Svr Constructions

S V R CONSTRUCTIONS · Rangareddy · RERA P02400001344

SVR CONSTRUCTIONS is a residential apartment project in B N REDDY NAGAR, Saroornagar, Ranga Reddy, developed by the registered promoter S V R CONSTRUCTIONS. The project is on 617.15 sq m of land and comprises one building with 1 Stilt + 5 upper floors and 15 homes: 10 2BHK and 5 3BHK. It is registered under TG-RERA number P02400001344, with a proposed completion date of 27/03/2025.

More from S V R Constructions · 3 projects →

01What we found

Period endedTG-RERA registration ran to 27 Mar 2025 - check its extension on TG-RERA
12documents on file - each fact links to its page
32court cases on this project's land (survey 59, B N Reddy Nagar)
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameSVR CONSTRUCTIONS RERA record
Project typeResidential apartment project RERA filing
Phase / registered portionNot identified as a separately named phase in the supplied record; the registration covers the project on Survey No. 59 PART
TG-RERA registrationP02400001344
Registration validity11/11/2019 to 27/03/2025; certificate states it is not extended
Registered promoterS V R CONSTRUCTIONS (also written “S. V. R. Constructions” in the filed declaration) RERA record
RERA status shown in supplied recordRegistration period ended 27/03/2025; no extension is recorded in the supplied certificate. This is separate from the stated completion deadline and from occupancy-certificate status.

Land and geographic identity

ItemProject record
LocalityB N REDDY NAGAR RERA record RERA filing
Revenue villageB N Reddy Nagar, as recorded in the project header; the filed title documents identify the land as Karmanghat village. The supplied records do not reconcile these location labels. RERA record Land records
Mandal / district / PINSaroornagar / Ranga Reddy / 500079 RERA record
Survey number and subdivisionSurvey No. 59 PART RERA record Land records
Plot identifiersPlots 99 AND 100 RERA filing
Registered site extent617.15 sq m in the RERA land details; the building permit records site area of 617.5 m². RERA filing
Total / net area and affected areaRERA land details: total 617.15 sq m, net 617.15 sq m, affected area 0 sq m. The building-permit extraction records net area 617.5 m², road-affected area 0 m² and nala-affected area 0 m². RERA filing
Boundaries in RERA land detailsNorth: Plot No. 101; South: 30FT ROAD; East: 30FT ROAD; West: Plot No. 103 RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building-permit approvalApproval No. 2/C4/05082/2019, File No. 2/C4/03435/2019, dated 27 March, 2019 Approvals record
Approved built-up area1,556.66 sq m in the RERA project fields RERA filing
Building countOne building/unit in the RERA project fields; one building is shown in the approval record. RERA filing
Sanctioned configuration1 Stilt + 5 upper floors; recorded height: 15 m
Cellar / parking levelsCellar recorded as 0; a separate sanctioned parking count or parking layout is not provided in the supplied material.
Approved versus RERA-declared homes15 homes in the RERA unit schedule (10 2BHK and 5 3BHK). The supplied permit extraction does not state a separate unit count. RERA unit table

Offering and status

ItemProject record
RERA-filed configurations2BHK: 10 units; 3BHK: 5 units RERA unit table RERA unit details
RERA-filed saleable areas2BHK: 62.87 sq m; 3BHK: 160.25 sq m RERA unit table RERA unit details
Booked / available2BHK: 5 booked, 5 available; 3BHK: 0 booked, 5 available. Counts are from the TG-RERA portal read and have no supplied as-of date, so they are indicative. RERA unit table RERA unit details
Construction stageNo independently verified site-progress evidence is supplied. The RERA amenities schedule includes percentage entries, but these are not independently verified construction-completion measurements. RERA amenities
Completion deadline27/03/2025, as stated in the RERA project record and promoter declaration RERA record
Revised completion dateNo revised date or extension is recorded in the supplied material
Occupancy / completion certificateNo occupancy or completion certificate is supplied; the available GHMC document is a building permit, not an occupancy certificate. Its stated validity ends 27 March, 2025.

2. The project story

  • The RERA record describes a single-building residential apartment development on Plots 99 and 100, Survey No. 59 PART, with a site extent recorded as 617.15 sq m. The filed GHMC building permit describes a stilt level and five upper floors, with a sanctioned height of 15 m. The RERA unit schedule lists 15 apartments: ten 2BHK and five 3BHK. RERA filing RERA unit table
  • The promoter’s Form B declaration gives 27/03/2025 as the completion undertaking. The RERA certificate records registration through that same date, but the certificate does not record an extension. No occupancy certificate or independently verified construction-progress report is included in the supplied evidence; therefore, the record provided here does not establish that the building is complete or ready for occupation.

3. Master plan, architecture & building design

  • The supplied GHMC building-permit extraction identifies one proposed building on Survey No. 59 PART, with 1 Stilt + 5 upper floors, a recorded height of 15 m, and approved built-up area of 1,556.66 sq m in the RERA project fields. The permit extraction lists stilt area of 312.02 and first-floor area of 196.15; the supplied extract does not explain the measurement unit for those two entries. It records no cellar and no road- or nala-affected area. RERA filing
  • The record does not establish a complete floor-by-floor unit arrangement, number of flats per floor, building footprint, lift or stair details, entrances, internal circulation, landscaped/open-space dimensions, or a phase-wise building organization. The layout-plan document is listed in the RERA filing but is not extracted in the supplied material.
  • A measured floor-plan result is available for the 3BHK design: software-measured carpet area is 102.8 sq m (1,106 sq ft), with a supplied loading figure of 36%. These are drawing-based measurements, not RERA-filed carpet-area disclosures; the drawing measurement requires review. The RERA-filed 3BHK saleable area is 160.25 sq m. Carpet, saleable area and common-area allocation are distinct measures. RERA unit details Floor plans

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK105562.87 sq mNot suppliedNot supplied
3BHK505160.25 sq m102.8 sq m (software-measured from drawings; requires review)36%
  • RERA supplies the configuration counts, bookings, availability and saleable areas. The booking counts have no supplied as-of date and should be treated as indicative. The 3BHK drawing measurement is not a RERA disclosure; saleable area includes the home’s share of common areas, whereas the drawing-based carpet measurement is a separate measure. RERA unit table RERA unit details Floor plans
  • The measured 3BHK plan identifies three bedrooms, a hall, kitchen, three toilets, a puja area and two utility areas. The drawing extraction lists the room dimensions and areas, but no measured carpet area is supplied for the 2BHK configuration. RERA unit details

5. Parking & vehicle circulation

The supplied GHMC permit extraction records Cellar 0 and does not provide a sanctioned parking-space count, parking-level plan, ramp or driveway details, accessible or visitor-space count, EV provision, or unit-wise parking allocation. The RERA project document list does not include an extracted parking schedule. Consequently, the number and allocation of parking spaces cannot be established from the supplied project evidence. Document index

6. Amenities, recreation & open spaces

The RERA amenities schedule contains percentage entries, but the supplied data does not establish that these percentages are independently verified physical completion measurements. The GHMC permit separately lists four rainwater-harvesting pits, 30 trees, a transformer space and a garbage house. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green strip / tot lot / parkRERA amenity entry; no area supplied. The GHMC permit lists tot-lot area as 0 m².RERA amenitiesRERA schedule lists 70%; not independently verified.
Community buildingsNo size or description suppliedRERA amenities0% listed; not independently verified.
Water conservation / rainwater harvestingGHMC permit lists 4 rainwater-harvesting pits.RERA amenitiesRERA schedule lists 100%; not independently verified.
Internal roads and footpathsNo dimensions suppliedRERA amenitiesListed as available; 0% shown in the schedule.
Street lightingNo specification suppliedRERA amenitiesListed as available; 0% shown in the schedule.
Water supplyNo source, storage or capacity suppliedRERA amenitiesListed as available; 0% shown in the schedule.
Visitor parkingNo number or size suppliedPromoter websiteVendor-listed only; not established by the supplied permit or RERA schedule.
Kids club / kids play areaNo size or capacity suppliedPromoter websiteVendor-listed only; not independently verified.

7. Utilities, building services & safety

  • The GHMC permit requires provision of a transformer space, a garbage house within the premises and a rainwater-harvesting structure; the permit extraction also records four rainwater-harvesting pits. These are approval requirements or recorded plan particulars, not evidence that the facilities have been installed or commissioned.
  • The RERA schedule lists water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, energy management, fire protection and fire-safety requirements, and an electrical meter room/sub-station/receiving station. It does not provide capacities or technical specifications, and the supplied percentage entries do not establish completed works. No supporting evidence is supplied for water source or storage, an STP or reuse system, electrical backup, lifts, fire equipment or clearances, CCTV/access control, waste segregation, or accessible routes. RERA amenities

8. Location, access & connectivity

  • The project record identifies B N REDDY NAGAR, Saroornagar Mandal, Ranga Reddy District, PIN 500079. The project land is recorded as Survey No. 59 PART, Plots 99 and 100; the title-report documents describe the land as being in Karmanghat village. The supplied records also describe the GHMC permit locality as Vishweshwarayya Engineering Colony. RERA record RERA filing
  • The RERA land details state 30FT ROAD on the east and south boundaries. A cadastral-parcel centroid is supplied at 17.41528, 78.35459. The location data lists Financial District (Nanakramguda) at 1.2 km; no route or travel time is supplied. RERA filing Location record

9. Developer & development status

  • The registered promoter is S V R CONSTRUCTIONS, identified in the project record as a partnership. Its supplied GSTIN is 36ADPFS2777N1Z3. The RERA registration certificate lists a promoter office at “Village: Mandal: District: Medchal-Malkajgiri, Pin: 500068”; the supplied certificate text does not provide a more specific office address. Parties record Corporate record
  • The promoter’s Form B declares a completion undertaking of 27/03/2025 and states that project collections will be handled through the required separate account and that approvals, audits and related RERA obligations will be addressed. These are promoter declarations. No verified construction-progress evidence, revised completion date, or occupancy certificate is supplied.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400001344; issued 11/11/2019; valid through 27/03/2025
Scope and evidenceForm C certificate for SVR CONSTRUCTIONS; no extension is recorded in the supplied certificate.
GHMC building permit order
Identifier / dateApproval No. 2/C4/05082/2019; File No. 2/C4/03435/2019; dated 27 March, 2019
Scope and evidencePermit for the proposed building on Survey No. 59 PART, recording 1 Stilt + 5 upper floors. The permit states that it does not confer ownership rights and requires an occupancy certificate before occupation.
Layout-plan filing
Identifier / dateDocument 50367
Scope and evidenceListed as a layout-plan document in the RERA filing; no extracted plan details are supplied. Document index
Form B promoter declaration
Identifier / dateDocument 71215
Scope and evidencePromoter declaration covering title/owner-development basis, encumbrance statement, completion undertaking and RERA compliance commitments.
Occupancy/completion certificate
Identifier / dateNot supplied
Scope and evidenceThe supplied records include no OC or completion certificate. Document index

Frequently asked questions

Is SVR CONSTRUCTIONS registered with Telangana RERA?

Yes. SVR CONSTRUCTIONS is registered with the Telangana Real Estate Regulatory Authority as P02400001344; the registration status is New Project.

Who is the developer of SVR CONSTRUCTIONS?

The promoter named in the RERA registration is S V R CONSTRUCTIONS.

Where is SVR CONSTRUCTIONS located?

SVR CONSTRUCTIONS is in B N REDDY NAGAR, Saroornagar, Rangareddy, Telangana (500079).

When will SVR CONSTRUCTIONS be completed?

The promoter's proposed date of completion filed with RERA is 27/03/2025. This is the promoter's declaration, not a guarantee.