Suradru
PRAKASH GROUP · Sangareddy · RERA P01100006825
SURADRU is a plotted development of open residential plots in Cheriyal Village, Kandi Mandal, Sangareddy District. The registered promoter is Prakash Group. The site area is 155094.98 sq.m, with a net site area of 146002.48 sq.m; the layout identifies plots 82 TO 155, 389 TO 394, and 395 TO 415, and plot configurations are not disclosed. The project is registered under TG-RERA registration P01100006825, with proposed completion recorded as 30/11/2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | SURADRU RERA record |
| Project type | Plotted development / open-plot layout RERA record |
| Phase / registered portion | Described as a new project; the registered survey schedule is Sy.Nos. 62, 65 TO 70, 73 TO 82, 83P, 93 AND 94. A separate phase designation is not disclosed. RERA record |
| TG-RERA registration | P01100006825 RERA record |
| Registration validity | 01/09/2023 to 10/06/2026, unless extended by the Authority; certificate records no extension. This is the registration-validity period, not the project-completion deadline. Approvals record |
| Registered promoter | Prakash Group; the RERA record identifies the organization type as Proprietorship. RERA record RERA filing |
| RERA status | The certificate is Form ‘C’, registration granted under section 5. The supplied record shows the stated validity ending 10/06/2026 and no extension. |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | CHEERIYAL / Cheriyal Village (the RERA certificate locality field says “KANDI, KANDI”; the HMDA draft layout letter identifies Cheeriyal Village). RERA record |
| Mandal | KANDI RERA record |
| District | Sangareddy (the layout letter spells this “Sanga Reddy Dist.”). RERA record |
| PIN | 502285 RERA record |
| Project survey numbers | Sy.Nos. 62, 65 TO 70, 73 TO 82, 83P, 93 AND 94. |
| Total site area | 155094.98 sq.m |
| Road-affected area | 2845.32 sq.m |
| Net site area / registered extent | 146002.48 sq.m RERA record |
| Boundaries | Not adequately disclosed in the supplied RERA fields; the west boundary is recorded as “NAN.” RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) |
| Principal approval | Draft layout permit 000136/LO/Plg/HMDA/2023, dated 10 July, 2023 |
| Approved built-up area | Not disclosed for this plotted layout. |
| Number of buildings / floor configuration | Not disclosed; this is a plotted layout, and the draft permission states that buildings are not to be constructed on plots until final layout plans are issued. |
| Layout organization | Draft letter identifies plots 82 TO 155, 389 TO 394, and 395 TO 415; it also identifies roads, parks/open space, social infrastructure and amenity land. |
| Layout roads | The draft letter lists road widths of 45 Mts, 18 mts and 60 feet. |
Offering and status
| Item | Record |
|---|---|
| Unit type | Open residential plots; plot-by-plot RERA inventory, count and saleable-size schedule are not supplied here. RERA record |
| Booked / available counts | Not disclosed in the supplied evidence. |
| Construction stage | No independently verified site-progress record is supplied. The RERA amenity schedule marks listed infrastructure items “YES” but reports 0 progress for each item. RERA amenities |
| Completion dates | The Form B declaration undertakes completion by 1o# JUly 2026 (OCR as supplied). The project header separately records proposed completion 30/11/2026. The evidence does not establish a revised completion date or explain the differing dates. RERA record |
| Occupancy / completion certificate | Not supplied. The available HMDA document is a draft layout letter, not a final layout release. |
The project story
SURADRU is registered as a plotted development in the Kandi mandal area of Sangareddy district. The registered land schedule covers Sy.Nos. 62, 65–70, 73–82, 83P, 93 and 94, and the RERA certificate identifies the project as SURADRU under registration P01100006825. RERA record
The HMDA document on file is a draft open-plot layout letter for the registered survey schedule. It records a total site area of 155094.98 sq.m, including 2845.32 sq.m affected by a master-plan road, and a net site area of 146002.48 sq.m. It lists plot numbers 82–155, 389–394 and 395–415, alongside layout roads and areas reserved for parks/open space, social infrastructure and amenities.
The supplied evidence does not establish physical construction progress or completion of the layout works. The RERA infrastructure schedule shows 0% progress against its listed entries, and no final layout release or completion/occupancy certificate is provided. The RERA certificate’s registration period and the promoter’s stated completion dates are separate matters; the evidence does not establish that the registration has been extended or that the development is complete. RERA amenities RERA record
Master plan, architecture & building design
This is a plotted layout, not a multi-storey building scheme in the supplied approval record. The HMDA draft letter gives the following land-use figures:
| Layout component | Area | Evidence |
|---|---|---|
| Total site area | 155094.98 sq.m | HMDA draft layout letter |
| Master-plan road affected area | 2845.32 sq.m | HMDA draft layout letter |
| Net site area | 146002.48 sq.m | HMDA draft layout letter |
| Plotted area | 85100.89 sq.m | HMDA draft layout letter |
| Layout road area | 42662.62 sq.m | HMDA draft layout letter |
| Park area | 14176.45 sq.m | HMDA draft layout letter |
| Social infrastructure area | 3653.30 sq.m | HMDA draft layout letter |
| Amenities area | 408.52 sq.m | HMDA draft layout letter |
The draft letter also records a maximum residential building height of 15 mtrs and residential building ground coverage not exceeding 25%. These are approval-document parameters; the letter says construction on plots is not to be allowed until final layout plans are issued.
No building count, building footprint, FSI, plot-by-plot dimensions, or final released layout plan is supplied. A software-derived layout summary describes the plot and area figures as read from the drawing and notes that plot counts and sizes require verification; it reports no complete plot-size schedule. Layout record
Homes, configurations & floor plans
The offering is open plots rather than apartments. A plot-by-plot RERA unit schedule, plot-size bands, booked/available counts, and RERA-filed saleable-area figures are not available in the supplied evidence. The approved layout letter identifies plot-number ranges but does not provide a complete unit inventory in the materials reviewed. RERA record Layout record
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Open residential plots | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
The promoter’s Form B declaration describes a plotted project. The supplied floor-plan record contains no measured homes; one drawing is a scan pending review and the other has no flats. Floor plans
Parking & vehicle circulation
The supplied materials do not establish a sanctioned parking-space count, visitor or accessible parking provision, or individual plot parking allocation. Parking arrangements should therefore be confirmed from the final layout documents and the buyer’s plot-specific sale documents.
The HMDA draft letter requires roads to be opened for access to neighbouring sites. It does not provide a parking plan or confirm completed road works.
Amenities, recreation & open spaces
The HMDA draft letter and RERA infrastructure schedule identify layout-level facilities and reserved areas. The RERA schedule marks listed infrastructure as “YES” while reporting 0% progress; it does not establish that those works have been completed or independently verified. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organized open space | 14176.45 sq.m | HMDA draft layout letter | Reserved in draft layout; completion not verified |
| Social infrastructure | 3653.30 sq.m | HMDA draft layout letter | Reserved in draft layout; completion not verified |
| Amenities area | 408.52 sq.m | HMDA draft layout letter | Reserved in draft layout; completion not verified |
| Green strip / tot lot / park | Area not separately specified in the RERA schedule | RERA infrastructure schedule RERA amenities | “YES”; 0% progress recorded |
| Community buildings | No size or facility description supplied | RERA infrastructure schedule RERA amenities | Progress recorded as 0; availability not stated |
| Avenue plantation | Area/quantity not supplied | HMDA draft letter | Listed as an approval-document work item; completion not verified |
| Park development | Area/quantity not supplied beyond the park area above | HMDA draft letter | Listed as an approval-document work item; completion not verified |
Utilities, building services & safety
The HMDA draft letter lists proposed layout infrastructure including storm-water drains, underground drainage lines, a common septic tank/STP, internal water-supply pipelines, an overhead tank, electrical supply lines, street lights, a transformer, rainwater-harvesting pits and a bio-compost unit. It also lists a transformer yard and cycling tracks. These are items recorded in the draft approval materials; the supplied evidence does not establish their installed capacity or completed status.
The RERA infrastructure schedule also lists water supply, sewerage, storm-water drains, treatment and disposal of sewage and sullage water, solid-waste management, water conservation/rainwater harvesting, energy management, fire protection and safety requirements, and an electrical meter room/sub-station/receiving station. The schedule records 0% progress for the entries; capacities, technical specifications and independent completion verification are not supplied. RERA amenities
Location, access & connectivity
The registered project location is Cheriyal Village, Kandi Mandal, Sangareddy District, Telangana, PIN 502285; the HMDA draft layout letter identifies the same village and mandal. RERA record
The supplied location record gives a cadastral parcel-centroid coordinate of 17.616620862411725, 77.99102969858377 and an approximate distance of 30.1 km to the nearest sampled Outer Ring Road interchange. The distance is a sampled-location measurement, not a project-promoter travel-time claim. Location record
No project-specific approach-road description, public-transport information or verified landmark-distance schedule is supplied.
Developer & development status
The RERA record identifies PRAKASH GROUP as the registered promoter and lists its organization type as Proprietorship. The named authorized signatory is PEREPI SRINIVASA RAO. The supplied project profile lists the promoter address as RELAINCE FRESH, YOUSAFGUDA ROAD, CHEERIYAL, CHEERIYAL, KANDI, Sangareddy, 502285; a verified corporate identifier and official contact details are not supplied. RERA filing Parties record RERA record
The promoter’s Form B is a self-declaration that the project land is free from encumbrances and that the project will be completed by the printed date “1o# JUly 2026” (OCR as supplied). The project header separately records a proposed completion date of 30/11/2026; no explanation of the dates or site-progress verification is supplied here. RERA record
The RERA registration certificate states validity from 01/09/2023 to 10/06/2026. No extension order or completion/occupancy certificate is included in the supplied evidence. Approvals record
Approvals, official records & documents
| What it establishes | SURADRU registration P01100006825; stated validity 01/09/2023–10/06/2026 and listed registration conditions |
|---|
| What it establishes | Draft open-plot layout permit 000136/LO/Plg/HMDA/2023, dated 10 July, 2023, for the listed Kandi/Cheriyal survey schedule; includes layout areas, plots and conditions |
|---|
| What it establishes | Promoter declaration concerning title basis, encumbrances, separate-account obligations, pending approvals and completion undertaking |
|---|
| What it establishes | Advocate title-search report and title-chain documents are filed; the supplied extract does not provide a complete final opinion |
|---|
| What it establishes | RERA-filed encumbrance statement is available; a fresh current search is not included in this Overview |
|---|
| What it establishes | Not supplied in the evidence reviewed |
|---|---|
| Reference | Document index |
Project at a glance
Project identity
Registered project name: SURADRU
Project type: Plotted development / open-plot layout
Phase / registered portion: Described as a new project; the registered survey schedule is Sy.Nos. 62, 65 TO 70, 73 TO 82, 83P, 93 AND 94. A separate phase designation is not disclosed.
TG-RERA registration: P01100006825
Registration validity: 01/09/2023 to 10/06/2026, unless extended by the Authority; certificate records no extension. This is the registration-validity period, not the project-completion deadline.
Registered promoter: Prakash Group; the RERA record identifies the organization type as Proprietorship.
RERA status: The certificate is Form ‘C’, registration granted under section 5. The supplied record shows the stated validity ending 10/06/2026 and no extension.
Land and geographic identity
Locality / revenue village: CHEERIYAL / Cheriyal Village (the RERA certificate locality field says “KANDI, KANDI”; the HMDA draft layout letter identifies Cheeriyal Village).
Mandal: KANDI
District: Sangareddy (the layout letter spells this “Sanga Reddy Dist.”).
PIN: 502285
Project survey numbers: Sy.Nos. 62, 65 TO 70, 73 TO 82, 83P, 93 AND 94.
Total site area: 155094.98 sq.m
Road-affected area: 2845.32 sq.m
Net site area / registered extent: 146002.48 sq.m
Boundaries: Not adequately disclosed in the supplied RERA fields; the west boundary is recorded as “NAN.”
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal approval: Draft layout permit 000136/LO/Plg/HMDA/2023, dated 10 July, 2023
Approved built-up area: Not disclosed for this plotted layout.
Number of buildings / floor configuration: Not disclosed; this is a plotted layout, and the draft permission states that buildings are not to be constructed on plots until final layout plans are issued.
Layout organization: Draft letter identifies plots 82 TO 155, 389 TO 394, and 395 TO 415; it also identifies roads, parks/open space, social infrastructure and amenity land.
Layout roads: The draft letter lists road widths of 45 Mts, 18 mts and 60 feet.
Offering and status
Unit type: Open residential plots; plot-by-plot RERA inventory, count and saleable-size schedule are not supplied here.
Booked / available counts: Not disclosed in the supplied evidence.
Construction stage: No independently verified site-progress record is supplied. The RERA amenity schedule marks listed infrastructure items “YES” but reports 0 progress for each item.
Completion dates: The Form B declaration undertakes completion by 1o# JUly 2026 (OCR as supplied). The project header separately records proposed completion 30/11/2026. The evidence does not establish a revised completion date or explain the differing dates.
Occupancy / completion certificate: Not supplied. The available HMDA document is a draft layout letter, not a final layout release.
The project story
SURADRU is registered as a plotted development in the Kandi mandal area of Sangareddy district. The registered land schedule covers Sy.Nos. 62, 65–70, 73–82, 83P, 93 and 94, and the RERA certificate identifies the project as SURADRU under registration P01100006825.
The HMDA document on file is a draft open-plot layout letter for the registered survey schedule. It records a total site area of 155094.98 sq.m, including 2845.32 sq.m affected by a master-plan road, and a net site area of 146002.48 sq.m. It lists plot numbers 82–155, 389–394 and 395–415, alongside layout roads and areas reserved for parks/open space, social infrastructure and amenities.
The supplied evidence does not establish physical construction progress or completion of the layout works. The RERA infrastructure schedule shows 0% progress against its listed entries, and no final layout release or completion/occupancy certificate is provided. The RERA certificate’s registration period and the promoter’s stated completion dates are separate matters; the evidence does not establish that the registration has been extended or that the development is complete.
Master plan, architecture & building design
This is a plotted layout, not a multi-storey building scheme in the supplied approval record. The HMDA draft letter gives the following land-use figures:
| Layout component | Area | Evidence |
|---|---|---|
| Total site area | 155094.98 sq.m | HMDA draft layout letter |
| Master-plan road affected area | 2845.32 sq.m | HMDA draft layout letter |
| Net site area | 146002.48 sq.m | HMDA draft layout letter |
| Plotted area | 85100.89 sq.m | HMDA draft layout letter |
| Layout road area | 42662.62 sq.m | HMDA draft layout letter |
| Park area | 14176.45 sq.m | HMDA draft layout letter |
| Social infrastructure area | 3653.30 sq.m | HMDA draft layout letter |
| Amenities area | 408.52 sq.m | HMDA draft layout letter |
The draft letter also records a maximum residential building height of 15 mtrs and residential building ground coverage not exceeding 25%. These are approval-document parameters; the letter says construction on plots is not to be allowed until final layout plans are issued.
No building count, building footprint, FSI, plot-by-plot dimensions, or final released layout plan is supplied. A software-derived layout summary describes the plot and area figures as read from the drawing and notes that plot counts and sizes require verification; it reports no complete plot-size schedule.
Homes, configurations & floor plans
The offering is open plots rather than apartments. A plot-by-plot RERA unit schedule, plot-size bands, booked/available counts, and RERA-filed saleable-area figures are not available in the supplied evidence. The approved layout letter identifies plot-number ranges but does not provide a complete unit inventory in the materials reviewed.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Open residential plots | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
The promoter’s Form B declaration describes a plotted project. The supplied floor-plan record contains no measured homes; one drawing is a scan pending review and the other has no flats.
Parking & vehicle circulation
The supplied materials do not establish a sanctioned parking-space count, visitor or accessible parking provision, or individual plot parking allocation. Parking arrangements should therefore be confirmed from the final layout documents and the buyer’s plot-specific sale documents.
The HMDA draft letter requires roads to be opened for access to neighbouring sites. It does not provide a parking plan or confirm completed road works.
Amenities, recreation & open spaces
The HMDA draft letter and RERA infrastructure schedule identify layout-level facilities and reserved areas. The RERA schedule marks listed infrastructure as “YES” while reporting 0% progress; it does not establish that those works have been completed or independently verified.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organized open space | 14176.45 sq.m | HMDA draft layout letter | Reserved in draft layout; completion not verified |
| Social infrastructure | 3653.30 sq.m | HMDA draft layout letter | Reserved in draft layout; completion not verified |
| Amenities area | 408.52 sq.m | HMDA draft layout letter | Reserved in draft layout; completion not verified |
| Green strip / tot lot / park | Area not separately specified in the RERA schedule | RERA infrastructure schedule | “YES”; 0% progress recorded |
| Community buildings | No size or facility description supplied | RERA infrastructure schedule | Progress recorded as 0; availability not stated |
| Avenue plantation | Area/quantity not supplied | HMDA draft letter | Listed as an approval-document work item; completion not verified |
| Park development | Area/quantity not supplied beyond the park area above | HMDA draft letter | Listed as an approval-document work item; completion not verified |
Utilities, building services & safety
The HMDA draft letter lists proposed layout infrastructure including storm-water drains, underground drainage lines, a common septic tank/STP, internal water-supply pipelines, an overhead tank, electrical supply lines, street lights, a transformer, rainwater-harvesting pits and a bio-compost unit. It also lists a transformer yard and cycling tracks. These are items recorded in the draft approval materials; the supplied evidence does not establish their installed capacity or completed status.
The RERA infrastructure schedule also lists water supply, sewerage, storm-water drains, treatment and disposal of sewage and sullage water, solid-waste management, water conservation/rainwater harvesting, energy management, fire protection and safety requirements, and an electrical meter room/sub-station/receiving station. The schedule records 0% progress for the entries; capacities, technical specifications and independent completion verification are not supplied.
Location, access & connectivity
The registered project location is Cheriyal Village, Kandi Mandal, Sangareddy District, Telangana, PIN 502285; the HMDA draft layout letter identifies the same village and mandal.
The supplied location record gives a cadastral parcel-centroid coordinate of 17.616620862411725, 77.99102969858377 and an approximate distance of 30.1 km to the nearest sampled Outer Ring Road interchange. The distance is a sampled-location measurement, not a project-promoter travel-time claim.
No project-specific approach-road description, public-transport information or verified landmark-distance schedule is supplied.
Developer & development status
The RERA record identifies PRAKASH GROUP as the registered promoter and lists its organization type as Proprietorship. The named authorized signatory is PEREPI SRINIVASA RAO. The supplied project profile lists the promoter address as RELAINCE FRESH, YOUSAFGUDA ROAD, CHEERIYAL, CHEERIYAL, KANDI, Sangareddy, 502285; a verified corporate identifier and official contact details are not supplied.
The promoter’s Form B is a self-declaration that the project land is free from encumbrances and that the project will be completed by the printed date “1o# JUly 2026” (OCR as supplied). The project header separately records a proposed completion date of 30/11/2026; no explanation of the dates or site-progress verification is supplied here.
The RERA registration certificate states validity from 01/09/2023 to 10/06/2026. No extension order or completion/occupancy certificate is included in the supplied evidence.
Approvals, official records & documents
| What it establishes | SURADRU registration P01100006825; stated validity 01/09/2023–10/06/2026 and listed registration conditions |
|---|
| What it establishes | Draft open-plot layout permit 000136/LO/Plg/HMDA/2023, dated 10 July, 2023, for the listed Kandi/Cheriyal survey schedule; includes layout areas, plots and conditions |
|---|
| What it establishes | Promoter declaration concerning title basis, encumbrances, separate-account obligations, pending approvals and completion undertaking |
|---|
| What it establishes | Advocate title-search report and title-chain documents are filed; the supplied extract does not provide a complete final opinion |
|---|
| What it establishes | RERA-filed encumbrance statement is available; a fresh current search is not included in this Overview |
|---|
| What it establishes | Not supplied in the evidence reviewed |
|---|
Frequently asked questions
Is SURADRU registered with Telangana RERA?
Yes. SURADRU is registered with the Telangana Real Estate Regulatory Authority as P01100006825; the registration status is New Project.
Who is the developer of SURADRU?
The promoter named in the RERA registration is PRAKASH GROUP.
Where is SURADRU located?
SURADRU is in CHEERIYAL, KANDI, Sangareddy, Telangana (502285).
When will SURADRU be completed?
The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.
More projects in Kandi