Svr Constructions
S V R CONSTRUCTIONS · Rangareddy · RERA P02400001344
SVR CONSTRUCTIONS is a residential apartment project in B N REDDY NAGAR, Saroornagar, Ranga Reddy, developed by the registered promoter S V R CONSTRUCTIONS. The project is on 617.15 sq m of land and comprises one building with 1 Stilt + 5 upper floors and 15 homes: 10 2BHK and 5 3BHK. It is registered under TG-RERA number P02400001344, with a proposed completion date of 27/03/2025.
More from S V R Constructions · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | SVR CONSTRUCTIONS RERA record |
| Project type | Residential apartment project RERA filing |
| Phase / registered portion | Not identified as a separately named phase in the supplied record; the registration covers the project on Survey No. 59 PART |
| TG-RERA registration | P02400001344 |
| Registration validity | 11/11/2019 to 27/03/2025; certificate states it is not extended |
| Registered promoter | S V R CONSTRUCTIONS (also written “S. V. R. Constructions” in the filed declaration) RERA record |
| RERA status shown in supplied record | Registration period ended 27/03/2025; no extension is recorded in the supplied certificate. This is separate from the stated completion deadline and from occupancy-certificate status. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | B N REDDY NAGAR RERA record RERA filing |
| Revenue village | B N Reddy Nagar, as recorded in the project header; the filed title documents identify the land as Karmanghat village. The supplied records do not reconcile these location labels. RERA record Land records |
| Mandal / district / PIN | Saroornagar / Ranga Reddy / 500079 RERA record |
| Survey number and subdivision | Survey No. 59 PART RERA record Land records |
| Plot identifiers | Plots 99 AND 100 RERA filing |
| Registered site extent | 617.15 sq m in the RERA land details; the building permit records site area of 617.5 m². RERA filing |
| Total / net area and affected area | RERA land details: total 617.15 sq m, net 617.15 sq m, affected area 0 sq m. The building-permit extraction records net area 617.5 m², road-affected area 0 m² and nala-affected area 0 m². RERA filing |
| Boundaries in RERA land details | North: Plot No. 101; South: 30FT ROAD; East: 30FT ROAD; West: Plot No. 103 RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building-permit approval | Approval No. 2/C4/05082/2019, File No. 2/C4/03435/2019, dated 27 March, 2019 Approvals record |
| Approved built-up area | 1,556.66 sq m in the RERA project fields RERA filing |
| Building count | One building/unit in the RERA project fields; one building is shown in the approval record. RERA filing |
| Sanctioned configuration | 1 Stilt + 5 upper floors; recorded height: 15 m |
| Cellar / parking levels | Cellar recorded as 0; a separate sanctioned parking count or parking layout is not provided in the supplied material. |
| Approved versus RERA-declared homes | 15 homes in the RERA unit schedule (10 2BHK and 5 3BHK). The supplied permit extraction does not state a separate unit count. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configurations | 2BHK: 10 units; 3BHK: 5 units RERA unit table RERA unit details |
| RERA-filed saleable areas | 2BHK: 62.87 sq m; 3BHK: 160.25 sq m RERA unit table RERA unit details |
| Booked / available | 2BHK: 5 booked, 5 available; 3BHK: 0 booked, 5 available. Counts are from the TG-RERA portal read and have no supplied as-of date, so they are indicative. RERA unit table RERA unit details |
| Construction stage | No independently verified site-progress evidence is supplied. The RERA amenities schedule includes percentage entries, but these are not independently verified construction-completion measurements. RERA amenities |
| Completion deadline | 27/03/2025, as stated in the RERA project record and promoter declaration RERA record |
| Revised completion date | No revised date or extension is recorded in the supplied material |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied; the available GHMC document is a building permit, not an occupancy certificate. Its stated validity ends 27 March, 2025. |
2. The project story
- The RERA record describes a single-building residential apartment development on Plots 99 and 100, Survey No. 59 PART, with a site extent recorded as 617.15 sq m. The filed GHMC building permit describes a stilt level and five upper floors, with a sanctioned height of 15 m. The RERA unit schedule lists 15 apartments: ten 2BHK and five 3BHK. RERA filing RERA unit table
- The promoter’s Form B declaration gives 27/03/2025 as the completion undertaking. The RERA certificate records registration through that same date, but the certificate does not record an extension. No occupancy certificate or independently verified construction-progress report is included in the supplied evidence; therefore, the record provided here does not establish that the building is complete or ready for occupation.
3. Master plan, architecture & building design
- The supplied GHMC building-permit extraction identifies one proposed building on Survey No. 59 PART, with 1 Stilt + 5 upper floors, a recorded height of 15 m, and approved built-up area of 1,556.66 sq m in the RERA project fields. The permit extraction lists stilt area of 312.02 and first-floor area of 196.15; the supplied extract does not explain the measurement unit for those two entries. It records no cellar and no road- or nala-affected area. RERA filing
- The record does not establish a complete floor-by-floor unit arrangement, number of flats per floor, building footprint, lift or stair details, entrances, internal circulation, landscaped/open-space dimensions, or a phase-wise building organization. The layout-plan document is listed in the RERA filing but is not extracted in the supplied material.
- A measured floor-plan result is available for the 3BHK design: software-measured carpet area is 102.8 sq m (1,106 sq ft), with a supplied loading figure of 36%. These are drawing-based measurements, not RERA-filed carpet-area disclosures; the drawing measurement requires review. The RERA-filed 3BHK saleable area is 160.25 sq m. Carpet, saleable area and common-area allocation are distinct measures. RERA unit details Floor plans
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 5 | 5 | 62.87 sq m | Not supplied | Not supplied |
| 3BHK | 5 | 0 | 5 | 160.25 sq m | 102.8 sq m (software-measured from drawings; requires review) | 36% |
- RERA supplies the configuration counts, bookings, availability and saleable areas. The booking counts have no supplied as-of date and should be treated as indicative. The 3BHK drawing measurement is not a RERA disclosure; saleable area includes the home’s share of common areas, whereas the drawing-based carpet measurement is a separate measure. RERA unit table RERA unit details Floor plans
- The measured 3BHK plan identifies three bedrooms, a hall, kitchen, three toilets, a puja area and two utility areas. The drawing extraction lists the room dimensions and areas, but no measured carpet area is supplied for the 2BHK configuration. RERA unit details
5. Parking & vehicle circulation
The supplied GHMC permit extraction records Cellar 0 and does not provide a sanctioned parking-space count, parking-level plan, ramp or driveway details, accessible or visitor-space count, EV provision, or unit-wise parking allocation. The RERA project document list does not include an extracted parking schedule. Consequently, the number and allocation of parking spaces cannot be established from the supplied project evidence. Document index
6. Amenities, recreation & open spaces
The RERA amenities schedule contains percentage entries, but the supplied data does not establish that these percentages are independently verified physical completion measurements. The GHMC permit separately lists four rainwater-harvesting pits, 30 trees, a transformer space and a garbage house. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot lot / park | RERA amenity entry; no area supplied. The GHMC permit lists tot-lot area as 0 m². | RERA amenities | RERA schedule lists 70%; not independently verified. |
| Community buildings | No size or description supplied | RERA amenities | 0% listed; not independently verified. |
| Water conservation / rainwater harvesting | GHMC permit lists 4 rainwater-harvesting pits. | RERA amenities | RERA schedule lists 100%; not independently verified. |
| Internal roads and footpaths | No dimensions supplied | RERA amenities | Listed as available; 0% shown in the schedule. |
| Street lighting | No specification supplied | RERA amenities | Listed as available; 0% shown in the schedule. |
| Water supply | No source, storage or capacity supplied | RERA amenities | Listed as available; 0% shown in the schedule. |
| Visitor parking | No number or size supplied | Promoter website | Vendor-listed only; not established by the supplied permit or RERA schedule. |
| Kids club / kids play area | No size or capacity supplied | Promoter website | Vendor-listed only; not independently verified. |
7. Utilities, building services & safety
- The GHMC permit requires provision of a transformer space, a garbage house within the premises and a rainwater-harvesting structure; the permit extraction also records four rainwater-harvesting pits. These are approval requirements or recorded plan particulars, not evidence that the facilities have been installed or commissioned.
- The RERA schedule lists water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, energy management, fire protection and fire-safety requirements, and an electrical meter room/sub-station/receiving station. It does not provide capacities or technical specifications, and the supplied percentage entries do not establish completed works. No supporting evidence is supplied for water source or storage, an STP or reuse system, electrical backup, lifts, fire equipment or clearances, CCTV/access control, waste segregation, or accessible routes. RERA amenities
8. Location, access & connectivity
- The project record identifies B N REDDY NAGAR, Saroornagar Mandal, Ranga Reddy District, PIN 500079. The project land is recorded as Survey No. 59 PART, Plots 99 and 100; the title-report documents describe the land as being in Karmanghat village. The supplied records also describe the GHMC permit locality as Vishweshwarayya Engineering Colony. RERA record RERA filing
- The RERA land details state 30FT ROAD on the east and south boundaries. A cadastral-parcel centroid is supplied at 17.41528, 78.35459. The location data lists Financial District (Nanakramguda) at 1.2 km; no route or travel time is supplied. RERA filing Location record
9. Developer & development status
- The registered promoter is S V R CONSTRUCTIONS, identified in the project record as a partnership. Its supplied GSTIN is 36ADPFS2777N1Z3. The RERA registration certificate lists a promoter office at “Village: Mandal: District: Medchal-Malkajgiri, Pin: 500068”; the supplied certificate text does not provide a more specific office address. Parties record Corporate record
- The promoter’s Form B declares a completion undertaking of 27/03/2025 and states that project collections will be handled through the required separate account and that approvals, audits and related RERA obligations will be addressed. These are promoter declarations. No verified construction-progress evidence, revised completion date, or occupancy certificate is supplied.
10. Approvals, official records & documents
| Identifier / date | P02400001344; issued 11/11/2019; valid through 27/03/2025 |
|---|---|
| Scope and evidence | Form C certificate for SVR CONSTRUCTIONS; no extension is recorded in the supplied certificate. |
| Identifier / date | Approval No. 2/C4/05082/2019; File No. 2/C4/03435/2019; dated 27 March, 2019 |
|---|---|
| Scope and evidence | Permit for the proposed building on Survey No. 59 PART, recording 1 Stilt + 5 upper floors. The permit states that it does not confer ownership rights and requires an occupancy certificate before occupation. |
| Identifier / date | Document 50367 |
|---|---|
| Scope and evidence | Listed as a layout-plan document in the RERA filing; no extracted plan details are supplied. Document index |
| Identifier / date | Document 71215 |
|---|---|
| Scope and evidence | Promoter declaration covering title/owner-development basis, encumbrance statement, completion undertaking and RERA compliance commitments. |
| Identifier / date | Not supplied |
|---|---|
| Scope and evidence | The supplied records include no OC or completion certificate. Document index |
1. Project at a glance
Project identity
Registered project name: SVR CONSTRUCTIONS
Project type: Residential apartment project
Phase / registered portion: Not identified as a separately named phase in the supplied record; the registration covers the project on Survey No. 59 PART
TG-RERA registration: P02400001344
Registration validity: 11/11/2019 to 27/03/2025; certificate states it is not extended
Registered promoter: S V R CONSTRUCTIONS (also written “S. V. R. Constructions” in the filed declaration)
RERA status shown in supplied record: Registration period ended 27/03/2025; no extension is recorded in the supplied certificate. This is separate from the stated completion deadline and from occupancy-certificate status.
Land and geographic identity
Locality: B N REDDY NAGAR
Revenue village: B N Reddy Nagar, as recorded in the project header; the filed title documents identify the land as Karmanghat village. The supplied records do not reconcile these location labels.
Mandal / district / PIN: Saroornagar / Ranga Reddy / 500079
Survey number and subdivision: Survey No. 59 PART
Plot identifiers: Plots 99 AND 100
Registered site extent: 617.15 sq m in the RERA land details; the building permit records site area of 617.5 m².
Total / net area and affected area: RERA land details: total 617.15 sq m, net 617.15 sq m, affected area 0 sq m. The building-permit extraction records net area 617.5 m², road-affected area 0 m² and nala-affected area 0 m².
Boundaries in RERA land details: North: Plot No. 101; South: 30FT ROAD; East: 30FT ROAD; West: Plot No. 103
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building-permit approval: Approval No. 2/C4/05082/2019, File No. 2/C4/03435/2019, dated 27 March, 2019
Approved built-up area: 1,556.66 sq m in the RERA project fields
Building count: One building/unit in the RERA project fields; one building is shown in the approval record.
Sanctioned configuration: 1 Stilt + 5 upper floors; recorded height: 15 m
Cellar / parking levels: Cellar recorded as 0; a separate sanctioned parking count or parking layout is not provided in the supplied material.
Approved versus RERA-declared homes: 15 homes in the RERA unit schedule (10 2BHK and 5 3BHK). The supplied permit extraction does not state a separate unit count.
Offering and status
RERA-filed configurations: 2BHK: 10 units; 3BHK: 5 units
RERA-filed saleable areas: 2BHK: 62.87 sq m; 3BHK: 160.25 sq m
Booked / available: 2BHK: 5 booked, 5 available; 3BHK: 0 booked, 5 available. Counts are from the TG-RERA portal read and have no supplied as-of date, so they are indicative.
Construction stage: No independently verified site-progress evidence is supplied. The RERA amenities schedule includes percentage entries, but these are not independently verified construction-completion measurements.
Completion deadline: 27/03/2025, as stated in the RERA project record and promoter declaration
Revised completion date: No revised date or extension is recorded in the supplied material
Occupancy / completion certificate: No occupancy or completion certificate is supplied; the available GHMC document is a building permit, not an occupancy certificate. Its stated validity ends 27 March, 2025.
2. The project story
- The RERA record describes a single-building residential apartment development on Plots 99 and 100, Survey No. 59 PART, with a site extent recorded as 617.15 sq m. The filed GHMC building permit describes a stilt level and five upper floors, with a sanctioned height of 15 m. The RERA unit schedule lists 15 apartments: ten 2BHK and five 3BHK.
- The promoter’s Form B declaration gives 27/03/2025 as the completion undertaking. The RERA certificate records registration through that same date, but the certificate does not record an extension. No occupancy certificate or independently verified construction-progress report is included in the supplied evidence; therefore, the record provided here does not establish that the building is complete or ready for occupation.
3. Master plan, architecture & building design
- The supplied GHMC building-permit extraction identifies one proposed building on Survey No. 59 PART, with 1 Stilt + 5 upper floors, a recorded height of 15 m, and approved built-up area of 1,556.66 sq m in the RERA project fields. The permit extraction lists stilt area of 312.02 and first-floor area of 196.15; the supplied extract does not explain the measurement unit for those two entries. It records no cellar and no road- or nala-affected area.
- The record does not establish a complete floor-by-floor unit arrangement, number of flats per floor, building footprint, lift or stair details, entrances, internal circulation, landscaped/open-space dimensions, or a phase-wise building organization. The layout-plan document is listed in the RERA filing but is not extracted in the supplied material.
- A measured floor-plan result is available for the 3BHK design: software-measured carpet area is 102.8 sq m (1,106 sq ft), with a supplied loading figure of 36%. These are drawing-based measurements, not RERA-filed carpet-area disclosures; the drawing measurement requires review. The RERA-filed 3BHK saleable area is 160.25 sq m. Carpet, saleable area and common-area allocation are distinct measures.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 5 | 5 | 62.87 sq m | Not supplied | Not supplied |
| 3BHK | 5 | 0 | 5 | 160.25 sq m | 102.8 sq m (software-measured from drawings; requires review) | 36% |
- RERA supplies the configuration counts, bookings, availability and saleable areas. The booking counts have no supplied as-of date and should be treated as indicative. The 3BHK drawing measurement is not a RERA disclosure; saleable area includes the home’s share of common areas, whereas the drawing-based carpet measurement is a separate measure.
- The measured 3BHK plan identifies three bedrooms, a hall, kitchen, three toilets, a puja area and two utility areas. The drawing extraction lists the room dimensions and areas, but no measured carpet area is supplied for the 2BHK configuration.
5. Parking & vehicle circulation
The supplied GHMC permit extraction records Cellar 0 and does not provide a sanctioned parking-space count, parking-level plan, ramp or driveway details, accessible or visitor-space count, EV provision, or unit-wise parking allocation. The RERA project document list does not include an extracted parking schedule. Consequently, the number and allocation of parking spaces cannot be established from the supplied project evidence.
6. Amenities, recreation & open spaces
The RERA amenities schedule contains percentage entries, but the supplied data does not establish that these percentages are independently verified physical completion measurements. The GHMC permit separately lists four rainwater-harvesting pits, 30 trees, a transformer space and a garbage house.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot lot / park | RERA amenity entry; no area supplied. The GHMC permit lists tot-lot area as 0 m². | RERA schedule lists 70%; not independently verified. | |
| Community buildings | No size or description supplied | 0% listed; not independently verified. | |
| Water conservation / rainwater harvesting | GHMC permit lists 4 rainwater-harvesting pits. | RERA schedule lists 100%; not independently verified. | |
| Internal roads and footpaths | No dimensions supplied | Listed as available; 0% shown in the schedule. | |
| Street lighting | No specification supplied | Listed as available; 0% shown in the schedule. | |
| Water supply | No source, storage or capacity supplied | Listed as available; 0% shown in the schedule. | |
| Visitor parking | No number or size supplied | Vendor-listed only; not established by the supplied permit or RERA schedule. | |
| Kids club / kids play area | No size or capacity supplied | Vendor-listed only; not independently verified. |
7. Utilities, building services & safety
- The GHMC permit requires provision of a transformer space, a garbage house within the premises and a rainwater-harvesting structure; the permit extraction also records four rainwater-harvesting pits. These are approval requirements or recorded plan particulars, not evidence that the facilities have been installed or commissioned.
- The RERA schedule lists water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, energy management, fire protection and fire-safety requirements, and an electrical meter room/sub-station/receiving station. It does not provide capacities or technical specifications, and the supplied percentage entries do not establish completed works. No supporting evidence is supplied for water source or storage, an STP or reuse system, electrical backup, lifts, fire equipment or clearances, CCTV/access control, waste segregation, or accessible routes.
8. Location, access & connectivity
- The project record identifies B N REDDY NAGAR, Saroornagar Mandal, Ranga Reddy District, PIN 500079. The project land is recorded as Survey No. 59 PART, Plots 99 and 100; the title-report documents describe the land as being in Karmanghat village. The supplied records also describe the GHMC permit locality as Vishweshwarayya Engineering Colony.
- The RERA land details state 30FT ROAD on the east and south boundaries. A cadastral-parcel centroid is supplied at 17.41528, 78.35459. The location data lists Financial District (Nanakramguda) at 1.2 km; no route or travel time is supplied.
9. Developer & development status
- The registered promoter is S V R CONSTRUCTIONS, identified in the project record as a partnership. Its supplied GSTIN is 36ADPFS2777N1Z3. The RERA registration certificate lists a promoter office at “Village: Mandal: District: Medchal-Malkajgiri, Pin: 500068”; the supplied certificate text does not provide a more specific office address.
- The promoter’s Form B declares a completion undertaking of 27/03/2025 and states that project collections will be handled through the required separate account and that approvals, audits and related RERA obligations will be addressed. These are promoter declarations. No verified construction-progress evidence, revised completion date, or occupancy certificate is supplied.
10. Approvals, official records & documents
| Identifier / date | P02400001344; issued 11/11/2019; valid through 27/03/2025 |
|---|---|
| Scope and evidence | Form C certificate for SVR CONSTRUCTIONS; no extension is recorded in the supplied certificate. |
| Identifier / date | Approval No. 2/C4/05082/2019; File No. 2/C4/03435/2019; dated 27 March, 2019 |
|---|---|
| Scope and evidence | Permit for the proposed building on Survey No. 59 PART, recording 1 Stilt + 5 upper floors. The permit states that it does not confer ownership rights and requires an occupancy certificate before occupation. |
| Identifier / date | Document 50367 |
|---|---|
| Scope and evidence | Listed as a layout-plan document in the RERA filing; no extracted plan details are supplied. |
| Identifier / date | Document 71215 |
|---|---|
| Scope and evidence | Promoter declaration covering title/owner-development basis, encumbrance statement, completion undertaking and RERA compliance commitments. |
| Identifier / date | Not supplied |
|---|---|
| Scope and evidence | The supplied records include no OC or completion certificate. |
Frequently asked questions
Is SVR CONSTRUCTIONS registered with Telangana RERA?
Yes. SVR CONSTRUCTIONS is registered with the Telangana Real Estate Regulatory Authority as P02400001344; the registration status is New Project.
Who is the developer of SVR CONSTRUCTIONS?
The promoter named in the RERA registration is S V R CONSTRUCTIONS.
Where is SVR CONSTRUCTIONS located?
SVR CONSTRUCTIONS is in B N REDDY NAGAR, Saroornagar, Rangareddy, Telangana (500079).
When will SVR CONSTRUCTIONS be completed?
The promoter's proposed date of completion filed with RERA is 27/03/2025. This is the promoter's declaration, not a guarantee.
More projects in Saroornagar