distances are provided in the project location record. Location record

Developer & development status

  • The registered promoter is RISINIA BUILDERS, recorded as a partnership. Its GSTIN is 36AAWFR6955R1ZR. The registered-office address supplied in the project record is Green Ikonia-1, F No. 306, Road No. 20, Alkapur Township Neknampur, Gajularamaram, Qutballapur, Medchal-Malkajgiri, 500055. Corporate record Parties record
  • RERA records two landowner/promoter entries: M/S. RISINIA DEVELOPERS and M/s. RISINIA BUILDERS, with area-share agreement types. The supplied development agreement description records RISINIA DEVELOPERS as land owner and RISINIA BUILDERS as developer. Parties record
  • The promoter’s Form B declaration undertakes completion by 21 November 2028. The building permit likewise states construction is to be completed before 21 November 2028. The project header separately records a proposed completion date of 21/03/2029. These dates are reported as recorded; the supplied evidence does not provide current construction progress or an occupancy certificate. RERA record

Approvals, official records & documents

TG-RERA registration certificate, Form C
Identifier / dateP02200005562; certificate validity 21/11/2022–21/11/2028
What the supplied material establishesRegistration of THE EDGE under section 5; the certificate states the promoter’s RERA obligations.
GHMC building permit order
Identifier / date4190/GHMC/KPL/2022-BP; 21 November 2022
What the supplied material establishesPermit for Tower A, Tower B and the club house, with stated site and building parameters and conditions.
GHMC file number
Identifier / date009898/GHMC/4865/KPL1/2022-BP
What the supplied material establishesFile reference on the building-permit record.
Promoter Form B declaration
Identifier / dateDeclaration dated 23.11.2022
What the supplied material establishesPromoter’s declared title basis, encumbrance statement, separate-account undertakings and completion undertaking.
Commencement / completion / occupancy records
Identifier / datePermit extract states commencement and completion notice requirements and requires OC before occupation
What the supplied material establishesNo separate commencement notice, completion certificate or OC is included in the supplied evidence.
Approved layout plan
Identifier / dateNot established in the supplied evidence
What the supplied material establishesThe available material identifies a building permit; no approved layout-plan document is included here. Document index

The GHMC permit also requires strict adherence to the sanctioned plan, prior approval for modifications, a completion notice and an occupancy certificate; its conditions are not reproduced in full here.

Frequently asked questions

Is THE EDGE registered with Telangana RERA?

Yes. THE EDGE is registered with the Telangana Real Estate Regulatory Authority as P02200005562; the registration status is New Project.

Who is the developer of THE EDGE?

The promoter named in the RERA registration is RISINIA BUILDERS.

Where is THE EDGE located?

THE EDGE is in GAJULARAMARAM, Qutballapur, Medchal-Malkajgiri, Telangana (500055).

When will THE EDGE be completed?

The promoter's proposed date of completion filed with RERA is 21/03/2029. This is the promoter's declaration, not a guarantee.

More projects in Gajularamaram